1 Presented by The Facilities Management Group TFMG / TFMG Architecture, PC in conjunction with EMTEC Engineers, LLC
2 Why are we here today? To solicit public comments to help us create the Comprehensive Plan JSCB Phase 2 Comprehensive Plan defines: Projects to be constructed in eligible schools Scope of renovations and funds allocated to each school Financing of projects Project schedules Development & Diversification Plan for Workforce & Business
3 Joint Schools Construction Board (JSCB): Created by Special Legislation by New York State in 2006 Legislation is required due to NYS regulations pertaining to municipal financing and borrowing Multiple phases of construction were anticipated to renovate all schools Phase 1 is substantially complete; Phase 2 is in planning stages Buffalo and Rochester have similar legislation
4 JSCB Phase 1: $156 million dollars of construction - completed in 2014 Roof Replacements Clary Bellevue Middle at Shea Fowler High School Total renovations / addition H.W. Smith K-8 Total renovations / addition Institute of Technology Total renovations / addition Dr. Weeks Elementary Total renovations
5 JSCB Phase 2: Legislation enacted in 2014 Up to $300 million of construction projects NYS comptroller to review financial plan and determine the amount of construction the JSCB can afford Projects at up to 15 schools which are defined in the Legislation
6 By legislation, eligible buildings are: 1. Bellevue Elementary School 9. Grant Middle School 2. Clary Middle School 10. Greystone Building 3. Corcoran High School 11. Henninger High School 4. Danforth Middle School 5. Ed Smith K-8 School 12. Huntington K-8 School 6. Expeditionary Learning 13. Nottingham High School 7. Fowler High School 14. Shea Building 8. Frazer K-8 School 15. Westside Academy at Blodgett
7 JSCB Phase 2 Financing: NY State Education Department (NYSED) determines a Maximum Cost Allowance (MCA) for each building based on a statewide formula MCA is also called building aid In many cases, the District s renovation needs for a particular building exceeds the MCA Challenge is to prioritize renovations to maximize use of MCA and minimize local taxpayer cost
8 2011 District Wide Master Plan: Significant Findings: Limited seating capacity in High Schools Stable enrollment anticipated for 20 years (~21,000 students) Existing school facilities will be needed for the next 20 years
9 2014 Annual Visual Inspections (AVI): NY State mandated inspection and report Documents the conditions of all public K-12 School facilities in NYS $908 million required to repair Syracuse s facilities Does not include new programming Costs will increase in future due to inflation
10 AVI Needs of Eligible Buildings: 1. Bellevue ES = $21.5 mil 2. Clary MS = $34.4 mil 3. Corcoran HS = $64.9 mil 4. Danforth = $32.4 mil 5. Ed Smith K-8 = $37.8 mil 6. Expeditionary Learning = $12 mil 7. Fowler High School = $2.5 mil 8. Frazer K-8 School = $ Grant Middle School = $51.6 mil 10. Greystone Building = $64.8 mil (est.*) 11. Henninger High School = $62.8 mil 12. Huntington K-8 School = $39.7 mil 13. Nottingham HS = $76.3 mil 14. Shea Building = $36.7 mil 15. Westside Academy at Blodgett = $57 mil TOTAL : $601.5 million *Building is currently unoccupied and does not have an existing AVI
11 JSCB Phase 2 Goals: Prioritize and complete as many needed renovations as possible Implement facilities improvements to enhance instruction Align with instructional programs in each school Career Technical Education (CTE) spaces Project Lead The Way facilities Technology upgrades Improve security Minimize local taxpayer costs (local share)
12 BELLEVUE ELEMENTARY SCHOOL Major Needs: Interior renovations entire building Walls Windows New roof New mechanical, electrical and plumbing systems
13 CLARY MIDDLE SCHOOL Major Needs: Window replacements New fire alarm system ADA improvements Interior renovations
14 Major Needs: Replacement of HVAC systems and related work Interior renovations Auditorium Bridges CORCORAN HIGH SCHOOL
15 DANFORTH MIDDLE SCHOOL Major Needs: New electrical, mechanical and plumbing systems Interior and exterior renovations Athletic fields
16 ED SMITH K-8 SCHOOL Major Needs: New mechanical, electrical and plumbing systems New windows Interior renovations Site work
17 EXPEDITIONARY LEARNING Major Needs: New HVAC system Structural repairs Roof replacement Exterior masonry
18 FOWLER HIGH SCHOOL Major Needs: New athletic facilities Auditorium and locker room renovations Roofing replacement
19 FRAZER K-8 SCHOOL Major Needs: Masonry repairs Site work Window replacements
20 GRANT MIDDLE SCHOOL Major Needs: Courtyard roofing Window replacement Masonry repairs Stone façade replacement Pool renovations
21 GREYSTONE BUILDING Major Needs: Interior renovations Masonry renovations Roofing replacement New mechanical, electrical and plumbing systems
22 HENNINGER HIGH SCHOOL Major Needs: Mechanical system replacements Roof replacement Site work Interior renovations Windows
23 HUNTINGTON K-8 SCHOOL Major Needs: Window replacements Site improvements Mechanical upgrades Interior and exterior upgrades
24 NOTTINGHAM HIGH SCHOOL Major Needs: Asbestos abatement in crawl spaces New mechanical, electrical and plumbing systems New roofing Pool Interior renovations
25 SHEA BUILDING Major Needs: Window replacements New mechanical, electrical and plumbing systems Interior renovations
26 WESTSIDE ACADEMY AT BLODGETT Major Needs: Exterior masonry restoration Window replacements Exterior doors Roofing Auditorium Interior renovations including new mechanical, electrical and plumbing systems.
27 JSCB Phase 2 Comprehensive Plan defines: Projects to be constructed in eligible schools Scope of renovations and funds allocated to each school Financing of projects Project schedules Development & Diversification Plan for Workforce & Business We are here today to listen to your input on the plan to upgrade these 15 schools.
28 Comments can be ed to: by August 25, 2014 at 4:30pm
JSCB. Joint Schools Construction Board
JSCB Joint Schools Construction Board REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR TRANCHE #1 OF PHASE II OF THE SYRACUSE COOPERATIVE SCHOOL RECONSTRUCTION ACT Prospective Consultants:
More informationJSCB. Joint Schools Construction Board
JSCB Joint Schools Construction Board REQUEST FOR PROPOSAL TO PROVIDE PROGRAM MANAGEMENT SERVICES FOR PHASE 2 OF THE SYRACUSE SCHOOLS CONSTRUCTION PROGRAM Prospective Consultants: The City of Syracuse
More informationJSCB. Joint Schools Construction Board
JSCB Joint Schools Construction Board REQUEST FOR PROPOSAL TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR TRANCHE #1 OF PHASE II OF THE SYRACUSE SCHOOLS COOPERATIVE SCHOOL RECONSTRUCTION ACT Prospective
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
More informationBond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
More informationEligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD)
Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD) GOAL: To attract new businesses and investors, to provide private property owners access
More informationDesign and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationHOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES
More informationFive-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
More informationDEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)
DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District
More informationCITY OF MOBILE COMMUNITY PLANNING & DEVELOPMENT DEPARTMENT
CITY OF MOBILE COMMUNITY PLANNING & DEVELOPMENT DEPARTMENT HOMEOWNER REHAB LOAN PROGRAM FOR ELIGIBLE RESIDENTS CITY WIDE Are You Having Problems with Your Plumbing? Do You Need a New Roof? Are Your Windows
More informationBond Refusal in Broward County - Frequently Asked Questions
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. 1. Q: What is a General Obligation Bond referendum and
More informationSpringfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)
Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval
More informationSpecial Purpose Local- Option Sales Tax IV
Special Purpose Local- Option Sales Tax IV and Positioning APS for Continued Success in the Future August 13, 2012 1 Background Passage of SPLOST Referenda Referendum 1: 1997-2002 Referendum 2: 2002-2007
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationEvery Student I Every Day I Every Possibility
For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools
More informationMEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
More informationFall 2012 Construction Craft Training Catalog
Fall 2012 Construction Craft Training Catalog Construction Training Centers of New York State The Education Affiliate of Associated Builders & Contractors Accredited by National Center for Construction
More informationSMART Initiative Information
SMART Initiative Information On November 4 th, Broward County voters will have an opportunity to cast their ballots regarding an $800 million General Obligation Bond. The proceeds of this bond will be
More informationPROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014
PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security
More informationCherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
More informationTHIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationArticle 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
More informationWhy does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?
Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation
More informationOnline Survey Executive Summary
Online Survey Executive Summary Center Moriches School District March 9, 2015 Online Survey Executive Summary METHODOLOGY The following results are based on a website and paper survey of 356 residents
More informationSTATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT The University at Buffalo Medical School was established in downtown Buffalo, New York in 1846. Later additional schools were added
More informationCentinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
More informationContracts for Commission Approval 1/26/2012
Contracts for Commission Approval 1/26/2012 School District Building Type Contracting Entity Contract Type 1 Akron PSD King Elementary B & B Wrecking & Excavating, Inc.* Demolition & Site Prep $508,150.00
More informationEstimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationREQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
More informationDescription of Project Statewide Student Data Warehouse
Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data
More informationPROGRAM DESCRIPTION HOMEOWNER REHABILITATION LOAN FOR INCOME ELIGIBLE CITY OF MOBILE HOMEOWNERS
CITY OF MOBILE COMMUNITY PLANNING & DEVELOPMENT CITYWIDE III HOMEOWNER REHAB PROGRAM HOMEOWNER REHABILITATION LOAN PROGRAM DESCRIPTION FOR INCOME ELIGIBLE CITY OF MOBILE HOMEOWNERS Our Home Rehab Program
More informationCommercial Building Program (CBP)
Commercial Building Program (CBP) Rehabilitation or Demolition Schuyler, Nebraska {previously titled, Commercial Building Rehabilitation Program } Aging commercial buildings require timely maintenance
More informationProject Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
More informationNovember 3, 2015 Bond and District Additional Assistance Election Information
November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements
More informationNewtown and Holland Middle Schools Construction Project Bid Review
Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,
More informationAttachment C. Application for Downtown Derry Revitalization Tax Relief Program
Site Property Owners: Last name: Last name: Application # First name: First name: Street Address: Address continued: Town/City State Zip code Property Address in Derry NH for Tax Relief Application Property
More informationDAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 7 Housing
HOUSING ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the
More informationPrint Shop/Mail Room
Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were
More informationSchematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
More informationDESIGN AND CONSTRUCTION DEPARTMENT - July 2014
DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.
More informationSCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers
SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers WHAT IS THE ISSUE? Last year our School Board entered into a full-scale study of our educational facilities conducted by the Ohio
More informationCity of Vernon REVITALIZATION TAX EXEMPTION BYLAW (CITY CENTRE DISTRICT) BYLAW #5362
City of Vernon REVITALIZATION TAX EXEMPTION BYLAW (CITY CENTRE DISTRICT) BYLAW #5362 THE CORPORATION OF THE CITY OF VERNON BYLAW NUMBER 5363 AMENDMENTS BYLAW NO. ADOPTION AMENDMENT 5515 September 8, 2014
More informationSECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4
SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4 Capital Budget CAPITAL BUDGET 1999 2013 RECOMMENDED EXECUTIVE
More informationINTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
More informationSample Outline (courtesy of City of Guelph Museums) Building Conservation Plan
Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan 1. Introduction 2. Commemorative Integrity Statement/Statement of Purpose 3. Contacts Staff City Contacts Ambulance Cold Storage
More informationCity of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE
City of Ashland Downtown Central Business District Downtown Revitalization Grant Program APPLICATION PACKAGE The following includes the Downtown Revitalization Grant Program Description and Grant Application
More informationBuilding Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
More informationRegulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation
Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation A. DEFINITIONS These Regulations provide guidelines for the application process and the Administration
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationSchool Facilities Referendum Recommendations
Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation
More informationNATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
More informationNECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS
NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS Rhode Island Department of Education School Building Authority 255 Westminster Street, Providence, RI 02909 Telephone (401)222-4600 Website: www.ride.ri.gov
More informationBudget Edition May 2015 roposed Budget 7 am to 9 pm District Office Budget Change Tax Levy Increase Vote Day Details A Look Inside
1 Budget Edition May 2015 Residents to vote on 2015/16 proposed budget May 19 Southern Cayuga Central School District residents will vote on a $16,397,112 budget proposal for the 2015-16 school year on
More informationLevittown Public Schools Information Technology 2015-2016 Proposed Budget
Levittown Public Schools Information Technology 205-206 Proposed Budget Presentation to the Board of Education Todd Connell, Director of IT February 4 th, 205 Servers/ Storage/ Backup Instructional Equipment
More informationFACILITIES MAINTENANCE
Program Direction and Accountability 1. The district s maintenance and operations department has a mission statement and goals and objectives that are established in writing. a. The maintenance department
More informationLindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
More informationPARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
More informationQUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW
QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW Slide 2: Quick Update Slides 3-4: Project Timeline Slides 5-19: Project Photographs Slides 20-29: Roof Photographs Slides 30-32: Budget Summary
More informationDowntown improvement Programs - How DDA Revolving Loan Fund Program Works
Fremont DDA Revolving Loan Fund Program Guidelines Introduction The Fremont Downtown Development Authority (DDA) established the Fremont DDA Revolving Loan Fund Program to promote economic development
More informationAPPENDIX E: CAPITAL NEEDS SUMMARY
APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs
More informationState of Florida Statewide Financial Statements Capital Asset Policy. Introduction
Introduction For fiscal year ending June 30, 2002, the State of Florida will be required to implement Statement No. 34 of the Governmental Accounting Standards Board (GASB), Basic Financial Statements
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationPENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit
Tab 34 Physical/Capital Needs Assessment & Energy Audit All Preservation developments must submit both of the following: A. Physical/Capital Needs Assessment A Physical/Capital Needs Assessment must be
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES TO ASSIST WITH AN EDUCATIONAL NEEDS ASSESSMENT OF BEAVER DAM HIGH SCHOOL ~ October 2015 ~ Issuing Agency: Beaver Dam Unified School District Educational
More informationRepair Project for April 7, 2009
Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades
More informationCity of Richmond Capital Planning and Asset Management
2006 UBCM Community Excellence Awards Leadership & Innovation Large Community City of Richmond Capital Planning and Asset Management Summary The City of Richmond is realizing significant cost savings in
More informationSchools. Goals. The City will:
Schools Goals The City will: Provide adequate public facilities and services for all services which the City provides. Provide excellent educational services that exceed state standards. Ensure that new
More informationRESNET Building Performance Conference Orlando, FL March 2011
RESNET Building Performance Conference Orlando, FL March 2011 Who we are: Joint Labor-Management Training Trust Fund Est.1969 Training Arm of LIUNA Services 70+ Affiliated Training Centers in the US and
More informationElection Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount
Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating
More informationFrequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
More informationNORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
More informationNew York State Aid to School Districts for Construction
New York State Aid to School Districts for Construction Prepared for The Rockefeller Foundation By: Patricia Zedalis July, 2003 TABLE OF CONTENTS Page Number Introduction.. 3 New York State s Public School
More informationDover High School & Regional Career Technical Center
Dover High School & Regional Career Technical Center Laura Wernick AIA, LEED AP Project Director HMFH Architects, Inc. Feasibility Study Update HMFH Architects, Inc. Completed Tasks Existing Conditions
More informationAugust 2013 K-12 Schools Grant Round - Awards
August 2013 K-12 Schools Grant Round - Awards Awarded: Aug 15, 2013 POLITICAL SUB NAME COUNTY SHORT DESCRIPTION Recommended Award Description Award Amount ALEXANDER PSD #2 MCKENZIE MODULAR TEACHER HOUSING
More informationAn Update on the Transformation Plan, School Finances, and the Vision for Education Facilities Plan for 21 st Century Learning Presentation to the
An Update on the Transformation Plan, School Finances, and the Vision for Education Facilities Plan for 21 st Century Learning Presentation to the Citizens of Sandusky, Ohio Tuesday, January 19, 2016 Wednesday,
More informationAngelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
More informationMOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION
MOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION 02 THE KORTE COMPANY LISTEN BEFORE YOU BUILD The more things change, the more they stay the same. Today s children learn using computers,
More informationREQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION
REQUEST FOR PROPOSAL For MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES For VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION CITY OF ROCHESTER November 2009 TABLE OF CONTENTS GENERAL INFORMATION
More informationFacility Needs and Costs in America s Great City Schools
Facility Needs and Costs in America s Great City Schools Council of the Great City Schools October 2011 Facility Needs and Costs in America s Great City Schools Michael Casserly Jonathon Lachlan-Haché
More informationKANSAS BOARD OF REGENTS
FOR IMMEDIATE RELEASE September 12, 2007 KANSAS BOARD OF REGENTS 1000 SW JACKSON SUITE 520 TOPEKA, KS 66612-1368 TELEPHONE 785-296-3421 FAX 785-296-0983 www.kansasregents.org STATE UNIVERSITIES BEGIN WORK
More informationPriority School Name Minuteman Technical Vocational High School
District: Minuteman Regional Vocational Technical School District School Name: Minuteman Technical Vocational High School Recommended Category: Preferred Schematic Date: July 30, 2015 Recommendation That
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN
More informationMore than 35 Mortgage Loan Officers who live and work in your neighborhood. Lending in MA, NH, RI, ME, CT & FL
Founded in 1855 More than 35 Mortgage Loan Officers who live and work in your neighborhood. Lending in MA, NH, RI, ME, CT & FL Largest servicer of mortgage loans headquartered in New England. Finances
More informationPublic Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
More informationTexas Two-year Colleges Briefing for State Policymakers
Texas Two-year Colleges Briefing for State Policymakers Increasing student performance is an urgent state and national priority for ensuring longterm economic growth and prosperity. To meet the goal for
More informationNMSU Alamogordo. (1) 2013 NM Higher Education Department New Mexico State University
NMSU Alamogordo Dr. Debra Teachman, Vice President for Academic Affairs Mr. Tony Salinas, Vice President for Business and Finance Ms. Nancy Montgomery, Director of Facilities (1) 2013 NM Higher Education
More informationCedarfield Plantation
July 31, 2015 Dear Members: The purpose of this mailer is to inform and encourage all homeowners to vote on one of two options for repair/renovations for our pool house. On Saturday, July 25, 2015, and
More informationThe District Energy Manager and Classroom Heating
Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 These guidelines supersede all previous instructions. It is crucial that these energy guidelines be observed in the operation
More informationASSET PRESERVATION SUMMARY REPORT Department of Natural Resources
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp ASSET PRESERVATION
More informationRequest for Proposals Facility Condition Audits
Request for Proposals Facility Condition Audits 1.0 SCOPE OF THE PROPOSAL 1.1 Introduction The City is seeking proposals from qualified Proponents to perform detailed facility condition audits for several
More informationFund 30020 Infrastructure Replacement and Upgrades
Focus Fund 30020 supports the long term needs of the County s capital assets to maximize the life of County facilities, avoid their obsolescence, and provide for planned repairs, improvements and restorations