1 How to ANALYZE AND COMMUNICATE PREVENTIVE MAINTENANCE - ADDRESS NOW - OR PAY LATER Tuesday, February 22, 2012, 10:15 a.m. 11:30 a.m. John Poytress Moderator Clovis USD Doug Halverson Presented by Clovis USD Bruce Pickering Hanford Joint Unified High School District Gil Nye Lawrence Nye Anderson Associates Gilbert L. Nye, PE Mechanical Engineer President How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later 1
2 Engineering / Design Important Part of System Maintenance Allow for maintenance consideration Include maintenance personnel early Incorporate suggestions & comments Plumbing and HVAC systems Plumbing Be sure water heater fits through door Mechanical room the right size Plumbing fixture trim to have continuity in manufacture 2
3 System / Equipment Quality Central Plant vs. Package Units You get what you pay for $4000 / ton vs. $6000 / ton Energy factors Package Units Maintenance Issues Lower costs lower quality 15 to 20 year life Equipment access, ground / roof access Filter and compressor maintenance No classroom interruptions 3
4 Central Plant year life Quality equipment Major components in one location Can add Thermal Energy Storage Classroom HVAC Unit Self contained (inside / outside) Split systems Floor / ceiling mounted unit ventilator Vertical air handler 4
5 Central Plant Classroom Unit Unit ventilator - Air delivered from one location - Filter size not standard Vertical air handler - Air distribution from ceiling - Standard filter sizes - Noise level Classroom Unit Maintenance In Classroom Units - Walk to unit - No tools to roof - Oil motors - Change filters 5
6 Central Plant Design Air Cooled vs. Water Cooled Maintenance vs. Energy Locate equipment indoors Mechanical Rooms Pumps, Boilers, Controls Extends equipment life Maintenance friendly 6
7 Cardinal Rules No equipment above ceiling No pneumatic controls Analyzing and Communicating Preventive Maintenance Address now or pay later C.A.S.H. Annual conference February
8 Preventive Maintenance Simplified Maintenance what is it? The process of repairing equipment after failure Dictionary says the work of keeping something in proper condition This implies steps taken to keep equipment or devices from failing Recent studies suggest most facilities do not spend enough to maintain equipment in good working order Most wait for failure then repair or replace Run to Fail 8
9 Types of Preventive Maintenance 1. Run to Fail or Reactive Maintenance >55% 2. Preventive Maintenance 31% 3. Predictive Maintenance 12% 4. Reliability Centered Maintenance 2% The need for Preventive Maintenance It is based on actual or impending failure The ideal is to keep equipment running efficiently for it s design life Nothing lasts forever, equipment has a predefined life expectancy-the useful life period The Bathtub Graph 9
10 Component Failure Rate Run to Fail OR Reactive Maintenance Run it until it breaks No actions taken to maintain equipment Predominant mode of maintenance in US Double edged sword 10
11 Run to Fail Reactive Maintenance ADVANTAGES: Low initial costs Less staff needed Less staff training Run to Fail Reactive Maintenance DISADVANTAGES: Increased costs due to unplanned down time Increased labor costs-overtime or outside repair source Higher repair costs-more major breakdowns Inefficient use of staff resources 11
12 Not the best time to start your PM program Preventive Maintenance Maintenance actions performed at a scheduled time as prescribed by equipment manufacturer or observed break down intervals The purpose is to use manufacturers recommended maintenance intervals to add to the useful life span of the equipment 12
13 Preventive Maintenance ADVANTAGES: Cost effective Increased component life cycle Lower energy costs Estimates of 12%-18% costs savings over Run to Fail Preventive Maintenance DISADVANTAGES: Major failures still likely to occur Labor intensive Includes unneeded maintenance Could cause damage to other components while performing unneeded maintenance 13
14 Preventive Maintenance While not the best maintenance program, it has several advantages over Run to Fail. If maintenance is performed as called for by the manufacturer the equipment s life can be extended as the designer had planned. Changing filters, properly lubricating, and cleanliness will also help save energy dollars. PM will not stop major failures, but will help reduce them. Predictive Maintenance Bases equipment needs on the actual condition of the component instead of a time table. Most catastrophic failures will be avoided. Maintenance can be scheduled to reduce overtime costs and smaller parts inventory is needed. 14
15 Predictive Maintenance ADVANTAGES: Increased component life Corrective actions taken prior to failure Less down time Less part and labor costs Predictive Maintenance Improved worker safety Energy savings 8%-12% savings over Preventive Maintenance program 70%-75% elimination of major breakdowns 15
16 Predictive Maintenance DISADVANTAGES: Increased investment in diagnostic tools and equipment Higher level of staff training Hard to sell, potential savings not readily seen by management Predictive Maintenance A predictive Maintenance program is hard to get off the ground. It is expensive in both labor and equipment. There needs to be a total buy-in and patience on the behalf of management that the desired out come of savings will occur. 16
17 Reliability Centered Maintenance (RCM) All equipment and components in a facility are not of equal importance. Design and operation differ from machine to machine. Failure rates are not equal. RCM takes into consideration that facilities have a limit on what resources can be devoted to equipment maintenance. The challenge is to use these funds and manpower in the most effective way. Reliability Centered Maintenance RCM is essentially a hybrid of the Reactive, Preventative, and Predictive types of maintenance. A common RCM program break down is: < 10% Reactive 25%-35% Preventive 45%-55% Predictive 17
18 Reliability Centered Maintenance ADVANTAGES: Can be the most efficient program Reduces costs by eliminating unneeded repairs and maintenance Minimizes major repair frequency Reliability Centered Maintenance Minimizes probability of sudden failures Allows personnel to focus maintenance on critical equipment Allows facility to match resources with it s needs 18
19 Reliability Centered Maintenance DISADVANTAGES: High startup costs due to more staff training and the need for sophisticated testing equipment Potential of savings not easily seen by management Initiating RCM 1. Develop a master equipment list 2. Prioritize these components based on importance 3. Assign them into logical groupings 4. Determine what kind maintenance work needs to be done and how often using: a. O & M manuals b. Equipment history c. Component failure analysis d. Good engineering judgment 19
20 Initiating RCM 5. Assess the size of your staff 6. Decide what tasks can be performed by your staff 7. What tasks need to be contracted out 8. Identify the most effective maintenance tasks and strategies to implement Summary Run to Fail Machinery runs until it dies No work done to preserve equipment Cost: $18/hp/yr 20
21 Summary Preventive Maintenance Maintenance determined by time intervals Repair or replacement of equipment usually prior to breakdown $13/hp/yr Summary Predictive Maintenance Schedule maintenance when mechanical or operational conditions are indicated Repair or replacement of equipment usually prior to breakdown $9/hp/yr 21
22 Summary Reliability Centered Maintenance Hybrid of previous 3 styles Best Savings Potential $6/hp/yr Clovis Unified Pm Program Use the RCM frame work Created inventory of equipment to be in program Catalogued in computerized work order system Prioritized frequency of PM work 22
23 Clovis Unified Pm Program Decided what PM tasks best benefited each machine Entered information in automated work order system to generate a PM request at the prescribed interval Work completed by technician and logged into our system. 23
24 Clovis Unified Pm Program We also created a PM team and schedule time at every site during the school year 2 days at Elementary sites 5 days at Intermediate and Administrative sites 10 days at Secondary sites Clovis Unified Pm Program A meeting is scheduled with every principal and plant supervisor about 30 days prior to the crew visiting their campus. The following is discussed: All open work orders pending by Maintenance, Grounds, and Custodial Discuss any Deferred Maintenance projects scheduled for the summer Review any additional work that needs to be addressed 24
25 The Double Edged Sword Worst recession in 50 years Clack County Schools-Las Vegas Need $5.1 BILLION to repair and modernize their schools over the next 10 years $3 BILLION is needed for repairs of run down schools They have 357 schools and 35 administrative sites $200 million per year is needed for maintenance Will rise to $260 million if repairs are deferred The Double Edged Sword Clark County School is 5 th largest in the country they spend $1.52 per sq ft on maintenance The 6 th largest district spends $2.68 sq ft Clark has cut their maintenance staff by 25% They spend only 11% of their maintenance budget on PM They are now in the Pay me later mode of PM 25
26 Preventive Maintenance Pay now or Pay later District Stats Three High Schools: Hanford High School, Started in the late eighteen hundreds and most existing buildings were built in the 50s and 70s. Built for 1700 students. The campus is on 65 acres and has 200,000 square feet of buildings. 26
27 Hanford West Built in 1963 & students 55 acres 190,000 square feet Sierra Pacific Built in ,000 square feet 91 acres, includes softball complex Will house 950 students and 1700 when built out. 27
28 Sanity Maintenance is a top priority! Priceless! Filter Changes We change filters at least three times a year on all A/C units. Some units get four or five changes because of their location. We have approximately 900 filters and it costs $25,000 per year. 28
29 Gym Bleachers: $6500 per year Gym Floors Yearly scuff and re-coat, complete sanding Re-finish every ten years. 29
30 Centrifugal Chillers Serviced three times per year Two inspections and one full service. Service includes condenser cleaning and oil samples. $5900 per year. Thermal Storage Chiller Serviced twice a year Service includes condenser cleaning, leak test, trim charge, and lubrication of auxiliary equipment. $1600 All A/C systems are enrolled in the "Savings by Design Program" with SCE. This saves the district $60,000 per year on electricity. 30
31 More Sanity Maintenance Package Units Our Maintenance staff performs the maintenance when they change filters. We stock belts, oil, grease. This works but we need an HVAC person on staff to better maintain systems. 31
32 Fulton Boilers Yearly service includes cleaning, inspection, and replacement of wear parts. Cooling towers are serviced three times a year. We use no chemical treatment. 32
33 Our mowers are maintained by the operators and the Bus Mechanics. Why Preventive Maintenance? Fewer customer complaints Fewer breakdowns Lower energy costs Less Fire Fighting! Lower repair costs 33
34 Why Preventive Maintenance? Peace of Mind Priceless! 34
Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320
Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320 Position: Facility Assistant Maintenance Manager B Date: May 17, 2010 - present 70% OF TIME- is spent on following duties. Assist the Facility
Chapter 5 Types of Maintenance Programs
Chapter 5 Types of Maintenance Programs 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that
Classification and Qualification STANDARDS
Classification and Qualification STANDARDS HVAC Series Classification Title Class Code Date Established Date Revised Operating Engineer Building Service Engineer Air Conditioning/Refrigeration Mechanic
1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%
1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.
ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS DATE: May 6, 2016 HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport BIDS CLOSE: May 12, 2016, at 2:30 p.m., Local Time TO ALL BIDDERS
Operations, Maintenance, and Commissioning
Operations, Maintenance, and Commissioning Building 54, Pearl Harbor Naval Facilities Engineering Command, Hawaii www.femp.energy.gov/training 1 www.femp.energy.gov/training eere.energy.gov Objectives
The Basics of Predictive / Preventive Maintenance
The Basics of Predictive / Preventive Maintenance Maintenance costs, as defined by normal plant accounting procedures, are normally a major portion of the total operating costs in most plants. Traditional
HVAC Repair and Maintenance Strategies by Ron Prager
HVAC Repair and Maintenance Strategies by Ron Prager (Demystifying HVAC) The PRSM editorial board recently raised the question of the best, strategic approach to HVAC maintenance. Of course, there is no
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Comparing Maintenance Costs of Geothermal Heat Pump Systems with Other HVAC Systems: Preventive Maintenance Actions and Total Maintenance Costs
DA-00-1-2 Comparing Maintenance Costs of Geothermal Heat Pump Systems with Other HVAC Systems: Preventive Maintenance Actions and Michaela A. Martin, P.E. Melissa G. Madgett Patrick J. Hughes, P.E. Member
Section 2: Estimating Energy Savings and Incentives
Section 2: Estimating Energy Savings and Incentives 2.1 Estimating Energy Savings and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 3 2.2.2
Your Guide to Buying an Energy-Efficient Central Air Conditioner
NJ Clean Energy Cool Advantage Rebates 866-NJSMART For more information on energy efficiency and renewable energy programs for New Jersey, visit New Jersey s Clean Energy website, www.njcleanenergy.com.
Preventive Maintenance. Learning Objectives: Howdy! Learning Objectives Cont:
Preventive Maintenance Fountain of Youth for HVAC Successful Learning Environment Bonus Strategies James D. McClure, P.E. Action Planning Guide As you listen to this presentation, use the chart in your
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS. Dr. Abdul-Mohsen Al-Hammad. I. Maintenance Management Systems
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS By Dr. Abdul-Mohsen Al-Hammad Outline I. Maintenance Management Systems II. Computerized Maintenance Management System. 2 1 I. Maintenance Management Systems
HVAC Claims: Repair vs. Replacement
HVAC Claims: Repair vs. Replacement Curtis M. VanNess Field Operations Manager Outline Brief history of HVAC How do HVAC systems work? Types of systems and equipment Causes of failure Repair vs. Replace
Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY. 304 2015-16 Sacramento City College Catalog
MET Degree: A.S. Certificates of Achievement: Commercial Building Energy Auditing and Commissioning Specialist Mechanical Systems Technician Commercial Building Energy Auditing and Commissioning Specialist
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary
Asset management systems increase reliability and efficiency
A PublicAtion of the international Society of AutomAtion Asset management systems increase reliability and efficiency Make use of technology to overcome barriers to better maintenance practices By Augie
FIELD MAINTENANCE SERVICE
FIELD MAINTENANCE SERVICE About Servicing The Patterson Group Products Patterson Pump Company is one of America s leading pump companies. Our roots are deep and our commitment to quality and service is
COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A
COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Identify, interpret, and
In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.
In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room
AGENDA BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room 1. Call to order at 6:30 p.m. 2. Review of Three Year Life Safety Recommendations from EGM Architects 3. Review of
Print Shop/Mail Room
Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were
REQUEST FOR PROPOSAL FOR DORCHESTER COUNTY COUNCIL HVAC SERVICES DCG 12-02. Due Date December 6, 2011
REQUEST FOR PROPOSAL FOR DORCHESTER COUNTY COUNCIL HVAC SERVICES DCG 12-02 Due Date December 6, 2011 DORCHESTER COUNTY COUNCIL 501 COURT LANE, ROOM 110 CAMBRIDGE, MARYLAND 21613 I. INTRODUCTION Dorchester
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER Raymond E. Tuttle and Robert R. Pete EG&G Florida BOC-035 Kennedy Space Center FL 32899 (407) 867-5705!qq, Abstract:
Technical Information Document MAINTENANCE MANAGEMENT SYSTEMS
Technical Information Document MAINTENANCE MANAGEMENT SYSTEMS RPS for INAC TID-AM-01 October 2000 Table of Contents Foreword... 1 MAINTENANCE MANAGEMENT SYSTEMS 2 1.0 Introduction... 2 2.0 Types of Maintenance...
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
HVAC MAINTENANCE SUPERVISOR (Range 121)
(Range 121) DEFINITION Supervises, plans, coordinates and performs a variety of fundamental and skilled work in the building and mechanical trades to ensure the overall physical integrity of District Locations.
Predictive Maintenance Strategy for Building Operations: A Better Approach
Predictive Maintenance Strategy for Building Operations: A Better Approach by Robert Hemmerdinger Executive summary Maintenance costs account for almost as large a percentage of a facility s operating
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
ABSTRACT DCMCCT PROJECT OVERVIEW
Title: Case Study of the Austin Energy Dell Regional Children s Medical Center of Central Texas Packaged Hybrid CHP Energy Plant in Austin, Texas Authors: Mr. Ed Mardiat, Burns & McDonnell Mr. Jim Teigen,
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
Job Grading Appeal Decision Under Section 5346 of Title 5, United States Code
U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Dallas Oversight Division 1100 Commerce Street, Room 4C22 Dallas, TX 75242
Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany
Life Cycle Costing Analysis of Water-cooled Chillers Chillventa Nuremburg, Germany Spring 2012 Description Life Cycle Cost Analysis is a method of determining and comparing the total costs of investment
Mechanical Engineering Technician- Plant Technician
Mechanical Engineering Technician- Plant Technician A competent Mechanical Engineering Technician- Plant Maintenance is expected to: 1. Ability to plan and execute work in a safe and responsible manner
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
EBS Building Operators Standard Operating Procedures BUILDING OPERATION & MAINTENANCE
EBS Building Operators Standard Operating Procedures BUILDING OPERATION & MAINTENANCE Maintenance Information: Routine maintenance requests are handled through the full time 24/7 Building Maintenance staff.
Data Centers That Deliver Better Results. Bring Your Building Together
Data Centers That Deliver Better Results Bring Your Building Together 1 Meeting the high demands of your data center Meeting the increasing heat loads associated with growing computational needs requires
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
PREVENTIVE MAINTENANCE AND FACILITY MANAGEMENT
1 PREVENTIVE MAINTENANCE AND FACILITY MANAGEMENT An Introduction to Facility Management Strategies for Alaskan Schools Presented By Mike Gaede Building Management Specialist 2 Discussion Topics Overview
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
Wet Bulb Temperature and Its Impact on Building Performance
Wet Bulb Temperature and Its Impact on Building Performance By: Kurmit Rockwell, PE, CEM, LEED AP and Justin Lee, PE, LEED, AP BD+C Energy Solution Services, AtSite, Inc. 1 What is Wet Bulb Temperature?
TRAINING, EXAMINATION AND CERTIFICATION
TECHNICAL STANDARDS & SAFETY AUTHORITY TRAINING, EXAMINATION AND CERTIFICATION REFRIGERATION OPERATOR CLASS B CERTIFICATION & EXAMINATION GUIDE REVISED EDITION 2 CERTIFICATIONS PERSUANT TO THE OPERATING
Xcel Business Customers: Program and Rebate Summary
Xcel Business Customers: Program and Rebate Summary Rebates for New Energy-Efficient Equipment Xcel offers prescriptive rebates to its business customers. What s a prescriptive rebate? It simply means
Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response
Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Sample - Existing Building Commissioning Plan
Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
BID RESULTS AB2012-02B RE-BID HVAC PREVENTIVE MAINTENANCE AND REPAIR FOR MERCER COUNTY LIBRARY SYSTEM FOR A PERIOD OF TWO YEARS
BID RESULTS AB2012-02B RE-BID HVAC PREVENTIVE MAINTENANCE AND REPAIR FOR MERCER COUNTY LIBRARY SYSTEM FOR A PERIOD OF TWO YEARS BID OPENING DATE: APRIL 25, 2012 CONTRACT PERIOD: JUNE 14, 2012 TO JUNE 13,
Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
Mechanical-Electrical Technology
Mechanical-Electrical Technology MET Degrees: A.S. Mechanical-Electrical Technology A.S. Wastewater Treatment Plant Operation A.S. Water Treatment Plant Operation Division of Advanced Technology Donnetta
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Caretaker Handbook. S:\5 Handbooks\Caretaker Handbook 151231.doc Page 1 of 9
Caretaker Handbook S:\5 Handbooks\Caretaker Handbook 151231.doc Page 1 of 9 Table of Contents Introduction... 2 Maintenance Coordinator Areas... 3 Management Structure... 4 School-based Administrator s
L&S Associates, LLC. Educational, Environmental, Maintenance & Operations Consultants (EEMOCo)
L&S Associates, LLC Educational, Environmental, Maintenance & Operations Consultants (EEMOCo) League City, Texas Home Office 281-386-6042 Tyler, Texas Area Office 903-504-1111 Athens, Texas Area Office
MEETING AGENDA. Project Administrator:
MEETING AGENDA Project Administrator: To: Ann Green M. Baker, SLCS C. Bullinger, SLCS R. Clark, SLCS Board C. Cox, SLCS S. Dotinga, Granger J. Graham, SLCS J. Gusick, SLCS, Board C. Hanshaw, SLCS Board
GREEN BAY AREA PUBLIC SCHOOL DISTRICT Board Policy Manual ENERGY MANAGEMENT
GREEN BAY AREA PUBLIC SCHOOL DISTRICT Board Policy Manual 733 ENERGY MANAGEMENT Energy management is necessary in order for the District to: minimize the impact energy cost increases will have on the budget,
Pricing. 1. Model RTAC 2254 Trane - Rochester Hills Court a. Scheduled service $ b. Vibration analysis $ c. Eddy current service $
is requesting proposals on behalf of Facilities Maintenance & Operations for Trane HVAC maintenance and repairs as specified below. This will be for as needed repairs at various county facilities. The
HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget
A PRIMER Educational HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget Contents: Introduction: The best HVAC system is durable, reliable
Acumen Enterprises, Inc.
Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter
HEATING, VENTILATION & AIR CONDITIONING
HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2
We re Happy with Our CMMS. Should We Be?
We re Happy with Our CMMS. Should We Be? Upcoming Webinars Sept 2013: Multiple FM Software Applications: Is Consolidation or Integration the Answer? Oct 2013: Dec 2013: Jan 2014: Maintenance Outsourcing:
Walkthrough Inspection Checklist
Walkthrough Inspection Checklist This checklist is to aid during an IAQ Walkthrough of the school. The checklist includes considerations both inside and outside the school building: Instructions: 1. Read
http://www.cityofsacramento.org/personnel INVITES APPLICATIONS FOR THE POSITION OF: HVAC Systems Mechanic An Equal Opportunity Employer
CITY OF SACRAMENTO Department of Human Resources 915 I Street, Historic City Hall Sacramento, CA 95814-2604 http://www.cityofsacramento.org/personnel INVITES APPLICATIONS FOR THE POSITION OF: HVAC Systems
Determining the Economic Value of Preventive Maintenance
Determining the Economic Value of Preventive Maintenance Preventive maintenance has been more popular in principle than in practice over the years. One scarcely can argue with the idea of keeping equipment
Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP
Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial
Basics of HVAC Cleaning
Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project
We ve got you covered.
Mechanical & Plumbing We ve got you covered. Energy Savings Maintenance Contracts Cooling Towers Re-piping Air-conditioning Building Automated Systems Boiler Retrofits Sewer Cleaning Drain Systems THE ONLY
EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY
EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY Spectrum Manufacturing warrants that the heat pumps and air handling equipment (if purchased with a Water to Water System) manufactured by Spectrum Manufacturing
PRESENTATION BY: MIKE BURT AIR FILTER SOLUTIONS INC. DENVER, COLORADO
PRESENTATION BY: MIKE BURT AIR FILTER SOLUTIONS INC. DENVER, COLORADO INEXPENSIVE RETROFIT DESIGNS FOR ABOVE CEILING UNITS Fan coil units Fan terminal units Single ducted fan powered units Heat pump units
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY
SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society
CCC/IOU Energy Efficiency Partnership and Campus Budget Challenges
and Campus Budget Challenges Dan Estrada Chancellor s Office Robert Brunn Southern California Edison Lisa Hannaman Southern California Edison California Community Colleges Systemwide Detail 72 districts
Heating & Cooling Efficiency
Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart
Ultrasound Condition Monitoring
Ultrasound Condition Monitoring Whitepaper Alan Bandes UE Systems, Inc. Abstract: Instruments based on airborne/structure borne ultrasound technology offer many opportunities for reducing energy waste
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy The decision to outsource equipment maintenance during times of economic boom is based on the desire of a company to