1 Tender Package 40 Scope of work The New Line Copenhagen Ringsted December 2012
2 The New Line Copenhagen - Ringsted Banedanmark Amerika Plads København Ø
3 The New Line Copenhagen Ringsted General description of TP 40 TP 40 earth and construction work stretch from st and ends at st In this package covers the first 5.7 km earthwork and small fauna passages, and for the last 12.5 Km also bridge structures, as well as roads, fauna passages, retaining walls and embankments. Also a number of roads will have to be either, relocated or reconstructed. Bridges on the first part, from Ishøj junction to Greve Centervej is build under contract TP41, which is planned to finish medium From here TP 40 will have free passage over and under all structures for doing the earthwork. The earthwork on the alignment includes both local earth balances as well as the total earth balance. Special attentions to be paid on the area around Mc Donald, Cementvej and Tåstrupvej, due to large intensity of traffic, which could arise some challenges during construction time. Design and build Being the Employer, Banedanmark requires the Contractor to design and build the following permanent civil works. St. Item Description - Temporary dewatering of groundwater during construction phase - Preparation of spoil area - Handling of topsoil along existing road (0-1 m from pavement) as mildly contaminated - Preparation of plans for traffic diversion during the entire construction phase - Foundations for overhead catenary system (optional) Embankments and excavation for railway Sub ballast and lower layer ballast on embankment Drainage of railway embankment and cutting including pumping stations and rainwater basins Access road at Tranegilde by (N-RO-13) Tranekilde Mark and path (drain ditch), new bridge, underpass of Tranekilde Mark, (N-F-08) Fauna passage at Tranekilde Mark (N-F-09) The New Line Copenhagen Ringsted 3
4 Fauna passage at Tranekilde Mark (N-F-10) Baldersbæk, Piping of Baldersbæk Ø2500, (N-F-11) Fauna passage next to Baldersbæk (N-F-25) Borrow area right side of track Fauna passage at field boundary (N-F-12) Fauna passage at Pilemøllevej (N-F-13) Fauna passage at Hedge (N-F-15) Fauna passage at Kildebrønde (field boundary) (N-F-18) Fauna passage at Kildebrøndemark (N-F-19) Snowbelt / Snow break plantation on left side of track Pond for toy boat sailing Greve Bæk (stream), Piping of Greve Bæk, (N-F-22) Access road to Stenkiste (N-RO-17) Grevestien (path), new bridge, overpass of Grevestien, (N- P-04) Relocation and elevation of Grevestien Retaining wall along Køgebugtmotorvejen / Mercedes, (N- RE-12) Retaining wall along Køgebugtmotorvejen / LASTAS Retaining wall along Køgebugtmotorvejen / Blue Water, (N- RE-13) Kildestien (path), new bridge, underpass of Kildestien, (N- TU-06) Relocation and elevation Kildestien Piping of Vardegårdsløbet (N-F-23) Retaining wall along Sanistål (S-RE-01) Fuglestien (path), new bridge, underpass of Fuglestien, (S- TU-01) Relocation and elevation of Fuglestien Amphibian fence on right and left side of track Rørmoseløbet, new bridge, underpass of Rørmoseløbet, (S- F-01) Metalstien (path), new bridge, underpass of Metalstien, (S- TU-02) Retaining wall along gas pipe (S-RE-02) Karlslunde Centervej, new bridge, overpass of Karlslunde Centervej, (S-BRO-02) Kildestierne 1 og Notgangen Vævargangen Kildegangen (S-RO-01) Retaining wall along gas pipe at Karlslunde Centervej, (S- RE-03) Karlslundestien no.1 below motorway M10, new bridge, underpass of Karlslundestien, (S-TU-03) Retaining wall along Karlslundestien, (S-RE-04) Relocation of Karlslundestien (S-RO-13) Karlslundestien no.2 below motorway M10, new bridge, underpass of Karlslundestien, (S-TU-04) Close down, filling and compaction of existing ochre basin The New Line Copenhagen Ringsted 4
5 Handling of sediments from existing ochre basin as contaminated Karlslunde Mosevej, new bridge, underpass of Karlslunde Mosevej, (S-BRA-01) Karlslundebæk (stream), new bridge, underpass of Karlslundebæk, (S-F-02) Relocation of Karlslundestien west of Karlslunde rasteplads Retaining wall along Karlslunde rasteplads, (S-RE-05) Path to Karlslunde rasteplads Karlstrup Møllebæk, new bridge, underpass of Karlstrup Møllebæk, (S-BRA-02) Firemileskoven, Fauna passage, (S-F-03) Dal dæmning, embankment crossing soft soil area, (S-PD- 01) Path at Engstrupstien (S-RO-16) Engstrupstien (path), new bridge over passing Engstrupstien, (S-TU-05) Path between Engstupstien and Cementvej (S-RO-17) Southern part of Firemileskoven (forest), Fauna passage, (S-F-05) Cementvej, new bridge, underpass Cementvej, (S-BRA-03) Relocation and elevation of Cementvej Relocation of Motelvej (S-RO-02) Access to service station (S-RO-03) Relocation of Silovej (S-RO-04) Relocation and elevation of Tåstrupvej (S-RO-05) Noise screen on left side of track (S-NS-01) Retaining wall along Mc. Donald, (S-RE-06) Tåstrupvej, new bridge, underpass of Tåstrupvej, (S-BRA- 04) Retaining wall along Weber (S-RE-07) Lizard habitat Ejrebæk (Stream), underpass of Ejrebæk, (S-F-08) Havbogårdsvej from Solrød Byvej to Havbogård and Ejrebækslund (S-RO-06) Amphibian fence on right side of track Bank along track on right side Solrød Bæk, new bridge, underpass of Solrød Bæk, (S-F- 09) Noise screen at bridge on right side of track (S-NS-02) Snowbelt / Snowbreak plantation on left side of track Jersie, fauna passage, (S-F-10) Åsvej, new bridge, underpass of Åsvej, (S-BRA-05) Relocation of Åsvej and path Access road to pumping station Jersie, fauna passage (S-F-11) Jersie, fauna passage (S-F-12) Roskildevej, new bridge, underpass of Roskildevej, (S-BRA- 06) Relocation of Roskildevej Relocation of Åmarken (S-RO-08) The New Line Copenhagen Ringsted 5
6 Jersie Mose, embankment crossing soft soil area, (S-PD-02) Amphibian fence on left and right side of track Jersie Mose, fauna passage, (S-F-13) Jersie Mose, Hyllemose, fauna passage, (S-F-14) Jersie Mose, Hyllemose, fauna passage, (S-F-15) Jersie Mose, embankment crossing soft soil area (S-PD-03) Gammelmosestreget, new bridge, underpass of Gammelmosestreget (S-TU-07) Skensved Å, new bridge, underpass of Skensved Å, (S-TU- 08) Jersie Mose, embankment crossing soft soil area, (S-PD-04) Tilkørsel til forplads til S-bane (S-RO-09) Ny forbindelsesvej Egedesvej Øslemaglevej (S-RO-10) Retaining wall along the platform (S-RE-11) Snogebækken (Stream), UP (S-F-16) Earth work All earthworks, drainage etc. necessary for layout of embankments and excavations along the alignment up to and included first layer of ballast according to BN1-6, are included in this package. The overall earth balance for this tender package has been designed by Banedanmark. The Contractor shall make a detailed design for the earth handling within the contract limit. Scope of work Together with this description is an overview plan indicating the scope of TP40 and contract limits. Constructions and road work carried out by TP41 and VD (Danish Road Directorate) is also marked on the plan for information only. The New Line Copenhagen Ringsted 6
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
More informationPurpose of the Local Liaison Committee
Agenda 1. Welcome, introductions and purpose of the Local Liaison Committee 2. Introduction to the scheme 3. Progress update 4. Elect a chair for future meetings 5. Agree agenda and terms of reference
More informationBanebranchen New line Copenhagen-Ringsted
Banebranchen New line Copenhagen-Ringsted 11th May 2011 High speed Copenhagen-Ringsted High speed Copenhagen Ringsted first phase of The one-hour target Caracteristics Denmark s first High-Speed railway,
More informationBruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
More informationInnovative Tender forms. Danish Experiences and Wishes
Innovative Tender forms Danish Experiences and Wishes A Member of Group Noroq? An Infrastructure Project Developer with focus on Totalenterprise and PPP Projects Noroq Key Facts Established 2011 Work Areas
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationLETBANE PÅ RING 3. Information about the public procurement process
Information about the public procurement process Document ID: L3-X-LB-PRE-0001 Version: 2.0 Issue date: 2015-11-10 Issued by: Ring 3 Letbane I/S Approved by: AGF Anne-Grethe Foss Checked by: PAMA Patrik
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationSUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationSECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationTown of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationCHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More information720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
More informationAgenda. Welcome. Introduction to Ringsted Fehmarn. E3006 King Frederik IX s Bridge. E1001 Track Works. Break: Networking and Sandwich
1 Agenda Welcome Introduction to Ringsted Fehmarn E3006 King Frederik IX s Bridge E1001 Track Works Break: Networking and Sandwich Tender & Contract Information Questions, remarks, comments and answers
More informationCONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationIAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationSeries 600: Earthworks
Series 600: Volume 4 home page 1 General Where the Contractor has obligations in respect of classification of earthworks materials then these obligations include sampling and testing in accordance with
More informationA Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationInterim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05
Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05 IAN 105/08 1 of 7 Jan 2008 1. Introduction The Construction (Design and
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationSEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
More informationUSE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Functions of a Filter Retain particles of the base
More informationExhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW
More informationSECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air,
More informationBasements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
More informationInformation Request 14
Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More informationThe rail engineering service provider. Consulting, planning, project management
The rail engineering service provider Consulting, planning, project management The rail engineering service provider Rail infrastructure is a complex system in which all the elements must be precisely
More informationSoil and Materials Engineers, Inc. Mark J. Quimby Project Consultant
Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History
More informationTobique Employment & Training
APPENDICES 3 Tobique Employment & Training Flood Mitigation July 30, 2012 Overview This proposal outlines the work required and budget for flood mitigation measures on Tobique First Nation which is required
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationSWAMP. Storm Water prevention - Methods to Predict damage from the water stream in and near road pavements in lowland areas
SWAMP Storm Water prevention - Methods to Predict damage from the water stream in and near road pavements in lowland areas Inception Report January 2009 Project coordinator: Mr. Knud A. Pihl. M.Sc. (DRI),
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationWork Breakdown Structure Element Dictionary. Final Design
Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationBONATTI: COMPANY OVERVIEW
BONATTI: COMPANY OVERVIEW Bonatti is an International General Contractor which provides Engineering, Procurement, Construction and Operation & Maintenance Services to the Oil & Gas and Power Industry.
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationWork Type Definition and Submittal Requirements
Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,
More informationLondon Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More informationApplication for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationAmendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationFigure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.
A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed
More informationLYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationGUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS
GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result
More informationNOTES FOR GUIDANCE ON THE METHOD OF MEASUREMENT FOR HIGHWAY WORKS
Volume 4 Section 2 Contents NOTES FOR GUIDANCE ON THE METHOD OF MEASUREMENT FOR HIGHWAY WORKS Introduction Chapters I, II and III Item Coverage Extra Over Items Remove From Store and Re-erect/Re-install/Relay
More informationTOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
More informationRole of the Environmental Management Representative (EMR)
Legacy Way Project Role of the Environmental Management Representative (EMR) What is Legacy Way The project consists of the following key elements: Two 4.2 km road tunnels connecting the Western Freeway
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationSTORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
More information5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationFailing Culverts Structural Problems & Economic Considerations
Failing Culverts Structural Problems & Economic Considerations Al Tenbusch, President, Tenbusch, Inc. Brian Dorwart, Senior Associate, Brierley Associates Albert F. Tenbusch, Engineer, Tenbusch, Inc. June
More informationCOWI s Role in the Copenhagen Metro Project
COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in
More information1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationREPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL
REPORT NO: 0.0 REPORT TITLE: SOURCE: DIVISION: FILE NO: POLICY: - STRATEGIC OBJECTIVE: Planning Scheme Amendment C202: 140-204 Western Avenue, Westmeadows Gareth Edgley, Senior Strategic Planner City Sustainability
More informationTrack Drainage Inspection and Maintenance
Track Drainage Inspection and Maintenance 1 Scope Civil Engineering RTS 3432, March 2006 The purpose of this drainage guide is to enable engineering and maintenance staff to inspect and maintain effective
More informationTHE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
More informationApplication by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)
Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or
More informationThe Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationPlanning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
More informationMember Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationOrganizing the future railway
CEO Jesper Hansen, Banedanmark 21.05.2013 Railway of the Future Danish ambition to handle the major part of the growth in passenger and railway traffic Banedanmark will increase the capacity of the railway
More informationPART 4: SITE INFORMATION
TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationUsing Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow
AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil
More informationHighway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
More informationAN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES
AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES REFERENCE National Handbook of Conservation Practices Code NY313 Waste Storage Facility. INTRODUCTION CAFO permits require an Agricultural
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationROXBURY PARK PLAY AREAS RENOVATION CITY OF BEVERLY HILLS TECHNICAL SPECIFICATIONS TABLE OF CONTENTS
ROXBURY PARK PLAY AREAS RENOVATION CITY OF BEVERLY HILLS TECHNICAL SPECIFICATIONS TABLE OF CONTENTS DIVISION 2 SITE CONSTRUCTION 02050 SITE DEMOLITION 02110 SITE CLEAR AND GRUB 02210 SITE GRADING 02230
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationSection 18.1.3 below clarifies which chapter should be consulted for different types of structure.
P age 647 18 Structures 18.1 General 18.1.1 Introduction and Governing Principles AT structures consist of road structures (structures associated with roads) and public transport structures (stations and