Track Drainage Inspection and Maintenance
|
|
|
- Vivian Wiggins
- 10 years ago
- Views:
Transcription
1 Track Drainage Inspection and Maintenance 1 Scope Civil Engineering RTS 3432, March 2006 The purpose of this drainage guide is to enable engineering and maintenance staff to inspect and maintain effective track drainage. Regular examination, inspection and routine maintenance of drainage systems is essential. Neglect of drainage problems will inevitably lead to track problems. The methods of designing drainage systems, from the initial concept through to specification of various components required and methods of construction are detailed in RTS Reason and nature of change Document reissued as ARTC Engineering Practice Manual. 3 Introduction Without adequate track drainage, track formation may become saturated leading to weakening and subsequent failure. Formation failure may be indicated by any of the following; mud pumping up through the ballast, repeated top and line problems, bog holes, or heaving of the formation. If the permanent way or track structure is to be maintained at a suitable standard for the passage of freight or high speed passenger trains, adequate drainage must be installed in new or upgraded track and existing drainage must be maintained so that it works effectively. The document is divided into the following sections: March 2006 Page 1 of 21
2 Section 4 looks at the various types of track drainage, both surface and subsurface. The application of these drains to track drainage is also discussed. Section 5 deals with inspection and assessment of drainage condition and effectiveness Section 6 looks at the various methods used to maintain track drainage systems. 4 Types of Drainage The types of track drainage fall under two broad headings: 1) Surface drainage 2) Subsurface drainage. 4.1 Surface Drainage Surface drainage works used by the ARTC consist of trench type open drains. These remove surface runoff before it enters the track structure, as well as carrying off water percolating out of the track structure. The three types of surface drains used are: 1) Cess drains. 2) Catch drains. 3) Mitre drains. Another form of surface drainage is the basic grading of the ground on either side of the tracks so that it falls away from the track, and allows water flowing out of the track structure to be removed. (See Figure 1). Shoulders graded to fall away from the track formation Figure 1 Typical Track Formation Grading may be used in very flat areas where it is difficult to get sufficient fall for either surface or subsurface drains Cess Drains Cess drains are surface drains located at formation level at the side of tracks, to remove water that has percolated through the ballast and is flowing.along the March 2006 Page 2 of 21
3 capping layer towards the outside of the track formation. They are most frequently found in cuttings where water running off the formation cannot freely drain away. (See Figure 2). C 1500 min C C 850 min 30 1 See detail Detail showing typical cess drain dimensions Figure 2 - Cess drain - Typical location Cess drains should be constructed with a minimum grade of 1 in 200. Surface drains can be constructed at flatter grades, as they are easily cleared of any sediment which may collect in them Catch Drains These may also be called top drains or surface drains. The purpose of catch drains is to intercept overland flow or runoff before it reaches the track and causes damage to the track or related structures, such as cuttings or embankments. For example, catch drains are generally located on the uphill side of a cutting to catch water flowing down the hill and remove it prior to reaching the cutting. If this water was allowed to flow over the cutting face it may cause excessive erosion and subsequent silting up of cess drains. (See Figure 3). March 2006 Page 3 of 21
4 min C Natural Surface C Surface runoff min 300 Natural Surface Catch drains may be either lined or unlined depending on local soil conditions. Half moon pipes or dish drains may be used instead of lined channels This type of drain may also be used on the uphill side of other track formations, such as embankments. Catch drains may be used to remove water and prevent ponding at the base of embankments or alongside tracks that cut across a slight downhill grade Mitre Drains Mitre drains are connected to cess, catch and surface drains to remove water, or to provide an escape for water from these drains. (See Figure 4). Cutoff drain Natural ground slope To waterway Falling grade Cutting Embankment Mitre drains Figure 4 - Mitre drain Mitre drains should be provided at regular intervals to remove water before it slows down and starts to deposit any sediment that it may be carrying. As the grade of the drain decreases (i.e. it becomes flatter) mitre drains should be provided at closer March 2006 Page 4 of 21
5 intervals. A typical interval for mitre drains is one drain approximately every 100 metres for a drain with a slope of 1 in 200. Where practicable, mitre drains should be installed at the ends of cuttings. The inlets and outlets should be splayed to allow water to be gathered or dispersed quickly. 4.2 Subsurface Drainage Adequate subsurface drainage is necessary for maintaining the integrity of the track formation and ensuring the stability of earth slopes. Subsurface drainage is used only where surface drains are inadequate. For example, through platforms or under multiple tracks. Subsurface drainage is used for: drainage of the track structure control of ground water the drainage of slopes These requirements may overlap considerably in any given drainage system Function of Subsurface Drains Subsurface drainage systems perform the following functions: a) Collection of infiltration water that seeps into the formation (capping layer), as shown in Figure 5. b) Drawdown or lowering of the watertable, as illustrated in Figure 6. c) Interception or cutoff of water seepage along an impervious boundary, as illustrated in Figure 7. d) Drainage of local seepage such as spring inflow, as shown in Figure 8. C Rainfall 30 1 Capping layer Collector drains Figure 5 - Collection of water seeping into the ballast structure. March 2006 Page 5 of 21
6 Original ground level C Cutting slope Original watertable Drawdown drain 30 1 Drawdown drain Figure 6 - Lowering the watertable Geotextile Seepage Zone Slotted Pipe Aggregate Filter Type 1 Aggregate, geotextile and slotted pipe drain Trench backfilled with excavated material Geotextile drain Seepage Zone Slotted Pipe Type 2 Geotextile drain Figure 7 - Interception and cutoff of seepage water March 2006 Page 6 of 21
7 Cutting face Connecting to either ditch or pipe drain Plan showing location of seepage drains Geotextile Aggregate Slotted pipe Section A-A A C 20 1 A Cross Section of Seepage drain Types of Subsurface Drainage Figure 8 - Drainage of local seepage Subsurface Drains can be classified into five types according to their location and geometry. 1) Longitudinal drain (Figure 9). 2) Transverse drain (Figure 10). 3) Drainage blankets (Figure 11). 4) Horizontal drains (Figure 12). 5) Vertical drains (Figure 12). March 2006 Page 7 of 21
8 Cutting Sump A Up track Down track 30-50m Sump interval A Catch Drain C 1500 Capping layer Aggregate 1500 Geotextile Slotted pipe Figure 9 - Typical longitudinal drain arrangement C Side of excavation Geotextile if required Compacted fill Free draining rockfill Rock protection for pipe outlet Slotted pipe Figure 10 - Typical transverse drain March 2006 Page 8 of 21
9 Geotextile Spall protection mm rock Figure 11 - Typical drainage blanket Unstable soil Excavation Embankment Watertable Permeable blanket Horizontal drain Vertical well drains Figure 12 - Typical horizontal and vertical drain arrangement Horizontal and vertical drains are more specialised and are seldom used for track drainage. Horizontal drains are generally used to drain wet soils and speed consolidation of earth structures. Vertical drains may also be used to speed consolidation. Another type of vertical drain is used to drain water from behind retaining walls or bridge abutments. Subsurface drains may also be classified according to the materials used in the drain. For example: a) Aggregate drains. b) Pipe drains. c) Geofabric (or geotextile) drains. d) A combination of the above. March 2006 Page 9 of 21
10 Aggregate Drains These drains consist of permeable granular material. The aggregate should be coarse enough to be free-draining but not so coarse as to allow the migration of fines into or through the permeable material. If this cannot be achieved by suitable grading, a filter of either granular material or geofabric may be required. Aggregate drains can be used for both drainage blankets or French drains (Figure 13). Subsoil Graded aggregate Geotextile filter Figure 13 - Cross-section of a French drain Pipe Drains These consist of perforated or slotted pipes, installed by trenching and backfilling. Some type of filter material around the pipe or permeable backfill is normally required to minimise clogging of the drain perforations or slots. (See Figures 14(a), 14(b), 14(c)). Impervious Subsoil Graded aggregate Geotextile filter Slotted pipe mm dia Figure 14(a) - Cross-section of a typical pipe drain with aggregate and geotextile envelope. Used where the surrounding soil is impervious Geotextile overlap Impervious Subsoil Graded aggregate Geotextile filter Slotted pipe mm dia Figure 14(b) - Cross-section of a typical subsoil drain used in pervious soil March 2006 Page 10 of 21
11 Capping Impervious Subsoil Geotextile filter Pervious fill Slotted pipe Figure 14(c) - Cross-section of a subsoil drain where the pipe is wrapped in geotextile. (Used where the depth of the pipe is limited so that pervious subsoil drains cannot be used). Geotextile Drains A geotextile drain may be a horizontal, vertical, or inclined blanket whose purpose is to collect subsurface water and convey it along the plain of the fabric to an outlet. The drain must also act as a filter to keep soil particles out of pores and prevent clogging. An example is shown in Figure 15. Vertical geotextile drain Retaining wall Horizontal geotextile drain (optional) Backfill Collector pipe Figure 15 - Geotextile (or geofabric) drain behind a retaining wall. A similar arrangement may be used behind bridge abutments. Other Types of Subsurface Drain Where large volumes of water may need to be removed by subsurface drains, a carrier pipe may be used in conjunction with a collector drain, as shown in Figure 16. With this arrangement the collector drain does not need to carry all the water. The advantage of this arrangement is that excess (large volumes) water is removed from the collector drain thus preventing it seeping into the subgrade again at a point further down the drainage route. Figure 16 shows a typical arrangement for a collector drain and carrier pipe located between two tracks. The subsurface water is collected by the collector drain between the two sumps shown, it is then conducted to the down stream sump where it can enter the carrier pipe and be removed without any risk of it re-entering the subgrade. (See Figure 18 for an example of this system used in yard drainage). March 2006 Page 11 of 21
12 Sump cage Subsoil drain (collector) Sump Sump Carrier pipe Figure 16 - Subsoil collector drain plus a larger carrier pipe 4.3 Typical Applications of Subsurface Drainage Subsurface drains are used where adequate surface drainage cannot be provided due to some restriction, or lack of available fall due to outlet restrictions. Locations where these circumstances may occur are, track junctions, turnouts, platforms, multiple tracks and cuttings. a) Platforms b) Cuttings c) Junctions d) Multiple tracks e) Bridges 5 Inspection of Drainage Systems 5.1 Introduction In order to have good quality track it is necessary not only to install adequate drainage but to regularly inspect it and undertake any necessary maintenance to ensure its effectiveness. ARTC standard TEP 05 sets out the formal policy for drainage inspection. This section gives more details on how to implement that policy. Inspections of drainage systems should be carried out at regular intervals. Inspections of cess drains, sump covers, inlets and outlets may be undertaken during routine track inspections. Detailed inspections of all the components of drainage systems are best carried out prior to the wettest period of the year. Without regular inspections and routine maintenance of drains, they may eventually become blocked with either sediment, debris or weed growth. If drains are allowed to become blocked or damaged they will fail in their function of draining the formation. They may even make matters worse, as water standing or ponding in parts of the drainage system may seep into the formation, via pipe slots or through March 2006 Page 12 of 21
13 the base of drainage trenches. This may lead to softening and loss of firm support for the track. 5.2 Inspections In order to have an effective drainage maintenance system it is necessary to carry out inspections, once a year. This inspection should take place in the drier part of the year. In addition to a yearly inspection of drainage, the condition of track side drainage should be inspected during routine track inspections. Track side drainage includes cess drains, sump covers and sump grates. During a drainage inspection the following items should be noted: a) Bog holes, heaves and slips. b) Foul ballast, mud pumping and its severity i.e. mud around the sleeper ends or mud volcanos. c) Poor track alignment (line) and level (top) at locations where Item (b) exists. d) Water ponding in drains or near the track or at the base of cuttings and embankments. e) Erosion of cutting and/or embankment faces. f) Erosion of drainage channels, inlets or outlets. g) Blocked drains due to weed growth, debris from track maintenance (old sleepers and rails) and or sediment build-up. h) Blocked sumps, grates and/or covers. i) The amount of sediment in silt traps j) Broken pipes or sumps. k) Missing sump covers or grates as well as covers and grates not correctly replaced after track maintenance work. The occurrence and extent of any of the above items should be noted on the Drainage Inspection Form (See TEP 05). i) The location and type of drain being inspected should be noted in the appropriate sections of the Form ii) iii) iv) Assess whether the drain being inspected is satisfactory or unsatisfactory. If a drain does not appear to be blocked and seems to be transporting water adequately (i.e. there is no water ponding or evidence of water ponding) the drain is satisfactory. If the drain is blocked with sediment, debris, or weed growth to such an extent that water is unable to flow through the drain is unsatisfactory. Note whether the drain is satisfactory or unsatisfactory If the drain is unsatisfactory note why this is so. This should be noted in the column headed "Comments" March 2006 Page 13 of 21
14 v) The last column is headed "Comments/Work Required" In this column the type of any maintenance work carried out should be noted as well as the date of this work. Once completed, inspection forms may then be retained as a record to establish a drainage history for each particular area. This will assist in assessing the suitability of maintenance work and drainage systems as well as ranking any maintenance work required Drainage Inspection Procedure A study of all plans and records should be made to establish what drainage was actually installed. If no records exist the following assumptions should be made (i.e. the types of drainage that should be encountered in various locations): a) Cuttings; cess drains, catch drains on the high side of the cutting and mitre drains at regular intervals. In newer or recently upgraded cuttings subsoil drains may be found. b) Embankments; graded shoulders and catch drains. c) Platforms; subsurface type drains in the six foot and/or along the edge of the platform base. d) Turnouts; graded shoulders, cess and/or subsurface drains. e) Tunnels; open drains along the sides or centre drains. In newer or recently upgraded tunnels there may be either centre or side subsurface drains. f) Bridges; weep holes in abutments, and in ballast top bridges there may be weep holes in the parapet wall and/or subsurface drains. g) Other track location; graded shoulders Setting Priorities for Drainage Maintenance It is necessary to set priorities for drainage maintenance so that the worst locations are repaired first. In order to establish to what extent the condition of the existing drainage system is affecting the track formation and/or its supporting earth structures (e.g. cuttings and embankments), it may be necessary to examine track recording data to establish whether there has been any repeated problems for top end line in areas corresponding with poor drainage. If so this may suggest the likelihood of more severe problems in the future if the drainage system is not repaired. Areas may be ranked according to the effect they have on the surrounding track formation or surrounding earth structures. For example the following situations are listed in order of decreasing importance: a) Bog holes, heaves (i.e. severe formation failures). b) Slips and slumping of slopes (saturation of slopes). c) Mud pumping up through ballast, top and line problems. March 2006 Page 14 of 21
15 d) Foul ballast plus top and line problems. e) Water ponding alongside track or at the base of earth structures. f) Erosion of cutting face (i.e. ineffective catch drains). g) Minor blockages and sediment build-up. h) Rubbish lying in drains. Take for example an area in which the drainage is blocked, mud is pumping up through the ballast and there is poor top and line. This would not be ranked as high as a complete formation failure, but would have a higher priority than a blocked (top) catch drain causing minor cutting face erosion. 6 Maintenance of Drainage Systems 6.1 Surface Drainage Maintenance Considerations Maintenance operations carried out on surface drains usually fall into one, or a combination of the following: a) Weed control. b) Removal of debris from other track maintenance activities. c) Removal of sediment. d) Regrading. A build-up of weeds within the surface drain tends to slow the passage of water through the drain, which, in turn, allows sediment to settle leading to a blockage of the drain. Such a blockage can render a drain useless and lead to a decay in the effectiveness of other drains in the system. For example, if a cutoff drain at the top of a cutting becomes blocked water may overflow the drain, run down the cutting face increasing erosion of the face and the cess drain will eventually block up due to the additional sediment load. Weeds may be removed using normal weed control practices. Sleepers and rails, for example, left in the cess drains after maintenance work tend to act as dams allowing water to pond alongside the track and seep into the formation. This will also allow sediment to settle. Thus old sleepers and rails should be removed to a suitable dump at the completion of any track work. When a drain fills with sediment, whether it is due to a blockage or a flat grade, this sediment should be removed and the drain regraded if necessary. The type of equipment used to remove the sediment depends on the extent of the blockage and the accessibility. (equipment used may range from a shovel to a gradall). Regrading is sometimes necessary due to scouring or to increase the grade of the drain slightly to reduce the amount of sediment that can settle in the ditch (channel). See Table 1 for a summary of Surface Drain Maintenance. Where cutting faces are exposed, thus undergoing unnecessary cutting face erosion March 2006 Page 15 of 21
16 leading to an acceleration of sediment build-up in cesses, these should be protected. Forms of protection commonly used are spray grasses, or seeding, sodding and shotcrete. Type of drain Problems encountered Possible remedies CESS DRAIN Blockages - weeds Poison - old sleepers and rail etc Should be removed and cess regraded. Old sleepers and rails should be removed when replaced and not left lying in the cess drain, if not removed from site sleepers should be gathered up and burned. CATCH DRAIN - Other Branches Approach other branches about equipment relocation. Spillages and Spent ballast. Remove and regrade cess. Blockages may lead to - Silt build up Clean out cess drain and regrade if - water ponding necessary. - overflow Uneven grades Regrade cess. Scour - Due to high water velocities Often found on down stream side of blockages As above Animal (rabbit) burrows are also a problem in some areas Poorly graded May be possible to widen cess or regrade cess to decrease water velocity, if not the cess should be regraded and/or lined. Eradicate or remove animals and fill in burrows Regrade the drain MITRE DRAINS generally used as outlets for cess and catch drains GRADED SHOULDER Scour - especially at outlets for catch drains above cuttings, where drains tend to be steep producing high velocities As above for cess drains Greatest problem is Scour Water ponding Use more regular outlets. Therefore, producing less water at lower velocities at each outlet. Or regrade and/or line the drain. Regrade or line the drain. If necessary provide some means of retarding the flow out of these drains Regrade the shoulders so that they fall away from the track. 6.2 Subsurface Drainage Outlets Table 1 - Summary of maintenance of surface drains. Outlets are the most critical element of a subsurface drainage system because they are susceptible to events which can impede the free flow of water. The main concerns are blockages due to weed growth, siltation of the adjacent ditch or stream, debris from the track or slope and the activities of animals or man. A system of marking outlets of subsurface drains should be implemented to enable easy location of outlets. March 2006 Page 16 of 21
17 It is recommended that outlets and outlet markers be inspected and repaired, if necessary, as part of routine maintenance at least once a year. As with the inspection of other drainage system components this should preferably be carried out in the period of least rainfall Pipes and Sumps Pipes and sumps are susceptible to blockages due to ballast and rubbish from the track, tree roots in search of water, siltation and pipe breakages or crushing. Sumps may be cleaned by either digging the sediment, ballast and rubbish out of the silt traps or by using a vacuum device (mainly used for deep sumps). Sumps filled with ballast are most effectively cleaned using post hole shovels, but these are ineffective for the removal of fine non-cohesive silt. Square nose shovels of varying widths are suitable only where sediment fills the silt trap. Where a sump is deeper than two metres it becomes too difficult to clean using shovels. In this case a vacuum device may be used. Once the sumps have been cleaned the adjoining pipes may be cleaned if necessary, by either rodding, hydroblasting or similar. Rodding the pipes involves the pushing of a circular plug, of approximately but slightly less diameter than the inside of the pipe, through the pipe using flexible rods. Rodding is done working from sump to sump starting at the downstream end. Any sediment or other debris pushed out of the pipe is then cleaned out of the sumps. Hydroblasting involves the removal of sediment by using a low pressure, high volume water jet, since high pressure low volume water jets tend to damage pipes. Hydroblasting is most effectively carried out using experienced Contractors. The process involved is as follows: i) Sections of the pipe network are cleaned from sump to sump working from the outlet pipe. ii) iii) iv) various nozzles are used to break up any encrustations and remove debris by either jetting it out into the sump or by relying on the volume of water and the grade of the pipe to create a self cleaning effect and remove any sediment. Once this operation is completed the sumps are cleaned either by the methods previously mentioned or by sludge pumps. This process is then repeated in the next pair of sumps and so on. Care must be taken to replace any displaced sump grates or covers removed during the cleaning and inspection of the drainage system. See Table 2 for a summary of Subsurface Drainage Maintenance. March 2006 Page 17 of 21
18 Type Of Drain Pipe, Aggregate Geotextile Filter and Sump Type Drain (Longitudinal Drains) Problems Encountered Blockages: - Rubbish & Ballast Possible Remedies Clean out rubbish and ballast. - Silt Hydroblast pipe or rod pipe. Remove sludge with sludge pump or shovel. Sump Grates and Covers Scour outlet Blocked by Rubbish and Silt Provide scour protection and/or decrease water velocity. Remove cover and or grate, clean sump if necessary. Clean and replace grates and cover. Remove rubbish etc. from site. Aggregate & Geotextile Drains e.g. Blankets Outlets Blocked Outlets Scour Blockages Remove vegetation. Clean outlets ensure no water ponds at outlets. Provide scour protection and or decrease water velocity. Clear away vegetationfrom outlet. Clear any other debris away from outlet e.g. spent ballast etc. 6.3 Typical Problems and Solutions Table 2 - Summary of Maintenance of Subsurface Drains This section looks at typical drainage problems, suggests possible reasons for their occurrence and practical maintenance solutions which range from simple cleaning to upgrading drainage Cuttings Drainage problems are exhibited by: a) Water ponding. b) Poor track alignment and level through the cutting. c) Pumping of mud up through the ballast. d) Rock pumping. The main causes of these problems are: i) Poorly graded cess drains. ii) iii) Blocked cess drains i.e. drains silted up due to cutting face erosion or debris (e.g. sleepers and spent ballast etc.). Foul ballast i.e. spillages from coal and wheat trains or mud causing the March 2006 Page 18 of 21
19 water to be trapped in the ballast. Another possible cause is the damming of water caused by the dumping of spoil by ballast cleaners at the ballast toe. Another problem associated with cuttings is where cut off drains have been provided but not maintained. Thus water can pond within these drains resulting in the saturation of the cutting face which would lead to slipping, slumping or piping of the cutting face. This may also allow water to overflow the drains and run down the cutting face causing excessive cutting face erosion, which in turn causes the cess drain to silt up quicker. There are a number of solutions to these problems depending on the size of the cutting and the number of tracks. These are: Narrow or Steep Cuttings Depending on the severity of the problem it may only be necessary to clean, regrade the cess and ballast clean the problem section. The other alternative is to install subsoil drains. The cess is deepened and a subsoil drain installed, the ballast is then allowed to fall over the drain. Thus if the surface (cess) drain becomes blocked (i.e. silted up) the subsurface water is still being drained away from the formation. This system can also be used on multiple track provided the formation is in good condition and graded towards the cess drains. Otherwise the formation may need to be reconstructed. Wide Cuttings In wider cuttings or if widening of the cutting is possible, the cess drains need only be deepened and widened so that water is drained out of and away from the track and does not prevent water flowing away from the track. This method should be used where easy access is available allowing regular maintenance to be carried out. Note: Cutting faces should be stabilised to reduce erosion and subsequent silting up of cess drains. For example spray grassing Embankments The main drainage problems associated with embankments are; water being trapped in the ballast due to fouling of the ballast (either from spillages or mud) and the build up of spoils from previous ballast cleaning operations. Another problem is that of water ponding at the embankment base, which may lead to slips. This water may cause saturation of the embankment base consequently causing further consolidation and settlement of the embankment. To prevent water being trapped in the ballast, leading to formation failures, the shoulders of the embankment must be kept clean and graded away from the track. Thus windrows of spend ballast must not be allowed to build up on embankment shoulders. Depositing ballast cleaning spoil over the side of the embankment stops water being trapped in the ballast but can cause water to be trapped in the embankment itself. The spent ballast tends to from an impermeable layer over the outside of the embankment. Catch drains must be installed and maintained such that water is prevented from March 2006 Page 19 of 21
20 ponding at the embankment base. An alternative to catch drains in flat areas is to grade surrounding ground away from the embankment such that if water does pond in the area, it is away from the embankment base. At areas of heavy seepage through embankments, a transverse subsoil drain should be installed to drain the water from the embankment, thus reducing the possibility of embankment saturation and any resulting problems. On multiple tracks where drainage problems have been encountered it may be necessary to install a transverse drain with suitable outlets to effectively drain water from the ballast. Note: Embankment faces should be stabilised to reduce erosion problems (e.g. spray grassing or sodding or geofabric, etc.) Platforms The main problem associated with platforms is the ponding of water which consequently causes formation failures, exhibited as poor track alignment, pumping sleepers and bog holes. The solutions available depend upon the severity of the problem. These are: a) Clean all sumps and pipes. b) Install a suitable drainage system in the six foot. c) Recondition track and install subsurface drainage system. d) Completely excavate problem area and replace with densely compacted fill up to the next formation level, then provide a 150 mm compacted granular capping layer and 300 mm of ballast cover. During reconstruction install a subsurface drainage system. Also at stations with island platforms there is often a problem with water ponding at the ends of the platform. This can be remedied by placing a sump in the six foot connected to an existing drainage system or suitable outlet. Note: Runoff from station buildings and platforms may be piped into sumps. This provides relatively clean water which can be used to help flush drainage systems Turnouts With the increased axle loads and cyclic forces exerted on turnouts it takes very little water for them to start pumping mud up through the ballast, consequently fouling the ballast and compounding the problem. Some solutions to this problem are as follows: a) Deepen and widen the cess drains on each side to drain water from the ballast and keep it clear of the formation. b) Install subsurface drains under problem areas during turnout reconditioning or renewal. Major problem areas are under heel blocks and crossings, these are points where the most pounding (greatest impact load) tends to occur. In come cases during turnout and crossing renewals asphaltic concrete has been March 2006 Page 20 of 21
21 used as a capping layer to help increase the impermeability of the formation thus giving it a longer life Yard Drainage The problems associated with yard drainage are similar to those of any other trackwork except on a larger scale. Where on most lines the drainage must cater for between one and four tracks in yards there are usually many more. Also yards tend to be constructed on very flat areas, thus there is very little fall available for surface and subsurface drainage systems. The simplest solution for any drainage problems in yards is to clean and regrade cesses and provide regular outlets in the form of sumps such that the best possible grades can be applied to the surface drains. The most effective method is to have the formation graded as shown in Figure 17 below. Figure.17 - Typical "saw tooth" formation used in yards Subsurface drains are located at the low points. If large flows are expected it may be necessary to install carrier pipes. Carrier pipes may be placed at a deeper level thus allowing the grades of subsoil drains to be increased between sumps. Figure 18 - Carrier Pipe Arrangement Bridge Abutments and Retaining Walls Unless adequate weep holes are installed during construction and kept clear by routine maintenance, weep holes tend to block, trapping water behind the abutment or retaining wall. This causes saturation of the earth (fill) behind the walls which can lead to further consolidation and settlement of the fill. Weep holes are required at and above the capping layer level as well as at the base of a wall. Weep holes should also be located at regular intervals down the wall, thus if the bottom holes become blocked the upper ones can still allow some water to escape. Existing weep holes should be cleared during regular bridge inspections. New holes should be bored through the wall if no holes exist or the existing holes are inadequate, especially if there are no weep holes present above the capping layer level. March 2006 Page 21 of 21
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
CODE OF PRACTICE - VOLUME TWO - TRAIN SYSTEM [CP2] TRANSADELAIDE INFRASTRUCTURE SERVICES. Issue: 2 Date: 26/09/08 Page: 1 of 21
Issue: 2 Date: 26/09/08 Page: 1 of 21 TRACK AND CIVIL INFRASTRUCTURE CODE OF PRACTICE VOLUME TWO - TRAIN SYSTEM [CP2] DRAINAGE 2004 No part of this document may be reproduced without prior written consent
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
NJ650.1404 Interception Drainage
NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks,
Extension Education Center 423 Griffing Avenue, Suite 100 Riverhead, New York 11901-3071 t. 631.727.7850 f. 631.727.7130 ASSESSING DRAINAGE PROBLEMS How can you tell the difference between a drainage problem
Part 7 GEOTEXTILE FILTER FABRICS
Part 7 GEOTEXTILE FILTER FABRICS Well Screens Slotted casings are normally employed as well screens within the aquifers being taped by water wells. The width of the slots should allow 50 to 60% of the
Property Care White Papers. Site Drainage: Monitor and Maintain
Monitor and Maintain Site Drainage Good site drainage is an important part of keeping water issues from affecting the building. The upkeep of existing systems should be an important part of any maintenance
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
SECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
Homeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
Session 7: Retrofitted Edge Drains 7.1
Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. List benefits of drainage 2. List components of edge drain systems 3. Describe recommended installation procedures 4. Identify typical construction
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
SC-07 STORM DRAIN INLET PROTECTION
Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed
CHAPTER 18 GROUNDWATER AND SEEPAGE
CHAPTER 18 GROUNDWATER AND SEEPAGE TABLE OF CONTENTS 18.1 INTRODUCTION...3 18.1.1 Purpose...3 18.1.2 Sources of Groundwater...4 18.1.3 Impacts of Groundwater on Highway Projects...4 18.2 PRELIMINARY INVESTIGATION...5
UNDER DRAINAGE AND FILTER DESIGN
UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
Preventing water damage in the basement
Preventing water damage in the basement Thousands of home insurance claims are filed every year. Some losses are major, others aren t, but they re always an inconvenience and usually avoidable! As prevention
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Functions of a Filter Retain particles of the base
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
Tree Pits Operation & Maintenance Guide
Tree Pits Operation & Maintenance Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems
www.stma.org Drainage A Crucial Component for Athletic Field Performance Part Three: Sub-Surface Installed Drainage Systems Water is applied to maintained turfgrass areas by irrigation or precipitation.
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
CHAPTER 7 DRAINAGE OF PAVEMENTS
CHAPTER 7 DRAINAGE OF PAVEMENTS 7-1. Drainage control Adequate drainage of surface and ground water is one of the most important considerations in the design, construction, and maintenance of roads, railroads,
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: [email protected] Module - 4
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
WSUD maintenance guidelines. A guide for asset managers
WSUD maintenance guidelines A guide for asset managers Table of contents Introduction 2 How to use the guidelines 3 1 Asset management framework 5 1.1 Types of maintenance 6 1.1.1 Proactive maintenance
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
= gallons of water produced by a 1-inch rainfall. Basic Principles of Artificial Drainage. length (feet) X width (feet) X.
1 Basic Principles of Artificial Drainage Artificial drainage Artificial drainage is the removal and relocation of excess soil water. Once soil has reached the point where all its voids are filled and
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
COMPREHENSIVE PAVEMENT DESIGN MANUAL
COMPREHENSIVE PAVEMENT DESIGN MANUAL Chapter 9 - Subsurface Pavement Drainage (Limited Revisions) Revision 1 July 2, 2002 Pages Changes CHANGES TO CHAPTER 9 Contents List of Figures and Tables included.
Riprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual
Seattle Public Utilities Natural Drainage Systems (NDS) Maintenance Manual 1 Revision Date: December 2007 2 Table of Contents I. Overview... 4 II. How to Use This Manual... 4 III. NDS Contacts... 4 List
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Block and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal
Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Watershed Works Manual
National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:
BMP #: Dry Wells / French Drains
Structural BMP Criteria BMP #: Dry Wells / French Drains A Dry Well, or French Drain, is a variation on an Infiltration Trench that is designed to temporarily stores and infiltrate rooftop runoff. Key
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
Scheduling Maintenance for Infiltration Basins and Trenches
Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
Chapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
First in Service First in Safety
7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Preventing Basement Flooding
Preventing Basement Flooding Perry Lindquist Land Resources Manager Waukesha County Dept. of Parks & Land Use Waukesha County Storm Water Workshop April 10, 2013 Presentation Outline Background Case study
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
February 4, 2011. [email protected]. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth
February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 [email protected]
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
Architectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
AUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
Soakage Trenches. A better way to manage stormwater. Thinking Globally and Acting Locally
Soakage Trenches A better way to manage stormwater Thinking Globally and Acting Locally A partnership of the Scranton Sewer Authority, The Lackawanna River Corridor Association and the citizens of Scranton
Operation & Maintenance Document Templates
Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities
Gettysburg Adams Chamber of Commerce Storm Water Management
Gettysburg Adams Chamber of Commerce Storm Water Management Table of Contents Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction Understanding Location and Landscape 2.1
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure