1 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING PART 4: SITE INFORMATION 1. Description of the Site and its surroundings 1.1. General description Tarlton Site: The site is located at the corner of Rustenburg (R400) and Ventersdorp Road (N14). The GPS coordinates are 26 4'42.89"S, 27 38'24.30"E. The site can be seen in the image below: The existing Site Layout information is presented in Annexure C4.1. The site is split into six operational areas; these are the rail loading area, tank farm, IRP area, offices and workshop, road tanker loading and road tanker staging areas. There are in most cases fences separating these areas. The primary entrance to the site is on the N14. This entrance passes directly to the truck staging area then through the security check point and into the site. The first building within the site is the office area, further northwest is the workshop then northwest of that is the tanker loading station then the additive dosing station then the spill basin. Adjacent to the offices to the south west is the existing fire pump house and reservoir; this is within the tank farm area. Further south west is the manifold which is adjoined to the tank farm then the control room in the south west corner. The whole south west edge of the site is the rail loading area, there is extensive staging with a loading gantry and associated pumping manifold approximately south west of the spill basin. The primary tank farm is roughly central on the site and is all contained in a single bund. There is a pump manifold to the north east of the bund area. NEC3 CONTRACT Page 1 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

2 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Finally there is the IRP area which falls between the rail loading, spill basin and primary tank farm towards the north of the site. This area includes a fuel processing facility as well as four storage tanks and a control room to the north west of the area adjacent to the spill basin. Cranage is likely to be required for the construction of the water tanks and the installation of some equipment into the pump house depending on the construction philosophy adopted. The space available in the area of this construction is limited however the buildings here are of limited height (Single story industrial construction). If there is any concern over the restriction of access for cranes, the relevant information should be requested immediately Existing buildings, structures, and plant & machinery on the Site This project is an upgrade on an existing facility and as such there are extensive existing buildings and facilities. There is a security upgrade being implemented on the site resulting in revisions to the site wide fencing, the entrance gates and guard houses as well as the office buildings. The available information for this upgrade is presented in Annexure C4.2. The interfaces for this project are the road and rail loading gantries, the tanks and the existing pumphouse and dam area. With regards to the gantries and tanks this information is presented in Annexure C4.3 and it useful for understanding of the scale of work required to fit equipment to these facilities. The available information for the pump house and reservoir is presented in Annexure C4.4 as there are to be temporary connections into the pumphouse, demolition of the pumphouse and demolition of and building in the area of the reservoir Sub-soil information There is extensive trenching required throughout the site as well as earthworks for foundations for the temporary and permanent tanks as well as the pumphouse and valve banks. There is an existing Geotechnical Report completed on the site and this is presented in Annexure C Hidden services This project entails extensive trenching for installation of buried pipes; as such it is necessary to establish as much information regarding the location of existing buried services as possible. The available drawings are therefore presented in Annexure C4.6. Further to this, the drawings for the security upgrade in Annexure C4.2 should also be consulted. All trenching work should be discussed with the site operations team in project meetings before work commences as they have extensive knowledge of the buried services on the site. As discussed in the Works Information and other documents there shall be a process of exploratory excavations implemented to attempt to detect routing problems before the major trenching reaches an obstruction. In developing the design the available information has been used and trench paths planned to avoid underground services wherever possible. Where information is limited the assumed straight line routed between draw boxes and the like have also been considered and avoided where possible. NEC3 CONTRACT Page 2 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

3 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING 1.5. Facilities available to Contractor Water Supply Potable Water; litre JoJo tank filled at 500 l/min with 1 outlet located in the existing fire pumphouse Land available 1.6. ANNEXURES Possible land marked on GA seen in Annexure C4.7 REFER TO CD Annexure C4.1 Existing Site Layout Annexure C4.2 Security Upgrade Annexure C4.3 Tank and Gantry Information Annexure C4.4 Pump House and Reservoir Annexure C4.5 Geotechnical Report Annexure C4.6 Buried Services Annexure C4.7 Contractors Area GA NEC3 CONTRACT Page 3 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

4 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.1 Existing Site Layout NEC3 CONTRACT Page 4 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

5

6

7 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.2 Security Upgrade NEC3 CONTRACT Page 5 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

8

9

10 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.3 Tank and Gantry Information NEC3 CONTRACT Page 6 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

11

12

13 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.4 Pump house and Reservoir NEC3 CONTRACT Page 7 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

14

15

16 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.5 Geotech Report NEC3 CONTRACT Page 8 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.6 - Buried Services NEC3 CONTRACT Page 9 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

69

70

71

72

73

74 TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY INCLUSIVE OF DEMOLITION, CIVIL, STRUCTURAL, BUILDING, MECHANICAL, ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPLY, INSTALLATION AND COMMISSIONING Annexure C4.7 Contractors Area GA NEC3 CONTRACT Page 10 of 10 Part C4 PRO-FAT-0226 Rev02 C4. Site Information

75 "COPYRIGHT IS VESTED IN SiVEST IN TERMS OF THE COPYRIGHT ACT (ACT 98 OF 1978) AND NO USE OR REPRODUCTION OR DUPLICATION THEREOF MAY OCCUR WITHOUT THE WRITTEN CONSENT OF THE AUTHOR" THIS DRAWING HAS BEEN PREPARED UNDER THE CONTROLS ESTABLISHED BY THE SiVEST QUALITY MANAGEMENT SYSTEM AND MEETS THE REQUIREMENTS OF THE SETA QUALITY GRADING SYSTEM THAT IS ISO COMPLIANT GENERAL NOTES 1. THIS DRAWING PROVIDES INFORMATION RELATED TO THE FORM OF THE WORK WHEN COMPLETED TOGETHER WITH GUIDANCE, WHERE FUNDAMENTAL TO THE DESIGN, FOR THE SEQUENCE OF CONSTRUCTION. THIS DRAWING DOES NOT PURPORT TO INCLUDE ANY NECESSARY PRECAUTIONS, ITEMS OR COMPONENTS REQUIRED FOR CONSTRUCTION SAFETY. ALL SUCH PRECAUTIONS MUST BE TAKEN AND ITEMS OR COMPONENTS SUPPLIED BY THE CONTRACTOR. 2. ANY DISCREPANCIES ARE TO BE CONFIRMED WITH THE ENGINEER ON SITE PRIOR TO WORK PROCEEDING. 3. ONLY WRITTEN DIMENSIONS SHALL BE USED. 4. ALL DIMENSIONS ARE IN MILLIMETERS. ISSUED FOR REVIEW ES A Revision Details By Date Suffix DURBAN OFFICE 4 Pencarrow Crescent La Lucia Ridge Office Estate Umhlanga Rocks 4320 South Africa Tel Fax [email protected] Project Title Drawing Title DRAWN BY : DESIGNED BY : TARLTON CONTRACTOR DEPOT GENERAL LAYOUT Scale ON ORIGINAL PLAN :500 (A0) DATE: ES Pr No: * * SIGNATURE : DATE : CHECKED ON BEHALF OF SiVEST BY : Pr No: * * SIGNATURE : DATE : SiVEST Drawing Number TLR-M-3011 Revision A

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan TPL 25 Tarlton Commissioning Plan Issue Date: 03/07/2015 Revision No.: A Project No.: 11992 Date: 03/07/2015 Document Title: TPL25 Tarlton Commissioning Plan Author: Edward Standen Revision Number: A Checked

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT BASIC ENVIRONMENTAL ASSESSMENT UPGRADING OF THE TRANSNET CITY DEEP CONTAINER TERMINAL, JOHANNESBURG SEPTEMBER 2008 INTRODUCTION Transnet Freight Rail would like to upgrade

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground

More information

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 SUBJECT COST ESTIMATE FOR A PROPOSED ELECTRICAL CABLE CONNECTION FOR PORTABLE GENSET ISSUE To conceptualize and

More information

PIPING DRAWINGS BASICS N.P.TODKAR

PIPING DRAWINGS BASICS N.P.TODKAR PIPING DRAWINGS BASICS N.P.TODKAR There are two types of views used in the piping drawings: a) Orthographic- Plans and Elevations b) Pictorial - Isometric Views Piping layout is developed in both plan

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Environmental Management System Procedures

Environmental Management System Procedures Environmental Management System s Plan Title Oils and Oil Contaminated Items Delivery, Storage, Use and Disposal Ref No Op-Proc-71 Related Documents EMS-Plan-7 Op-Proc-72 EMS-F-71 EMS-F-72 Record of Revisions

More information

QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE

QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE GA Insurance House, Ralph Bunche Road, P O Box 42166-00100 Nairobi, Kenya. Telephone: 2711633 Fax 2714542 E-mail: [email protected] QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE AGENT:

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation

More information

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012 Centinela Valley Union High School District Measure CV Program Update July 23, 2012 Site Construction Progress Site Updates Hawthorne High School Lawndale High School Leuzinger High School 2 Hawthorne

More information

PROPOSAL FORM. All the questions to be answered completely. Incase of shortage of space kindly enclose the information as an annexure :

PROPOSAL FORM. All the questions to be answered completely. Incase of shortage of space kindly enclose the information as an annexure : Bajaj Allianz General Insurance Company Limited Regd. Office & Head Office : GE Plaza, Airport Road, Yerawada, Pune - 411 006. CIN: U66010PN2000PLC015329 FOR CONTRACTOR S ALL RISKS INSURANCE PROPOSAL FORM

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

The Construction (Design and Management) Regulations 2007

The Construction (Design and Management) Regulations 2007 STATUTORY INSTRUMENTS 2007 No. 320 HEALTH AND SAFETY The Construction (Design and Management) Regulations 2007 Made - - - - - 7th February 2007 Laid before Parliament 15th February 2007 Coming into force

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

WORK SCOPE. Domains in which we work:

WORK SCOPE. Domains in which we work: WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial

More information

Construction Services

Construction Services Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Standard Operating Guideline Maintenance Management System

Standard Operating Guideline Maintenance Management System Standard Operating Guideline (SOG) Title: MAINTENANCE MANAGEMENT SYSTEM District Name: Date Prepared: Date Revised: OBJECTIVE: A Maintenance Management System is an organized method of collecting documentation

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Guidelines for Rights of Way

Guidelines for Rights of Way Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

SITE SAFETY LOGISTIC PLAN

SITE SAFETY LOGISTIC PLAN SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL Rev Purpose of Issue Originated Reviewed Authorised Date 0 First issue Anil Kumar Ken Duguid Stephen Pottle 21-07-2010

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

General Liability Insurance Application (Contractors Supplemental Questionnaire)

General Liability Insurance Application (Contractors Supplemental Questionnaire) Insurance Services www.metroinsurance.com General Liability Insurance Application Note: Throughout this questionnaire the words you and your include all entities seeking coverage. Note: This and other

More information

Maximum and minimum problems. Information sheet. Think about

Maximum and minimum problems. Information sheet. Think about Maximum and minimum problems This activity is about using graphs to solve some maximum and minimum problems which occur in industry and in working life. The graphs can be drawn using a graphic calculator

More information

EMERGENCY STORAGE PROJECT

EMERGENCY STORAGE PROJECT EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to: Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

Fact sheet 6: for farmers

Fact sheet 6: for farmers Fact sheet 6: for farmers Fuel Oil Storage June 2013 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The Water

More information

PROPOSAL FORM FOR CONTRACTORS ALL RISKS INSURANCE. 1. Title of contract (if project consists of several sections, specify section(s) to be insured)

PROPOSAL FORM FOR CONTRACTORS ALL RISKS INSURANCE. 1. Title of contract (if project consists of several sections, specify section(s) to be insured) Lumen Insurance, a trade name on of GasanMamo Insurance Ltd. Regulated by the Malta Financial Services Authority. Registered in Malta, Msida Road, Gzira GZR 1405, Malta www.gasanmamo.com Cyprus Agents

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

2007 No. 00 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2007

2007 No. 00 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2007 2 N D DRAFT STATUTORY INSTRUMENTS 2007 No. 00 HEALTH AND SAFETY The Construction (Design and Management) Regulations 2007 Made - - - - Day Month 2007 Laid before Parliament Day Month 2007 Coming into force

More information

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Background What is a Spill Prevention, Control and Countermeasure (SPCC) Plan? An SPCC plan is a written document that describes

More information

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing

More information

SECTION IX SLIP LINING PIPELINES

SECTION IX SLIP LINING PIPELINES AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...

More information

Activity Yes No N/A Notes

Activity Yes No N/A Notes CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:

1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following: Secondary Containment, Spill Control and Drainage Guidelines for Hazardous Materials per 2010 CFC PURPOSE The intent of this guideline is to provide the requirements for the design and construction of

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

CONTRACTORS GENERAL LIABILITY APPLICATION Note: Throughout this questionnaire the words you and your include all entities seeking coverage

CONTRACTORS GENERAL LIABILITY APPLICATION Note: Throughout this questionnaire the words you and your include all entities seeking coverage CONTRACTORS BEST INSURANCE SERVICES INC. 20335 Ventura Blvd., Ste 426, Woodland Hills, CA 91364 Phone No: 818-348-4900 FAX No: 866-309-9237 CA License #0F37560 CONTRACTORS GENERAL LIABILITY APPLICATION

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

The Flow Regulator. Flow regulation

The Flow Regulator. Flow regulation Flow regulation Overloading in sewerage works and drainage systems can be avoided by using an attenuation reservoir, or by directing flow to a less sensitive area. Automatic flow control in gravity fed

More information

C1.2 CONTRACT DATA PROVIDED BY EMPLOYER (ECC3)

C1.2 CONTRACT DATA PROVIDED BY EMPLOYER (ECC3) C1.2 CONTRACT DATA PROVIDED BY EMPLOYER (ECC3) The conditions of contract are the NEC3 Engineering and Construction Contract (June 2005), copies of which may be obtained from the South African Institution

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

Chashma Nuclear Site in Pakistan with Possible Reprocessing Plant

Chashma Nuclear Site in Pakistan with Possible Reprocessing Plant Chashma Nuclear Site in Pakistan with Possible Reprocessing Plant David Albright and Paul Brannan January 18, 2007 The Institute for Science and International Security (ISIS) ISIS has obtained commercial

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

PROPOSAL FOR CONTRACTORS ALL RISKS

PROPOSAL FOR CONTRACTORS ALL RISKS PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name

More information

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8

More information

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Below is a step-by-step guide to the process of installing a borehole

Below is a step-by-step guide to the process of installing a borehole Tel: 01600 860 344 Email: [email protected] Web: www.filterclean.co.uk Company number: 1337705 Below is a step-by-step guide to the process of installing a borehole Step 1 A Site Consultation/Basic

More information

Natural Gas Summit 11/14/12

Natural Gas Summit 11/14/12 Natural Gas Summit 11/14/12 1 Natural Gas Summit 11/14/12 Maureen Ball Joined Central New York Oil and Gas (Inergy) in 1999. Participated in the development and construction of various storage, compression,

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

SEBENICO ATSI COMPANY OVERVIEW

SEBENICO ATSI COMPANY OVERVIEW Capability Statement SEBENICO ATSI Sebenico ATSI in line with our Aboriginal principles will implement solid processes and good governance to bring together Indigenous and Non indigenous people to work

More information

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services. Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9

More information

Contractors All Risks Insurance

Contractors All Risks Insurance Contractors All Risks Insurance Proposal Form ADNIC is a Public Joint Stock Company incorporated in the United Arab Emirates by Law No. (4) of 1972, and it is governed by the provisions of the UAE Federal

More information

TAKE FOR SAFETY. 1. Stop, step back, observe 2. Think through the task 3. Identify any hazards 4. Control the hazards 5. Complete the task safely

TAKE FOR SAFETY. 1. Stop, step back, observe 2. Think through the task 3. Identify any hazards 4. Control the hazards 5. Complete the task safely TAKE 5 FOR SAFETY 1. Stop, step back, observe 2. Think through the task 3. Identify any hazards 4. Control the hazards 5. Complete the task safely The purpose of Take 5 is to ensure that all work activities

More information

Penn-America Insurance Company Contractors General Liability Application

Penn-America Insurance Company Contractors General Liability Application Penn-America Insurance Company Contractors General Liability Application Applicant s Name Agent Name Address Mailing Address PROPOSED EFFECTIVE DATE: From To 12:01 A.M., Standard Time at the address of

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK. Consent to deposit building materials and making of excavations in the Public Highway

HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK. Consent to deposit building materials and making of excavations in the Public Highway HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK Consent to deposit building materials and making of excavations in the Public Highway All Correspondence to : Reading Borough Council Highways Department

More information

Exploration for natural gas

Exploration for natural gas FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with

More information

DEPARTMENT OF LABOUR. No. R. 84 7 February 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 CONSTRUCTION REGULATIONS, 2014

DEPARTMENT OF LABOUR. No. R. 84 7 February 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 CONSTRUCTION REGULATIONS, 2014 STAATSKOERANT, 7 FEBRUARIE 2014 No. 37305 3 GOVERNMENT NOTICES DEPARTMENT OF LABOUR No. R. 84 7 February 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 CONSTRUCTION REGULATIONS, 2014 The Minister of Labour

More information

Transformer Deluge Systems

Transformer Deluge Systems Transformer Deluge Systems How Do Transformer Fires Ignite? Common causes of transformer failure: Weather-related events such as lightning Short circuits in electrical equipment The most common cause is

More information

3. QUALITY ASSURANCE REQUIREMENTS

3. QUALITY ASSURANCE REQUIREMENTS 3. QUALITY ASSURANCE REQUIREMENTS 3.1 General This section covers the Kaipara District Council requirements for monitoring and testing of physical asset construction to ensure that the final asset delivered

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

Grant Planning Permission - Subject To The Following:-

Grant Planning Permission - Subject To The Following:- WARD 08_07 15/01148/APP 29th June 2015 Section 42 application to amend Condition 4 of application 13/00053/EIA (as consented at appeal dated 18/03/2014) to allow for revised turbine model (from Enercon

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 & 126)

LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 & 126) t NATIONAL ENVIRONMENTAL COVERAGE CORP. of the South LLC 2065 FIRST STREET, SUITE 201 SLIDELL, LA 70458 (504) 781-6808 FAX (504) 781-6562 LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 &

More information

Section A SPCC Plan Implementation Checklist This section of the report addresses compliance with certain requirements of Federal Regulations 40 CFR 112. I. STATUS OF SPCC PLAN (40 CFR 112.3) YES NO A.

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20

More information

Contract Works. Proposal Form

Contract Works. Proposal Form Proposal Form Contract Works Specified Contract Works and Legal Liability Arranged through ASR Underwriting Agencies Pty Ltd Underwritten by Certain Underwriters at Lloyd s IMPORTANT NOTES TM PLEASE READ

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information