1 (ATTACHMENT 11) ACTION ON MONTHLY FACILITIES MATTERS: FMS AWARD OF CONTRACTS, RECOMMENDATION AND REQUEST FOR PROPOSAL OFFICE OF THE SUPERINTENDENT 5225 West Vliet Street P O Box 2181 Milwaukee, Wisconsin Phone: Fax: Vendor Selection Overview UNIT PRICES FOR ASBESTOS ABATEMENT & DISPOSAL SERVICES VARIOUS SITES 1. Description of Project and Proposed Vendor A Request for Proposal (RFP) was issued by Facilities and Maintenance Services to obtain firm(s) to provide asbestos abatement and disposal services at MPS sites by using a unit price cost structure. Unit prices for various categories/scope of work were requested including, but not limited to: disposal services, mobilization and overhead; abatement activities including floor tile and mastic, carpet removal over asbestos flooring, and asbestos containing pipe insulation; minor demolition necessary for abatement related activities; and equipment and supplies. This approach will allow MPS to preapprove a selected number of firms providing flexible support for the activities and requirements necessary to maintain its sites in a safe and code compliant condition. Work will be assigned on an as-needed basis. A total of four (4) firms submitted responses and the following three (3) firms have been determined to best meet the evaluation criteria for the services and prices requested: Veolia Environmental Services KPH Environmental Corporation Professional Asbestos Removal and Survey Services Corp. 2. Justification for Selection of Proposed Vendor The three (3) recommended firms received the highest rankings for the evaluation criteria provided. Firms will be contacted on an as needed basis and firms will be selected on a project by project basis, based on the firm that provides the lowest overall total unit costs for the scope of work for each individual task/project. The selected firm will be issued a purchase order for the work performed. The firms will be contacted in advance to supply the services as requested. In the event that the selected firm cannot meet MPS project schedule, they are to immediately notify MPS and the work will then be offered to the next ranking firm. 3. RFP Evaluation Criteria 50% Overall cost of the Unit Prices 20% The experience and qualifications of the firm in providing the services as requested within the RFP. 20% The experience and qualifications of specific personnel included as a part of the firm, including past performance with MPS. 10% Reference responses, including past performance with MPS. 4. Experience in Other Districts/MPS Veolia Environmental Services: Madison School District, Shorewood School District, Oak Creek/Franklin School District, Janesville School District, University of Wisconsin-Whitewater, Oregon, WI School District, Genoa City, WI School District, Viroqua, WI School District and MPS. KPH Environmental Corporation: Did not identify any prior experience in other school districts besides MPS. Professional Asbestos Removal and Survey Services Corp.: Waukesha School District, Racine Unified School District and MPS. 5. Evaluation Plan The recommended firms are required to provide all work in accordance with applicable Federal, State and Local regulations, codes and ordinances for disposal and abatement activities for individual projects on an as-needed basis. Should any firm fail to provide proper protection or fail to arrive at the agreed upon time to proceed, damages shall be 11-1
2 assessed and the work may be assigned to another firm. In addition, the agreement may be terminated by either party within seven (7) days written notice should either party fail to substantially perform in accordance with its terms through no fault of the other. 6. Cost Unit prices were requested as outlined above. A copy of the submitted fees for each firm are provided as separate attachments. 11-2
3 REQUEST FOR PROPOSAL Unit Prices for Asbestos Abatement & Disposal Services - Various Sites VEOLIA ENVIRONMENTAL UNIT PRICES MOBILIZATION & OVERHEAD: Include as one lump sum all costs associated with mobilization, administration, office support, including but not limited to: Trucking, travel time, meeting attendance, insurance, submittal preparation and revisions. Mobilization & Overhead for projects limited to repairs ONLY... $8.00 /lump sum Mobilization & Overhead for all removal or removal & repair projects... $ /lump sum Bonds for projects greater than or equal to $10, % of total other costs Construct a 3 chamber decontamination unit... $ /each Construct a 5 chamber decontamination unit... $ /each (5 chamber required if >25 linear feet of TSI is removed.) FLOOR TILE AND MASTIC: This rate applies to whatever mastic is present at the site. If a Contractor believes there is a pricing difference between black and yellow mastic, they may bid based assuming it is for black mastic (which is the dominant ACM mastic in the District). However, during the period the contractor is allowed to verify field conditions, if they determine that yellow mastic is present, they may either perform the work for the price of black mastic or decline to accept the project. Once accepted they will not be given a change order if yellow mastic is encountered. The Contractor should assume that all patched tiles in a field of ACM tiles are adhered with yellow mastic on top of the original black mastic. In addition, MPS is assuming that all contractors will remove mastic using non-mechanical methods. MPS will make an award decision based on that assumption. If a Contractor elects to use mechanical methods, they are to absorb the differential cost between notification fees between DHS and DNR elsewhere in their pricing structure. All contractors are to advise MPS of their intent to use mechanical methods prior to acceptance of the project. Supply unit rate quotes for removal of the following combinations of quantities and substrates: On Concrete On Plywood On Hardwood Substrate Wood to be removed square feet $ 7.65/s.f. $ 8.50/s.f. $ 9.25/s.f square feet $ 3.50/s.f. $ 3.67/s.f. $ 4.00/s.f square feet $ 2.10/s.f. $ 2.23/s.f. $ 2.55/s.f square feet $ 2.05/s.f. $ 2.05/s.f. $ 2.50/s.f. FLOOR TILE ONLY. MASTIC TO REMAIN Supply unit rate quotes for removal of the following regardless of substrate: square feet $ 5.50/s.f square feet $ 2.25/s.f square feet $ 1.25/s.f square feet $ 1.10/s.f. 11-3
4 CARPETING GLUED IN PLACE OVER OTHER ACM TO BE REMOVED Supply unit rate quotes for removal of the following: square feet $ 0.50/s.f square feet $ 0.50/s.f square feet $ 0.50/s.f square feet $ 0.50/s.f. Removal of metal edging and fasteners $ 1.00/l.f. PIPE INSULATIONS Supply unit rate quotes for the removal of pipe insulation utilizing OSHA Class 1 methods by negative pressure glove bags with recirculating negative air units in the work area. Contractor is advised that fitting and hanger insulation is included in the linear footage in association with aircell, magnesia or woolfelt (cardboard) insulation and is not subject to additional reimbursement. Remove aircell, mag or woolfelt pipe insulation from lines including fitting and hanger insulation per linear foot. Remove fitting or hanger insulation from non-acm (fiberglass, armaflex etc.) lines. With metal jacket W/o metal jacket $ 2.50/l.f. $ 20.00/l.f $ 25.00/each PIPE INSULATION REPAIR & DEBRIS CLEANUP Supply unit rate quotes for the repair of pipe insulation and/or clean up of debris from pipe insulation utilizing OSHA Class 3 methods with recirculating negative air units in the work area. Contractor may assume a minimum of 10 each per mobilization. length and 6 diameter with Wrap and Cure (or equal) length and between 6-12 diameter with Wrap and Cure (or equal) Debris clean up with HEPA vac within room (below ceiling) (each = area up to 9 s.f.) $ 20.00/ea. $ 22.00/ea. $ 60.00/ea. MINOR DEMOLITION FOR ABATEMENT ACTIVITIES Supply unit rate quotes to provide open access and the removal of existing interior wall construction identified below, for access to materials for abatement. existing interior concrete block per $ 30.00/sq.ft. square foot. existing interior clay tile per square foot. $ 35.00/sq.ft. existing interior brick per square foot. $ 35.00/sq.ft. 11-4
5 Milwaukee Public Schools Labor Rates Labor Rate for Certified Asbestos Worker 1st Shift 2 nd Shift 3 rd Shift (7:00 AM (3:30 PM (11:30 PM to 3:30 PM) to 11:30 PM) to 7:00 AM) Straight-Time (Monday Through Friday 8 hours work) per hour Over-Time Monday Through Friday after 8 hours and Saturday up to 8 hours per hour Double Time: Sundays, Holidays, and Saturdays after 8 hours work per hour Multiplier to the above rates for individual certified as a supervisor with competent person responsibilities. $31.03 $31.03 $31.03 $38.87 $38.87 $38.87 $51.83 $51.83 $ Notes applicable to labor rates ONLY: 1. All materials, supplies, equipment, tools shall be provided by the contractor. If associated with T&M work it may be invoiced at cost + 10% (MPS expects that the base cost shall be at or below a rate that is available to MPS at the time the work is performed). For items associated with material derived pricing, they are NOT reimbursable. 2. Disposal dumpster will be provided by MPS for T&M work ONLY. 3. MPS will not conduct PEL monitoring of contracted workers. 4. The rates stated are based on MPS providing a request for labor to the contractor by noon on the day prior to the start of the project. 5. For projects less than 8 hours long, the contractor may bill a minimum of 5 hours (inclusive of up to one hour of travel time). For full work days, travel is NOT reimbursable. 6. Unless specifically requested by MPS, contracted employees will be used as workers only and will not be considered to be supervisors or competent persons. In the event that MPS requests a competent person, the contractor will be allowed to utilize the above multiplier. (Note that a multiplier of 1 indicates no change and 1.05 would add 5% to the base figure.) 7. All contracted employees are responsible for their own safety. 8. There will be no compounding of rates (i.e. no double time for work on a holiday Sunday) 9. Contractor is to bill in ¼ hour increments and shall fax to MPS ( ) a summary of each workers hours by the end of the following business day. EQUIPMENT/SUPPLIES TO BE PROVIDED ALONG WITH LABOR RATES: Supply unit rate quotes to provide the following materials and equipment if so requested by MPS if (MPS does NOT provide as per note #1 above. Provide 2000 CFM negative air and filters $ 25.00/day Provide HEPA vac and bags $ 10.00/day Provide 60 x 60 glove bag inc. disposal $ 10.00/each Provide & dispose of 30 gallon fiber bbl. $ 10.00/each Provide & dispose of mastic remover $ 7.50/gallon 11-5
6 REQUEST FOR PROPOSAL Unit Prices for Asbestos Abatement & Disposal Services - Various Sites KPH ENVIRONMENTAL CORPORATION UNIT PRICES MOBILIZATION & OVERHEAD: Include as one lump sum all costs associated with mobilization, administration, office support, including but not limited to: Trucking, travel time, meeting attendance, insurance, submittal preparation and revisions. Mobilization & Overhead for projects limited to repairs ONLY... $ /lump sum Mobilization & Overhead for all removal or removal & repair projects... $ /lump sum Bonds for projects greater than or equal to $10, % of total other costs Construct a 3 chamber decontamination unit... $ /each Construct a 5 chamber decontamination unit... $ /each (5 chamber required if >25 linear feet of TSI is removed.) FLOOR TILE AND MASTIC: This rate applies to whatever mastic is present at the site. If a Contractor believes there is a pricing difference between black and yellow mastic, they may bid based assuming it is for black mastic (which is the dominant ACM mastic in the District). However, during the period the contractor is allowed to verify field conditions, if they determine that yellow mastic is present, they may either perform the work for the price of black mastic or decline to accept the project. Once accepted they will not be given a change order if yellow mastic is encountered. The Contractor should assume that all patched tiles in a field of ACM tiles are adhered with yellow mastic on top of the original black mastic. In addition, MPS is assuming that all contractors will remove mastic using non-mechanical methods. MPS will make an award decision based on that assumption. If a Contractor elects to use mechanical methods, they are to absorb the differential cost between notification fees between DHS and DNR elsewhere in their pricing structure. All contractors are to advise MPS of their intent to use mechanical methods prior to acceptance of the project. Supply unit rate quotes for removal of the following combinations of quantities and substrates: On Concrete On Plywood On Hardwood Substrate Wood to be removed square feet $ 9.23/s.f. $ 10.23/s.f. $ 11.23/s.f square feet $ 4.00/s.f. $ 5.00/s.f. $ 6.00/s.f square feet $ 2.75/s.f. $ 2.85/s.f. $ 2.95/s.f square feet $ 2.15/s.f. $ 2.25/s.f. $ 2.35/s.f. FLOOR TILE ONLY. MASTIC TO REMAIN Supply unit rate quotes for removal of the following regardless of substrate: square feet $ 6.00/s.f square feet $ 3.75/s.f square feet $ 2.50/s.f square feet $ 2.00/s.f. 11-6
7 CARPETING GLUED IN PLACE OVER OTHER ACM TO BE REMOVED Supply unit rate quotes for removal of the following: square feet $ 5.75/s.f square feet $ 3.85/s.f square feet $ 2.50/s.f square feet $ 2.19/s.f. Removal of metal edging and fasteners $ 9.75/l.f. PIPE INSULATIONS Supply unit rate quotes for the removal of pipe insulation utilizing OSHA Class 1 methods by negative pressure glove bags with recirculating negative air units in the work area. Contractor is advised that fitting and hanger insulation is included in the linear footage in association with aircell, magnesia or woolfelt (cardboard) insulation and is not subject to additional reimbursement. Remove aircell, mag or woolfelt pipe insulation from lines including fitting and hanger insulation per linear foot. Remove fitting or hanger insulation from non-acm (fiberglass, armaflex etc.) lines. With metal jacket W/o metal jacket $ 23.50/l.f. $ 19.50/l.f $ 18.50/each PIPE INSULATION REPAIR & DEBRIS CLEANUP Supply unit rate quotes for the repair of pipe insulation and/or clean up of debris from pipe insulation utilizing OSHA Class 3 methods with recirculating negative air units in the work area. Contractor may assume a minimum of 10 each per mobilization. length and 6 diameter with Wrap and Cure (or equal) length and between 6-12 diameter with Wrap and Cure (or equal) Debris clean up with HEPA vac within room (below ceiling) (each = area up to 9 s.f.) $ 9.75/ea. $ 12.75/ea. $ 9.96/ea. MINOR DEMOLITION FOR ABATEMENT ACTIVITIES Supply unit rate quotes to provide open access and the removal of existing interior wall construction identified below, for access to materials for abatement. existing interior concrete block per $ 28.00/sq.ft. square foot. existing interior clay tile per square foot. $ 23.00/sq.ft. existing interior brick per square foot. $ 27.50/sq.ft. 11-7
8 Milwaukee Public Schools Labor Rates Labor Rate for Certified Asbestos Worker 1st Shift 2 nd Shift 3 rd Shift (7:00 AM (3:30 PM (11:30 PM to 3:30 PM) to 11:30 PM) to 7:00 AM) Straight-Time (Monday Through Friday 8 hours work) per hour Over-Time Monday Through Friday after 8 hours and Saturday up to 8 hours per hour Double Time: Sundays, Holidays, and Saturdays after 8 hours work per hour Multiplier to the above rates for individual certified as a supervisor with competent person responsibilities. $39.50 $54.16 $58.00 $56.91 $79.68 $85.37 $75.14 $ $ Notes applicable to labor rates ONLY: 10. All materials, supplies, equipment, tools shall be provided by the contractor. If associated with T&M work it may be invoiced at cost + 10% (MPS expects that the base cost shall be at or below a rate that is available to MPS at the time the work is performed). For items associated with material derived pricing, they are NOT reimbursable. 11. Disposal dumpster will be provided by MPS for T&M work ONLY. 12. MPS will not conduct PEL monitoring of contracted workers. 13. The rates stated are based on MPS providing a request for labor to the contractor by noon on the day prior to the start of the project. 14. For projects less than 8 hours long, the contractor may bill a minimum of 5 hours (inclusive of up to one hour of travel time). For full work days, travel is NOT reimbursable. 15. Unless specifically requested by MPS, contracted employees will be used as workers only and will not be considered to be supervisors or competent persons. In the event that MPS requests a competent person, the contractor will be allowed to utilize the above multiplier. (Note that a multiplier of 1 indicates no change and 1.05 would add 5% to the base figure.) 16. All contracted employees are responsible for their own safety. 17. There will be no compounding of rates (i.e. no double time for work on a holiday Sunday) 18. Contractor is to bill in ¼ hour increments and shall fax to MPS ( ) a summary of each workers hours by the end of the following business day. EQUIPMENT/SUPPLIES TO BE PROVIDED ALONG WITH LABOR RATES: Supply unit rate quotes to provide the following materials and equipment if so requested by MPS if (MPS does NOT provide as per note #1 above. Provide 2000 CFM negative air and filters $ 35.00/day Provide HEPA vac and bags $ 17.50/day Provide 60 x 60 glove bag inc. disposal $ 19.98/each Provide & dispose of 30 gallon fiber bbl. $ 28.00/each Provide & dispose of mastic remover $ 23.50/gallon 11-8
9 REQUEST FOR PROPOSAL Unit Prices for Asbestos Abatement & Disposal Services - Various Sites PROFESSIONAL ASBESTOS REMOVAL & SURVEY SERVICES UNIT PRICES MOBILIZATION & OVERHEAD: Include as one lump sum all costs associated with mobilization, administration, office support, including but not limited to: Trucking, travel time, meeting attendance, insurance, submittal preparation and revisions. Mobilization & Overhead for projects limited to repairs ONLY... $ /lump sum Mobilization & Overhead for all removal or removal & repair projects... $ /lump sum Bonds for projects greater than or equal to $10, % of total other costs Construct a 3 chamber decontamination unit... $ /each Construct a 5 chamber decontamination unit... $ /each (5 chamber required if >25 linear feet of TSI is removed.) FLOOR TILE AND MASTIC: This rate applies to whatever mastic is present at the site. If a Contractor believes there is a pricing difference between black and yellow mastic, they may bid based assuming it is for black mastic (which is the dominant ACM mastic in the District). However, during the period the contractor is allowed to verify field conditions, if they determine that yellow mastic is present, they may either perform the work for the price of black mastic or decline to accept the project. Once accepted they will not be given a change order if yellow mastic is encountered. The Contractor should assume that all patched tiles in a field of ACM tiles are adhered with yellow mastic on top of the original black mastic. In addition, MPS is assuming that all contractors will remove mastic using non-mechanical methods. MPS will make an award decision based on that assumption. If a Contractor elects to use mechanical methods, they are to absorb the differential cost between notification fees between DHS and DNR elsewhere in their pricing structure. All contractors are to advise MPS of their intent to use mechanical methods prior to acceptance of the project. Supply unit rate quotes for removal of the following combinations of quantities and substrates: On Concrete On Plywood On Hardwood Substrate Wood to be removed square feet $ 2.50/s.f. $ 2.50/s.f. $ 2.85/s.f square feet $ 2.30/s.f. $ 2.30/s.f. $ 2.85/s.f square feet $ 2.30/s.f. $ 2.30/s.f. $ 2.85/s.f square feet $ 2.10/s.f. $ 2.10/s.f. $ 2.50/s.f. FLOOR TILE ONLY. MASTIC TO REMAIN Supply unit rate quotes for removal of the following regardless of substrate: square feet $ 1.80/s.f square feet $ 1.20/s.f square feet $ 1.20/s.f square feet $ 1.20/s.f. 11-9
10 CARPETING GLUED IN PLACE OVER OTHER ACM TO BE REMOVED Supply unit rate quotes for removal of the following: square feet $ 1.00/s.f square feet $ 0.75/s.f square feet $ 0.50/s.f square feet $ 0.50/s.f. Removal of metal edging and fasteners $ 3.00/l.f. PIPE INSULATIONS Supply unit rate quotes for the removal of pipe insulation utilizing OSHA Class 1 methods by negative pressure glove bags with recirculating negative air units in the work area. Contractor is advised that fitting and hanger insulation is included in the linear footage in association with aircell, magnesia or woolfelt (cardboard) insulation and is not subject to additional reimbursement. Remove aircell, mag or woolfelt pipe insulation from lines including fitting and hanger insulation per linear foot. Remove fitting or hanger insulation from non-acm (fiberglass, armaflex etc.) lines. With metal jacket W/o metal jacket $ 21.00/l.f. $ 17.00/l.f $ 21.00/each PIPE INSULATION REPAIR & DEBRIS CLEANUP Supply unit rate quotes for the repair of pipe insulation and/or clean up of debris from pipe insulation utilizing OSHA Class 3 methods with recirculating negative air units in the work area. Contractor may assume a minimum of 10 each per mobilization. length and 6 diameter with Wrap and Cure (or equal) length and between 6-12 diameter with Wrap and Cure (or equal) Debris clean up with HEPA vac within room (below ceiling) (each = area up to 9 s.f.) $ 9.50/ea. $ 10.50/ea. $ 8.75/ea. MINOR DEMOLITION FOR ABATEMENT ACTIVITIES Supply unit rate quotes to provide open access and the removal of existing interior wall construction identified below, for access to materials for abatement. existing interior concrete block per $ 9.50/sq.ft. square foot. existing interior clay tile per square foot. $ 9.50/sq.ft. existing interior brick per square foot. $ 12.50/sq.ft
11 Milwaukee Public Schools Labor Rates Labor Rate for Certified Asbestos Worker 1st Shift 2 nd Shift 3 rd Shift (7:00 AM (3:30 PM (11:30 PM to 3:30 PM) to 11:30 PM) to 7:00 AM) Straight-Time (Monday Through Friday 8 hours work) per hour Over-Time Monday Through Friday after 8 hours and Saturday up to 8 hours per hour Double Time: Sundays, Holidays, and Saturdays after 8 hours work per hour Multiplier to the above rates for individual certified as a supervisor with competent person responsibilities. $46.50 $58.12 $69.75 $69.75 $87.18 $87.18 $93.00 $ $ Notes applicable to labor rates ONLY: 19. All materials, supplies, equipment, tools shall be provided by the contractor. If associated with T&M work it may be invoiced at cost + 10% (MPS expects that the base cost shall be at or below a rate that is available to MPS at the time the work is performed). For items associated with material derived pricing, they are NOT reimbursable. 20. Disposal dumpster will be provided by MPS for T&M work ONLY. 21. MPS will not conduct PEL monitoring of contracted workers. 22. The rates stated are based on MPS providing a request for labor to the contractor by noon on the day prior to the start of the project. 23. For projects less than 8 hours long, the contractor may bill a minimum of 5 hours (inclusive of up to one hour of travel time). For full work days, travel is NOT reimbursable. 24. Unless specifically requested by MPS, contracted employees will be used as workers only and will not be considered to be supervisors or competent persons. In the event that MPS requests a competent person, the contractor will be allowed to utilize the above multiplier. (Note that a multiplier of 1 indicates no change and 1.05 would add 5% to the base figure.) 25. All contracted employees are responsible for their own safety. 26. There will be no compounding of rates (i.e. no double time for work on a holiday Sunday) 27. Contractor is to bill in ¼ hour increments and shall fax to MPS ( ) a summary of each workers hours by the end of the following business day EQUIPMENT/SUPPLIES TO BE PROVIDED ALONG WITH LABOR RATES: Supply unit rate quotes to provide the following materials and equipment if so requested by MPS if (MPS does NOT provide as per note #1 above. Provide 2000 CFM negative air and filters $ 15.00/day Provide HEPA vac and bags $ 10.00/day Provide 60 x 60 glove bag inc. disposal $ 14.00/each Provide & dispose of 30 gallon fiber bbl. $ 26.33/each Provide & dispose of mastic remover $ 14.43/gallon 11-11
Bid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)
Bid Tabulation for IFB #9708 (Asbestos and Services) Item IES of Marshall, Inc (SERVPRO) B&R Insulation Inc Major Abatement (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
Asbestos Containing Material MANAGEMENT PLAN
Asbestos Containing Material MANAGEMENT PLAN Introduction Extensive research has shown exposure to asbestos containing material (ACM) when it becomes airborne (commonly referred to as friable) poses a
Chicago Public Schools 6 Month Asbestos Surveillance 2015 - Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: Carter G Woodson South Oracle Unit: 26541 Building ID: 7820 Address: 4444 S. Evans Region: 04 Mail Room: 41 Surveyor: Johnson, Mr. Michael
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
Chicago Public Schools 6 Month Asbestos Surveillance 2015- Spring
Chicago Public Schools 6 Month Surveillance 2015- Spring School: John W Garvy School Oracle Unit: 23301 Building ID: 3510 Address: 5225 N Oak Park Avenue Region: 01 Mail Room: 30 Surveyor: Zacarias, Mr.
North Carolina State University. Asbestos Management Plan
North Carolina State University 1.0 Introduction Purpose The purpose of this plan is to establish the polices and procedures to be used at North Carolina State University (NCSU) in the management of building
ADDENDUM 5 TO IFB 5212-BC UNLV UCC DORMITORY COMPLEX HUGHES AND FAIMAN HALLS HVAC AND ROOFING REPLACEMENT. University of Nevada, Las Vegas
ADDENDUM 5 TO IFB 5212-BC UNLV UCC DORMITORY COMPLEX HUGHES AND FAIMAN HALLS HVAC AND ROOFING REPLACEMENT University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA May 22, 2013 Robert R. Jones, Ph.D., REM, AHERA Asbestos Inspector, 5/22/13 Signature Date Asbestos Virginia
The Richard Stockton University ASBESTOS MANAGEMENT PLAN
The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling
UNOFFICIAL. 1. Owner: Delaware Department of Transportation (DelDOT) WEBSITE
SECTION 01013 - SUMMARY OF THE WORK - ASBESTOS ABATEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
Invoice. Subtotal. Balance Due. Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON. Total. www.rainbowintl.me
Rainbow International Carpet Care & Restoration Specialists (North York) Invoice 711197 Invoice To Work Location Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON Sample Corporation
Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety
Asbestos Abatement Management Program Facilities Operations and Development Environmental Health & Safety November 7, 2012 INTRODUCTIONS David Kos (EHS) Director of Environmental Affairs David Kehl (EHS)
Asbestos Management POLICY
Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management
Asbestos Survey Form (See Instructions)
Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: [email protected] 1. Purpose of Survey Renovation Demolition
Asbestos Management Program
Asbestos Management Program Facilities and Operations Revision #4: February 17, 2012 Page IMPORTANT Asbestos related incidents must be reported IMMEDIATELY to your supervisor Emergency Contacts During
University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
Characteristics/Applications
Facilities Operations and Development Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://fod.osu.edu The Ohio State University Asbestos Management
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
Saxe Middle School Auditorium Renovation February 4, 2015
Saxe Middle School Auditorium Renovation February 4, 2015 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary
We are pleased to submit the summary of charges and proposed costs as a result of the damges created by the flood.
January 8, 2014 Sony Imageworks 300-1128 Homer St, 3rd Floor Vancouver, BC Attention: Mr. Jason Dowdeswell Summary - Flood damages - 200-1128 Homer Street Vancouver We are pleased to submit the summary
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
Appendix 2-A: Asbestos Assessment Summary Table
Final Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 2-A: Assessment Summary Table Earth Resources 1 Main First Floor A33 Heater Unit 1 EA F Poor Y Assumed ACM 1 Main Second
OGS LIMITED ASBESTOS & LEAD SURVEY REPORT
our people and our passion in every project OGS LIMITED ASBESTOS & LEAD SURVEY REPORT Building 44 Willard Drug Treatment Center 7116 County Road 132 Willard, NY Prepared for: NYSOGS 33 rd Floor, Corning
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110228 PREPARED FOR: Stantec, Inc.
Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.
Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina H&H Job No. CLT-204 August 13, 2009 2923 South Tryon Street Suite 100 Charlotte,
Asbestos Inspection Project Procedure
EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University
AHERA 3-Year Asbestos Re-Inspection
AHERA 3-Year Asbestos Re-Inspection Denver 940 Fillmore Street Denver, Colorado 80206 Report Date: November 20, 2013 OEI Project No. 13.159 Prepared For: John Lewis Denver 940 Fillmore Street Denver, CO
Washington University Asbestos Operations and Maintenance Plan
1. Purpose Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to airborne asbestos
REQUEST FOR PROPOSALS. On-Call HVAC Contractor Services GFN 1661
REQUEST FOR PROPOSALS On-Call HVAC Contractor Services GFN 1661 CITY OF SILVERTON PUBLIC WORKS DEPARTMENT 830 MCCLAINE STREET SILVERTON, OREGON, 97381 PROJECT TYPE: HVAC Contractor Services PROPSALS DUE
SECTION 16 ASBESTOS MANAGEMENT
SECTION 16 ASBESTOS MANAGEMENT 16.1 Asbestos Management Procedure 16.2 Asbestos O&M Procedure Reviewed: October 2008 Revised: February 2003 Date Accepted: April 2002 Draft Date: December 2001 16.1 ASBESTOS
SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
How to Estimate the Cost of a. Laboratory Renovation. Candidate Number: 0714144
How to Estimate the Cost of a Laboratory Renovation Candidate Number: 0714144 December 15, 2014 1 Table of Contents Cover Page Page 1 Table of Contents Page 2 Introduction Page 3 Types & Methods of Measurements
May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240
May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901
LEGAL REVIEW & UPDATE
LEGAL REVIEW & UPDATE There are lots of laws and regulations designed to protect workers, the general public, and the environment. However, not everyone follows the laws. Many people deliberately break
RFI Questions. Reference (Sect/Para/Pag e) QUESTION GOVERNMENT RESPONSE 1 RFP and Drawings
PRE PROPOSAL INQUIRY FORM Government Reponse Project Title: NAVFAC - Paint and Repair Building 110 date: 8/23/12 SOLICITATION NO.: #2703893 RFI Questions Question No. Reference (Sect/Para/Pag e) QUESTION
2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987.
Penn State University Environmental Health and Safety Asbestos Management Program I. Introduction Over the past several decades the hazards of asbestos exposure have become well known. With this influx
Replacement of Heat System Components
STATEMENT OF WORK FOR Replacement of Heat System Components At Warehouse Takoraudantie 4 08/17/2013 REV 8-24-13 Project 2013-021 Page 1 of 6 1.0 INTRODUCTION 1.1 Overview: The U.S. Embassy Helsinki has
ASBESTOS MANAGEMENT PLAN
ASBESTOS MANAGEMENT PLAN SAN JOSE STATE UNIVERSITY Environmental Health & Occupational Safety Asbestos Management Plan 1.0 Introduction 2.0 Policy 3.0 Responsibilities 4.0 Contract Administration 5.0 In-House
Mold Management Plan Operations & Maintenance
Document #: SAFETY_015 Revision Date: October 4, 2010 Mold Management Plan Operations & Maintenance Developed by: Environmental Health & Safety Approved by: Associate VP of Facilities & Campus Services
THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL ENVIRONMENT, HEALTH AND SAFETY 1120 Estes Drive Extension Chapel Hill, North Carolina 27599 CB#1650
THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL ENVIRONMENT, HEALTH AND SAFETY 1120 Estes Drive Extension Chapel Hill, North Carolina 27599 CB#1650 REVISION TWO EFFECTIVE DATE: August 2008 UPDATED: April
Approved by: UBC ACT Committee
The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy
WRD 23.10. -- Presumptive asbestos identification requirements for asbestos-containing materials (ACM).
WRD 23.10 SUBJECT: Occupational Exposure to Asbestos DATE ISSUED: April 30, 1997 I. Background: OSHA amended the Occupational Exposure to Asbestos Standards for general industry, construction, and shipyard
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations
Room ID------- Material ID ASBESTOS Components Positive? Yes, No, Trace, Assumed PISTM-1 White pipe insulation on hot water supply and return throughout building Yes 5-10% CH, 5-15%AM NA NA LF 1400 FLVCT-7
Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.
APPENDIX B PHOTOLOG Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1. Photo 2: This photograph shows layered floor tile and
UI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material
LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material Asbestos Policy and Criteria Policy: Pierce County Recycling Composting and Disposal (LRI) has established an
STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION
West Virginia University Environmental Health and Safety STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION Origination Date August 2013. Contents Purpose:... 2 Job Scope... 2 Definitions... 2 Roles/Responsibilities:...
PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS
PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS I. GENERAL A. All work to be performed under the change order must be itemized, including the work of all subcontractors. B. Items must be relevant
MOLD REMEDIATION PROCEDURES
Page: 1 of 5 1.0 PROGRAM OBJECTIVE The purpose of this procedure is to define the responsibilities, methods, procedures and training required to safely and effectively remove or clean mold-contaminated
Please feelfree to call or e- mail me ifyou have any questions regarding any aspect ofyour claim and we will be happy to assist you.
Indiana Insured: Creve Coeur Public School Dist. 76 Business: ( 309) 698-3600 Property: 400 N Highland Creve Coeur, IL 660 Home: 400 N Highland Creve Coeur, IL 660 Claim Rep.: Tim Higgerson Estimator:
Don Hau, Project Development, 100 Shops Building, 319 15th Avenue SE, Minneapolis, MN 55414
July 13, 1993 REPORT: Complete Building Asbestos Survey TO: FROM: Don Hau, Project Development, 100 Shops Building, 319 15th Avenue SE, Minneapolis, MN 55414 Michael Buck, Asbestos Group, Environmental
IMPROVEMENT COST ESTIMATE powered by HomeFixers
IMPROVEMENT COST ESTIMATE powered by HomeFixers 123 Main St, Anytown, USA 12345 2000 SF $ 45,041.06 100.0% $22.52 per sq. ft. Stage 1: Pre-Construction $ 1,461.00 3.2% 1 House Secured $ 106.00 0.2% Lockbox
REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
1200 N. COLORADO WINSLOW, ARIZONA
ASBESTOS HAZORD EMERGENCY RESPONSE ACT (AHERA) INSPECTION & REPORT OF FIINGS FOR IUSTRIAL ARTS 1200 N. COLORADO WINSLOW, ARIZONA Submitted to: MR. RICHARD WILLIAMS BELFOR PROPERTY RESTORATION 23610 N.
Asbestos Frequently Asked Questions
Asbestos Frequently Asked Questions What is asbestos? Asbestos is a mineral which is mined, processed, and used in many building materials. Since 1988, asbestos has been banned in most US building components;
6% Chrysotile NA 2 008 White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor
1.0 Asbestos Inspection Barge, Waggoner Summer & Cannon performed an asbestos survey for building 4666 (the Building) at the George C. Marshall Space Flight Center in Huntsville, Alabama on April 5, 2012.
ITEM QUANTITY UNIT UNIT AMOUNT UNIT AMOUNT AMOUNT
PROJECT: BID #15-18: 2015 JANITORIAL MAINTENANCE SERVICES ABM Onsite Services West Inc Xw101 Portland Habilitation Center Inc Township United Bldg Svc, LLC Alvarez Janitorial LLC Innovative Services NW
NORMI Professional Guidance for DIY Projects
NORMI Professional Guidance for DIY Projects In general, a well-trained and experienced indoor mold remediation professional (CMR) should be consulted when performing remediation. You may find a NORMI
PRE-DEMOLITION ASBESTOS SURVEY
PRE-DEMOLITION ASBESTOS SURVEY For: City of Largo PSTA Building 14840 49th Street North Largo, Pinellas County, Florida Prepared for: Collman & Karsky Architects 4301 Anchor Plaza Parkway, Suite 100 Tampa,
SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION 028214 ASBESTOS REMEDIATION FLOOR TILE AND MASTIC
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
ASBESTOS IN THE HOME
ASBESTOS IN THE HOME This information will help you understand asbestos: what it is, its health effects, where it is in your home and what to do about it. Even if asbestos is present in your home, it is
GUIDANCE DOCUMENT (redline version 2.0, released 01/30/09) on amended Industrial Code Rule 56(ASBESTOS) Page 1 of 88
1 1. 2 (b ) Purpose and Intent. This Section indicates that these regulations include those who supervise and employ persons employed in all aspects of an asbestos project. Does this statement include
CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) LAWN MOWING SERVICES
CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) I. Introduction: The City of Alliance is seeking a contractor(s) for lawn mowing services, and hereby requests sealed written quotes from contractors to perform
Program Demand Cost Model for Alaskan Schools
Program Demand Cost Model for Alaskan Schools 14th Edition Education Support Services / Facilities 2015 Consultant Editor HMS, Inc. 4103 Minnesota Drive Anchorage, Alaska Division of School Finance &
Environmental Education Associates. Asbestos in Construction
Environmental Education Associates Asbestos in Construction Asbestos What Is It? 1-2 Asbestos is a naturally occurring mineral, found in rock form and is mined from the earth similar to iron, lead, and
Asbestos Management Plan EC 45 Page 1
Name: Asbestos and ACBM (asbestos containing building material) Management Plan Areas Affected: All buildings that contain asbestos and ACBM on campus Effective Date: 1/1/09 Reviewed/Revised: 12/15/12
Owner Name: Address: City: State: Zip: Name: Address: City: State: Zip: Contact: Tel: DEMOLITION CONTRACTOR Name: Address: City: State: Zip:
FORSYTH COUNTY ENVIRONMENTAL ASSISTANCE & PROTECTION NOTIFICATION AND PERMIT APPLICATION ASBESTOS DEMOLITION/RENOVATION OPERATIONS 12/11 1. TYPE OF NOTIFICATION: Original Revised Courtesy 2. FACILITY INFORMATION
RFP #015-020. Request for Proposals. Case High School Fieldhouse and Locker Room Renovation and Renovation
Racine Unified School DISTRICT 3109 Mount Pleasant Street Racine, Wisconsin 53404 262-631-7030 RFP #015-020 Request for Proposals Case High School Fieldhouse and Locker Room Renovation and Renovation The
Building Owners Responsibilities for Asbestos
Building Owners Responsibilities for Asbestos August 2012 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can be provided to you in a different format (Braille,
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization
MOLD REMEDIATION KEY STEPS
MOLD REMEDIATION KEY STEPS The EPA has developed the following guidelines for mold remediation managers. These guidelines are generally helpful, but we believe an expert in the industry should be consulted
ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions
The Language Used In This Document Does Not Create An Employment Contract Between The Employee And The Agency. This Document Does Not Create Any Contractual Rights Or Entitlements. The Agency Reserves
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
Mold Response and Remediation Plan
1.0 Policy Statement The University of New Haven has developed a mold response and remediation plan in accordance with best practices set forth by the Environmental Protection Agency (EPA), Occupational
Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)
Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%) I. Asbestos Survey Requirements Prior to performing any construction,
D Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
MOLD RESPONSE AND REMEDIATION PLAN
MOLD RESPONSE AND REMEDIATION PLAN Prepared By: Triumvirate Environmental Developed: April 2011 Last Revised: March 2015 Program Approval Associate Vice President of Public Safety & Administrative Services
Safeway 691 Berkeley. 1444 Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:
Safeway 691 Berkeley Preliminary Draft Environmental Survey for Renovation Store Data: Total Area: 26,327 Sq. Ft. at main level ACM 12x12: 17,600 Sq. Ft. Approx. Est. Vinyl Sheet: NA Other: See Table 1444
Miami University s Asbestos Operations & Maintenance Program Administered by
Miami University s Asbestos Operations & Maintenance Program Administered by ENVIRONMENTAL SAFETY & RISK MANAGEMENT 529-2829 Table of Contents Purpose 2 Personnel Covered Under the Asbestos Mangement Plan