1 Asbestos Containing Material MANAGEMENT PLAN Introduction Extensive research has shown exposure to asbestos containing material (ACM) when it becomes airborne (commonly referred to as friable) poses a serious health problem. The inhalation of ACM has been directly linked to cancer initiation and respiratory illnesses such as asbestosis of the lung in humans. Public Health Agencies across the country have developed regulations to prevent airborne exposure of ACM by building occupants. The Texas Department of State Health Services (DSHS) is the state agency in Texas that regulates asbestos containing material (ACM) in public buildings. Building owners such as the University under the DSHS regulations bear the primary responsibility for the identification of ACM in their respective buildings and taking measures to prevent ACM material from becoming airborne (friable) within the occupied portions of their buildings. These regulations are comprehensive and can be found in the Texas Administrative Code (TAC) section These regulations involve the license of all persons working on an asbestos abatement project, procedures for conducting abatement or encapsulation and record-keeping requirements. The goal of this plan is to prevent exposure to friable ACM to the building occupants at University of Houston, unless they are asbestos licensed personnel working on asbestos projects. Training All new employees who may come in contact with ACM during the function of their duties must be trained about ACM. These employees include Custodial, Building Maintenance, Utilities, IT/Telecom technicians, and Project Managers involved in renovation or demolition projects. This training will be provided by Environmental Health Life Safety (EHLS) and is required to be repeated every two years. Potential Disturbance of ACM The disturbance of ACM includes grinding, cutting, drilling, sawing, etc. of suspect material. ACM can be found in floor tiles, mastic, carpet glue, baseboard and baseboard glue, sheetrock/joint compound, and ceiling tiles. Suspect asbestos containing materials also include thermal system insulation (TSI), fireproofing insulation, ceiling deck, moisture barriers, roofing, and Transite pipes or siding. Facility Maintenance Work Orders Facilities Management personnel who use work orders shall see either ACM Free or ACM Found in the Tracking 2 field of the Work Order page. If the Tracking 2 field states ACM Free, then the work can proceed (see example below).
2 If, however, the Tracking 2 field states ACM Found, (as shown below) then additional steps are necessary. The first step is to determine if the work involves the potential disturbance of ACM such as grinding, cutting or sawing into suspect materials. If Facilities Management personnel are not going to disturb the asbestos containing material such as by painting the walls, changing a lock, shampooing carpet, or changing a light bulb, or other nondisturbance activities then the work can proceed. It is important that Facilities Management personnel be aware that ACM is found in many campus buildings but poses no threat unless it is disturbed. If the work does involve the potential disturbance of ACM the issuing supervisor must check Visual Map for the current ACM locations. To check go to FAMIS, click on the Visual Map tab and you will be able to see the type and locations (see example below).
3 In Visual Map 1) Select a building from the Building dropdown list 2) Select a floor from the Floor dropdown list 3) Select Asbestos from the Theme dropdown list You will see something like this: The screen will show the ACM types and locations for that specific floor. The ACM will be described by moving the cursor over the map. If personnel are going to disturb the asbestos or have concerns or questions about potential disturbance, then contact your supervisor or the Asbestos & Safety Coordinator (A&SC) before proceeding with the work. Renovation, Construction and Demolition Projects FP&C managers involved in any renovation or demolition activities on campus must submit the Asbestos Containing Material (ACM) Checklist prior to the start of the project. This checklist is available on the EHLS website The first step is to review the building ACM locations in FAMIS-Visual Map as outlined above. If the information is insufficient to identify the location of ACM then the A&SC must be contacted for assistance. Further investigation of historical abatement records or possible confirmation sampling will be done by the A&SC to verify if ACM is present.
4 Small abatement projects may be conducted using the University s Operations & Maintenance (O&M) Notification. These projects involve less than 160 square feet or less than 260 linear feet of ACM removal. The A&SC must be contacted prior to starting an O&M project and a licensed abatement contractor must be used. In abatement projects involving greater than 160 square feet or greater than 260 linear feet, the Project Manager must hire a DSHS licensed asbestos consultant, DSHS licensed asbestos contractor and submit the 10-day Notification to DSHS prior to starting the project. Once the abatement is completed, all the ACM project documents must be sent to the A&SC by the Project Manager. A&SC annotates most recent ACM locations in FAMIS-Visual Map to reflect changes of the ACM removed during the project. The most recent locations will be updated accordingly by the A&SC in FAMIS-Visual Map. Project documents will be downloaded into the ACM building related document files by building number and year. The goal is to have accurate and updated ACM locations and project documentations of all buildings at University of Houston. Fees All projects that involve 10-Day Notifications will incur fees. These fees will be invoiced from DSHS sometime after the project is completed. The fees invoices must be paid in a timely manner or DSHS will send a Notice of Violation (NOV) for failure to pay. In order to ensure proper payment of all asbestos related fees, including notifications written by General Contractors or any other delegated contractors, please follow these steps; On the DSHS 10-Day Notification Form, on page 2 PROJECT INFORMATION A FACILITY OWNER (see below): PROJECT INFORMATION A. FACILITY OWNER Fill in this section as follows Facility Owner Name: University of Houston Attention: Mr. Dash Khambhati Mailing Address: Environmental Health & Life Safety 4513 Cullen Blvd. Ste. 201 City: Houston State: Texas Zip:
5 AHERA Assessments The Charter School and the Daycare Center are regulated by the (Texas) DSHS and the Child Protection Services, respectively. Every 3 years a re-inspection of ACM, that may still be remaining at the locations must be done by the A&SC according to the Asbestos Hazard Emergency Response Act (AHERA) rules by the EPA. AHERA covers schools grades K through 12. A&SC will provide the oversight.. New Construction University policy prohibits the use of asbestos containing building material in new construction. A certificate signed and dated by either the contractor or the architect stating that no asbestos was used in the construction of the building is sufficient. The certificate can be found on Plant Operations website via e-manual. A copy of the certificate must be ed to A&SC at mailto:[email protected] General ACM Guidelines Labels and Signs An approved danger label shall be affixed to all ACM areas within a building that is accessible to maintenance staff. Buildings where ACMs are distributed extensively throughout the mechanical rooms, utility closets, IT closets, etc. may meet the requirement by posting a large label at appropriate places, such as on pipe insulations or on walls or on doors on the interior. EHLS will monitor the ACM labeling on campus. The following type of label is sufficient. DANGER ASBESTOS Asbestos Floor Tile and Mastic 1. Carpet Installation a. It is university policy (and industry standard) that floor tiles/and mastic containing asbestos shall be abated prior to carpet installation/removal. b. In the situation where only the mastic glue of the floor tiles contains asbestos, the practice will be to remove the floor tile and mastic by DSHS licensed contractors and consultant. This is the best business practice to avoid the occurrence of tiles breaking and releasing the asbestoscontaining mastic/glue from its matrix in the future.
6 Resilient Floor Coverings Institute (RFCI) It is the University of Houston s policy that RFCI methods are highly discouraged and requires advanced approval by the A&SC. Asbestos Roofing Material 1. Before any roofing project begins, the material should be tested to confirm asbestos content of tar, felt, flashing and patching tar. 2. An initial asbestos surveys that indicates 1-2 percent asbestos should be further analyzed by the point counting method. If the original samples are not available; then three negative point counting samples must be obtained of the sample material and in the same location of the previously analyzed positive sample. 3. All ACM activities must comply with the OSHA worker protection rules and the EPA regulations prohibiting visible emissions. 4. Personnel air monitoring is required whenever asbestos is disturbed to confirm airborne fiber concentrations. 5. The University of Houston requires the hiring of an accredited company with accredited asbestos trained workers and supervisors to conduct removal of roofing materials. The workers must wear disposable coveralls and respirators, which in turn require medical examinations and respirator training. Double suiting is an acceptable practice while working with asbestos roofing materials. At least one person on-site must meet the OSHA requirement for a competent person. 6. Area monitoring samples shall be collected downwind and at ground level during asbestos removal to document that fiber levels were not elevated in publicly accessible areas. Transite Pipe 1. Transite piping whether in the interior or exterior of the building, if detected, shall be removed using DSHS licensed contractors and consultants. 2. Proper procedures for air monitoring, following OSHA and EPA regulations is required. Clearance sampling is required for pipes inside a building.
7 Thermal System Insulation (TSI) 1. TSI of piping whether in the interior or exterior of the building, if detected, shall be removed using DSHS licensed contractors and consultants. 2. Proper procedures for air monitoring, following OSHA and EPA regulations is required. Clearance sampling is required for pipes inside a building. Sheetrock and Joint Compound 1. ACM Sheetrock and Joint Compound removal must be contracted to DSHS licensed contractors and consultants. 2. The consultant will provide asbestos abatement project management oversight. The A&SC will provide guidance to the University of Houston project managers.
University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
Characteristics/Applications
Facilities Operations and Development Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://fod.osu.edu The Ohio State University Asbestos Management
SECTION 16 ASBESTOS MANAGEMENT
SECTION 16 ASBESTOS MANAGEMENT 16.1 Asbestos Management Procedure 16.2 Asbestos O&M Procedure Reviewed: October 2008 Revised: February 2003 Date Accepted: April 2002 Draft Date: December 2001 16.1 ASBESTOS
ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015
ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA May 22, 2013 Robert R. Jones, Ph.D., REM, AHERA Asbestos Inspector, 5/22/13 Signature Date Asbestos Virginia
Washington University Asbestos Operations and Maintenance Plan
1. Purpose Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to airborne asbestos
Loss Control TIPS Technical Information Paper Series
Loss Control TIPS Technical Information Paper Series Innovative Safety and Health Solutions SM Asbestos-Containing Material (ACM) In Buildings The presence of asbestos in buildings, particularly those
Asbestos Management POLICY
Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management
The Richard Stockton University ASBESTOS MANAGEMENT PLAN
The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling
ASBESTOS MANAGEMENT INTRODUCTION
SECTION: II. General Hygiene/ Safety Chapter: 7. Asbestos Management Revision Date: 12/05/2013 Review Date: ASBESTOS MANAGEMENT INTRODUCTION PURPOSE This policy has been developed to ensure that hazardous
AHERA 3-Year Asbestos Re-Inspection
AHERA 3-Year Asbestos Re-Inspection Denver 940 Fillmore Street Denver, Colorado 80206 Report Date: November 20, 2013 OEI Project No. 13.159 Prepared For: John Lewis Denver 940 Fillmore Street Denver, CO
Asbestos Frequently Asked Questions
Asbestos Frequently Asked Questions What is asbestos? Asbestos is a mineral which is mined, processed, and used in many building materials. Since 1988, asbestos has been banned in most US building components;
TRU Asbestos Management
Number: OH&S 9.20.1 Revision Date: 09/08/2015 TRU Asbestos Management TRU Asbestos Management Page 1 of 5 1. PURPOSE 1.1. To describe the process and management of asbestos containing materials on the
ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions
The Language Used In This Document Does Not Create An Employment Contract Between The Employee And The Agency. This Document Does Not Create Any Contractual Rights Or Entitlements. The Agency Reserves
EXHIBIT A SCOPE OF SERVICES
EXHIBIT A SCOPE OF SERVICES 1.0 INTRODUCTION Asbestos consulting services are required for Item/Segment No. 227775-1, SR-7 (US 441) from Fillmore Street to South of Stirling Road, Hollywood, Broward County,
Asbestos Survey Form (See Instructions)
Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: [email protected] 1. Purpose of Survey Renovation Demolition
Asbestos Management Plan EC 45 Page 1
Name: Asbestos and ACBM (asbestos containing building material) Management Plan Areas Affected: All buildings that contain asbestos and ACBM on campus Effective Date: 1/1/09 Reviewed/Revised: 12/15/12
Asbestos Inspection Project Procedure
EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University
North Carolina State University. Asbestos Management Plan
North Carolina State University 1.0 Introduction Purpose The purpose of this plan is to establish the polices and procedures to be used at North Carolina State University (NCSU) in the management of building
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by
2013 AHERA 3 Year Re-Inspection Report For 82 Scofieldtown Road Stamford, CT Performed by P.O. Box 423 Stratford, CT 06615 Inspection Date: April 17, 2013 82 Scofieldtown Road Stamford, CT I. EXECUTIVE
Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
Asbestos 2 hr. Awareness
Asbestos 2 hr. Awareness LEA Designee Definition Any local educational agency as defined in section 198 of the Elementary and Secondary Education Act of 1965 (20U.S.C. 3381) The owner of any nonpublic,
Wellesley College Asbestos Management Program
Wellesley College Asbestos Management Program Table of Contents Page Policy 2 Impacts of Asbestos Containing Materials (ACM)... 3 Compliance... 3 Objectives... 4 Operational Controls Standard Operating
Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy
Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within
IDENTIFICATION OF ASBESTOS You can t identify asbestos-containing materials with the naked eye. Experienced employees can identify suspected
Asbestos is a mineral fiber that was historically used in a variety of building construction materials due to its structural strength and for its qualities as an insulator and fire-retardant. The use of
Building Owners Responsibilities for Asbestos
Building Owners Responsibilities for Asbestos August 2012 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can be provided to you in a different format (Braille,
1200 N. COLORADO WINSLOW, ARIZONA
ASBESTOS HAZORD EMERGENCY RESPONSE ACT (AHERA) INSPECTION & REPORT OF FIINGS FOR IUSTRIAL ARTS 1200 N. COLORADO WINSLOW, ARIZONA Submitted to: MR. RICHARD WILLIAMS BELFOR PROPERTY RESTORATION 23610 N.
NDSU TABLE OF CONTENTS
NDSU TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 DEFINITIONS AND DESCRIPTIONS 3.0 OPERATIONS AND MAINTENANCE PROCEDURES FOR ACM 4.0 FIBER RELEASE EPISODES 5.0 DEMOLITION INFORMATION 6.0 REMARKS 1.0 INTRODUCTION
ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208
ASBESTOS AWARENESS TRAINING Title 8, GISO Section 5208 What is Asbestos? Generic term for group of minerals known for their strength, flame/heat resistance, & indestructible qualities. Miracle mineral
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER 56TH FIGHTER WING (AETC) AIR FORCE INSTRUCTION 32-1052 LUKE AIR FORCE BASE Supplement 1 5 NOVEMBER 2008 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION
May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240
May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901
WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES
California Institute of Technology WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727
NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
ASBESTOS in state and local government
ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.
Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety
Asbestos Abatement Management Program Facilities Operations and Development Environmental Health & Safety November 7, 2012 INTRODUCTIONS David Kos (EHS) Director of Environmental Affairs David Kehl (EHS)
BOSTON COLLEGE OFFICE OF ENVIRONMENTAL HEALTH & SAFETY ASBESTOS MANAGEMENT PROGRAM
BOSTON COLLEGE OFFICE OF ENVIRONMENTAL HEALTH & SAFETY ASBESTOS MANAGEMENT PROGRAM Prepared: May, 1999 Revised: February, 2004 Reviewed: September, 2004 Table of Contents Section Title Page # 1.0 Program
Miami University s Asbestos Operations & Maintenance Program Administered by
Miami University s Asbestos Operations & Maintenance Program Administered by ENVIRONMENTAL SAFETY & RISK MANAGEMENT 529-2829 Table of Contents Purpose 2 Personnel Covered Under the Asbestos Mangement Plan
University of Michigan Dearborn The Department of Environmental Health and Safety & Emergency Management Asbestos Management Program General
University of Michigan Dearborn The Department of Environmental Health and Safety & Emergency Management Asbestos Management Program General What is Asbestos? Asbestos is the name applied to six naturally
Approved by: UBC ACT Committee
The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy
2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987.
Penn State University Environmental Health and Safety Asbestos Management Program I. Introduction Over the past several decades the hazards of asbestos exposure have become well known. With this influx
The Truth About Asbestos In Your Home
The Truth About Asbestos In Your Home A Complete Report For Anyone Starting A Home Repair Or Remodeling Project In this report you will find out: What asbestos is. What the dangers are of being exposed
UBC Plant Operations Asbestos Work Procedures April 2004
UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other
Understanding Asbestos: Implications for the Individual and the Community Development Practitioner
Understanding Asbestos: Implications for the Individual and the Community Development Practitioner By Eric Fortner, Project Consultant [email protected] June 2014 EXECUTIVE SUMMARY Asbestos is
ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.
ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station
UI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
ASBESTOS OPERATIONS AND MAINTENANCE PLAN
UNIVERSITY OF FLORIDA ASBESTOS OPERATIONS AND MAINTENANCE PLAN Administered by: Environmental Health and Safety Building 179 PO Box 112190 Gainesville, Florida 32611 Introduction The following document
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL I. INTRODUCTION BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT Asbestos Asbestos is a naturally occurring fibrous mineral that is mined from
ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823
ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at Bailey Hall Building #315 East Lansing, Michigan 48823
LEGAL REVIEW & UPDATE
LEGAL REVIEW & UPDATE There are lots of laws and regulations designed to protect workers, the general public, and the environment. However, not everyone follows the laws. Many people deliberately break
University of the Sciences Environmental Health and Radiation Safety (EHRS) Department Q&A ON ASBESTOS
Q&A ON ASBESTOS WHAT IS ASBESTOS? "Asbestos" is the name given to a group of minerals that occur naturally as masses of strong, flexible fibers that can be separated into thin threads and woven. These
Fact Sheet on Asbestos
Fact Sheet on Asbestos WHAT IS ASBESTOS? Asbestos is a naturally occurring mineral found in certain rock formations, mined from open pit mines. Most of the asbestos used in the United States today comes
2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.
2009 Housing Provider Forum A Guide to Asbestos Management - Owner Requirements Regulation respecting Asbestos on Construction Projects and in Buildings and Repair Operations Presented by Jeff Drummond
Asbestos Management Program and Procedures. Northern Illinois University
Asbestos Management Program and Procedures Northern Illinois University Department of Environmental Health and Safety 8/12/2013 INTRODUCTION Contents INTRODUCTION... 2 PURPOSE... 6 DEFINITIONS... 8 GENERAL
Why was asbestos used?
Asbestos Awareness What is Asbestos? Why was asbestos used? Asbestos appealed to manufacturers and builders for a variety of reasons. It is strong yet flexible, and it will not burn. It conducts electricity
Asbestos Operations and Maintenance Program. San José State University
San José State University One Washington Square San José, California Facilities Development and Operations Department July 25, 2012 1) Purpose and Scope The purpose of the Asbestos Operations and Maintenance
ASBESTOS AWARENESS. Slide #1
ASBESTOS AWARENESS Slide #1 OBJECTIVES Participants will be able to: Describe what asbestos is. Identify in what components asbestos is typically found. Describe the health effects of exposure to asbestos.
Asbestos: Common Questions and Answers
Asbestos: Common Questions and Answers 1. What is asbestos? Asbestos is the name given to a group of minerals that occur naturally as masses of strong, flexible fibres that can be separated into thin threads
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS 1.0 GENERAL 1.1 SUMMARY A. The following procedures apply to the project manual and drawings for asbestos in
UNVERSITY HIGH SCHOOL U0018 65-108-9010-0001 500 W. Gregory St. Normal, IL 61761. School Asbestos Management Plan. Supplemental.
UNVERSITY HIGH SCHOOL U0018 65-108-9010-0001 500 W. Gregory St. Normal, IL 61761 School Asbestos Management Plan Supplemental Prepared By: David Martin Management Planner Environmental Health and Safety
OGS LIMITED ASBESTOS & LEAD SURVEY REPORT
our people and our passion in every project OGS LIMITED ASBESTOS & LEAD SURVEY REPORT Building 44 Willard Drug Treatment Center 7116 County Road 132 Willard, NY Prepared for: NYSOGS 33 rd Floor, Corning
ASBESTOS AWARENESS. For workers and building occupants
ASBESTOS AWARENESS For workers and building occupants Asbestos Awareness Asbestos is a serious health hazard commonly found in our environment today. This module is designed to provide an overview of asbestos
PRE-DEMOLITION ASBESTOS SURVEY
PRE-DEMOLITION ASBESTOS SURVEY For: City of Largo PSTA Building 14840 49th Street North Largo, Pinellas County, Florida Prepared for: Collman & Karsky Architects 4301 Anchor Plaza Parkway, Suite 100 Tampa,
Mount Sinai Pediatric Environmental Health Specialty Unit WTC Asbestos Fact Sheet
This fact sheet answers frequently asked health questions (FAQs) about asbestos. It is part of a series of fact sheets describing potential health risks to children from exposures related to the World
ASBESTOS AWARENESS TRAINING. For workers and building occupants
University of Nevada, Reno ASBESTOS AWARENESS TRAINING PROGRAM For workers and building occupants John A Braun, CSP Asbestos Awareness OSHA Standards for Asbestos are: 29 CFR 1910.1001 applies to all occupational
British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT
BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk
Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406.
Asbestos Survey for Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington May 1, 2014 Project #A2014/0406 prepared for: Port of Pasco PO Box 769 Pasco, WA 99301 prepared by: Blue Mountain
POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for
POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan
Saxe Middle School Auditorium Renovation February 4, 2015
Saxe Middle School Auditorium Renovation February 4, 2015 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary
UNOFFICIAL. 1. Owner: Delaware Department of Transportation (DelDOT) WEBSITE
SECTION 01013 - SUMMARY OF THE WORK - ASBESTOS ABATEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001).
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001). You will learn the: About the dangers of asbestos. How to identify asbestos. How to protect yourself
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110228 PREPARED FOR: Stantec, Inc.
EVERYONE'S RESPONSIBILITY
EVERYONE'S RESPONSIBILITY Guidelines for an Asbestos Operations and Maintenance Program February 2007 Guidelines for an Asbestos Operations and Maintenance Program Workplace Safety & Health Division 200
DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements 340-248-0250. Asbestos Abatement Project Exemptions
DIVISION 248 ASBESTOS REQUIREMENTS Asbestos Emission Standards and Procedural Requirements 340-248-0250 Asbestos Abatement Project Exemptions (1) Any person who conducts or provides for the conduct of