Saxe Middle School Auditorium Renovation February 4, 2015
|
|
|
- Alannah Dayna Bates
- 10 years ago
- Views:
Transcription
1 Saxe Middle School Auditorium Renovation February 4, 2015
2 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary of Sampling and Results Abatement and Monitoring Goals: Student, Staff and Worker Protection
3 2014 FLOOR PLAN
4 Hazardous Building Material Sampling HAZARDOUS BUILDING MATERIAL SAMPLING HazMat testing Required by State and Federal regulations prior to renovation or demolition Asbestos Containing Material Sampling Lead-Based Paint Sampling Poly-Chlorinated Biphenyl (PCB) Sampling
5 Hazardous Building Material Sampling HAZARDOUS BUILDING MATERIAL SAMPLING Asbestos Containing Materials Defined as materials containing more than 1% asbestos. Sampling 89 samples were collected for analysis. Results Only limited areas of pipe insulation, behind walls and above dropped ceilings, were found to contain asbestos.
6 HAZARDOUS BUILDING MATERIAL SAMPLING Lead-Based Paint Defined as paint containing equal to or greater than 1.0 mg/cm² of lead Sampling 32 readings were taken with an X-ray analyzer (XRF) Results Paint on steel ceiling beams was reported via XRF to contain lead at concentrations of 1.2 and 1.5 mg/cm²
7 HAZARDOUS BUILDING MATERIAL SAMPLING- in Auditorium PCBs Commonly used in building products such as caulking, glazing and paints Federal level for EPA involvement is 50 ppm. State level is >1 and <50 ppm Sampling Analyzed 42 samples of paints and caulks Results Caulk concentrations were between 0.94 and 2.6 ppm Paint concentrations on doors, frames and walls ceilings were between 5.9 and 87 ppm with the exception of - Gray paint found on concrete floors contained PCBs in concentrations of 1,600 to 4,900 ppm
8 CERAMICS ROOM Due to the elevated concentrations of PCB s in the gray paint the Committee authorized T & B to test the only other rooms in the school that contained the same color floor paint: Ceramics and boiler rm both had levels of PCB 1000 ppm & 890 ppm (Boiler rm.) The Ceramics room was taken off line The boiler room is inaccessible to the students Rooms will be remediated this summer
9 HAZARDOUS BUILDING MATERIAL SAMPLING PCB Dust Wipe Samples Collected and analyzed 6 wipe samples from 3 locations on the auditorium floor Results No PCBs were detected in four of the samples One set of wipe samples showed concentrations of 2.5 to 2.9 ug/wipe Clearance level for dust wipes in schools is 1.0 ug/wipe NCPS closed the auditorium Additional Testing Currently conducting testing of concrete substrate to determine extent of remedial requirements. Working with EPA on pre-approval of remediation plan
10 ABATEMENT PROCESS Work will be done during Summer 2015 and the building will be closed to the public Develop and adopt Best Management Practices Prepare technical specifications and Health & Safety Plan for abatement of hazardous building materials Focus on methods to contain, transport and dispose Abatement areas will be fully contained using 6-mil polyethylene barriers. The work area will be marked with caution tape and warning signs.
11 Abatement Monitoring ABATEMENT MONITORING Monitoring of abatement will be conducted by a licensed Project Monitor The monitor will observe and document removal activities are being conducted in accordance with technical specifications and Health & Safety Plan Air samples for asbestos fibers and dust will be collected interior to the building during abatement activities Air samples will be analyzed on-site to determine if any corrective actions are necessary to minimize dust Following removal activities, the monitor will conduct a visual inspection of all work areas to confirm no dust or debris remain
12 POST ABATEMENT SAMPLING Confirmatory samples will be collected from abated areas following removal of asbestos and PCB containing materials. Asbestos air clearance sampling prior to re-occupancy to ensure no asbestos fibers are present prior to removing containments PCB Bulk Samples will collect of substrate materials to remain, PCB dust wipe samples interior to work area and outside work area to ensure no PCB containing dust is present, and PCB air samples will be collected prior to reoccupancy
13 NEXT STEPS Prepare bid documents for Remediation contractors Bid the work by the end of March Start removal at the end of the school year Remediation completed by end of summer 2015
14 Questions or Comments?
SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
Asbestos Frequently Asked Questions
Asbestos Frequently Asked Questions What is asbestos? Asbestos is a mineral which is mined, processed, and used in many building materials. Since 1988, asbestos has been banned in most US building components;
POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for
POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan
Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority
Analysis of Brownfield Cleanup Alternatives (ABCA) for Hudepohl Brewery Site Introduction & History The Port of Greater Cincinnati Development Authority (Port Authority) has developed a draft proposal
6% Chrysotile NA 2 008 White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor
1.0 Asbestos Inspection Barge, Waggoner Summer & Cannon performed an asbestos survey for building 4666 (the Building) at the George C. Marshall Space Flight Center in Huntsville, Alabama on April 5, 2012.
MEMORANDUM. General: Foundation:
MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010
2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by
2013 AHERA 3 Year Re-Inspection Report For 82 Scofieldtown Road Stamford, CT Performed by P.O. Box 423 Stratford, CT 06615 Inspection Date: April 17, 2013 82 Scofieldtown Road Stamford, CT I. EXECUTIVE
Mount Sinai Pediatric Environmental Health Specialty Unit WTC Asbestos Fact Sheet
This fact sheet answers frequently asked health questions (FAQs) about asbestos. It is part of a series of fact sheets describing potential health risks to children from exposures related to the World
Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel
Second Edition Revised January 2014 Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel Summary of Requirements
WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES
California Institute of Technology WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727
Restoration Specific Asbestos and Lead Based Paint Survey Report. 2503 Logan Ave Colorado Springs, CO 80909
Restoration Specific Asbestos and Lead Based Paint Survey Report Property Information: 2503 Logan Ave Colorado Springs, CO 80909 Inspection Conducted By: Shannon Anderson Colorado Cert #14225 Ted Anderson
Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015
Addendum 1: Changes to the Draft IS/MND Text and Figures Introduction This summary presents minor corrections and revisions made to the Draft IS/MND initiated by the public, staff and/or consultants based
Hazardous Building Materials Management During Facility Demolition IOL CAB Demo Project Learning's RemTech - October 17, 2012
Hazardous Building Materials Management During Facility Demolition IOL CAB Demo Project Learning's RemTech - October 17, 2012 Presented By: David Wytrykush, CRSP Goals of the Presentation Scope of Presentation
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
Asbestos Survey Form (See Instructions)
Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: [email protected] 1. Purpose of Survey Renovation Demolition
Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety
Asbestos Abatement Management Program Facilities Operations and Development Environmental Health & Safety November 7, 2012 INTRODUCTIONS David Kos (EHS) Director of Environmental Affairs David Kehl (EHS)
Asbestos Management Plan EC 45 Page 1
Name: Asbestos and ACBM (asbestos containing building material) Management Plan Areas Affected: All buildings that contain asbestos and ACBM on campus Effective Date: 1/1/09 Reviewed/Revised: 12/15/12
OGS LIMITED ASBESTOS & LEAD SURVEY REPORT
our people and our passion in every project OGS LIMITED ASBESTOS & LEAD SURVEY REPORT Building 44 Willard Drug Treatment Center 7116 County Road 132 Willard, NY Prepared for: NYSOGS 33 rd Floor, Corning
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
Asbestos Containing Material MANAGEMENT PLAN
Asbestos Containing Material MANAGEMENT PLAN Introduction Extensive research has shown exposure to asbestos containing material (ACM) when it becomes airborne (commonly referred to as friable) poses a
Approved by: UBC ACT Committee
The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy
Lead Exposure Management Plan
Lead Exposure Management Plan 1.0. Policy CSUF has developed the Lead Exposure Management Plan to reduce occupational and environmental exposure to lead, a potent neurotoxin and carcinogen that causes
An Information Booklet Addressing PCB-Containing Materials in the Indoor Environment of Schools and Other Public Buildings
An Information Booklet Addressing PCB-Containing Materials in the Indoor Environment of Schools and Other Public Buildings Prepared by Bureau of Environmental Health Massachusetts Department of Public
Bid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)
Bid Tabulation for IFB #9708 (Asbestos and Services) Item IES of Marshall, Inc (SERVPRO) B&R Insulation Inc Major Abatement (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear
2012 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs
2012 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs ASBESTOS Abatement Worker/Supervisor Air Sampling Technician (NYS) Allied Trades (NYS) NIOSH
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL I. INTRODUCTION BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT Asbestos Asbestos is a naturally occurring fibrous mineral that is mined from
ASBESTOS SCIENCE TECHNOLOGIES, INC.
ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - [email protected] Report for Lincoln Elementary School 1582 Lincoln Road Yuba City, Ca. 95993 Mold Report
ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.
ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station
ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES FAIRFIELD HILLS CAMPUS HAZARDOUS SUBSTANCES REMOVAL DANBURY HALL AND EIGHT SINGLE FAMILY HOMES
ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES FAIRFIELD HILLS CAMPUS HAZARDOUS SUBSTANCES REMOVAL DANBURY HALL AND EIGHT SINGLE FAMILY HOMES UNITED STATES ENVIRONMENTAL PROTECTION AGENCY BROWNFIELDS CLEANUP
LEAD MANAGEMENT PROGRAM
Page: 1 of 7 1.0 Purpose and Applicability 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110228 PREPARED FOR: Stantec, Inc.
Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations
May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240
May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901
ASBESTOS IN THE HOME
ASBESTOS IN THE HOME This information will help you understand asbestos: what it is, its health effects, where it is in your home and what to do about it. Even if asbestos is present in your home, it is
North Carolina State University. Asbestos Management Plan
North Carolina State University 1.0 Introduction Purpose The purpose of this plan is to establish the polices and procedures to be used at North Carolina State University (NCSU) in the management of building
09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS
09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS PDS SE-160 01-2006 1. PRODUCT NAME SE-160 Clear Surface Coating (water-based copolymer) Specialty Elastomeric Topcoat 2. MANUFACTURER
NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
AHERA 3-Year Asbestos Re-Inspection
AHERA 3-Year Asbestos Re-Inspection Denver 940 Fillmore Street Denver, Colorado 80206 Report Date: November 20, 2013 OEI Project No. 13.159 Prepared For: John Lewis Denver 940 Fillmore Street Denver, CO
Safety & Risk Management Policies and Procedures
Safety & Risk Management Policies and Procedures Title: Lead Management Policy Date: October 2013 Rationale: As lead is a hazardous material, it is important to provide Southwestern University employees
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
Gramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
The Rehab Inspector and LBP
The Rehab Inspector and LBP 2013 Housing Conference OCD/OCCD Sawmill Creek Resort and Conference Center November 20-22, 2013 GH Runevitch- Presenter The Rehab Inspector and LBP The Rehab Specialist has
Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406.
Asbestos Survey for Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington May 1, 2014 Project #A2014/0406 prepared for: Port of Pasco PO Box 769 Pasco, WA 99301 prepared by: Blue Mountain
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.
2009 Housing Provider Forum A Guide to Asbestos Management - Owner Requirements Regulation respecting Asbestos on Construction Projects and in Buildings and Repair Operations Presented by Jeff Drummond
EVERYONE'S RESPONSIBILITY
EVERYONE'S RESPONSIBILITY Guidelines for an Asbestos Operations and Maintenance Program February 2007 Guidelines for an Asbestos Operations and Maintenance Program Workplace Safety & Health Division 200
USES and CONCERNS. County of Santa Clara Safety Coordinator Forum
ASBESTOS & LEAD USES and CONCERNS County of Santa Clara Safety Coordinator Forum What is Asbestos? A naturally occurring mineral found in certain rocks. This mineral separates into strong, thin fibers
Prestige Home Inspection LLC
Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012
CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR. License Requirements & Work Practice Standards
CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR License Requirements & Work Practice Standards License Required By April 22, 2010, construction contractors that perform renovation on certain older buildings
Asbestos Inspection Project Procedure
EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University
ASBESTOS MANAGEMENT PLAN
ASBESTOS MANAGEMENT PLAN SAN JOSE STATE UNIVERSITY Environmental Health & Occupational Safety Asbestos Management Plan 1.0 Introduction 2.0 Policy 3.0 Responsibilities 4.0 Contract Administration 5.0 In-House
The Richard Stockton University ASBESTOS MANAGEMENT PLAN
The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling
Asbestos abatement Sampling & Analysis. Abatement Project Supervision
Asbestos abatement Sampling & Analysis Abatement Project Supervision TOPICS FOR DISCUSSION Air Sampling PERSONNEL AREA Analysis PCM Analysis TEM Analysis TYPES OF SAMPLING Two types of air sampling are
Asbestos Management POLICY
Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management
Safeway 691 Berkeley. 1444 Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:
Safeway 691 Berkeley Preliminary Draft Environmental Survey for Renovation Store Data: Total Area: 26,327 Sq. Ft. at main level ACM 12x12: 17,600 Sq. Ft. Approx. Est. Vinyl Sheet: NA Other: See Table 1444
Control Provisions under the Air Pollution Control Ordinance
ProPECC PN 2/97 ENVIRONMENTAL PROTECTION DEPARTMENT PRACTICE NOTE FOR PROFESSIONAL PERSONS Handlin of Asbestos Containin Materials in Buildins Introduction Asbestos is a generic name given to a group of
Case Studies. Disaster Recovery Restoration Remediation Decontamination 800.808.1553 www.rolyncompanies.com
Case Studies 800.808.1553 www.rolyncompanies.com Property Type: College Loss Type: Water and Flood Location: Hyattsville, Maryland Once Rolyn received clearance from the insurance adjuster, crews began
Airborne asbestos is a serious health hazard.
A Homeowner s Guide What is asbestos? Asbestos is a naturally occurring mineral fiber that has been used in more than 3,000 different construction materials and manufactured products. It is commonly found
Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association
Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association Presented by: Russell E. Stauffer, PE AMEC Environment & Infrastructure, Inc. October 30, 2014 75 East
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS 1.0 GENERAL 1.1 SUMMARY A. The following procedures apply to the project manual and drawings for asbestos in
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER 56TH FIGHTER WING (AETC) AIR FORCE INSTRUCTION 32-1052 LUKE AIR FORCE BASE Supplement 1 5 NOVEMBER 2008 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS Dust and Debris Management Procedures refers to preventive measures that shall be undertaken by the contractor to prevent exposure
Room ID------- Material ID ASBESTOS Components Positive? Yes, No, Trace, Assumed PISTM-1 White pipe insulation on hot water supply and return throughout building Yes 5-10% CH, 5-15%AM NA NA LF 1400 FLVCT-7
FDIC ENVIRONMENTAL CHECKLIST OF. FDIC Asset Number 88310023. Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois
FDIC ENVIRONMENTAL CHECKLIST OF FDIC Asset Number 88310023 Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois ATC Project Number 301.75462.0102 September 29, 2012 Prepared by: Prepared
RFI Questions. Reference (Sect/Para/Pag e) QUESTION GOVERNMENT RESPONSE 1 RFP and Drawings
PRE PROPOSAL INQUIRY FORM Government Reponse Project Title: NAVFAC - Paint and Repair Building 110 date: 8/23/12 SOLICITATION NO.: #2703893 RFI Questions Question No. Reference (Sect/Para/Pag e) QUESTION
TRU Asbestos Management
Number: OH&S 9.20.1 Revision Date: 09/08/2015 TRU Asbestos Management TRU Asbestos Management Page 1 of 5 1. PURPOSE 1.1. To describe the process and management of asbestos containing materials on the
DF Technical & Consulting Services Ltd. 4407 68 Avenue, Edmonton, AB T6B 2N2 Ph: 780.468.3131 Fax: 780.468.3224 Toll Free: 855.668.
4407 68 Avenue, Edmonton, AB T6B 2N2 Ph: 780.468.3131 Fax: 780.468.3224 Toll Free: 855.668.3131 November 18, 2014 Parks Canada PO Box 900 Banff, Alberta T1L 1K2 Attention: Mr. Glenn Exley Regarding: Hazardous
BECHTEL JACOBS COMPANY ORR WASTE CERTIFICATION PROGRAM DOCUMENT CONTROL SYSTEM
BECHTEL JACOBS COMPANY ORR WASTE CERTIFICATION PROGRAM DOCUMENT CONTROL SYSTEM If you print the following document, this page must be attached to the front of the document and you must fill in the information
LEAD PROGRAM MANUAL EHS LEAD-BASED PAINT PROGRAM MANAGEMENT RESPONSIBILITIES TABLE OF CONTENTS NYU EHS LEAD MANAGEMENT MANUAL
TABLE OF CONTENTS NYU EHS LEAD MANAGEMENT MANUAL 1.0 EHS Lead Safety Policy 2.0 EHS Lead SOPs - Lead-Based Paint Program Management Responsibilities 2.1 Residential Buildings 2.2 Academic Buildings 3.0
ABClean Frequently Asked Questions (FAQ)
ABClean Frequently Asked Questions (FAQ) 1. How can I recognize asbestos containing products during cleaning, renovation, demolition or dismantling task? Considering construction date, which buildings
Now that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On?
w that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On? By Completing a Building and Occupant Survey Hopefully Your Questions will be Answered