TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

Size: px
Start display at page:

Download "TERMS OF REFERENCE FOR SCOPING OF EIA STUDY"

Transcription

1 Intas Pharmaceuticals Ltd., Valia-Bharuch TERMS OF REFERENCE FOR SCOPING OF EIA STUDY The EIA study will be carried out with the specific terms of reference and the report thereof will be complied in the structural document as described below: 1.0 INTRODUCTION Purpose of the project, brief description of the project name, nature, size, location of the project and its importance to the region/country. Profile of the Project Proponent, name and contact address, Organizational Chart, Project Consultants etc. 2.0 PROJECT DESCRIPTION 2.1 Background of the Project: Justification of the project Land description- survey numbers, village, taluka, district, state and extent of the land. Location and infrastructure setup along with plant layout A topographical map of the project area delineating the major topographical features such as land use, drainage, locations of habitats, major constructions including roads, railways, pipelines, major industries in the area. Significance and relevance, highlighting the benefit to surrounding area and economic development of the Local/State/ Country. Location of National Park, Wildlife sanctuary, migratory routes of wild animals etc. within 10 km of project area. If the 10 Km area from project site is ecologically fragile, a detailed justification. 2.2 Project details: Regulatory frame work and Litigations pending against the existing project Status and stages of other regulatory clearances like forest clearance consent to establish from State Pollution Control Board etc. List of products along with production capacity Raw materials required, source, mode of storage and transport. Manufacturing process details along with chemical reactions and process flow charts. The breakup of water requirement as per different activities and detailed water balance Wastewater generation, management and disposal Generation of Air pollution and its management Solid and Hazardous Waste Generation and management strategy Power and Water requirement and its supply Approval of competent authority for utilization of ground and surface water. Manpower recruitment Total Capital cost estimate Implementation schedule of the project. Page 1

2 Intas Pharmaceuticals Pvt. Ltd., Valia-Bharuch 3.0 DESCRIPTION OF THE BASELINE ENVIRONMENTAL STATUS Study area & study Period Looking to the project activity and probable impact, baseline data collection for 3 month (except monsoon) within 5/10 km of the study area Maps of the study area clearly delineating the locations of various monitoring stations (air/water/noise/soil) Procedure and methodology of base line data collection Details Of Baseline Data Collection: Parameters Air Environment A) Micro Meteorological Wind speed, wind direction, ambient temperature and relative humidity. Sampling Location & Frequency 1 near project site OR from IMD for the nearest observatory center One hourly Continuous for three months Comments B) Ambient Air Quality PM2.5, PM10, SO2, NOx, NH3, HCl and VOC 24 hourly twice a week at 5 locations including project site (1 station in upwind direction & 2 stations in downwind direction & 1 in cross wind direction) during the study period. Based on the trial run of ISCST-3 model it is estimated the maximum GLC would take place within 500 meter. Water Environment Total Water Requirement: 182 KLD Industrial Wastewater Discharge: Zero Liquid Discharge Soil & Land Environment One grab sample from 5 locations (for both ground and surface sources) within the study area including project site. One grab sample from 5 locations during the study period within the study area including project site. The fresh water requirement will be met by borewell. Treated effluent from ETP will be completely reused to achieve zero effluent discharge. The hazardous waste will be handled properly, stored into adequate storage area and finally disposed off as per the GPCB Norms. Page 2

3 Intas Pharmaceuticals Ltd., Valia-Bharuch Parameters Noise Environment Sampling Location & Frequency Once during the study period for 24 hrs. at 5 locations within study area including project site Comments There is no major source of noise pollution from the project activity except D.G. set. Ecological Environment Data through primary survey with study area & verification with secondary data There is no Historical place, Archaeological place, Wildlife sanctuary or National park within 15 km radius from project site. Socio-Economic Environment Socio-economic base line data will be collected from District Census Handbook (2011) of District Bharuch There will be a positive impact as it will generate direct/indirect employment opportunities. 4.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 Air Environment Impact of flue gas, process gas and fugitive emissions from the project. Prediction of air pollution due to production activities, loading and unloading, transportation. Emission Inventory of PM, SO2, NOX, NH3 and HCl. Prediction of impact on ambient air quality using appropriate mathematical model. Description of model, input requirements and reference of derivation. Isopleths distribution of major pollutants and their analysis and presentation in tabular form/base map. Measures to reduce the emissions of pollutants during production, loading, unloading, transportation, etc to maintain the air quality. Adoption of pollution control equipment to reduce pollution emission from point source. Planning of green belt development. 4.2 Water Environment Impact of water drawl on surface and groundwater resources Impact on groundwater and surface water regime from effluent management & disposal. Measures to minimize contamination of surface and groundwater Effluent treatment plant for meeting the prescribed standard Page 3

4 Intas Pharmaceuticals Pvt. Ltd., Valia-Bharuch Reuse and recycling of wastewater Proper discharge facility 4.3 Land Environment Impact on topography, drainage pattern, etc. Impact on soil quality Visual Impact on surrounding environment Plantation/afforestation of local varieties of plants Landscaping, plantation, afforestation to minimize adverse visual and noise impact 4.4 Noise Environment Impact on ambient noise level due to production activities, D.G. Set operation, transportation, and ancillaries. Measures for noise abatement Supply of Ear muffs to workers Green belt area development 4.5 Biological Environment Anticipated Impact (Flora and Fauna): Impact on flora and fauna due to air emissions, noise, vibration, vehicular movement, etc. Regeneration of rare and endangered plants of economic importance including medicinal plants. Action plan for control of pollution Green belt and its raising schedule 4.6 Socio- Economic Environment Displacement of human settlements Positive and negative impacts on present status of livelihood in the area Rehabilitation and resettlement of land oustees and displaced people Training to locals for employment in the project Employment opportunities 5.0 ENVIRONMENTAL MONITORING PROGRAM Monitoring of quality of water, air, noise and occupational health status of project personnel. Page 4

5 Intas Pharmaceuticals Ltd., Valia-Bharuch Planned monitoring program to evaluate the effectiveness of various / specific aspects of technological / mitigation measures. Environmental audit of various activities including budgeting and financial management with reference to environmental management. Plantation monitoring programme to ensure survival and growth rate of plantations. Analysis of data, its interpretation and evaluation 6.0 ADDITIONAL STUDIES 6.1 Public consultation Public hearing with the issues raised by the public and the response of the project proponent 6.2 Risk Assessment (RA) and Disaster Management Plan (DMP) Identification and type of risk associated with production (fires, toxic chemicals / hazardous / flammable gas etc.) Details of safety measures to prevent accident and disaster Disaster management plan and emergency response system with proper organizational set-up to deal with such situation. Occupational health risks 7.0 PROJECT BENEFITS Improvements in physical and social infrastructure. The employment potential and other benefits in detail that accrue. 8.0 ENVIRONMENTAL MANAGEMENT PLAN (EMP) Administrative and technical set up for management of environment Mechanism of self-monitoring for compliance with environmental regulations Institutional arrangements with other organizations/ Govt. authorities for effective implementation of environmental management plan Integrating in the environmental management plan measures for minimizing use of natural resources water, land, energy etc. 9.0 SUMMARY AND CONCLUSION (SUMMARY EIA) A clear presentation of the finding of critical environmental issues and their resolutions. The summary makes use of base maps, tables and figures for information as succinct with meaningful presentations and stands alone as a document. It covers the following: Introduction Project description and Project benefits Anticipated environmental impacts and mitigation measures Additional studies Environmental Monitoring Program Page 5

6 Intas Pharmaceuticals Pvt. Ltd., Valia-Bharuch Environmental Management Plan Risk Assessment (RA) and Disaster Management Plan (DMP) 10.0 DISCLOSURE OF CONSULTANTS ENGAGED The team of consultants engaged in this project will be given. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I m aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date : 11/02/2017 Signature : Place : Bharuch Name of Applicant : Kirti Maheshwari Designation : Chief Technical Officer Page 6

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

TAMIL NADU POLLUTION CONTROL BOARD FORM I

TAMIL NADU POLLUTION CONTROL BOARD FORM I TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Proposed Terms of Reference (TOR) For

Proposed Terms of Reference (TOR) For Proposed Terms of Reference (TOR) For OBJECTIVE Environmental Impact Assessment of Proposed Delhi to Jaipur Expressway of 8/6/4 lanes ( Green Field Project) Terms of Reference (TOR) are proposed for preparation

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

TORs for proposed EIA & RA study

TORs for proposed EIA & RA study TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one

More information

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA TABLE OF CONTENTS BACKGROUND 4 1. Executive

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Guidance for assessment of representativeness and reliability of baseline environmental attributes

Guidance for assessment of representativeness and reliability of baseline environmental attributes Annex IV Methods of Monitoring and Analysis Guidance for assessment of representativeness and reliability of baseline environmental attributes (Also Please Refer CPCB Guidelines on Methods of Monitoring

More information

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : 200000 TPA Phase 1 : 40000 TPA

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

Permitting of Development and Infrastructure Projects in Abu Dhabi

Permitting of Development and Infrastructure Projects in Abu Dhabi Table of Contents 1.0 Purpose... 4 1.1 What Is a Objection Certificate for Development and Infrastructure Projects?... 4 1.2 Why Is an NOC Required?... 4 2.0 Scope... 4 2.1 What Development and Infrastructure

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN Consultancy Services for Preparation of Feasibility Report of Two- Laning of Km 0.0 to Km 38.750 of SH-22 comprising the section from Mandrayal to Karauli (Highway 1 Package 13) TERMS OF REFERENCE (proposed)

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

What will it be; define the value

What will it be; define the value Level 2 Frame Facility: Greenfield Power Plant with Carbon Capture All 6 Project Phases All aspects for the relevant facility Stage Identify (Concept Study) Evaluate (Pre-Feasibility Study) Define (Feasibility/FEED

More information

IMPLEMENTING ISO 14001:2004. www.aecos.co.uk

IMPLEMENTING ISO 14001:2004. www.aecos.co.uk IMPLEMENTING ISO 14001:2004 www.aecos.co.uk What is an Environmental Management System? A systematic framework to manage the immediate and long term environmental impacts of an organisation s products,

More information

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) TABLE OF CONTENTS PAGE PART I INTRODUCTION Corporate Health, Safety and Environment Policy.. 1 Purpose... 2 HSEMS Framework... 3 PART

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information

Environmental Assessment

Environmental Assessment OP 4.01 Page 1 of 5 Environmental Assessment Note: OP 4.01 replaces the policy elements of IFC s Environmental Analysis and Review of International Finance Corporation Projects (Washington, D.C.: IFC,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

APPLICATION for ISO Certification (All Standards)

APPLICATION for ISO Certification (All Standards) APPLICATION for ISO Certification (All Standards) Contents Section 1 General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

THE IMPORTANCE OF INFRASTRUCTURE THE REALITIES OF THE WORLD IN WHICH WE LIVE A NEW FACT OF LIFE

THE IMPORTANCE OF INFRASTRUCTURE THE REALITIES OF THE WORLD IN WHICH WE LIVE A NEW FACT OF LIFE THE ENVISION RATING SYSTEM Envision was developed in joint collaboration between the Zofnass Program for Sustainable Infrastructure at the Harvard University Graduate School of Design and the Institute

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in

More information

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based)

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) vill Gejamuda, tehsil & Dist-Raigarh, (Chattisgarh) CONTENTS 1.0 Introduction

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Iron and Steel Manufacturing

Iron and Steel Manufacturing Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

G U Y A N A ACT NO. 11 OF 1996 ENVIRONMENTAL PROTECTION ACT 1996 ARRANGEMENT OF SECTIONS PART I PRELIMINARY SECTION

G U Y A N A ACT NO. 11 OF 1996 ENVIRONMENTAL PROTECTION ACT 1996 ARRANGEMENT OF SECTIONS PART I PRELIMINARY SECTION G U Y A N A ACT NO. 11 OF 1996 ENVIRONMENTAL PROTECTION ACT 1996 ARRANGEMENT OF SECTIONS I assent. SAMUEL HINDS Prime Minister Performing the functions Of the President. PART I PRELIMINARY SECTION 5 th

More information

Department of Environmental Engineering

Department of Environmental Engineering Department of Environmental Engineering Master of Engineering Program in Environmental Engineering (International Program) M.Eng. (Environmental Engineering) Plan A Option 1: (1) Major courses: minimum

More information

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011)

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011) NEBOSH National Diploma in Environmental Management Unit ED1 MANAGement of Environmental Risk element 6: Environmental Legislative Framework and Methods of Enforcement Sample material (Material correct

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE Document Number: HP 5951-1746-1 (CIQC STD 0014) Page 1 of 6 I. INTRODUCTION As supply chain management becomes more complex in today's procurement processes, supplier environmental management has become

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

SHE Standards. Safety, Health and Environmental Protection Standards

SHE Standards. Safety, Health and Environmental Protection Standards SHE Standards Safety, Health and Environmental Protection Standards Revision 2.01 December 2010, Valid from December 01, 2010 2 Contents SHE Standards Contents Foreword 3 1 Management Process 1.1 Policy,

More information

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1

More information

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery Key things to Know About Environment as a Cross Cutting Issue In Early Recovery This brief note provides an overview of key things to know about environment for early recovery actors, including Early Recovery

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information