TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

Size: px
Start display at page:

Download "TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT"

Transcription

1 TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA

2 TABLE OF CONTENTS BACKGROUND 4 1. Executive Summary 6 2. Introduction 6 3. Policy, Legal and Administrative Framework 7 4. Public Participation and Consultation 7 5. Comprehensive Description of the Proposed Project The Proponent Project Concept & Description Project Infrastructure Project Operations & Maintenance 9 6. Description of the Existing Environment Physical Natural Hazards Biological Heritage Human/Social Identification and Assessment of Potential Direct and Indirect Impacts Physical Natural Hazards Manmade Hazards Biological Heritage Human/Social Carrying capacity of Big Pelican Cay Carrying capacity of Little Pelican Cay Cumulative Environmental Impacts Recommended Mitigation Residual Impacts Natural Resource Valuation (NRV) Cost Benefit Analysis 14 2

3 13. Identification and Analysis of Alternatives Environmental Management of the Project Environmental Monitoring and Management Plans Training for Construction Staff Training for Operations staff Evacuation Plan Closure plan References Appendices (including but not limited to) EIA Terms of Reference Glossary of Technical Terms Reference Documents Specific Technical Studies / Reports Data Tables Photographs & Maps Composition of the Research Team Notes of Public Consultation sessions Instruments used in Community Surveys 16 3

4 BACKGROUND Pelican Island Resorts Limited (PIRL) has expressed a desire to establish a resort development on Big Pelican Cay and Little Pelican Cay in Portland Bight, St Catherine. Further to a field inspection in September 2010 by a multidisciplinary team from the National Environment and Planning Agency (NEPA) a consultative meeting was held on 26 October 2010 with the proponents and officers of NEPA at the Development Assistance Centre (DAC), NEPA. At that meeting it was agreed that given that the Portland Bight area is a protected area and subject to conservation legislation, regulations, and guidelines and given the environmental sensitivity and the unique biodiversity of the area, and given that the proposed development is new and still unproven in Jamaica, an Environmental Impact Assessment (EIA) will be required to support any decision regarding the proposed development. CABARITA 4

5 The purpose of this document therefore is to establish the Terms of Reference (TOR) for the EIA. The TOR was agreed upon by NEPA and the proponents of the development. The EIA report must be produced in accordance with this TOR. Where the need arises to modify the TOR, the proponent shall inform the Agency of the need and obtain the approval for the modification of the TOR from the Agency before the final EIA report is submitted. 5

6 1. Executive Summary This section should allow for a clear understanding of the project proposal and summarize the significant results of the EIA study, e.g. positive and negative environmental, social and economic impacts, options considered, reasons for selection of the proposed option and the measures to be implemented to prevent or mitigate negative impacts or capitalize on positive impacts. 2. Introduction Provide the context of the project and the EIA, the delineation and justification of the boundary of the study area, general methodology, assumptions and constraints of the study. The study area shall include at least the area within 3 km radius of Little Pelican Cay, and the transport corridor from the staging area on the mainland to Big Pelican Cay and Little Pelican Cay. 6

7 3. Policy, Legal and Administrative Framework Outline the pertinent legislation, regulations, policies and standards governing environmental quality, safety and health, protection of sensitive areas, protection of endangered species, siting and land use control at the national and local levels. The examination of the legislation should include the relevant international conventions, protocols and treaties where applicable (inter alia the Convention on Wetlands of International Importance and the Convention on Biological Diversity). All applicable legislation, regulations, policies and standards in relation to the construction and operation of the development should be highlighted, including but not be limited to the other development permits such as Planning and Building. Describe traditional land use and prescriptive rights including public access rights. Discuss issues relating to provisions for law enforcement and security as it relates to this development. 4. Public Participation and Consultation The proponent should consult with relevant entities and the public throughout the EIA process. Document the public participation. Describe the public participation methods, timing, type of information provided and collected from the public and stakeholder target groups consultations. Instruments used to collect the information must be included in the appendix. Summarise the issues identified during the public participation process and discuss the public input that has been incorporated or addressed in the TOR and EIA. Concerns that were raised by the public but not considered in the EIA must be justified. Public Meetings shall be held in accordance with the Guidelines for Public Presentation at a time and location signed off by the National Environment and Planning Agency (NEPA). Public meetings shall be held to present: 1. The conceptual design of the project and the TOR before the EIA starts. Feedback received will be used to further refine the TOR. 2. The findings of the EIA when it is completed. 7

8 5. Comprehensive Description of the Proposed Project This should include but not be limited to the following: 5.1. The Proponent This section should provide a description/profile of the company proposing to carry out the development project, profile of principals of the company, and business alliances of the company Project Concept & Description This section should provide detailed description of the project including but not limited to: History and background of the project, Site location, site layout, Expected project components and alternatives that may be considered by the developer, Schematic plans, Estimated cost of the proposed development, Proposed project milestones, If the project is to be done on a phased basis, all phases should be clearly defined and the relevant time schedules provided, supported by maps, diagrams or any other appropriate visual aids, Proposed times of operation of the facilities, Construction methods and equipment, Construction materials Project Infrastructure Overview of the proposed infrastructure and structural components on the Cays and on the mainland, including but not limited to the conceptual/preliminary design for : water storage and supply, drainage, sewage disposal, solid waste disposal, transportation systems (on land and water), electrical power(fossil energy, wind, sun, wave and tidal), communications and other utility requirements, supporting infrastructure on the mainland, any beach modification or works on the foreshore and the floor of the sea; including but not limited to any seagrass or coral removal and replanting. 8

9 5.4. Project Operations & Maintenance Proposed operations and maintenance activities including but not limited to: equipment and machinery to be involved, and how these will be mobilized, areas to be used for storage of machinery and material should be clearly indicated, transportation systems or arrangement pre-, during- and post construction, workforce requirements, including proposals for mobilization and accommodation, health, safety and security systems. 6. Description of the Existing Environment An inventory and assessment of the natural resources in the study area should be conducted for a period equivalent to at least one (1) calendar year adequately representing seasonal, diurnal and nocturnal variations. Secondary data can be used in the assessment as long as it is representative and relevant. The source of all data (existing or collected for the study) must be disclosed; who collected the information, when and where. All limitations and assumption made must be clearly stated. The proponent shall submit an inventory of existing data and a statement on the data gaps for review by NEPA before starting the EIA. The following aspects must be described in this section: 6.1. Physical Morphology and morphological processes (Topography & coastal features including bathymetry of surrounding waters). In light of the transient nature of cays a historical review of the evolution of the cays should be included going back at least 30 years. Soils & geology of the area, including but not limited to: geological structure faults on the Cays and offshore in surrounding waters bearing capacity permeability mineral resource potential Existing Infrastructure 9

10 Climate (wind and precipitation), run-off and drainage Data to support the use of alternative energy sources (wind solar, wave) Air quality Water quality Identify source of freshwater, including drinking water supply 6.2. Natural Hazards Wave and marine currents Hurricanes and storm surges Earthquakes and tsunamis 6.3. Biological Flora and fauna survey of the cays and surrounding environment, detailed qualitative and quantitative assessment of the offshore cays, including inventory (list) and distribution (map) of species. Detailed description and qualitative and quantitative assessment of marine habitats and communities including but not limited to sea grass, coral reef and their associated biota; commentary on the ecological health and functions, threats and conservation significance of terrestrial and marine habitats. Species interdependence, habitats/niche specificity and community structure and diversity must also be considered. The field data collected shall include, but is not limited to: Species lists and distribution for each community (ecosystem) Migratory species, insects and micro-organisms should also be considered, A habitat map of the area, Coral cover (percentage and health), Sea grass (percentage cover and health), Other benthic features of the proposed development areas as well as the areas of potential impact, Fish and other marine species, Vegetation profile of the cays, Assessment of seabirds (including but not limited to Bridled Terns) 6.4. Heritage Archaeological assessment - land and marine (shipwrecks, etc.) 6.5. Human/Social Demography, regional setting, location assessment and current and potential land-use 10

11 Description of existing infrastructure such as transportation, electricity, solid waste disposal; water and telecommunications, and public health and safety Identify all existing resource users (including traditional users) ranging from subsistence utilization of the natural resources to commercial activities Public perception of the proposed project inclusive of potential impacts on social, aesthetic, historical and cultural values and any prescriptive rights for usage of the cays. 7. Identification and Assessment of Potential Direct and Indirect Impacts A detailed analysis of the various project components shall be done in order to identify the potential environmental impacts, both negative and positive, of the project at all stages. The identified impacts must be profiled to assess the magnitude and importance of the impacts. The extent and quality of the available data shall be characterized, explaining significant information deficiencies and any uncertainties associated with the predictions of impacts. The impact must take in account the number and magnitude of mitigation strategies which need to be employed to reduce the risk(s) introduced to the environment. Where possible, impacts must be quantified. Each project activity or impact is to be assessed and ranked for both the magnitude and importance of the impact and presented in a weighted matrix for all the phases of the project (i.e. preconstruction, construction and occupation and operational). The impacts to be assessed shall include but not be limited to the following: 7.1. Physical The impact of physical activities and elements on the environment are to be addressed: Impacts of construction activities such as site clearance, earthworks and spoil disposal. Impacts of operation and maintenance activities Impacts of accidental oil and chemical spills Impacts of solid waste, trade and sewage effluent Impacts on Air Quality Impacts on Water Quality 11

12 Impacts of the supporting infrastructure on the mainland Impacts of access routes and transportation infrastructure Impacts on visual aesthetics and landscape Demands/requirements of the following shall not only be described but also quantified: Water supply Drainage Sewage disposal; empirical data must be provided to show that the sewage treatment facility has the capacity to remove the nutrients to meet the National Sewage Effluent Standards; Solid Waste Disposal Transport systems (on land and water) Energy demands(fossil fuels, wind, sun, wave and tidal) Communications and other utility requirements Transport systems and supporting infrastructure required (cays and mainland (anchoring and docking facilities) 7.2. Natural Hazards Impact of Natural Hazards: hurricanes, storm surges, earthquakes and tsunamis, etc, are to be analysed. The natural hazard risk assessments must take into account climate change projections. Storm surge analysis should be conducted to inform coastal setbacks from the high water mark, the elevation of buildings above sea level and any other impact mitigation measures. Analysis of sedimentation dynamics - erosion and deposition should be carried out Manmade Hazards Impact of manmade hazards, e.g. major maritime accident, in the shipping lane or in the harbour facilities of Portland Bight, on the operations of a resort development on the Cays. The impact of the exploration for and the extraction of mineral resources on or around the cays should also be considered 7.4. Biological Direct and indirect impact on ecology and on the terrestrial and 12

13 marine habitats with emphasis on any rare, endangered, and endemic species found. This should include habitat loss, loss of special and natural features. Impact of noise and vibration especially on marine mammals and sea turtles. Impact of light pollution Heritage Impact of the development on any archaeological site identified in the assessment. Explore how salvaging works and archaeological recovery would affect or can be integrated with the proposed development 7.6. Human/Social Effects on socio-economic status such as changes to public access and recreational use, impacts on existing and potential economic activities, contribution of development to national economy and development of surrounding communities. Safety and security arrangement. Support staff needs Carrying capacity of Big Pelican Cay The carrying capacity of Big Pelican Cay is to be determined Carrying capacity of Little Pelican Cay The carrying capacity of Little Pelican Cay is to be determined. 8. Cumulative Environmental Impacts The cumulative environmental impact shall take in account the carrying capacity of Big and Little Pelican Cays the potential impact of related coastal zone management issues e.g. the planned expansions of the port facilities in Rocky Pont, Port Esquivel and Old Harbour Bay and the increase of shipping traffic as a result of the expansion of these port facilities. In assessing the cumulative impacts of the development the EIA should examine possible impacts of development of these cays on the surrounding cays, i.e., physical, biological, social, etc. 13

14 9. Recommended Mitigation Mitigation and abatement measures shall be formulated for each potential negative impact identified. This will also include recommendations for the maximization and enhancement of beneficial impacts, energy conservation and the use of green building technology 10. Residual Impacts Identify any residual negative impacts for which no solution for mitigation has been proposed 11. Natural Resource Valuation (NRV) A Natural Resource Valuation of the study area shall be carried out using an established and appropriate method for obtaining a value for the ecosystems services. Survey instruments are to be submitted to NEPA for sign off. A cost benefits analysis of the use-change as per the proposed project and the existing use must be included. The cost benefit analysis is to compare the annual value of lost welfare associated with the impacts from the project with the net social gain from the project. All data and survey instruments must be included in the appendices. 12. Cost Benefit Analysis The EIA should examine the potential life span of the development proposed in light of the transient nature of some cays and undertake an investment risk assessment/cost benefit analysis to determine the viability of the development especially in light of the objectives of the vision 2030 Jamaica - National Development Plan. 13. Identification and Analysis of Alternatives Alternatives to the site location (on other cays or islands), project design, scale, conditions of operation and technology shall be analysed including the no-action alternative. The examination of project alternatives should incorporate the use history of the overall area in which the site is located and previous uses of the site itself. These alternatives must be assessed based on the physical, ecological and socio-economic parameters of the proposed site. 14

15 Justification for the selection of the chosen alternative(s) shall be included. 14. Environmental Management of the Project Draft Environmental Monitoring and Management Plans A draft environmental monitoring and management plan must be developed which will detail the monitoring requirements for pre-, during- and post- construction and during the operational phases of the project. This will include recommendations to ensure the documented implementation of mitigation measures and long term minimization of negative impacts and maximization of positive impacts. At a minimum the draft monitoring plan should include: Introduction outlining the need for a monitoring programme The activity being monitored and the parameters chosen to effectively carry out the exercise The methodology to be employed and the frequency of monitoring Frequency of reporting to NEPA The sites being monitored. These should incorporate a control site where no impact from the development is expected Raw data to be collected and relevant Tables and graphs to be used Training for construction staff Training for operation staff Evacuation Plan Closure plan 15. References 16. Appendices: EIA Terms of Reference Glossary of Technical Terms 15

16 16.3. Reference Documents Specific Technical Studies / Reports Data Tables Photographs & Maps Composition of the Research Team List members of the team that undertakes the assessment, including name, qualification and roles. The team required to successfully complete this EIA is expected to include but not limited to the following professionals: Socio-economist or economic geographer Environmental Economist Environmental Chemist or chemical engineer Marine biologist Quaternary Geologist or Geomorphologist Engineering geologist Notes of Public Consultation sessions Instruments used in Community Surveys 16

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 HEALTH Kindergarten: Grade 1: Grade 2: Know that litter can spoil the environment. Grade 3: Grade 4:

More information

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=? ./01&2/M./T34 1MP36T ST3T.M./T 1a$t3l$4 536e-al4 13$7363 83%3te9 Sol9ara 1 Pro;ect!"l$%e ( Mai$ &e(ort Te-t )e*te%,e- 2//0 :; =?@ ENVIRONMENTAL IMPACT STATEMENT VOLUME A: MAIN REPORT TEXT CR 7008_09_v4

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

BMP Guidelines. Environmental Impact Assessment (EIA) report for activities related to hydrocarbon exploration and exploitation offshore Greenland

BMP Guidelines. Environmental Impact Assessment (EIA) report for activities related to hydrocarbon exploration and exploitation offshore Greenland BMP Guidelines for preparing an Environmental Impact Assessment (EIA) report for activities related to hydrocarbon exploration and exploitation offshore Greenland Danish National Environmental Research

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Broken Arrow Public Schools AP Environmental Science Objectives Revised 11-19-08

Broken Arrow Public Schools AP Environmental Science Objectives Revised 11-19-08 1 st six weeks 1 Identify questions and problems that can be answered through scientific investigation. 2 Design and conduct scientific investigations to answer questions about the world by creating hypotheses;

More information

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION

More information

Oregon Territorial Sea Plan

Oregon Territorial Sea Plan Oregon Territorial Sea Plan PART FIVE: Use of the Territorial Sea for the Development of Renewable Energy Facilities or Other Related Structures, Equipment or Facilities PART FIVE of the Territorial Sea

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

REQUEST FOR PROPOSAL (RFP) For Consultancy Services

REQUEST FOR PROPOSAL (RFP) For Consultancy Services National Environment & Planning Agency 10 & 11 Caledonia Avenue, Kingston 5, Jamaica W.I. Tel: (876) 754-7540 Fax: (876) 754-7595-6, toll free help-line: 1-888-991-5005 Website: http://www.nepa.gov.jm

More information

Sustainable Tourism Management - an overview -

Sustainable Tourism Management - an overview - of Sustainable Tourism Management - an overview - Dr. Head of Dept of Tourism Dublin Institute of Technology Who are we? Dublin Institute of of Technology 6 x Faculties Faculty of of Tourism and and Food

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

RECALLING Paragraph b of Article 13 of the Convention on the Protection of the Marine Environment of the Baltic Sea Area, 1974 (Helsinki Convention),

RECALLING Paragraph b of Article 13 of the Convention on the Protection of the Marine Environment of the Baltic Sea Area, 1974 (Helsinki Convention), CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE BALTIC SEA AREA HELSINKI COMMISSION - Baltic Marine HELCOM 19/98 Environment Protection Commission 15/1 Annex 3 19th Meeting Helsinki, 23-27

More information

Section E2 Coastal Engineering: Reconstruction Management and Mitigation

Section E2 Coastal Engineering: Reconstruction Management and Mitigation 271 Section E2 Coastal Engineering: Reconstruction Management and Mitigation 272 Objectives To familiarize the assessor with the process that should be followed in organizing any reconstruction efforts.

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Introduction to protection goals, ecosystem services and roles of risk management and risk assessment. Lorraine Maltby

Introduction to protection goals, ecosystem services and roles of risk management and risk assessment. Lorraine Maltby Introduction to protection goals, ecosystem services and roles of risk management and risk assessment. Lorraine Maltby Problem formulation Risk assessment Risk management Robust and efficient environmental

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:

More information

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems Secretariat of the Convention on Biological Diversity Foreword The rapid and often uncontrolled

More information

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy

More information

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy

More information

Comparison of HSESAP Revisions 2 and 3

Comparison of HSESAP Revisions 2 and 3 The structure of HSESAP Revision 3 is considerably modified from Revision 2. The following summary is provided to identify the comparative location of key information and any changes following the revision

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we

More information

GENERAL SPECIFICATION

GENERAL SPECIFICATION R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT

More information

Longboat Dr Noeleen Smyth. Pitcairn 24 21 41 S, 128 18 58 W. UK Overseas Territories and Crown Dependencies: 2011 Biodiversity snapshot 87

Longboat Dr Noeleen Smyth. Pitcairn 24 21 41 S, 128 18 58 W. UK Overseas Territories and Crown Dependencies: 2011 Biodiversity snapshot 87 Longboat Dr Noeleen Smyth Pitcairn 24 21 41 S, 128 18 58 W 13 UK Overseas Territories and Crown Dependencies: 2011 Biodiversity snapshot 87 Pitcairn Author: Michele Christian, Division Manager Natural

More information

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS 5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS The methods that are used to conduct the environmental impact assessment (EIA) of the Project are described in this section. The EIA uses a methodological framework

More information

Oregon. Climate Change Adaptation Framework

Oregon. Climate Change Adaptation Framework Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Terms of Reference For First Joint Mission for the Pilot Programme on Climate Resilience (PPCR) In St. Vincent and the Grenadines

Terms of Reference For First Joint Mission for the Pilot Programme on Climate Resilience (PPCR) In St. Vincent and the Grenadines Terms of Reference For First Joint Mission for the Pilot Programme on Climate Resilience (PPCR) In St. Vincent and the Grenadines 1 Glossary of Terms and Abbreviations CIF IDB MTESP NEMO NESDC NESDP NGO

More information

Protecting Floodplain. While Reducing Flood Losses

Protecting Floodplain. While Reducing Flood Losses Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf

More information

21st International Conference of The Coastal Society

21st International Conference of The Coastal Society 21st International Conference of The Coastal Society MARINE STEWARDSHIP AREA OFFERS A MODEL FOR INTEGRATING SCIENCE, MANAGEMENT, STEWARDSHIP AND ECOSYSTEM THINKING IN THE CONSERVATION OF COASTAL RESOURCES

More information

Baltic Sea Perspective on - Building a Gas Pipeline and - Oil Spills

Baltic Sea Perspective on - Building a Gas Pipeline and - Oil Spills Baltic Sea Perspective on - Building a Gas Pipeline and - Oil Spills Dr Juha-Markku Leppänen Head of the Monitoring and Assessment Unit, Marine Research Centre, Finnish Environment Institute (SYKE) Content

More information

Natural Resource Management Profile

Natural Resource Management Profile Conducting environmental impact assessments Ensures the identification of the geographic, environmental, economic, social, and cultural scope and parameters to be used for the impact assessment study.

More information

Environmental Science

Environmental Science Environmental Science UNIT I: Introduction to Environmental Science The student will demonstrate the ability to use scientific skills necessary to identify and analyze environmental issues. a. Define environmental

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Guideline: A risk assessment approach to development assessment in coastal hazard areas Guideline: A risk assessment approach to development assessment in coastal hazard areas Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, 2013. The

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

NRDA PROCEDURES AND TERMS

NRDA PROCEDURES AND TERMS NRDA PROCEDURES AND TERMS (Paraphrased from the National Oceanic and Atmospheric Administration Guidance Documents for Natural Resource Damage Assessment Under the Oil Pollution Action of 1990) INTRODUCTION

More information

The Norwegian ecosystem-based management plan for the Barents Sea and sea areas off the Lofoten Islands. The Barents Sea

The Norwegian ecosystem-based management plan for the Barents Sea and sea areas off the Lofoten Islands. The Barents Sea The Norwegian ecosystem-based management plan for the Barents Sea and sea areas off the Lofoten Islands By: Dr. Erik Olsen, Research Scientist The Barents Sea Continental shelf sea Average depth 230m Area

More information

A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region

A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region 0 Climate Change Readiness Index A Self Assessment to Address Climate Change Readiness in Your Community Communities

More information

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists Environmental Law Primer Adapted from Vermont Law School s Environmental Law Primer for Journalists General Categories Command and Control Liability Disclosure Ecosystem and Place-based Programs Marketable

More information

Developing a Representative System of Marine Protected Areas in NSW 1 Developing a Representative System of Marine Protected Areas in NSW an Overview N O V E M B E R 2 0 0 1 New South Wales Developing

More information

Appendix J Online Questionnaire

Appendix J Online Questionnaire Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date

More information

Development of innovative tools for understanding marine biodiversity and assessing good environmental status: the progress of the EU project DEVOTES

Development of innovative tools for understanding marine biodiversity and assessing good environmental status: the progress of the EU project DEVOTES Development of innovative tools for understanding marine biodiversity and assessing good environmental status: the progress of the EU project DEVOTES Angel Borja Scientific Symposium 2015, 6-7 May, Malmö,

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us. About Us Edge Engineering & Science, LLC (EDGE) is a privately owned professional services firm headquartered in Houston, Texas. EDGE was established with the primary goal of providing high quality environmental

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X The Royal Society for Protection of Nature (RSPN) in collaboration with Department of Curriculum Research & Development (DCRD) of Ministry of Education

More information

Management of Marine Environment ENVS 590. Instructor Dr. Assad A. Al-Thukair

Management of Marine Environment ENVS 590. Instructor Dr. Assad A. Al-Thukair Management of Marine Environment ENVS 590 Instructor Dr. Assad A. Al-Thukair Contingency Planning Background Elements of Contingency Planning Information gathering Strategy development Operational plan

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

How To Be Sustainable With Tourism

How To Be Sustainable With Tourism QUÉBEC DECLARATION ON ECOTOURISM In the framework of the UN International Year of Ecotourism, 2002, under the aegis of the United Nations Environment Programme (UNEP) and the World Tourism Organization

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities The Strategic Environmental Assessment Directive: Guidance for Planning Authorities Practical guidance on applying European Directive 2001/42/EC on the assessment of the effects of certain plans and programmes

More information

SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA

SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA 1. MATERIALS AND PRINCIPLES OF CONSTRUCTION:- Site Development and Layouts,

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Australian Antarctic Science Strategic Plan 2011-12 to 2020-21 Stream Implementation Plan November 2013

Australian Antarctic Science Strategic Plan 2011-12 to 2020-21 Stream Implementation Plan November 2013 Australian Antarctic Science Strategic Plan 2011-12 to 2020-21 Stream Implementation Plan November 2013 Stream 2.2 Stream goal Vulnerability and spatial protection To provide the scientific foundation

More information

PRINCIPLES OF ENVIRONMENTAL PLANNING AND MANAGEMENT EPM 131: PEN USE & PRESENTATION TECHNIQUES - STUDIO 1

PRINCIPLES OF ENVIRONMENTAL PLANNING AND MANAGEMENT EPM 131: PEN USE & PRESENTATION TECHNIQUES - STUDIO 1 COURSE DESCRIPTION 100 LEVEL EPM 111: PRINCIPLES OF ENVIRONMENTAL PLANNING AND Concepts and principles. Introduction to environmental planning and management. Evolution and nature of resource utilization.

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA?

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA? Independent, integrated thinking Experience from the first large scale tidal turbine EIA in Europe How do we work towards effective and proportionate EIA? Liz Foubister IEMA Webinar 30 th July 2014 What

More information

Department of the Interior. Departmental Manual

Department of the Interior. Departmental Manual Page 1 of 10 Department of the Interior Departmental Manual Effective Date: 10/23/2015 Series: Public Lands Part 600: Public Land Policy Chapter 6: Implementing Mitigation at the Landscape-scale Originating

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

CLASS SPECIFICATION Environmental Specialist 30000339

CLASS SPECIFICATION Environmental Specialist 30000339 City of Portland Job Code: Multiple CLASS SPECIFICATION Environmental Specialist 30000339 FLSA Status: Exempt Union Representation: City of Portland Professional Employees Association (COPPEA) GENERAL

More information

Facts on biodiversity

Facts on biodiversity Facts on biodiversity What is biodiversity? Biological diversity (biodiversity) comprises diversity of species and habitats as well as the genetic diversity within the individual species of fauna and flora.

More information

The Next Generation Science Standards (NGSS) Correlation to. EarthComm, Second Edition. Project-Based Space and Earth System Science

The Next Generation Science Standards (NGSS) Correlation to. EarthComm, Second Edition. Project-Based Space and Earth System Science The Next Generation Science Standards (NGSS) Achieve, Inc. on behalf of the twenty-six states and partners that collaborated on the NGSS Copyright 2013 Achieve, Inc. All rights reserved. Correlation to,

More information

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation

More information

CHAPTER 2: APPROACH AND METHODS APPROACH

CHAPTER 2: APPROACH AND METHODS APPROACH CHAPTER 2: APPROACH AND METHODS APPROACH Given Hawaii s biological uniqueness on a global scale, the Comprehensive Wildlife Conservation Strategy (CWCS) recognizes the importance of protecting all native

More information

PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS

PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS UNEP GLOBAL JUDGES PROGRAMME APPLICATION OF ENVIRONMENTAL LAW BY NATIONAL COURTS AND TRIBUNALS PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS OUTLINE OF PRESENTATION A) Major environmental issues B) Responses

More information

Long Term Challenges for Tidal Estuaries

Long Term Challenges for Tidal Estuaries A view from a former tidal river manager expert with experience from 6 decades living at, with and from the Tidal River Elbe chairman of the European Interreg Project TIDE (Tidal River Development) Land

More information

Protected Area Categories and Management Objectives

Protected Area Categories and Management Objectives Protected Area Categories and Management Objectives A protected area is defined as: An area of land and/or sea especially dedicated to the protection and maintenance of biological diversity, and of natural

More information

Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change

Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change 1. Background and rationale Mountains exist in many regions of the world and are home to a significant fraction of the world

More information

Preliminary Views on the Draft Early Restoration Programmatic Environmental Impact Statement and Phase III Early Restoration Plan

Preliminary Views on the Draft Early Restoration Programmatic Environmental Impact Statement and Phase III Early Restoration Plan Preliminary Views on the Draft Early Restoration Programmatic Environmental Impact Statement and Phase III Early Restoration Plan The Deepwater Horizon Natural Resource Damage Assessment Trustees (Trustees)

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

New Marine Pollution Laws for PNG

New Marine Pollution Laws for PNG Page 1 of 6 New Marine Pollution Laws for PNG Paper March 2008 1. Introduction - the need for new laws Marine resources are of utmost importance to Papua New Guinea (PNG): which has some of the highest

More information

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015 State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 N a t i o n a l O c e a n i c a n d A t m o s p h e r i c A d m i n i s t r a t i o n ( N O A A ) C o a s t a l S e r v i c e s C e n t e r March

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert

More information

Official Journal of the European Communities. (Acts whose publication is obligatory)

Official Journal of the European Communities. (Acts whose publication is obligatory) 22.12.2000 L 327/1 I (Acts whose publication is obligatory) DIRECTIVE 2000/60/EC OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 23 October 2000 establishing a framework for Community action in the field

More information