1 VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : TPA Phase 1 : TPA Phase 2 : TPA LOCATION: Kannawan Village, Bachharawan Gram panchayat, Maharajganj Tehsil, Raebareli District U.P. state. Registered Office Visaka Towers, 69/3, S,P. ROAD, Secunderabad AP Submitted to MINISTRY OF ENVIRONMENT & FORESTS PARIYAVARAN BHAVAN, LODHI ROAD, C.G.O. COMPLEX, NEW DELHI

2 TERMS OF REFERENCES (TOR) BY THE PROPONENT- VIL LIMITED, 1.0 INTRODUCTION: Location Size of the project Kannawan Village, Bachharawan Gram panchayat, Maharajganj Tehsil, Raebareli District U.P. state.. : Manufacturing of Asbestos Cement Sheets and Accessories Capacity from 120,000 TPA to 320,000 TPA The expansion in productivity: No Additional land No Additional Building for Phase -1 Additional Equipment Increase size of the Sheet Improved vacuum systems Improved waste recycling ADVANTAGES TO THE PROJECT: There is a positive impact on the environment due to the usage of fly ash of about 27% in the product which is a waste material of a nearby Thermal power station. The land is declared as industrial area by the government itself after a thorough study by expertise. 2.0 UTILITIES POWER Connected maximum demand of 750 KVA which is under HT limits. The required power connection is obtained from APSEB. However, D.G sets of 2 X 500 KVA are installed. No Additional DG Sets required. 2

3 MANPOWER The regular manpower required for Existing administration, and production purposes around 50. Additional manpower (both regular and contract basis) for expansion will be up to 50. WATER Water requirement for Existing is 140 KLD, Proposed Phase -1 expansion will be 60 KLD. Proposed Phase -2 expansion will be 200 KLD. Total water requirement for both existing and proposed will be 400 KLD (per day) for process + administrative purposes. It will be met by Existing bore wells within the project site. 3.0 SITE The expansion Project will be implemented with in the VIL premises which is at 3.5 Kms from Bachharawan Gram panchayat, Tehsil Maharajganj, and District Rae-bareli. State High way No.36 is coonecting Lucknow to Rae-Bareli The company has proposed to go for expansion operations in the existing premises of VIL. No Additional Land is required. PLANT AREA SPLIT UP Total Area Plant facility Storage Approach roads Green belt 10.0 Hectares 1.6 hectares 0.8 hectares 0.4 hectares 6.0 hectares 3

4 RM CONSUMPTION in TPM WATER CONSYUMPTION in KLD EXISTING PROPOSED PROPOSED Existing Phase 1 Phase 2 Phase 1 Phase 2 Cement 4050 TPM 1320 TPM 5282 TPM Process 110 KLD 35 KLD 150 KLD Fly ash 2925 TPM 0872 TPM 3487 TPM Cure & cool 005 KLD 05 KLD 010 KLD Chrysotile TPM 0290 TPM 1159 TPM Domestic 015 KLD 15 KLD 020 KLD other fibre Pulp 0063 TPM 0031 TPM 0123 TPM Gardening 010 KLD 10 KLD 015 KLD Total 7848 TPM 2513 TPM TPM Total 140 KLD 65 KLD 195 KLD Main reasons for initially selecting the site is that land is in existing premises of VIL. after a thorough study of negative/positive impact studies due to the major development in the area. Easy to receive and importing material. Good transportation is possible as the site is situated near the highway. Man power availability. Nearer to raw material and market. Getting additional raw material for additional production capacity is also not a constraint. Sufficient raw material is available. Utilizing more Fly ash from the nearby Thermal Power Station as a major part of the raw material. As for transportation of goods, there is already existing black topped roads from the State High way No 36 to the project site. 4.0 DESCRIPTION OF ENVIRONMENT Khannawan village is a geographical part of Bachhranwan GP, Maharajganj Tehsil and Rae-Bareli District in Uttar Pradesh. The average annual rainfall is mm. The maximum and minimum temperatures of the region are 45 C and 2.5 C. Area falls under semi- arid zone category. The area of interest for the REIA studies is 10 Km radius with Project site as its center. 4

5 SITE LOCATION MAP WITH GOOGLE EARTH IMAGE PROJECT SITE 5

6 5.0 PROJECT DESCRIPTION SALIENT FEATURES OF THE PROJECT SITE Village Tehsil District State Altitude Latitude Longitude Soil Type Land Availability Location of Project Kannawan Village, Bachharanwan GP, Maharajganj Tehsil, Raebareli District U.P. state. 381 feet N E Sandy loamsoils 10 hectares General Climatic Conditions Maximum Temperature ( 0 c) 45 Minimum Temperature ( 0 c) 2.5 Relative Humidity(%) 24-89% Annual Rainfall Average (mm) 800 Nearest Highway Nearest Railway Station Nearest Airport Nearest Town Nearest Village Water bodies Accessibility State Highway-36 <1.0 km Bachharanwan 3.5km Lucknow 55 km Rae-bareli 27 km Khannawan 1.0km Historical / Important Places Sai river 4 km (S) Reserved Forests Archaeological/ Historically important areas Sanctuaries / National Parks Sensitive Places Seismic Zone(As per 1893) NIL None None None Zone I 6 6

7 RAW MATERIALS The raw materials required are Asbestos fibre & other fibres (8 to 9%), Binders cement & flyash materials (45 to 47% and 27% respectively) RAW MATERIALS- SOURCE Raw Material Cement Fly ash Fibre Pulp Water Source Nearby sources Nearby Power station Fully Imported from Canada, Brazil,Russia Local Existing Bore wells of VIL LTD As for transportation of goods, there is already existing black topped roads. As for transportation of goods, there is already existing black topped roads from the State High way No 36 to the project site. This is quite adequate for the possible truck movement envisaged. MANUFACTURING PROCESS OF A.C. PRODUCT Asbestos Fiber of different grades are imported, mainly from Canada, Russia, Zimbabwe etc, and received in pressure packed condition in impermeable bags in palletized form. The fibre pallets are transported to the factory in closed containers through the trailer trucks. These palletized fiber bags are unloaded in fiber go-downs with the help of fork lifts. Fiber bag pallets are conveyed to the fiber feeding section by means of fork lifts. The fiber bags shall be slit open in closed automatic bag opening device. The empty bags shall be lifted by a hooking device attached within the bag opening device and carried to the attached bag shredder unit and the fiber after passing through the lump breaker shall be collected in the attached blender where some water shall be added to maintain the process in wet condition.. When all the bags in one charge empties the fiber 7

8 on to the blender, the fiber in wet form shall be taken to the Edge Runner Mill via a screw conveyor and elevator which is also joined by the shredded bag pieces from the shredder unit. Here at ERM some more water is further added to the fibre for milling operation. The bag opening device & the edge runner mill shall be kept under negative pressure by tapping it on to a Bag Filter Type Dust Collector with pulse jet which again is connected to a Hydro-static Precipitator, connected to a blower (capacity _ 7500 m3/hr) driven by a 15 Hp motor. The delivery point of the blower is connected to the Air Wet Washer and through to a 18 m tall stack. The Hydro-static Precipitator works on the principle of tidal wave generation. Particles collected in hydro-static precipitator shall be periodically recycled in wet form. From this point onwards the total process operations involving fibre are carried out in wet condition with no possibility of dust generation during manufacturing process. The milled fiber is weighed in weigh hopper. The pre-requisite quantity of fiber which is about 8% of the product is mixed with required quantity of water in Wet Opener or fibre cone where it is recirculated for about 3 to 4 minutes. The above slurry along with other fibers, if any, a small quantity (around less than 1%) of pulp and small quantities of homogenized solid waste + process sludge in slurry form (from sludge recycling tank/wet Ball Mill) is taken to Beater tank. Cement is received and stored in godown., from where it is conveyed to the Cement + Fly ash Mixing Tank via screw conveyor. Next, Fly ash is received and stored in closed go-down. Fly ash shall be pneumatically conveyed Pre-requisite quantity of Special binders - Fly ash (around 26 to 28 % of the product) is mixed with water, converted into slurry and sent to Storage tanks. A measured quantity of Fly ash slurry is taken to the Batch Hopper and then to the Cement + Fly ash Mixing Tank. The cement + FA slurry thus prepared in the Mixing tank is sent to Wet Rotary Sieve & thence to the Beater Tank, thus joining fiber slurry. The RM slurry thus prepared is transferred to Storage Tank where it is under constant agitation. From here slurry is taken to the Dilution Tank(or Distribution Tank) and diluted further using recycled process water. Slurry from the Dilution 8

9 Tank is taken to the sheet forming machine consisting of an assembly of 5 vats placed in series and with rotating sieve cylinders placed one in each of 5 vats. The sieve cylinders are fitted at its periphery, with the wire mesh of specific size (mostly 40 mesh on top surface and 5 mesh on bottom surface). An end-less felt made of synthetic woven fabric runs tangentially atop the sieve cylinders. The slurry through the sieve cylinders gets filtered out. The differential hydrostatic pressure thus created between the sieve cylinder and Vat causes an asbestos cement film to be formed and picked up by the sieve cylinder which in turn gets transferred to the moving felt. The gradually thickening slurry due to filtration is constantly diluted in the vats. The excess water in film is dehydrated by vacuum system. The wet film from the felt is then transferred on to the rotating sheet forming drum. After the required thickness is achieved the wet sheet is cut by automatic cutter fixed on the sheet forming drum. The formed sheet is then trimmed widthwise with long cutters to the required width. The length of the sheet varies as per the market requirement from 1.5 M to 3 M. after cutting to the required length the sheet is transferred on to the profiling machine (Corrugator) by vacuum sucking. The formed sheets are stacked in between the steel moulds ( templates) which will be air cured for about 12 hrs in a closed chamber. After the air curing the sheets are separated out from the templates in destacker machine. The templates are cleaned and lubricated and sent back to profiling machine. The sheets then are inspected on-line, stacked on steel pallets and water cured for a minimum of 12 days before being finally inspected and then dispatched. 9

10 6.0 PROPOSED SCOPE OF WORK FOR EIA STUDY: OBJECTIVE: Preparation of REIA/EMP Studies is a pre-requisite as per EIA-2006 Notification. The proposed Project expansion envisages setting up of 200,000 TPA ASBESTOS CEMENT SHEET PLANT in two phases of Phase TPA and Phase-2 160,000 TPA. EIA and EMP will be prepared to address these developmental activities. The EIA study includes determination of baseline conditions surrounding to the proposed developmental facilities, assessment of the impacts on the environment due to the operation of the proposed expansion Project and making recommendations on the preventive measures to be taken, to minimize the impact on the environment to acceptable levels. The field data around proposed project will be collected within 10 Kms radius of Project Site. 6.1 COMPONENTS OF THE EIA STUDY: The component of the EIA study includes: Determination of baseline conditions using primary data generation and secondary data available from existing reports and studies and historical data from government published reports Detailed description of all elements of the project activities during the preconstruction, construction and operational phases. The elements analyzed and included the infrastructures of the project including drainage features, roads, waste collection, disposal and management and utility requirements. Identifying the sources of pollution and assessing the impacts on the environment due to proposed project. Analysis and assessment of designs to 10

11 ensure environmental soundness, sustainability and regulatory compliance of the designs are studied. Preparation of EIA and EMP documents with recommendations on preventive and mitigative measures for limiting the impact on environment to the desired level during various stages of project. Development of a suitable post study-monitoring program to comply with various environmental regulations also done; and Risk Assessment (RA) describing the probable risks and preventive & precautionary measures to be followed in the event of emergency situations such as accidents, fire, oil spills, etc. 7.0 BASELINE ENVIRONMENTAL DATA GENERATION: Field assessments of the physical, ecological, and socioeconomic aspects of the site and surrounding environs of the development facilities shall be conducted. These assessments shall be used to determine the potential impacts of the proposed expansion project. The survey includes a photo-inventory of the physical and biological features of the site and environs, and the areas viewed with respect to the suitability of the proposed facility. The data generation will include: Physical: Climate, air and noise quality, geology, topography, groundwater/surface water hydrology and quality and hazard vulnerability. Ecological: Terrestrial and aquatic communities; presence of rare, threatened, and endangered species. Socioeconomic: Demography, regional setting, location assessment, and land uses. 11

12 The baseline monitoring on physical parameters encompassing the entire developmental facilities are proposed to be carried out after TOR approval for assessing the environmental quality. A reconnaissance survey has been conducted prior to commencement of sampling to select the locations by a team of technical experts. The sampling requirements have been established based on the standard scientific methods. The details of monitoring to be carried out on environmental attributes are presented in Table below: Environmental Data Generation- Scope of work covered SNo. Attributes Scope of Work 1 Ambient Air 10 Locations - 2 days/week for 12 weeks Quality (3 months) PM2.5,PM10, SO2, NOx, and CO will be monitored as per CPCB guidelines. 2 Meteorological data Design of ambient air quality sampling network with regard to topography, population, sensitive locations, emission sources, background concentrations and possible impact zones, through application of screening air quality models for assessing the maximum GLC zones prior to start of baseline study. 1 Location - 90 days Wind speed, direction, temperature, humidity, cloud cover and rainfall will be monitored. This is to be further supported by the 12

13 SNo. Attributes Scope of Work meteorological data for the area of interest from the nearest meteorological observatory and Trend analysis of micrometeorological data generated at the site. 3 Water Quality 10 Locations- (Surface & Ground water samples) Once during the EIA study Parameters as per IS-10500, IS:2296 and EPA Act as applicable. The survey also include estimation of water balance and assessment of impacts on regional water demand and availability of fresh water due to drawl of water for plant, recommendations on water conservation and rain water harvesting measures based on past experience on similar projects; and identification of suitable location and methodology for disposal of waste water form all sources. 4 Soil Quality 10 Locations once during EIA study. Parameters related to afforestation, nutrients, pollutants etc will be carried out. 5 Noise Levels 10 Locations (Residential, Commercial and Sensitive areas) once during EIA study. Readings will be taken for 24-hr duration at each location 6 Land use Land use as per the district census 13

14 SNo. Attributes Scope of Work handbooks as well as with the help of satellite imagery will be presented in 10- km radius study area. 7 Solid waste Characterization of all the solid wastes generated from the plant operations and its disposal including impacts due to disposal. 8 Geology and These aspects will be covered for 10-km Hydro-geological aspects radius study area for proposed project site. The data will be compiled from the secondary sources only. 9 Socio-Economic Socio-economic and health aspects will be and Health covered for 10-km radius study area aspects based on the Census documents and NIC database. 10 Ecological studies Flora and fauna will be studied in 10-km (Terrestrial and radius study area. These studies will be Aquatic) based on primary as well as secondary sources. The survey also includes assessment of the species diversity, density, abundance etc. in the study area and formulation of ecological indexes, assessment of likely changes on flora and fauna due to the project related activities, suggestions for conservation and protection of flora and fauna in the study area. 14

15 LEGISLATION AND REGULATORY CONSIDERATIONS: Government policies, legislation and regulations relevant to the proposal have been identified. Local plans and policies will also be evaluated. Project characteristics will be analyzed to ensure compliance with these policies, legislation and regulations. Appropriate recommendations will be provided to ensure regulatory compliance. 8.0 IDENTIFICATION OF SOURCES OF POLLUTION AND IMPACT ASSESSMENT: 8.1 Sources of Pollution in the Project Area This includes the following: Identifying the sources of pollution of air, water, land, noise and solid and hazardous wastes; Quantifying the emissions from the pollution generating sources; and Quantification of solid and HW wastes and likely disposal methods will be suggested. The proposed expansion project may have some impacts on the environment during construction, drilling and commercial production. The parameters likely to be affected are air quality, water quality, soil quality; noise levels, etc. on account of gaseous emissions, liquid effluent discharges, resultant particulates, generation of solid wastes, etc will be discussed. The major pollution potential sources in the project are as under: a) Construction Phase (If any) Approach road construction Laying pipelines Transport of men and material Construction of sheds & Buildings 15

16 b) Development Phase Land acquisition and site preparation Disposal of construction waste Sewage from campsites Site restoration c) Regular Operational Phase Transporting raw material Produce-water disposal Domestic wastewater disposal Disposal of solid waste Transport of men and material Storage of materials Fire / Explosion d) Decommissioning Phase Transport of men and material Decommissioning of processing units Transport and disposal of waste Restoration of site There are various qualitative as well as quantitative methods of conducting EIA studies, each having its own merits and demerits. We intend to use the best logical tool to assess the impact of the project. The baseline data generated from the above studies will be analyzed and compared with applicable standards prescribed by the CPCB and MOEF. By this means, the impact whether positive or negative will be assessed and the environmental attributes requiring special attention for mitigating the 16

17 negative impact, if any, will be identified. Also the areas, which fulfill the prescribed environmental norms and not requiring further improvements, will be specified. Both short-term and long term impacts particularly on sensitive targets such as habitat of endangered species of wildlife, crops, historically/culturally important sites/monuments, and centers with concentrated population in the study area will be established. Mitigation measures to reduce adverse impacts will be suggested. The potential impacts due to the project could be as follows: Change in land use due to the proposed project Potential impact on soil and groundwater due to waste handling, transportation and disposal Air quality and noise level impacts due to project activities. Potential impacts due to the Vehicular movement and emissions; Storage of materials Impact on socio-economic environment due to increased direct and indirect employment generation, and social welfare activities in the nearby villages The above impact assessment and proposed mitigative measures are described below Impact on Land Use Impact Assessment The land use impacts due to proposed project will be identified in terms of local land use planning efforts. The change in land use pattern of project site will also be identified. This includes visual impact, impact on forest, impact due to industrial growth and growth due to socio-economic factors. 17

18 Mitigation Measures The mitigation measures will be addressed towards restoration of land disturbed by the proposed project activities to the extent possible. Impact on Demography and Socio-Economics Impact Assessment On the basis of the compiled information and the proposed employment and other benefits to the people of the study area as well as others, the likely socio-economic impacts of proposed project in post-project scenarios for demography, facilities and services, agricultural sector, civic infrastructure and basic amenities, industrial sector, economic status and health status of people, etc will be assessed. Mitigation Measures Strategies to mitigate the negative impacts of the project will be developed for areas where negative impacts are projected to occur. The potential actions considered will include both policy and planning actions. The roles of different bodies in mitigation measures will be identified. Impact on Soil Impact Assessment Impacts on soil characteristics include destruction of soil profile, changes in soil productivity, increased erosion and subsequent loss of agricultural soils and land use changes. Details of solid and hazardous wastes likely to be generated from the operations and their treatment and disposal mechanism 18

19 vis-à-vis the proposed treatment facilities in the project will be assessed and mitigation measures will be suggested accordingly. Mitigation Measures Based on analysis, mitigation measures will be proposed which will avoid, minimize or compensate for significant adverse impact on soil characteristics. Impact on Water Quality We propose to address the impacts due to water requirement, Impacts due to the domestic sewage, treatment and disposal will also be addressed. Mitigation Measures Considering the dependence of the people in the area on ground water as sources for drinking purposes, the prevailing quality and extent of contamination due to the proposed project activities, the mitigation measures will include and the treatment required for meeting the effluent discharge standards specified under the Environment Protection Rules and PCB will be addressed. The disposal arrangements will be conceptually indicated. Impact on Meteorology Impact Assessment The climatologically factors, which play an important role in the environmental analysis of the process of transportation, dilution and dispersion of pollutants, will be analyzed. Meteorological data will be collected to ascertain wind roses, atmospheric stability conditions and prevalence of inversion levels around the project site. This will enable to 19

20 define the atmospheric conditions likely to prevail in the study area and use it as a basis for air quality modeling studies. Impact on Ambient air Quality Impact Assessment Emission inventory will be carried in the study area. A computer based internationally recognized mathematical air quality model (ISCST3) suitable for the region would be used to predict the concentration of SO2, NOx & SPM due to the operation of the proposed plant. The results will be presented for short-term (24-hourly) concentrations in and around the project site. The dispersion model results will be included in the report using isopleths or other graphical methods, over laying a land use map of the surrounding area. The predicted air quality results will be compared with existing regulations. Mitigation Measures Potential mitigation measures include the control measures at the source level and providing adequate stack heights. The measures to control the fugitive dust emissions such green belt development and sprinkling will be suggested. Impact on Noise Impact Assessment Sources of noise and its impact on the environment will be addressed. The noise level at varying distances for multi-sources will be predicted using Noise model. A comparison of measured noise (Leq) at monitoring locations 20

21 to that of predicted noise levels (Leq) will be made and mitigatory measures will be recommended to conform to regulatory ambient air noise standards. Baseline noise levels in different zones like industrial, residential and sensitive areas like hospitals, wild life habitation etc will be monitored. The potential noise level exposure will be determined and evaluate for acceptable limits of exposure. Mitigation Measures The potential mitigation measures will be addressed to reduce noise levels by control at source, provision of greenery to absorb noise during its propagation, isolation of high noise generating sources, use of protective measures especially in high noise areas. Impact on Ecology Impacts on terrestrial species especially during dry season will be assessed particularly those which are sensitive to the pollution. Recommendations will be made to mitigate such adverse impacts as soil erosion and habitat loss. 9.0 ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) includes all the mitigatory measures proposed under each significant environmental attribute. For each potential negative impact identified, recommendations will be presented for 21

22 avoidance, minimization or mitigation of impacts along with costs associated with potential mitigation. Further, a suitable green belt development plan for the project site will be included in the EMP report. The EMP will addresses the following: Identify and summarize all anticipated significant adverse environmental impacts: Identify and summarize all mitigation measures, including the type of impact to which it relates and the conditions under which it is required; Define a set of policies and objectives for environmental performance and continual enhancement of performance; Wastewater and produced water handling, treatment and disposal; Solid and hazardous waste handling and disposal; Green belt development plan; Recommend monitoring and reporting procedures including the parameters to monitored, methods to be used, sampling locations, frequency of measurements, detection limits and definition of thresholds that will signal the need for corrective actions; Recommend capacity development and training requirements for implementation of EMP; and Recommend an organizational structure for effective implementation of the EMP; An environmental monitoring and management plan have developed for the sensitive elements of the environment that may require monitoring during construction and production phase of the proposed project. Recommendations have made on the institutional arrangements that will be necessary to ensure effective monitoring and management. A detailed management and monitoring program has developed to reduce the effects of potential negative environmental impacts. The EMP also reflects statutory requirements, M/s. VIL LIMITED 22

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Package Treatment Plant Policy and Procedure

Package Treatment Plant Policy and Procedure Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION 1389 Pursuant to Article 104 paragraph 1 item 4 of the Waste Act (Official Gazette 178/04, 111/06), the Minister of Environmental

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based)

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) vill Gejamuda, tehsil & Dist-Raigarh, (Chattisgarh) CONTENTS 1.0 Introduction

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 HEALTH Kindergarten: Grade 1: Grade 2: Know that litter can spoil the environment. Grade 3: Grade 4:

More information

Appendix- I Index Map

Appendix- I Index Map Appendix- I Index Map Apdx-1-1 STUDY AREA 10 KM AROUND THE PROPOSED PROJECT Apdx-1-2 Appendix II 1.0 PAPER MACHINE SECTION PROCESS DESCRIPTION 1.1 UWF Printing and Writing Paper Machine The paper machine

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Maverick Consulting. Engineering and Management Consulting Company

Maverick Consulting. Engineering and Management Consulting Company Maverick Consulting Engineering and Management Consulting Company At Maverick, we have access to experienced team of experts who provide consultancy services for the benefit of the organization. The services

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Initial Environmental Examination Project Number: 43936 May 2010 Proposed Loan and Administration of Grant for Solar Power Project (Thailand) (Cofinanced by the Clean Energy

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment: 412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Solid Waste Treatment Facility Solid Waste Permit Application

Solid Waste Treatment Facility Solid Waste Permit Application Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.

More information

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY 1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

Assessment of Air Emissions Martin Marietta Materials Facilities on Highway 34, Weld County, Colorado Project No.: 4572.003

Assessment of Air Emissions Martin Marietta Materials Facilities on Highway 34, Weld County, Colorado Project No.: 4572.003 April 1, 2015 Mr. James Sharn 10170 Church Ranch Way, Suite 201 Westminster, Colorado 80021 Subject: Assessment of Air Emissions Facilities on Highway 34, Weld County, Colorado Project No.: 4572.003 Dear

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

Dated: 27 th June 2014

Dated: 27 th June 2014 To Shri T.N. Venkatesh, I.A.S, CEO M/s. Tamil Nadu Cements Corporation Ltd. 2 nd Floor, LLA Building, 735 Anna Salai, Chennai-600002, Tamil Nadu. Email: co@tancem.com Fax: 044 28523991 F. No. J-11011/83/2014-IA-II

More information

Free Examples of plant layout drawing

Free Examples of plant layout drawing Free layout examples; a wide variety of industrial layouts, within different facility types. Principles of plant layout and design will apply widely. Free Examples of plant layout drawing Principles of

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

History of the SPCC Rule

History of the SPCC Rule 2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally

More information