7 Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter from various process units shall conform to the HCL) particulate matter from various standards prescribed by the concerned authorities from time to time. At no time the emission levels shall go beyond the stipulated standards. In the event of failure of pollution process units are conform to the standards prescribed by the concerned authorities from time to time control system(s) adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. 2 Ambient air quality monitoring stations shall be set up in the downwind direction as well as where maximum ground level concentration are anticipated in consultation with the SPCB. 3 The company shall install cyclone separator to control the emissions from the.boiler 4 Spent solvents shall be recovered as far as possible & recovery shall not be less than 95 percent. During purification process, solvent vapours are emitted tom purification tanks as fugitive emissions. Action shall be taken to reduce the emission as far as possible. Use-of toxic solvents like Methylene. Chloride (M.C.)etc. shall be minimum. All venting equipment shaii have vapour recovery system. 5 Industry shall switch over to aqueous based coating film in place of use of Methylene-Chioride in coating operation, in a phased manner. 6 Industry shall switch over to Use of non halogenated solvents in place of a halogenated solvents in a phased manner 7 The company shall undertake fallowing Waste Minimization measures a. Meeting and control of quantities of active ingredients to minimize waste b. Reuse of by-products from the process as raw materials or as raw material substitutes in other processes c. Use of automated filling to minimize spillage d. Use of close feed system into batch reactors e. Venting equipment through vapour recovery system f. Use of high pressure hoses for equipment Ambient air quality monitoring stations will be setup The company installed cyclone separator to control the emissions from the.boiler Spent solvents are recovered as far as possible up to 95 % Industry will be switch over to aqueous based coating film in place of use of Methylene- Chioride in coating operation, in a phased manner. Industry will be switch over to Use of non halogenated solvents in place of a halogenated solvents in a phased manner Waste Minimization measures are being taken up as per the suggestions and agreed for these points
8 clearing to reduce wastewater generation 8 The industry shall monitor hazardous air pollutants and submit the report to, Ministry/CPCB/SPCB. 9 Fugitive emissions in the work zone environment, product, raw material storage area shall be regularly monitored. The emissions shall Conform to the limits imposed by SPCB, 10 The effluent generation shall not increase m3/d (5461 from process and washings, 2.5m3/d of domestic effluent. 1.5m3/d.from the boiler blow down. 0.5m3/d from cooling tower and 0.5m3/d of DM effluent). The process effluent after primary treatment shall be treated in psychrometric evaporation system. the effluent from boiler blow down and cooling water blow down shall be.used for coal ash quenching. The domestic effluent shall be sent to septic tank with soak pits 11 The solid waste generated in the form of process sludge and residues from neutralization tank, solar evaporation pond. process residues (0.132MTPD) would be stored temporarily Within plant premises and disposed of in proposed TSDF in Karnataka or the existing TSDF at Dundigal in AP if permitted. The coal ash from the boilers(0.4mtpd) would be sold to the brick manufacturers. The waste oil (100 lit/annum) will be sent to authorized recyclers. The used battery(1no year) would be sent to authorized recyclers. 12 The company shall develop rainwater harvesting structures to harvest the run off water for recharge of ground water 13 Green belt shall be provided in 25% of the plant area to mitigate the effects of fugitive emission all around the plant. Development of green belt shall be as per the Central Pollution Control Board guidelines. Fugitive emissions in the work zone environment, product, raw material storage area will be regularly monitored. Agreed and being followed The solid waste generated in the form of process sludge and residues from neutralization tank, solar evaporation pond. process residues (0.132MTPD) are stored temporarily Within plant premises and disposed of in proposed TSDF The company will develop rainwater harvesting structures to harvest the run off water for recharge of ground water Green is developed in 25% of the plant area Sl.No General Conditions Compliance to the Conditions 1 The project authorities shall strictly adhere to the The project authorities are strictly stipulations made by the Karnataka State Pollution Control adhere to the stipulations made by the Board (KSPCB). Karnataka State Pollution Control Board (KSPCB). 2 At no time, the emissions shall exceed the prescribed limits. In the event of failure of any pollution control system adopted by the unit, the unit shall be immediately put out of operation and shall not be restarted until the desired efficiency has been achieved. In the event of failure of any pollution control system adopted by the unit, the unit will immediately put out of operation and won t restart until the desired efficiency has been achieved.
9 3 No further expansion or modifications in the plant shall be carried out without prior approval of the SEIAA / Ministry of Environment and Forests as the case may be. In case of deviations or alterations in the project proposal from those submitted to this Authority to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any. 4 The project authorities shall strictly comply with the rules and regulations under manufacture, storage, and import of Hazardous Chemicals rules, 1989 as amended in October 1994 and January Authorization from KSPCB shall be obtained for collection, treatment, storage, disposal of hazardous wastes. 5 The project authorities must strictly comply with the rules and regulations with regard to handling and disposal of hazardous waste in accordance with the Hazardous Waste (Management and Handling) Rules, Authorization from KSPCB must be obtained for collection, treatment, storage, disposal of hazardous wastes. 6 The overall noise levels in and around the plant area shall be kept well within the standards (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, Rules, 1989 viz, dba(daytime) and 70dbA(night time) 7 The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/EMP report No further expansion or modifications in the plant will be carried out without prior approval of the SEIAA / Ministry of Environment and Forests as the case may be. Authorization from Karnataka State Pollution Control Board is obtained Obtained authorization under handling and disposal of hazardous waste in accordance with the Hazardous Waste (Management and Handling) Rules, Overall noise levels in and around the plant area is kept well with standards by providing all noise control measures The project proponent will comply with all the environmental protection measures and safeguards as per the information provided. 8 A separate Environmental Management cell equipped with full fledged laboratory facilities shall be set up to carry out the Environmental Management and Monitoring function 9 The project authorities shall earmark separate funds to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government along with the implementation schedule for all the conditions stipulated herein. The funds so.provided shall not be diverted for any other purpose. A separate Environmental Management cell is formed The project authorities will earmark separate funds to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government 10 The implementation of the project vis-à-vis environmental Monthly compliance status reports will
10 action plans shall be monitored by MoEF, Regional Office at Bangalore / KSPCB/ monthly compliance status report shall be submitted to monitoring agencies. 11 The project proponent shall inform the public that the project has been accorded environmental clearance by the SEIAA and copies of the clearance letter are available with the KSPCB and may be seen at website of the Authority at This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspaper that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same be forwarded to the MoEF Regional Office at Bangalore / KSPCB / CPCB and the Department of Environmental & Ecology, Bangalore. 12 The project authorities shall inform the MoEF Regional Office at Bangalore / KSPCB / CPCB and the Department of Environmental & Ecology, Bangalore, the date of financial closure and final approval of the project by the concerned authorities and the date of start of the project. 13 The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory 14 The Ministry reserves the fight to stipulate additional conditions, if found,necessary. The company in a time bound manner will implement these conditions. 15 The above conditions will be enforced inter alia under the provisions of the (water prevention &control of pollution) Act1981,the environment( protection) act 1986,Hazardous wastes(management and Handling)Rules2003 and the public Liability Insurance Act 1991 along with their amemedments and rules be submitted to monitoring agencies. Details are provided in previous compliance report The project authorities are ready to inform the MoEF Regional Office at Bangalore / KSPCB / CPCB and the Department of Environmental & Ecology, Bangalore, the date of financial closure and final approval of the project by the concerned authorities and the date of start of the project. Agreed Agreed Agreed
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust
Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationHalf Yearly Compliance Report for the period from April 2013 to September 2013
Half Yearly Compliance Report for the period from April 2013 to September 2013 Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) EC to expansion of Cement Grinding Unit
More informationDescription of Condition. Status of compliance. Natural Gas/ RNLG shall be used as fuel for the power plant. (No change in fuel is envisaged)
Status of Compliance of the stipulated conditions of the Environment Clearance No. J 13012/36/2011-IA.II (T) Dt. October 21, 2011 Period from June, 2011 to Nov., 2011 A. Specific Conditions Condition No.
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationTERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates
More informationEnvironment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
More informationAPPLICATION FOR EXEMPTION Assessing Authority
TO: Combined Request for Pollution Control and Recycling Property Tax Exemption and Iowa Code Section 427.1 (19) APPLICATION FOR EXEMPTION Assessing Authority IMPORTANT: The application should be filed
More informationENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
More informationEnvironmental Accounting Guidelines
Environmental Accounting Guidelines 2002 March 2002 Ministry of the Environment Contents Introduction... 1 1. What is Environmental Accounting?... 3 1.1 Definition...3 1.2 Functions and Roles of Environmental
More informationPROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
More informationThe Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery
More informationEnvironmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
More informationGreen Seal Best Practices Guide for Fleet Vehicle Maintenance Operations
Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations June 4, 1996 Green Seal, Inc. 1001 Connecticut Ave. NW, Ste 872 Washington, DC USA 20036-5525 (202) 872-6400 FAX (202) 872-4324
More informationIDENTIFYING YOUR WASTE
United States Environmental Protection Agency EPA530-F-97-029 September 1997 http://www.epa.gov Solid Waste and Emergency Response IDENTIFYING YOUR WASTE THE STARTING POINT This brochure explains the methodology
More informationINDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive
INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive Legal reference Council Directive 96/61/EC of 24 September 1996 concerning integrated pollution prevention and control (Official
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More informationModule 5: Objectives And Targets
Module 5: Objectives And Targets Guidance...5-2 Figure 5-1: Considerations for Developing Objectives and Targets...5-3 Tools...5-5 Tool 5-1: Objectives and Targets Worksheet...5-5 Tool 5-2: Sample Procedure
More informationENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference
CAPACITY-BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT PROJECT ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS Terms of Reference Background: The
More informationIron and Steel Manufacturing
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron
More informationPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
29.00 WASTE RECOVERY SYSTEM Plant 3 (proposed ) YARD INCINERATOR 3 (proposed ) WASTE RECOVERY SYSTEM Plant 1 INCINERATOR 1 45 46 INCINERATOR 2 WASTE RECOVERY SYSTEM PLANT 2 3 NOS STORAGE TANKS AQUEOUS
More informationCENTRAL POLLUTION CONTROL BOARD Parivesh Bhawan, East Arjun Nagar Delhi-110032
CENTRAL POLLUTION CONTROL BOARD Parivesh Bhawan, East Arjun Nagar Delhi-110032 CPCB Project on Preparation of COINDS document on Pharmaceutical industry and Development of Emission standards including
More informationCoke Manufacturing. Industry Description and Practices. Waste Characteristics
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Coke Manufacturing Industry Description and Practices Coke and coke by-products, including coke oven gas, are produced by
More informationF. No. J-11011/43/2011-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division)
F. No. J-11011/43/2011-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division) Indira Paryavaran Bhawan Jor Bagh Road, Ali Ganj, New Delhi - 110003
More informationTOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
More informationUTILITIES DEPARTMENT
UTILITIES DEPARTMENT Dear Business Owner, As a Business owner or manager you know how important it is to provide a safe and reliable service or product. Similarly, the City of Brighton Utilities Department
More informationSir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents
F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationGE Power & Water Water & Process Technologies. Water Treatment Solutions for Unconventional Gas
GE Power & Water Water & Process Technologies Water Treatment Solutions for Unconventional Gas Addressing Today s Challenges Today, corporations, individuals and governmental bodies alike are focused on
More informationSub: To, M/s Chettinad Cement Corporationjpfmited Kumararajah Muthiah Nagar Puliyur Cement Factory Karrur District - 639114 Tamilnadu
F. No. J-11011/399/2008-IA 'Ul) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -11Q.003. E-mail: ms.industry-mef@nic.in TeJe/fax:
More informationKSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara Village, Janjgir- Champa - District.
KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara Village, Janjgir- Champa - District., Chhattisgarh FOR PERIOD: DEC,2013 TO MAY,201,2014 SIX MONTHLY COMPLIANCE REPORT
More informationPREPARING INDUSTRIAL ENGINEERING REPORTS
PREPARING INDUSTRIAL ENGINEERING REPORTS EARLE HARTLING, LOS ANGELES COUNTY SANITATION DISTRICT JOHN ROBINSON, JOHN ROBINSON CONSULTING, INC WateReuse LA Chapter December 2, 2014 Presentation Overview
More informationMARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8 ONSITE WASTEWATER TREATMENT FACILITIES REGULATION 1. Definitions a. Aggregate means a clean graded hard rock, volcanic rock,
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
More information2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationVarious Environmental Projects at Vanderbijlpark Works. December 2014
Various Environmental Projects at Vanderbijlpark Works December 2014 1 1 Several Air Quality Projects 2 Emission reduction projects FMB DUST CONTROL INSTALLED SYSTEM The dust control system at the FMB
More informationPollution inventory reporting - guidance for operators of waste transfer stations
Pollution inventory reporting - guidance for operators of waste transfer stations Environmental Permitting (England and Wales) Regulations 2010 Regulation 60(1) Version 5 December 2012 UNCLASSIFIED We
More informationTAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
More informationBY-LAW CONCERNING DISCHARGES AT PURIFICATION WORKS ON THE TERRITORY OF THE URBAN AGGLOMERATION OF MONTRÉAL
VILLE DE MONTRÉAL BY-LAW RCG 08-041 BY-LAW CONCERNING DISCHARGES AT PURIFICATION WORKS ON THE TERRITORY OF THE URBAN AGGLOMERATION OF MONTRÉAL In view of article 17 of the by-law entitled Règlement sur
More informationNEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM
NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM Helping New Jersey s small businesses understand the complex world of environmental regulation Pollution Prevention Practical Solutions Practical
More informationPoint-wise COMPLIANCE REPORT Of the Additional Information Sought by SEAC-Gujarat
Point-wise COMPLIANCE REPORT Of the Additional Information Sought by SEAC-Gujarat ON MANUFACTURING OF SYNTHETIC ORGANICS CHEMICALS Activity: 5(f), Category: B2 FOR PROPOSED PROJECT OF M/s. CHANDAN SYNTHETICS
More informationDated: 27 th June 2014
To Shri T.N. Venkatesh, I.A.S, CEO M/s. Tamil Nadu Cements Corporation Ltd. 2 nd Floor, LLA Building, 735 Anna Salai, Chennai-600002, Tamil Nadu. Email: co@tancem.com Fax: 044 28523991 F. No. J-11011/83/2014-IA-II
More informationTOWN OF YARMOUTH. L.L. Pzpr
TOWN OF YARMOUTH 1146 ROUTE 28 SOUTH YARMOUTH MASSACHUSETTS 02664 Tel (508) 398-2231 Fax (508) 398-2365 BOARD OF HEALTH REGULATIONS GOVERNING THE INSPECTION AND MAINTENANCE OF ON SITE SEWAGE DISPOSAL SYSTEMS
More informationIran. F. Fakheri J. Environ. Raouf, Health. et al., Sci. IDENTIFICATION Eng., 2005, Vol. AND 2, No. CLASSIFICATION... 4, pp. 261-266 source reduction
Iran. J. Environ. Health. Sci. Eng., 2005, Vol. 2, No. 4, pp. 261-266 IDENTIFICATION AND CLASSIFICATION OF INDUSTRIAL SOLID WASTES IN AMMONIA UNIT OF RAZI PETROCHEMICAL COMPLEX AND FEASIBILITY OF WASTE
More informationF.N. J-11011/80/2012-IA.II(I) Government of India Ministry of Environment, Forest & Climate Change. Dated: 27 th February, 2015
F.N. J-11011/80/2012-IA.II(I) Government of India Ministry of Environment, Forest & Climate Change Indira Paryavaran Bhawan Jor Bagh Road, Ali Ganj, New Delhi 110003 E-mail: satish.garkoti@nic.in Tele
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
More informationASME QRO Certification Program
ASME QRO Certification Program ASME QRO Certification For Operators of Resource Recovery Facilities Applicant Information Table of Contents Table of Contents Page QRO Certification Overview...1 Types of
More informationLICENCE NUMBER: L8272/2008/2 FILE NUMBER: 2013/000545
WESTERN AUSTRALIA DEPARTMENT OF ENVIRONMENT REGULATION Environmental Protection Act 1986 Licensee: Nationwide Oil Pty Ltd Registered Office: Level 4, 441 St Kilda Road MELBOURNE VIC 3004 ACN: 066 383 364
More informationRULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE
(Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN
More informationPRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
More informationIngredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
More informationYou have applied in accordance with Section 9 of the Environmental Protection Act for approval of:
Ministry of the Environment Ministère de l Environnement ISP Canada Corp. 34 Industrial Street Toronto, Ontario M4G 1Y9 AMENDED CERTIFICATE OF APPROVAL AIR NUMBER 0275-864JR4 Issue Date: April 1, 2011
More informationCan I Recycle Some of My Industrial or Hazardous Wastes?
TCEQ REGULATORY GUIDANCE Waste Permits Division RG-240 August 2006 Can I Recycle Some of My Industrial or Hazardous Wastes? Purpose. The purpose of this document is to assist those who recycle industrial
More informationTreatment of Hazardous Waste On-Site by Generators
IDEM Indiana Department of Environmental Management Office of Land Quality 100 North Senate Indianapolis, IN 46204 OLQ PH: (317) 232-8941 Guidance Treatment of Hazardous Waste On-Site by Generators The
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More informationEl Paso Water Utilities Public Service Board. Application for Renewal Industrial Wastewater Discharge Permit
El Paso Water Utilities Public Service Board Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationAIR TOXICS - TITLE III CAA NESHAP. (National Emission Standards For Hazardous Air Pollutants)
AIR TOXICS - TITLE III CAA PERC DRY CLEANING NESHAP (National Emission Standards For Hazardous Air Pollutants) Office of Air Quality Planning and Standards Office of Air and Radiation August 1993 1 PWC
More informationF002... The following spent
261.31 Hazardous wastes from non-specific sources. (a) The following solid wastes are listed hazardous wastes from non-specific sources unless they are excluded under 260.20 and 260.22 and listed in appendix
More informationGreening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment
Greening Our Future By Educating Tomorrow s Workforce Module 2: Lean Manufacturing and the Environment 11/16/2011 Module 2: Lean Manufacturing and the Environment What You Will Learn From This Module:
More informationPlanning, Designing, Monitoring and Inspection of Wastewater Treatment Systems of Industries
International Journal of Chemistry and Chemical Engineering. ISSN 2248-9924 Volume 3, Number 3 (2013), pp. 225-230 Research India Publications http://www.ripublication.com Planning, Designing, Monitoring
More informationHow To Understand The Benefits Of An Industrial Symbiosis
Triple Bottom Line Accounting Applied for Industrial Symbiosis Forth ALCAS Conference Sydney, Australia, Feb 2325, 2005 Biji Kurup, William Altham & Rene van Berkel Centre of Excellence in Cleaner Production
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR PROPOSED RESIN MANUFACTURING UNIT BY SURVEY NO:- 173/1, VILLAGE PADANA, PADANA BHIMASAR ROAD, TALUKA GANDHIDHAM, DISTRICT KUTCH, GUJARAT OF M/S. MAPLE PANELS PVT. LTD. SUMMARY
More informationWaste and Cost Reduction Techniques for Small Parts Cleaners
Waste and Cost Reduction Techniques for Small Parts Cleaners Edited by Ron Still Mechanical components typically need cleaning during repair and maintenance activities, and most maintenance shops use parts
More informationDisposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets
Disposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets Working in partnership with: Blank inside front cover page Best Management Practice for Catering Outlets Fat,
More informationMALAYSIA S REQUIREMENTS ON INDUSTRIAL EFFLUENT TREATMENT SYSTEMS -The WEPA Workshop and Annual Meeting 18-21 February 2013 Siem Reap, Combodiaby
MALAYSIA S REQUIREMENTS ON INDUSTRIAL EFFLUENT TREATMENT SYSTEMS -The WEPA Workshop and Annual Meeting 18-21 February 2013 Siem Reap, Combodiaby enforcement DIVISION DEPARTMENT OF ENVIRONMENT, MALAYSIA
More informationSTATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
--.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean
More informationLooking after your Septic Tank System
Looking after your Septic Tank System Name: Bought to you by Address: File this in your property file. 0800 TO FLUSH Call 0800 TO FLUSH 1 What do you know about your septic tank system? Just like your
More informationWASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
More informationHalf Yearly Environmental Clearance Compliance Report by United Phosphorus Ltd., Unit # 05, Jhagadia, Gujarat Period from January-June 2013
September 2, 2013 Dr A Mehrotra, Director (S) Ministry of Environment & Forests Western Region Office Kendriya Paryavaran Bhavan Link Road # 3 E 5, Ravi Shankar Nagar Bhopal 462 016 Madhya Pradesh Unit
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
More informationMarch 27, 2009. Your letter stated that U.S. EP A has requested the information pursuant to authority granted under certain provisions of CERCLA
More information
TORs for proposed EIA & RA study
TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one
More informationWest Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet
West Virginia Department of Environmental Protection Division of Air Quality Fact Sheet For Final Renewal Permitting Action Under 45CSR30 and Title V of the Clean Air Act Permit Number: R30-10700001-2009
More informationEnvironmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
More informationWilliam E. Dunn Water Reclamation Facility. Facility Overview & Information
William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa
More information1.2. Structure and contents of the waste water statistics
Statistics on Waste Water Generation, Treatment and Discharge in Germany By Birgit Hein Statistiches Bundesamt, Germany 1.1. Introduction The current ongoing German statistics on water and wastewater are
More informationST. CLOUD TECHNICAL AND COMMUNITY COLLEGE HAZARDOUS WASTE PROCEDURE
APPLICABILITY This procedure is applicable to all St. Cloud Technical & Community College faculty, staff and students. GENERAL Federal, state and local governments impose strict regulations concerning
More informationABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN
ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN The purpose of this plan is to provide detailed instructions for slug prevention and control. A complete copy of this plan is maintained
More informationThe Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India
The Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India Brian Wilson International Lead Management Center (ILMC) In conjunction with:
More informationEcological Aspects of Oil Shale Processing
Abstract Ecological Aspects of Oil Shale Processing Y. Zhirjakov, Institute of Oil Shale Research Tallinn Technical University Tallinn, Estonia 26 th Oil Shale Symposium Oil shale belongs to lean and environmentally
More informationRAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT
RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT WASTE MINIMIZATION IN THE OIL FIELD - APPENDIX C NOTES RAILROAD COMMISSION OF TEXAS LIST OF E&P WASTES: EXEMPT AND NON EXEMPT
More informationGenerating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:
P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation
More informationUse of Substitute Fuels in Large Combustion Plants (LCPs)
Use of Substitute Fuels in Large Combustion Plants (LCPs) By Pat Swords Content of the Presentation What are substitute fuels What is the experience to date with these fuels What are the regulatory implications
More informationUrban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency
Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land
More informationFLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS
FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS Chapter 1: Introduction General Notes Lead Agency: Florida Department of Environmental Protection (DEP) Division of
More informationNASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
More informationFinal Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
More informationSelf Assessment Exercise
Self Assessment Exercise Read the following extract of supporting documentation for Permit Application for Galvos plc galvanising facility and the accompanying tables. Decide if the proposed control techniques
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationEnvironment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.
Environment Management Plan of At Khasra No. 605 PTC Road, Village & Tehsil Narender Nagar, District Tehri Garhwal (Uttarakhand) Brief Features of the Project: Name of the Project Hotel & Resort Project
More information5: Types of Hazardous Waste
1. Introduction THE TEXAS A&M UNIVERSITY SYSTEM HEALTH SCIENCE CENTER CHAPTER XI HAZARDOUS WASTE DISPOSAL Hazardous waste disposal is governed by the EPA and the TCEQ through State and Federal regulations.
More informationA Green Idea. Reclaiming Urban Wood Waste And Urban Forest Debris. For Fuel/Combustion & Renewable Energy
A Green Idea Reclaiming Urban Wood Waste And Urban Forest Debris For Fuel/Combustion & Renewable Energy Presentation Edward Kalebich Chief Operating Officer Robbins Community Power Facility located Chicago
More informationEnvironmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
More informationRemediation of VOC Contaminated Groundwater
Remediation of VOC Contaminated Groundwater Background Contaminated groundwater has become an ever-increasing problem in the United States and around the world. Treatment and disposal of waste is a serious
More informationGreening the canned peach production
Greening the canned peach production Dimitris Folinas a, Dimitrios Aidonis b, Panayotis D. Karayannakidis c a,b,c,d Department of Logistics, Technological Educational Institute of Central Macedonia, Katerini
More informationPUBLISHED IN OFFICIAL GAZETTE OF THE REPUBLIC OF MACEDONIA NO. 6/2004 LAW ON WASTE MANAGEMENT
PUBLISHED IN OFFICIAL GAZETTE OF THE REPUBLIC OF MACEDONIA NO. 6/2004 LAW ON WASTE MANAGEMENT Skopje, October 2004 CONTENTS OF THE LAW ON WASTE MANAGEMENT I. GENERAL PROVISIONS Article 1 Subject of regulation
More informationUDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,