4.8 SURCHARGE LOADS Minimum Construction Surcharge Load CT TRENCHING AND SHORING MANUAL

Size: px
Start display at page:

Download "4.8 SURCHARGE LOADS Minimum Construction Surcharge Load CT TRENCHING AND SHORING MANUAL"

Transcription

1 CT TRENCING AND SORING MANUAL 48 SURCARGE LOADS A surcarge load is any load wic is imposed upon te surface of te soil close enoug to te excavation to cause a lateral pressure to act on te system in addition to te basic eart pressure Groundwater will also cause an additional pressure, but it is not a surcarge load Examples of surcarge loads are spoil embankments adjacent to te trenc, streets or igways, construction macinery or material stockpiles, adjacent buildings or structures, and railroads 481 Minimum Construction Surcarge Load Te minimum lateral construction surcarge of 7 psf ( ) sall be applied to te soring system to a dept of 10 feet (s) below te soring system or to te excavation line wicever is less See Figure 4-47 Tis is te minimum surcarge loading tat sall be applied to any soring system regardless of weter or not te system is actually subjected to a surcarge loading Surcarge loads wic produce lateral pressures greater tan 7 psf would be used in lieu of tis prescribed minimum Tis surcarge is intended to provide for te normal construction loads imposed by small veicles, equipment, or materials, and workmen on te area adjacent to te trenc or excavation It sould be added to all basic eart pressure diagrams Tis minimum surcarge can be compared to a soil aving parameters of = 109 pcf and Ka = 033 for a dept of feet [(033)(109)() = 7 psf] Q s Figure 4-47 Minimum Lateral Surcarge Load 4-70

2 EART PRESSURE TEORY AND APPLICATION 48 Uniform Surcarge Loads Were a uniform surcarge is present, a constant orizontal eart pressure must be added to te basic lateral eart pressure Tis constant eart pressure may be taken as: K Q Eq 4-66 Were: = constant orizontal eart pressure due to uniform surcarge K = coefficient of lateral eart pressure due to surcarge for te following conditions: Use Ka for active eart pressure Use Ko for at-rest eart pressure Q = uniform surcarge applied to te wall backfill surface witin te limits of te active failure wedge 4-71

3 CT TRENCING AND SORING MANUAL 483 Boussinesq Loads Typically, tere are tree (3) types of Boussinesq Loads Tey are as follows: 4831 Strip Load Strip loads are loads suc as igways and railroads tat are generally parallel to te wall Te general equation for determining te pressure at distance below te ground line is (See Figure 4-48): Q R sin cos Eq 4-67 Were R is in radians L 1 Q (psf) L a L 1 = Distance from wall to left edge of strip load L = Distance from wall to rigt edge of strip load / a = widt of surcarge strip R = ( /180) Figure 4-48 Boussinesq Type Strip Load 4-7

4 EART PRESSURE TEORY AND APPLICATION 483 Line Load A line load is a load suc as a continuous wall footing of narrow widt or similar load generally parallel to te wall K-Railing could be considered to be a line load Te general equation for determining te pressure at distance below te ground line is: (See Figure 4-49) For m 04: For m > 04 Q l 0n Eq n Q l m n 18 Eq 4-69 m n L 1 m Ql (plf) n L 1 = Distance from wall to line load Figure 4-49 Boussinesq Type Line Load 4-73

5 CT TRENCING AND SORING MANUAL 4833 Point Load Point loads are loads suc as outrigger loads from a concrete pump or crane A weel load from a concrete truck may also be considered a point load wen te concrete truck is adjacent an excavation and in te process of te unloading Te truck could be positioned eiter parallel or perpendicular to te excavation Te general equation for determining te pressure at distance below te ground line is: (See Figure 4-50) For m 04: For m > 04 Q p n 08 Eq n 3 Q p m n 177 Eq 4-71 m n 3 L 1 m Qp (lbs) n L 1 = Distance from wall to point load Figure 4-50 Boussinesq Type Point Load 4-74

6 EART PRESSURE TEORY AND APPLICATION In addition, is furter adjusted by te following wen te point is furter away from te line closest to te point load: (see Figure 4-51) ' cos 1 1 Eq 4-7 L at =Lateral distance to desired point on wall Wall Qp (lbs) L at PLAN VIEW Figure 4-51 Boussinesq Type Point Load wit Lateral Offset 4-75

7 CT TRENCING AND SORING MANUAL 484 Traffic Loads Traffic near an excavation is one of te more commonly occurring surcarge loads Trying to analyze every possible scenario would be time consuming and not very practical For normal situations, a surcarge load of 300 psf spread over te widt of te traveled way sould be sufficient Te following example compares te pressure diagrams for a S0 truck (using point loads) centered in a 1' lane to a load of Q = 300 psf (using te Boussinesq Strip metod) Te dept of excavation is 10' x 1 m m x m m n dept Dept n For line AB, see Eq 4-71 For loads at an angle to AB, see Eq

8 EART PRESSURE TEORY AND APPLICATION Front and rear rigt weels: 668, cos Front and rear left weels: 494, cos ) Rigt rear weels: ) Left rear weels: 3) Rigt center weels: 4) Left center weels: 5) Rigt front weels: 6) Left front weels: Combine and simplify similar equations: a) 11n 036 n n 144 n b) ,00006 n n ,0001 n 10 1 n ,00006 n n ,0001 n 10 1 n ,00006 n n ,0001 n 10 1 n 3 Dept n a) b)

9 CT TRENCING AND SORING MANUAL S0 Truck 1 Strip (Point loading witout impact) (Q = 300 psf) CONCLUSION: Strip load of Q = 300 psf compares favorably to a point load evaluation for S0 truck loadings 4-78

10 EART PRESSURE TEORY AND APPLICATION 4841 Example 4-7 Sample Problem Surcarge Loads Example 4-7 Surcarge Loads Surcarge Lateral Pressures (psf) Dept Q = 100 Q = 00 Q = 300 Sum * * * * Minimum construction surcarge load Add soil pressures of surcarge loads to derive combined pressure diagram 4-79

11 CT TRENCING AND SORING MANUAL 485 Alternate Surcarge Loading (Traffic) An acceptable alternative to te Boussinesq analysis described below consists of imposing imaginary surcarges beind te soring system suc tat te resulting pressure diagram is a rectangle extending to te computed dept of te soring system and of a uniform widt of 100 psf Generally, alternative surcarge loadings are limited to traffic and ligt equipment surcarge loads Oter loadings due to structures, or stockpiles of soil, materials or eavy equipment will need to be considered separately Q D Figure 4-5 Alternate Traffic Surcarge Loading 4-80

ACT Math Facts & Formulas

ACT Math Facts & Formulas Numbers, Sequences, Factors Integers:..., -3, -2, -1, 0, 1, 2, 3,... Rationals: fractions, tat is, anyting expressable as a ratio of integers Reals: integers plus rationals plus special numbers suc as

More information

SAT Subject Math Level 1 Facts & Formulas

SAT Subject Math Level 1 Facts & Formulas Numbers, Sequences, Factors Integers:..., -3, -2, -1, 0, 1, 2, 3,... Reals: integers plus fractions, decimals, and irrationals ( 2, 3, π, etc.) Order Of Operations: Aritmetic Sequences: PEMDAS (Parenteses

More information

Section 2.3 Solving Right Triangle Trigonometry

Section 2.3 Solving Right Triangle Trigonometry Section.3 Solving Rigt Triangle Trigonometry Eample In te rigt triangle ABC, A = 40 and c = 1 cm. Find a, b, and B. sin 40 a a c 1 a 1sin 40 7.7cm cos 40 b c b 1 b 1cos40 9.cm A 40 1 b C B a B = 90 - A

More information

Math 113 HW #5 Solutions

Math 113 HW #5 Solutions Mat 3 HW #5 Solutions. Exercise.5.6. Suppose f is continuous on [, 5] and te only solutions of te equation f(x) = 6 are x = and x =. If f() = 8, explain wy f(3) > 6. Answer: Suppose we ad tat f(3) 6. Ten

More information

1.6. Analyse Optimum Volume and Surface Area. Maximum Volume for a Given Surface Area. Example 1. Solution

1.6. Analyse Optimum Volume and Surface Area. Maximum Volume for a Given Surface Area. Example 1. Solution 1.6 Analyse Optimum Volume and Surface Area Estimation and oter informal metods of optimizing measures suc as surface area and volume often lead to reasonable solutions suc as te design of te tent in tis

More information

13 PERIMETER AND AREA OF 2D SHAPES

13 PERIMETER AND AREA OF 2D SHAPES 13 PERIMETER AND AREA OF D SHAPES 13.1 You can find te perimeter of sapes Key Points Te perimeter of a two-dimensional (D) sape is te total distance around te edge of te sape. l To work out te perimeter

More information

Geometric Stratification of Accounting Data

Geometric Stratification of Accounting Data Stratification of Accounting Data Patricia Gunning * Jane Mary Horgan ** William Yancey *** Abstract: We suggest a new procedure for defining te boundaries of te strata in igly skewed populations, usual

More information

Notes: Most of the material in this chapter is taken from Young and Freedman, Chap. 12.

Notes: Most of the material in this chapter is taken from Young and Freedman, Chap. 12. Capter 6. Fluid Mecanics Notes: Most of te material in tis capter is taken from Young and Freedman, Cap. 12. 6.1 Fluid Statics Fluids, i.e., substances tat can flow, are te subjects of tis capter. But

More information

Once you have reviewed the bulletin, please

Once you have reviewed the bulletin, please Akron Public Scools OFFICE OF CAREER EDUCATION BULLETIN #5 : Driver Responsibilities 1. Akron Board of Education employees assigned to drive Board-owned or leased veicles MUST BE FAMILIAR wit te Business

More information

Instantaneous Rate of Change:

Instantaneous Rate of Change: Instantaneous Rate of Cange: Last section we discovered tat te average rate of cange in F(x) can also be interpreted as te slope of a scant line. Te average rate of cange involves te cange in F(x) over

More information

Verifying Numerical Convergence Rates

Verifying Numerical Convergence Rates 1 Order of accuracy Verifying Numerical Convergence Rates We consider a numerical approximation of an exact value u. Te approximation depends on a small parameter, suc as te grid size or time step, and

More information

Derivatives Math 120 Calculus I D Joyce, Fall 2013

Derivatives Math 120 Calculus I D Joyce, Fall 2013 Derivatives Mat 20 Calculus I D Joyce, Fall 203 Since we ave a good understanding of its, we can develop derivatives very quickly. Recall tat we defined te derivative f x of a function f at x to be te

More information

New Vocabulary volume

New Vocabulary volume -. Plan Objectives To find te volume of a prism To find te volume of a cylinder Examples Finding Volume of a Rectangular Prism Finding Volume of a Triangular Prism 3 Finding Volume of a Cylinder Finding

More information

Pressure. Pressure. Atmospheric pressure. Conceptual example 1: Blood pressure. Pressure is force per unit area:

Pressure. Pressure. Atmospheric pressure. Conceptual example 1: Blood pressure. Pressure is force per unit area: Pressure Pressure is force per unit area: F P = A Pressure Te direction of te force exerted on an object by a fluid is toward te object and perpendicular to its surface. At a microscopic level, te force

More information

Determine the perimeter of a triangle using algebra Find the area of a triangle using the formula

Determine the perimeter of a triangle using algebra Find the area of a triangle using the formula Student Name: Date: Contact Person Name: Pone Number: Lesson 0 Perimeter, Area, and Similarity of Triangles Objectives Determine te perimeter of a triangle using algebra Find te area of a triangle using

More information

MATHEMATICS FOR ENGINEERING DIFFERENTIATION TUTORIAL 1 - BASIC DIFFERENTIATION

MATHEMATICS FOR ENGINEERING DIFFERENTIATION TUTORIAL 1 - BASIC DIFFERENTIATION MATHEMATICS FOR ENGINEERING DIFFERENTIATION TUTORIAL 1 - BASIC DIFFERENTIATION Tis tutorial is essential pre-requisite material for anyone stuing mecanical engineering. Tis tutorial uses te principle of

More information

M(0) = 1 M(1) = 2 M(h) = M(h 1) + M(h 2) + 1 (h > 1)

M(0) = 1 M(1) = 2 M(h) = M(h 1) + M(h 2) + 1 (h > 1) Insertion and Deletion in VL Trees Submitted in Partial Fulfillment of te Requirements for Dr. Eric Kaltofen s 66621: nalysis of lgoritms by Robert McCloskey December 14, 1984 1 ackground ccording to Knut

More information

How To Ensure That An Eac Edge Program Is Successful

How To Ensure That An Eac Edge Program Is Successful Introduction Te Economic Diversification and Growt Enterprises Act became effective on 1 January 1995. Te creation of tis Act was to encourage new businesses to start or expand in Newfoundland and Labrador.

More information

Shell and Tube Heat Exchanger

Shell and Tube Heat Exchanger Sell and Tube Heat Excanger MECH595 Introduction to Heat Transfer Professor M. Zenouzi Prepared by: Andrew Demedeiros, Ryan Ferguson, Bradford Powers November 19, 2009 1 Abstract 2 Contents Discussion

More information

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers PDHonline Course C155 (2 PDH) Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers Instructor: Richard P. Weber, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA

More information

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for: HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

FINITE DIFFERENCE METHODS

FINITE DIFFERENCE METHODS FINITE DIFFERENCE METHODS LONG CHEN Te best known metods, finite difference, consists of replacing eac derivative by a difference quotient in te classic formulation. It is simple to code and economic to

More information

Perimeter, Area and Volume of Regular Shapes

Perimeter, Area and Volume of Regular Shapes Perimeter, Area and Volume of Regular Sapes Perimeter of Regular Polygons Perimeter means te total lengt of all sides, or distance around te edge of a polygon. For a polygon wit straigt sides tis is te

More information

Math Test Sections. The College Board: Expanding College Opportunity

Math Test Sections. The College Board: Expanding College Opportunity Taking te SAT I: Reasoning Test Mat Test Sections Te materials in tese files are intended for individual use by students getting ready to take an SAT Program test; permission for any oter use must be sougt

More information

Warm medium, T H T T H T L. s Cold medium, T L

Warm medium, T H T T H T L. s Cold medium, T L Refrigeration Cycle Heat flows in direction of decreasing temperature, i.e., from ig-temperature to low temperature regions. Te transfer of eat from a low-temperature to ig-temperature requires a refrigerator

More information

Projective Geometry. Projective Geometry

Projective Geometry. Projective Geometry Euclidean versus Euclidean geometry describes sapes as tey are Properties of objects tat are uncanged by rigid motions» Lengts» Angles» Parallelism Projective geometry describes objects as tey appear Lengts,

More information

f(x + h) f(x) h as representing the slope of a secant line. As h goes to 0, the slope of the secant line approaches the slope of the tangent line.

f(x + h) f(x) h as representing the slope of a secant line. As h goes to 0, the slope of the secant line approaches the slope of the tangent line. Derivative of f(z) Dr. E. Jacobs Te erivative of a function is efine as a limit: f (x) 0 f(x + ) f(x) We can visualize te expression f(x+) f(x) as representing te slope of a secant line. As goes to 0,

More information

Lecture 10: What is a Function, definition, piecewise defined functions, difference quotient, domain of a function

Lecture 10: What is a Function, definition, piecewise defined functions, difference quotient, domain of a function Lecture 10: Wat is a Function, definition, piecewise defined functions, difference quotient, domain of a function A function arises wen one quantity depends on anoter. Many everyday relationsips between

More information

2.12 Student Transportation. Introduction

2.12 Student Transportation. Introduction Introduction Figure 1 At 31 Marc 2003, tere were approximately 84,000 students enrolled in scools in te Province of Newfoundland and Labrador, of wic an estimated 57,000 were transported by scool buses.

More information

Chapter 11. Limits and an Introduction to Calculus. Selected Applications

Chapter 11. Limits and an Introduction to Calculus. Selected Applications Capter Limits and an Introduction to Calculus. Introduction to Limits. Tecniques for Evaluating Limits. Te Tangent Line Problem. Limits at Infinit and Limits of Sequences.5 Te Area Problem Selected Applications

More information

The modelling of business rules for dashboard reporting using mutual information

The modelling of business rules for dashboard reporting using mutual information 8 t World IMACS / MODSIM Congress, Cairns, Australia 3-7 July 2009 ttp://mssanz.org.au/modsim09 Te modelling of business rules for dasboard reporting using mutual information Gregory Calbert Command, Control,

More information

EC201 Intermediate Macroeconomics. EC201 Intermediate Macroeconomics Problem set 8 Solution

EC201 Intermediate Macroeconomics. EC201 Intermediate Macroeconomics Problem set 8 Solution EC201 Intermediate Macroeconomics EC201 Intermediate Macroeconomics Prolem set 8 Solution 1) Suppose tat te stock of mone in a given econom is given te sum of currenc and demand for current accounts tat

More information

College Planning Using Cash Value Life Insurance

College Planning Using Cash Value Life Insurance College Planning Using Cas Value Life Insurance CAUTION: Te advisor is urged to be extremely cautious of anoter college funding veicle wic provides a guaranteed return of premium immediately if funded

More information

Research on the Anti-perspective Correction Algorithm of QR Barcode

Research on the Anti-perspective Correction Algorithm of QR Barcode Researc on te Anti-perspective Correction Algoritm of QR Barcode Jianua Li, Yi-Wen Wang, YiJun Wang,Yi Cen, Guoceng Wang Key Laboratory of Electronic Tin Films and Integrated Devices University of Electronic

More information

Catalogue no. 12-001-XIE. Survey Methodology. December 2004

Catalogue no. 12-001-XIE. Survey Methodology. December 2004 Catalogue no. 1-001-XIE Survey Metodology December 004 How to obtain more information Specific inquiries about tis product and related statistics or services sould be directed to: Business Survey Metods

More information

- 1 - Handout #22 May 23, 2012 Huffman Encoding and Data Compression. CS106B Spring 2012. Handout by Julie Zelenski with minor edits by Keith Schwarz

- 1 - Handout #22 May 23, 2012 Huffman Encoding and Data Compression. CS106B Spring 2012. Handout by Julie Zelenski with minor edits by Keith Schwarz CS106B Spring 01 Handout # May 3, 01 Huffman Encoding and Data Compression Handout by Julie Zelenski wit minor edits by Keit Scwarz In te early 1980s, personal computers ad ard disks tat were no larger

More information

Note nine: Linear programming CSE 101. 1 Linear constraints and objective functions. 1.1 Introductory example. Copyright c Sanjoy Dasgupta 1

Note nine: Linear programming CSE 101. 1 Linear constraints and objective functions. 1.1 Introductory example. Copyright c Sanjoy Dasgupta 1 Copyrigt c Sanjoy Dasgupta Figure. (a) Te feasible region for a linear program wit two variables (see tet for details). (b) Contour lines of te objective function: for different values of (profit). Te

More information

Numerical analysis of displacements of a diaphragm wall

Numerical analysis of displacements of a diaphragm wall Numerical analysis of displacements of a diapragm wall M.Mitew Warsaw University of Tecnology, Warsaw, Poland ABSTRACT: In te paper, numerical analysis and parameter study ave been presented taking into

More information

An inquiry into the multiplier process in IS-LM model

An inquiry into the multiplier process in IS-LM model An inquiry into te multiplier process in IS-LM model Autor: Li ziran Address: Li ziran, Room 409, Building 38#, Peing University, Beijing 00.87,PRC. Pone: (86) 00-62763074 Internet Address: jefferson@water.pu.edu.cn

More information

Sections 3.1/3.2: Introducing the Derivative/Rules of Differentiation

Sections 3.1/3.2: Introducing the Derivative/Rules of Differentiation Sections 3.1/3.2: Introucing te Derivative/Rules of Differentiation 1 Tangent Line Before looking at te erivative, refer back to Section 2.1, looking at average velocity an instantaneous velocity. Here

More information

In other words the graph of the polynomial should pass through the points

In other words the graph of the polynomial should pass through the points Capter 3 Interpolation Interpolation is te problem of fitting a smoot curve troug a given set of points, generally as te grap of a function. It is useful at least in data analysis (interpolation is a form

More information

The Derivative as a Function

The Derivative as a Function Section 2.2 Te Derivative as a Function 200 Kiryl Tsiscanka Te Derivative as a Function DEFINITION: Te derivative of a function f at a number a, denoted by f (a), is if tis limit exists. f (a) f(a+) f(a)

More information

Computer Science and Engineering, UCSD October 7, 1999 Goldreic-Levin Teorem Autor: Bellare Te Goldreic-Levin Teorem 1 Te problem We æx a an integer n for te lengt of te strings involved. If a is an n-bit

More information

Tangent Lines and Rates of Change

Tangent Lines and Rates of Change Tangent Lines and Rates of Cange 9-2-2005 Given a function y = f(x), ow do you find te slope of te tangent line to te grap at te point P(a, f(a))? (I m tinking of te tangent line as a line tat just skims

More information

Solutions by: KARATUĞ OZAN BiRCAN. PROBLEM 1 (20 points): Let D be a region, i.e., an open connected set in

Solutions by: KARATUĞ OZAN BiRCAN. PROBLEM 1 (20 points): Let D be a region, i.e., an open connected set in KOÇ UNIVERSITY, SPRING 2014 MATH 401, MIDTERM-1, MARCH 3 Instructor: BURAK OZBAGCI TIME: 75 Minutes Solutions by: KARATUĞ OZAN BiRCAN PROBLEM 1 (20 points): Let D be a region, i.e., an open connected set

More information

f(a + h) f(a) f (a) = lim

f(a + h) f(a) f (a) = lim Lecture 7 : Derivative AS a Function In te previous section we defined te derivative of a function f at a number a (wen te function f is defined in an open interval containing a) to be f (a) 0 f(a + )

More information

KM client format supported by KB valid from 13 May 2015

KM client format supported by KB valid from 13 May 2015 supported by KB valid from 13 May 2015 1/16 VRSION 1.2. UPDATD: 13.12.2005. 1 Introduction... 2 1.1 Purpose of tis document... 2 1.2 Caracteristics of te KM format... 2 2 Formal ceck of KM format... 3

More information

Chapter 7 Numerical Differentiation and Integration

Chapter 7 Numerical Differentiation and Integration 45 We ave a abit in writing articles publised in scientiþc journals to make te work as Þnised as possible, to cover up all te tracks, to not worry about te blind alleys or describe ow you ad te wrong idea

More information

6. Differentiating the exponential and logarithm functions

6. Differentiating the exponential and logarithm functions 1 6. Differentiating te exponential and logaritm functions We wis to find and use derivatives for functions of te form f(x) = a x, were a is a constant. By far te most convenient suc function for tis purpose

More information

2 Limits and Derivatives

2 Limits and Derivatives 2 Limits and Derivatives 2.7 Tangent Lines, Velocity, and Derivatives A tangent line to a circle is a line tat intersects te circle at exactly one point. We would like to take tis idea of tangent line

More information

Grade 12 Assessment Exemplars

Grade 12 Assessment Exemplars Grade Assessment Eemplars Learning Outcomes and. Assignment : Functions - Memo. Investigation: Sequences and Series Memo/Rubric 5. Control Test: Number Patterns, Finance and Functions - Memo 7. Project:

More information

Theoretical calculation of the heat capacity

Theoretical calculation of the heat capacity eoretical calculation of te eat capacity Principle of equipartition of energy Heat capacity of ideal and real gases Heat capacity of solids: Dulong-Petit, Einstein, Debye models Heat capacity of metals

More information

The EOQ Inventory Formula

The EOQ Inventory Formula Te EOQ Inventory Formula James M. Cargal Matematics Department Troy University Montgomery Campus A basic problem for businesses and manufacturers is, wen ordering supplies, to determine wat quantity of

More information

SAT Math Facts & Formulas

SAT Math Facts & Formulas Numbers, Sequences, Factors SAT Mat Facts & Formuas Integers:..., -3, -2, -1, 0, 1, 2, 3,... Reas: integers pus fractions, decimas, and irrationas ( 2, 3, π, etc.) Order Of Operations: Aritmetic Sequences:

More information

10 Building Code Opportunities for California Local Governments

10 Building Code Opportunities for California Local Governments IN PARTNERSHIP WITH 0 Building Code Opportunities for California Local Governments Go beyond Title 24 codes by instituting local ordinances tat elp you reac your climate goals sooner and reap rewards earlier.

More information

Investing in Roads: Pricing, Costs and New Capacity

Investing in Roads: Pricing, Costs and New Capacity Investing in Roads: Pricing, Costs and New Capacity Cristoper rcer Stepen Glaister Department of Civil and Environmental Engineering Imperial College London November 2006 Researc commissioned by te Independent

More information

3 Ans. 1 of my $30. 3 on. 1 on ice cream and the rest on 2011 MATHCOUNTS STATE COMPETITION SPRINT ROUND

3 Ans. 1 of my $30. 3 on. 1 on ice cream and the rest on 2011 MATHCOUNTS STATE COMPETITION SPRINT ROUND 0 MATHCOUNTS STATE COMPETITION SPRINT ROUND. boy scouts are accompanied by scout leaders. Eac person needs bottles of water per day and te trip is day. + = 5 people 5 = 5 bottles Ans.. Cammie as pennies,

More information

Section 3.3. Differentiation of Polynomials and Rational Functions. Difference Equations to Differential Equations

Section 3.3. Differentiation of Polynomials and Rational Functions. Difference Equations to Differential Equations Difference Equations to Differential Equations Section 3.3 Differentiation of Polynomials an Rational Functions In tis section we begin te task of iscovering rules for ifferentiating various classes of

More information

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of

More information

Chapter 6 Tail Design

Chapter 6 Tail Design apter 6 Tail Design Moammad Sadraey Daniel Webster ollege Table of ontents apter 6... 74 Tail Design... 74 6.1. Introduction... 74 6.. Aircraft Trim Requirements... 78 6..1. Longitudinal Trim... 79 6...

More information

Heat Exchangers. Heat Exchanger Types. Heat Exchanger Types. Applied Heat Transfer Part Two. Topics of This chapter

Heat Exchangers. Heat Exchanger Types. Heat Exchanger Types. Applied Heat Transfer Part Two. Topics of This chapter Applied Heat Transfer Part Two Heat Excangers Dr. Amad RAMAZANI S.A. Associate Professor Sarif University of Tecnology انتقال حرارت کاربردی احمد رمضانی سعادت ا بادی Autumn, 1385 (2006) Ramazani, Heat Excangers

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

Area-Specific Recreation Use Estimation Using the National Visitor Use Monitoring Program Data

Area-Specific Recreation Use Estimation Using the National Visitor Use Monitoring Program Data United States Department of Agriculture Forest Service Pacific Nortwest Researc Station Researc Note PNW-RN-557 July 2007 Area-Specific Recreation Use Estimation Using te National Visitor Use Monitoring

More information

Strategic trading in a dynamic noisy market. Dimitri Vayanos

Strategic trading in a dynamic noisy market. Dimitri Vayanos LSE Researc Online Article (refereed) Strategic trading in a dynamic noisy market Dimitri Vayanos LSE as developed LSE Researc Online so tat users may access researc output of te Scool. Copyrigt and Moral

More information

SAMPLE DESIGN FOR THE TERRORISM RISK INSURANCE PROGRAM SURVEY

SAMPLE DESIGN FOR THE TERRORISM RISK INSURANCE PROGRAM SURVEY ASA Section on Survey Researc Metods SAMPLE DESIG FOR TE TERRORISM RISK ISURACE PROGRAM SURVEY G. ussain Coudry, Westat; Mats yfjäll, Statisticon; and Marianne Winglee, Westat G. ussain Coudry, Westat,

More information

What is Advanced Corporate Finance? What is finance? What is Corporate Finance? Deciding how to optimally manage a firm s assets and liabilities.

What is Advanced Corporate Finance? What is finance? What is Corporate Finance? Deciding how to optimally manage a firm s assets and liabilities. Wat is? Spring 2008 Note: Slides are on te web Wat is finance? Deciding ow to optimally manage a firm s assets and liabilities. Managing te costs and benefits associated wit te timing of cas in- and outflows

More information

UNIFORM FLOW. Key words Uniform flow; most economical cross-section; discharge; velocity; erosion; sedimentation

UNIFORM FLOW. Key words Uniform flow; most economical cross-section; discharge; velocity; erosion; sedimentation Capter UNIFORM FLOW.. Introduction.. Basic equations in uniform open-cannel flow.3. Most economical cross-section.4. Cannel wit compound cross-section.5. Permissible velocity against erosion and sedimentation

More information

DEHA SPHERICAL HEAD LIFTING ANCHOR SYSTEM KKT 13-E

DEHA SPHERICAL HEAD LIFTING ANCHOR SYSTEM KKT 13-E KKT 13-E CONCRETE Tis catalogue is an installation and application instruction as defined in VDI/BV-BS 6205 Introduction Certified quality from HALFEN Connect to safety. VDI/BV-BS 6205 HALFEN Sperical

More information

Guide to Cover Letters & Thank You Letters

Guide to Cover Letters & Thank You Letters Guide to Cover Letters & Tank You Letters 206 Strebel Student Center (315) 792-3087 Fax (315) 792-3370 TIPS FOR WRITING A PERFECT COVER LETTER Te resume never travels alone. Eac time you submit your resume

More information

2.23 Gambling Rehabilitation Services. Introduction

2.23 Gambling Rehabilitation Services. Introduction 2.23 Gambling Reabilitation Services Introduction Figure 1 Since 1995 provincial revenues from gambling activities ave increased over 56% from $69.2 million in 1995 to $108 million in 2004. Te majority

More information

2.1: The Derivative and the Tangent Line Problem

2.1: The Derivative and the Tangent Line Problem .1.1.1: Te Derivative and te Tangent Line Problem Wat is te deinition o a tangent line to a curve? To answer te diiculty in writing a clear deinition o a tangent line, we can deine it as te iting position

More information

EXCAVATOR SAFETY TRAINING

EXCAVATOR SAFETY TRAINING EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure

More information

SWITCH T F T F SELECT. (b) local schedule of two branches. (a) if-then-else construct A & B MUX. one iteration cycle

SWITCH T F T F SELECT. (b) local schedule of two branches. (a) if-then-else construct A & B MUX. one iteration cycle 768 IEEE RANSACIONS ON COMPUERS, VOL. 46, NO. 7, JULY 997 Compile-ime Sceduling of Dynamic Constructs in Dataæow Program Graps Soonoi Ha, Member, IEEE and Edward A. Lee, Fellow, IEEE Abstract Sceduling

More information

Writing Mathematics Papers

Writing Mathematics Papers Writing Matematics Papers Tis essay is intended to elp your senior conference paper. It is a somewat astily produced amalgam of advice I ave given to students in my PDCs (Mat 4 and Mat 9), so it s not

More information

MATHEMATICAL MODELS OF LIFE SUPPORT SYSTEMS Vol. I - Mathematical Models for Prediction of Climate - Dymnikov V.P.

MATHEMATICAL MODELS OF LIFE SUPPORT SYSTEMS Vol. I - Mathematical Models for Prediction of Climate - Dymnikov V.P. MATHEMATICAL MODELS FOR PREDICTION OF CLIMATE Institute of Numerical Matematics, Russian Academy of Sciences, Moscow, Russia. Keywords: Modeling, climate system, climate, dynamic system, attractor, dimension,

More information

Contact Details. Physical Address: Corner Church & Bosman Street CGO Building Pretoria

Contact Details. Physical Address: Corner Church & Bosman Street CGO Building Pretoria Contact Details Pysical Address: Corner Curc & Bosman Street CGO Building Postal Address: Telepone No: +27 12 337 2000 Fax No: +27 12 328 4217 E-mail Address: ttp://www.publicworks.gov.za 1. Introduction

More information

An Introduction to Milankovitch Cycles

An Introduction to Milankovitch Cycles An Introduction to Milankovitc Cycles Wat Causes Glacial Cycles? Ricard McGeee kiloyear bp 45 4 35 3 5 15 1 5 4 - -4-6 -8 temperature -1 Note te period of about 1 kyr. Seminar on te Matematics of Climate

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

Average and Instantaneous Rates of Change: The Derivative

Average and Instantaneous Rates of Change: The Derivative 9.3 verage and Instantaneous Rates of Cange: Te Derivative 609 OBJECTIVES 9.3 To define and find average rates of cange To define te derivative as a rate of cange To use te definition of derivative to

More information

a joint initiative of Cost of Production Calculator

a joint initiative of Cost of Production Calculator a joint initiative of Cost of Production Calculator 1 KEY BENEFITS Learn to use te MAKING MORE FROM SHEEP cost of production calculator to: Measure te performance of your seep enterprise year on year Compare

More information

VERTICAL STRESS INCREASES IN SOIL TYPES OF LOADING. Point Loads (P) Line Loads (q/unit length) Examples: - Posts. Examples: - Railroad track

VERTICAL STRESS INCREASES IN SOIL TYPES OF LOADING. Point Loads (P) Line Loads (q/unit length) Examples: - Posts. Examples: - Railroad track VERTICAL STRESS INCREASES IN SOIL Point Loads (P) TYPES OF LOADING Line Loads (q/unit length) Revised 0/015 Figure 6.11. Das FGE (005). Examples: - Posts Figure 6.1. Das FGE (005). Examples: - Railroad

More information

Chapter 10: Refrigeration Cycles

Chapter 10: Refrigeration Cycles Capter 10: efrigeration Cycles Te vapor compression refrigeration cycle is a common metod for transferring eat from a low temperature to a ig temperature. Te above figure sows te objectives of refrigerators

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

A strong credit score can help you score a lower rate on a mortgage

A strong credit score can help you score a lower rate on a mortgage NET GAIN Scoring points for your financial future AS SEEN IN USA TODAY S MONEY SECTION, JULY 3, 2007 A strong credit score can elp you score a lower rate on a mortgage By Sandra Block Sales of existing

More information

Care after stroke. or transient ischaemic attack. Information for patients and their carers

Care after stroke. or transient ischaemic attack. Information for patients and their carers Care after stroke or transient iscaemic attack Information for patients and teir carers 2008 Tis booklet is based on te National Clinical Guideline for Stroke, tird edition, wic includes te National Institute

More information

Unemployment insurance/severance payments and informality in developing countries

Unemployment insurance/severance payments and informality in developing countries Unemployment insurance/severance payments and informality in developing countries David Bardey y and Fernando Jaramillo z First version: September 2011. Tis version: November 2011. Abstract We analyze

More information

K x ' Retaining. Walls ENCE 461. Foundation Analysis and Design. Mohr s Circle. and Lateral Earth. Pressures. Lateral Earth Pressure.

K x ' Retaining. Walls ENCE 461. Foundation Analysis and Design. Mohr s Circle. and Lateral Earth. Pressures. Lateral Earth Pressure. Lateral Earth Pressure Coefficient K x ' z ' K = lateral earth pressure coefficient x = horizontal effective stress Mohr s Circle and Lateral Earth Pressures x ' = = z ' ENCE 461 Foundation Analysis and

More information

Torchmark Corporation 2001 Third Avenue South Birmingham, Alabama 35233 Contact: Joyce Lane 972-569-3627 NYSE Symbol: TMK

Torchmark Corporation 2001 Third Avenue South Birmingham, Alabama 35233 Contact: Joyce Lane 972-569-3627 NYSE Symbol: TMK News Release Torcmark Corporation 2001 Tird Avenue Sout Birmingam, Alabama 35233 Contact: Joyce Lane 972-569-3627 NYSE Symbol: TMK TORCHMARK CORPORATION REPORTS FOURTH QUARTER AND YEAR-END 2004 RESULTS

More information

Valve Selection and Sizing

Valve Selection and Sizing Valve Selection and Sizing SECTION OF ENGINEERING MANUAL OF AUTOMATIC CONTROL 77-1100 Contents Introduction... 2 Definitions... 2 Valve Components... 2 Valve Flow Caracteristics... 2 Valve Flow Terms...

More information

Estimating Trench Excavation

Estimating Trench Excavation Estimating Excavation By Steven J. Peterson, PE, MBA Introduction excavation is often performed by hydraulic backhoe excavators. This is because hydraulic excavators are not only good at excavating below

More information

6. Vectors. 1 2009-2016 Scott Surgent (surgent@asu.edu)

6. Vectors. 1 2009-2016 Scott Surgent (surgent@asu.edu) 6. Vectors For purposes of applications in calculus and physics, a vector has both a direction and a magnitude (length), and is usually represented as an arrow. The start of the arrow is the vector s foot,

More information

1 The Collocation Method

1 The Collocation Method CS410 Assignment 7 Due: 1/5/14 (Fri) at 6pm You must wor eiter on your own or wit one partner. You may discuss bacground issues and general solution strategies wit oters, but te solutions you submit must

More information

On a Satellite Coverage

On a Satellite Coverage I. INTRODUCTION On a Satellite Coverage Problem DANNY T. CHI Kodak Berkeley Researc Yu T. su National Ciao Tbng University Te eart coverage area for a satellite in an Eart syncronous orbit wit a nonzero

More information

SAT Math Must-Know Facts & Formulas

SAT Math Must-Know Facts & Formulas SAT Mat Must-Know Facts & Formuas Numbers, Sequences, Factors Integers:..., -3, -2, -1, 0, 1, 2, 3,... Rationas: fractions, tat is, anyting expressabe as a ratio of integers Reas: integers pus rationas

More information

www.mathsbox.org.uk Displacement (x) Velocity (v) Acceleration (a) x = f(t) differentiate v = dx Acceleration Velocity (v) Displacement x

www.mathsbox.org.uk Displacement (x) Velocity (v) Acceleration (a) x = f(t) differentiate v = dx Acceleration Velocity (v) Displacement x Mechanics 2 : Revision Notes 1. Kinematics and variable acceleration Displacement (x) Velocity (v) Acceleration (a) x = f(t) differentiate v = dx differentiate a = dv = d2 x dt dt dt 2 Acceleration Velocity

More information

Sample Test Questions

Sample Test Questions mathematics College Algebra Geometry Trigonometry Sample Test Questions A Guide for Students and Parents act.org/compass Note to Students Welcome to the ACT Compass Sample Mathematics Test! You are about

More information

MERIDA TRANSLATION OF THE ORIGINAL OPERATING INSTRUCTIONS CITY BIKES, TREKKING BIKES EN 14764 KIDS BIKES EN 14765 PEDELEC, E-BIKE, EPAC EN 15194

MERIDA TRANSLATION OF THE ORIGINAL OPERATING INSTRUCTIONS CITY BIKES, TREKKING BIKES EN 14764 KIDS BIKES EN 14765 PEDELEC, E-BIKE, EPAC EN 15194 MERIDA TRANSLATION OF THE ORIINAL OPERATIN INSTRUCTIONS CITY BIKES, TREKKIN BIKES EN 14764 KIDS BIKES EN 14765 PEDELEC, E-BIKE, EPAC EN 15194 Read at least pages 12-19 before your first ride! Perform te

More information

Factoring Synchronous Grammars By Sorting

Factoring Synchronous Grammars By Sorting Factoring Syncronous Grammars By Sorting Daniel Gildea Computer Science Dept. Uniersity of Rocester Rocester, NY Giorgio Satta Dept. of Information Eng g Uniersity of Padua I- Padua, Italy Hao Zang Computer

More information

For Sale By Owner Program. We can help with our for sale by owner kit that includes:

For Sale By Owner Program. We can help with our for sale by owner kit that includes: Dawn Coen Broker/Owner For Sale By Owner Program If you want to sell your ome By Owner wy not:: For Sale Dawn Coen Broker/Owner YOUR NAME YOUR PHONE # Look as professional as possible Be totally prepared

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information