1 Impulse Voltage Test of Power Transformers Lukesh Kumar Sahu 1, Shruti Soni 2, Chandra Shekhar Chandrakar 3 1, 2, 3 Department of Electrical and Electronics Engineering, KITE Raipur Chhattisgarh Swami Vivekananda Technical University Raipur (C.G.) India [email protected] [email protected] [email protected] Abstract: During the Lightning Impulse (LI) test of transformer windings with a low impedance it is difficult to ensure a minimum time to half-value of 40 μs in accordance with IEC and IEC This is caused by the oscillating discharge determined by the impulse voltage test generator capacitance and the transformer impedance. In most cases using special adapted circuits can solve the problem Keywords: Impulse Voltage, Resistive earthing, Projection of an impulse voltage, effective impulse capacitance. 1. Introduction 1.1 Impulse voltage test generator with capacitive load For the LI testing of basic arrangements but also of different electrical components a purely capacitive load can be assumed. The impulse voltage shape generated by an impulse voltage test generator based on the MARX multiplier circuit can be described by two exponential functions with different time constants. Whereas the LI front time T1 according to IEC [1] is essentially determined by the resistance of the front resistor Rs located in the impulse voltage test generator and the load capacitance Ct, see Figure 1, the time to half-value T2 is determined by the impulse capacitance of the impulse capacitor Ci and the resistance of the tail resistor Rp being part of the impulse voltage test generator. According to IEC there are the following time parameters and tolerances for the standard LI 1.2/50: Front time T1 = 1.2 μs + 30 % Time to half-value T2 = 50 μs + 20 % (b) Figure 1: LI test at a capacitive load a) Principal circuit b) Standard LI 1.2/50 (IEC ) with time parameter T1 and T2 Equation for the voltage shape Vi t = V K e 1 t2 e 1 t1 ` (1) 1.2 Impulse voltage test generator with inductive load (a) Ci Impulse capacitance Ct Capacitance of the load (including voltage divider) Rp Tail resistor Rs Front resistor SG Switching spark gap In most of the cases power transformers cannot be assumed as a purely capacitive load for the LI testing. Usually the LI test voltage is applied to one winding terminal of the transformer to be tested, whereas all other terminals are connected with the earth. Hereby, not only the input capacitance of the transformer winding acts as the load for the impulse voltage test generator but also its impedance to all other short-circuited windings. The principal circuit (Figure 1) must be extended by the transformer inductance Lt that is connected in parallel to the test capacitance Ct (Figure 2). 120
2 (a) Ci -Impulse capacitance Ct- Capacitance of the load including voltage divider) Lt- Inductance of the load Rp- Tail resistor Rs- Front resistor SG -Switching spark gap International Journal of Science and Research (IJSR) the aperiodic discharge of the impulse capacitance turns to a damped oscillating cosine shape. This is permitted in principle acc. to IEC [2]. However, the lower tolerance limit for the time to half-value of T2 min may not remain under 40 μs (= 50 μs - 20 %). At the other side the amplitude of opposite polarity of the LI voltage dmax should not exceed 50 %. To fulfill these both requirements the impulse voltage impulse voltage test generator must have a minimum required impulse capacitance Ci req, which can be calculated closely as following C i req 2 T 2 2min (4) L l With T2 = 40 μs Hence it follows with equation (3): C i req 2 T 2 min 2 1oo ω P tot V imp% V P P 2 (5) (b) Figure 2: LI test at an inductive/capacitive load a) Principal circuit b) Voltage shape depending on the -inductance factor Ll Equation for the voltage shape is V i t V K 1 e δt cos ωt φ K 2 e 1/t (2) Though the requirement for a minimum impulse capacity Ci req of the impulse voltage test generator is necessary but it is not sufficient to meet the requirements T2 min 40 μs (IEC) and dmax 50 %. Moreover, the oscillating circuit formed by the impulse capacitance Ci of the impulse voltage test generator and the winding inductance Lt must have a certain characteristic damping. This is mainly determined by the front and tail resistors (Rs, Rp) located in the impulse voltage test generator. If the damping is to low, a minimum time to half-value T2min 40 μs can be reached but the amplitude of opposite polarity d is more than 50 %. For a higher damping the requirement for the amplitude of opposite polarity d 50 % can be fulfilled, but the time to half-value may remain smaller than 40 μs, see Figure 3. In the case that the impulse capacitance of the impulse voltage test generator Ci is not greater than the minimum required impulse capacitance Ci req according to equation (5), the adjustment of the damping of the test circuit must be done very exactly. The margin for the adjustment, i.e. for the sufficient circuit damping, becomes greater the more the impulse capacitance of the applied impulse voltage test generator Ci exceeds the minimum required impulse capacitance Ci req according to equation (5). Thereby the inductance Lt of the load becomes smaller with decreasing impedance voltage V imp % with decreasing rated phase-to-phase voltage VP-P and with increasing power P tot of the transformer winding to be tested. Therefore the lowest values of the inductance Lt have to be considered by testing the low-voltage side windings for power transformers. For a three-phase winding in a star connection the following equation can be applied: L l = V 2 imp% V P P (3) 100 ω P tot ω =2πƒ Lt Inductance (stray inductance) of the winding to be tested Vimp% Impedance voltage of the winding to be Tested VP-P Rated phase-to-phase voltage of the three-phase winding to be tested Ptot Rated total power of the three-phase winding to be tested f Rated frequency With decreasing inductance Lt the impulse capacitance Ci of the impulse voltage test generator is not only discharged via the tail resistor Rp but also via the low inductance Lt of the winding to be tested. Thereby the time to half-value T2 of the LI is reduced and Figure 3: LI test of power transformers with different damping of the test circuit (a), (b): Damping to low - the amplitude of opposite polarity d of the LI is too high (d > 50%) (c): Optimal damping (T2 > 40μs, d < 50%) 121
3 (d), (e): Damping to high - T2 is to short (T2 < 40μs) International Journal of Science and Research (IJSR) 2. Resistive Earthing of Winding Terminals If the requirements acc. to equation (5) cannot be fulfilled for the LI test of power transformers with an existing impulse voltage test generator, IEC allows for the following exceptions: a) A shorter time to half-value than T2 = 40 μs can be agreed between the manufacturer and the customer of the transformer b) Winding terminals being not directly exposed to the test voltage, can be earthed via termination resistors The resistance of the termination resistors has to remain under 500 Ohm. Furthermore, it has to made sure that the voltage which will occur at the resistively earthed winding terminals will not exceed 75 % of the rated LI withstand voltage of these windings. With this method it is often possible to extend the operating range of an impulse voltage test generator considerably. Nevertheless, it must be noted that hereby, the impulse voltage stress of the tested windings may considerably deviate from the voltage stress for direct earthing. It has to be agreed between customer and manufacturer which exception is accepted. voltage and the stage energy of an impulse voltage test generator for the LI test. The total charging voltage of the impulse voltage test generator should lie for LI testing 30 % 60 % above the highest required LI test voltage. In many cases the value of 30 % is sufficient for routine tests. If development tests are to be carried out, a total charging voltage, which lays 60 % above the highest rated LI test voltage, is recommended. If the exception earthing via termination resistors is not considered, the required impulse capacitance Ci req can be calculated for each winding voltage level acc. to equation (5). Taking into consideration the different circuitry options of the impulse voltage test generator (parallel connection of stages, partial operation) and the above aspects regarding the total charging voltage the stage charging energy can be calculated in principle for each possible test case. Normally a stage energy of 5 10 kj per 100- kv-stage and a stage energy of kj per 200-kV-stage will be sufficient. Whereas the lower values apply to transformers with lower power, the higher values apply to transformers with higher power (Figure 4). Often, impulse voltage test generators for power transformer testing have energy of 15 kj per 200-kVstage, see Figure Extension of The Loading Range of Impulse Voltage Test Generators Often it is required to test transformer with such a high power, for which the existing impulse voltage test generator has not been originally meant. In such cases it is necessary to utilize al reserves of the existing impulse voltage test generator. 4.1 Increasing the effective impulse capacitance The following generally known measures can be taken: a) running the impulse voltage test generator in partial operation, i.e. with the minimum number of stages, being necessary to reach the required test voltage level. b) Switching a certain number of generator stages respectively in parallel and connect this parallel stages in series to reach the required test voltage. 4.2 Increasing the parallel resistors If the time to half-value remains only a few below the permitted lower limit T2 min = 40 μs, it is possible to reach a value of T2 40 μs by increasing the tail resistors Rp. Usually the tail resistors meant for switching impulse voltage can be applied. Figure 4: Impulse Voltage Test System IP 360/3600 G (360 kj, 3600 kv) with impulse voltage divider and chopping multiple spark gaps, with stage energy of 20 kj being used for the LI test of power transformers up to 765 kv A further increase of the resistance of the tail resistors Rp above the resistance value for the SI generation does not have any result. 3. Projection of an impulse voltage test generator for the LI test of power transformers The main technical data of the transformers to be tested, like the circuitry and the arrangement of the windings, their rated voltage, rated power, impedance voltage and not at least the rated frequency determine essentially the total charging 122
4 Figure 5: Impulse Voltage Test System IP 150/2000 G (150 kj, 2000 kv) with impulse voltage divider and chopping multiple spark gap, with a stage energy of 15 kj being used for the I test of power transformers up to 245 kv 4.3 Decreasing the damping of the test circuit As already mentioned in chapter 2, if the circuit damping is to high, a time to half-value of T2 40 μs is not reached even with a sufficient impulse capacitance of the impulse voltage test generator (Ci Ci req), see Figure 3.The front and tail resistors in the impulse voltage test generator are mostly responsible for that damping. The damping caused by the tail resistors Rp can be considerably eliminated by their increase, as already recommended in chapter For a further reduction of the damping the resistance of the front resistor Rs has to be reduced. This would cause a shorter front time T1 of the LI. To keep the front time T1 unchanged, the capacitance of the load has to be increased corresponding to the reduction of the resistance of the front resistor Rs. This is easily realized by connecting an additional capacitor in parallel to the transformer winding to be tested. Unfortunately, the effect of this method is limited, because a reduction of the resistance of the front resistor Rs will lead to oscillations on the front of the LI voltage soon, which may exceed the permitted limit for the overshoot of 5 % /1/. Figure 6: Test circuit with Glaninger-circuit (Lg and R l ) for LI testing of power transformers with extremely low impedance Ci -Impulse capacitance C l -Capacitance of the load (including voltage divider) Lg -Glaninger-coil L l -Inductance of the load Rp -Tail resistor Rs -Front resistor R l -Resistor in parallel to the load SG- Switching spark gap The Glaninger-coil must have an inductance value ca μh, to be ineffective for the fast impulse front and to bridge the front resistor Rs during the much longer impulse tail. So the front of the LI impulse remains unchanged and the tail is extended. Consequently an additional resistor R l has to be switched in parallel to the load inductance Lt, to form a true voltage divider consisting of Rs//Lg and R l //L l. Figure 7: LI test of power transformers by using the Glaninger-circuit, adjustment of the voltage shape at the voltage crest by means of an additional resistor Rt (optimal adjustment Rt = 300 Ohm for this example) 4.4 Application of the Glaninger-circuit The disadvantage of oscillations on the voltage front after a reduction of the front resistor Rs is completely avoided with a circuit invented by GLANINGER [3]. Hereby the front resistor responsible for the voltage front remains unchanged but it is bridged by an additional inductance formed by an air-coil (Figure 6). 123
5 Figure 8: LI test of power transformers by using the Glaninger-circuit, adjustment of the time to half-value T2 and the amplitude of opposite polarity d by means of the tail resistor Rp (optimal adjustment Rp = 60 Ohm for this example, T2 > 40 μs, d < 50 %) With a Glaninger-circuit the front time T1, the time to halfvalue T2 and the amplitude of opposite polarity d of the LI test voltage can be set almost independently, i.e. T1 with the tail resistor Rs, T2 and d with the resistors Rp und Rt (Figure 7 and 8). A variation of the Glaninger-coil inductance is as a rule not necessary. The Glaninger circuit enables for LI testing the most effective adaptation of the impulse voltage test generator and the transformer to be tested. An existing impulse voltage test generator can be utilized optimally. 5. Conclusion The testing of power transformers with LI test voltage acc. to the IEC standards presupposes special knowledge of the interaction between the impulse voltage test generator and the inductive load. For example, there exists a close connection between the main data of the transformer to be tested and the required impulse capacitance of the impulse voltage test generator. There are also requirements related to the damping characteristic of the test circuit to utilize an existing impulse voltage test generator optimally. Some basic aspects and circuitries were described in this paper. References [1] IEC ( ), High-voltage test techniques. Part 1: General definitions and test requirements. [2] IEC ( ), Power transformers Part 3: Insulation levels, dielectric tests and external clearances in air. [3] Glaninger, P.: Stoßspannungsprüfung an elektrischen Betriebsmitteln kleiner Induktivität. ISH Zürich, 1975, Beitrag HV. 124
Lightning current simulation in the laboratory - parameters, procedures and test equipment -
Lightning current simulation in the laboratory - parameters, procedures and test equipment - Dipl.-Ing. J. Schönau, Dr.-Ing. M. Naß, CE-LAB GmbH Prof. Dr.-Ing. F. Berger, Ilmenau University of Technology
INTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60071-2 Third edition 1996-12 Insulation co-ordination Part 2: Application guide This English-language version is derived from the original bilingual publication by leaving out
Guidance for upgrading to GB4943.1-2011 (IEC 60950-1: 2005, MOD)
Guidance for upgrading to GB4943.1-2011 (IEC 60950-1: 2005, MOD) Note: This guidance document is a translation of official Chinese document which is issued by CQC (China Quality Certification Center) on
Impedance Matching and Matching Networks. Valentin Todorow, December, 2009
Impedance Matching and Matching Networks Valentin Todorow, December, 2009 RF for Plasma Processing - Definition of RF What is RF? The IEEE Standard Dictionary of Electrical and Electronics Terms defines
GUIDE FOR TESTING POWER TRANSFORMERS
GUIDE FOR TESTING POWER TRANSFORMERS Routine test 11/11/02 Pagina 1 di 10 INDEX Introduction... 3 1 Dielectric tests Separate-source voltage withstand test... 4 2 Induced voltage test... 5 3 Voltage ratio
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
A Practical Guide to Dielectric Testing
Chroma Systems Solutions, Inc. A Practical Guide to Dielectric Testing 19032 Series Electrical Safety Analyzer & 19050 Series Hipot Tester AC/DC/IR/SCAN Keywords: Dielectric tests, insulation resistance
Testing of Power Transformers. Routine tests, Type tests and Special tests
Testing of Power Transformers Routine tests, Type tests and Special tests Testing of Power Transformers Routine tests, Type tests and Special tests Testing of Power Transformers Routine tests, Type tests
How to design SMPS to Pass Common Mode Lightning Surge Test
Application Note, V1.0, September 2006 How to design SMPS to Pass Common Mode Lightning Surge Test Power Management & Supply N e v e r s t o p t h i n k i n g. Edition 2006-09-06 Published by Infineon
However, industrial applications may utilize a relay, which short-circuits the ICL path after the inrush sequence.
Application note for Inrush Current Limiters (ICL) Turning on electrical devices generally cause high inrush currents which can damage electronic components and cause interruption of the line voltage if
Instrument Transformers Application Guide
Instrument Transformers Application Guide Edited by ABB AB High Voltage Products Department: Marketing & Sales Text: Knut Sjövall, ABB Layout, 3D and images: Mats Findell, ABB SE-771 80 LUDVIKA, Sweden
SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS
SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS Michael Hensel HIGHVOLT Prüftechnik Dresden GmbH 2 3 Content 1 Introduction Test parameters and their significance Differences
CHAPTER 28 ELECTRIC CIRCUITS
CHAPTER 8 ELECTRIC CIRCUITS 1. Sketch a circuit diagram for a circuit that includes a resistor R 1 connected to the positive terminal of a battery, a pair of parallel resistors R and R connected to the
BASIC ELECTRONICS AC CIRCUIT ANALYSIS. December 2011
AM 5-202 BASIC ELECTRONICS AC CIRCUIT ANALYSIS December 2011 DISTRIBUTION RESTRICTION: Approved for Pubic Release. Distribution is unlimited. DEPARTMENT OF THE ARMY MILITARY AUXILIARY RADIO SYSTEM FORT
Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA
Discussion on Class I & II Terminology IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA What is Class I & II? C57.12.00 2010 is the only document we have that defined these terms. 5.10 Insulation
Power transformers. Special transformers Railway
Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together
AS2815. 1.5A Low Dropout Voltage Regulator Adjustable & Fixed Output, Fast Response
1.5A Low Dropout oltage Regulator Adjustable & Fixed Output, Fast Response FEATURES Adjustable Output Down To 1.2 Fixed Output oltages 1.5, 2.5, 3.3, 5.0 Output Current of 1.5A Low Dropout oltage 1.1 Typ.
Circulating Current Relay. Type IRXm
Circulating Current Relay Type IRXm ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while lowering
TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta?
TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS What Is Tan δ, Or Tan Delta? Tan Delta, also called Loss Angle or Dissipation Factor testing, is a diagnostic method of testing
TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer
168-08 TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE APPARATUS A three-phase outdoor oil-immersed distribution transformer DESIGNATION 1000 kva SERIAL No. 1-08-112-01-0001 Rated power Rated voltage
AC Direct Off-Line Power Supplies
AC Direct Off-Line Power Supplies r Introduction Many DC power supplies found in electronic systems, including those in this Tech School, rectify the 120 volts available at an electric outlet. The initial
Power Supplies. 1.0 Power Supply Basics. www.learnabout-electronics.org. Module
Module 1 www.learnabout-electronics.org Power Supplies 1.0 Power Supply Basics What you ll learn in Module 1 Section 1.0 Power Supply Basics. Basic functions of a power supply. Safety aspects of working
Electricity. Confirming Coulomb s law. LD Physics Leaflets P3.1.2.2. 0909-Wie. Electrostatics Coulomb s law
Electricity Electrostatics Coulomb s law LD Physics Leaflets Confirming Coulomb s law P3... Measuring with the force sensor and newton meter Objects of the experiments Measuring the force between two charged
Line Reactors and AC Drives
Line Reactors and AC Drives Rockwell Automation Mequon Wisconsin Quite often, line and load reactors are installed on AC drives without a solid understanding of why or what the positive and negative consequences
The full wave rectifier consists of two diodes and a resister as shown in Figure
The Full-Wave Rectifier The full wave rectifier consists of two diodes and a resister as shown in Figure The transformer has a centre-tapped secondary winding. This secondary winding has a lead attached
Inrush Current. Although the concepts stated are universal, this application note was written specifically for Interpoint products.
INTERPOINT Although the concepts stated are universal, this application note was written specifically for Interpoint products. In today s applications, high surge currents coming from the dc bus are a
Application Note, Rev.1.0, September 2008 TLE8366. Application Information. Automotive Power
Application Note, Rev.1.0, September 2008 TLE8366 Automotive Power Table of Contents 1 Abstract...3 2 Introduction...3 3 Dimensioning the Output and Input Filter...4 3.1 Theory...4 3.2 Output Filter Capacitor(s)
Application Note AN- 1095
Application Note AN- 1095 Design of the Inverter Output Filter for Motor Drives with IRAMS Power Modules Cesare Bocchiola Table of Contents Page Section 1: Introduction...2 Section 2 : Output Filter Design
ACCURACY OF POTENTIALTRANSFORMERS
8 VOLTAGE TRANSFORMERS Two types of voltage transformer are used for protective-relaying purposes, as follows: (1) the "instrument potential transformer," hereafter to be called simply "potential transformer,"
Capacitor Voltage Transformer. Answers for energy.
Capacitor Voltage Transformer Answers for energy. Capacitor Voltage Transformer Siemens Capacitor Voltage Transformers are based on technology from Trench, a recognized world leader in the design and manufacture
Charged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content
Charged cable event David Pommerenke, [email protected], 916 785 4550 Last update: Feb.23, 2001 Content Goal Energy sources, which may lead to CDE. Complexity of the different discharge modes. Possible
Understanding Power Impedance Supply for Optimum Decoupling
Introduction Noise in power supplies is not only caused by the power supply itself, but also the load s interaction with the power supply (i.e. dynamic loads, switching, etc.). To lower load induced noise,
Three phase circuits
Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors
Transformers. Special transformers Reactors products
Transformers Special transformers Reactors products Reactors Custom designed, custom built ABB Oy Transformers has extensive experience and numerous references from different reactor applications, having
Slide 1 / 26. Inductance. 2011 by Bryan Pflueger
Slide 1 / 26 Inductance 2011 by Bryan Pflueger Slide 2 / 26 Mutual Inductance If two coils of wire are placed near each other and have a current passing through them, they will each induce an emf on one
14.5GHZ 2.2KW CW GENERATOR. GKP 22KP 14.5GHz WR62 3x400V
14.5GHZ 2.2KW CW GENERATOR GKP 22KP 14.5GHz WR62 3x400V UTILIZATION OF GKP 22KP GENERATOR With its characteristics of power stability whatever the load, very fast response time at a pulse, low ripple,
SURGE PROTECTIVE DEVICES
SURGE PROTECTIVE DEVICES 1. INTRODUCTION In order to ensure safety of people, protection of equipment and, to a certain extent, continuity of supply, insulation co-ordination aims at reducing the likelihood
Coordination of Telecommunications Surge Protective Devices in Countries with Unstable AC Power
App Notes ~ Outdoor Power System Design and Cost Considerations 1 Authors Peter Nystrom President TSi Power Corp. Coordination of Telecommunications Surge Protective Devices in Countries with Unstable
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing
The Bergeron Method. A Graphic Method for Determining Line Reflections in Transient Phenomena
The ergeron Method Graphic Method for Determining Line Reflections in Transient Phenomena SDY04 October 996 IMPORTNT NOTICE Texas Instruments (TI) reserves the right to make changes to its products or
CAN Bus Transceivers Operate from 3.3V or 5V and Withstand ±60V Faults
CAN Bus Transceivers Operate from 3.3V or 5V and Withstand ±6 Faults Ciaran Brennan design features The LTC2875 is a robust CAN bus transceiver that features ±6 overvoltage and ±25kV ESD tolerance to reduce
INTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60076-11 First edition 2004-05 Power transformers Part 11: Dry-type transformers This English-language version is derived from the original bilingual publication by leaving out
SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation
SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation 4 Compliance Proof of Compliance (Sub clause 4.1.1) The SABS safety mark The SABS approved performance mark
www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.
s www.siemens.com/energy High Voltage Circuit Breakers AP Type 7.5 kv to 800 kv Answers for energy. The AP High Voltage Circuit Breakers Available up to 800 kv Decades of our experience in high voltage
Diode Circuits. Operating in the Reverse Breakdown region. (Zener Diode)
Diode Circuits Operating in the Reverse Breakdown region. (Zener Diode) In may applications, operation in the reverse breakdown region is highly desirable. The reverse breakdown voltage is relatively insensitive
Inductors in AC Circuits
Inductors in AC Circuits Name Section Resistors, inductors, and capacitors all have the effect of modifying the size of the current in an AC circuit and the time at which the current reaches its maximum
Using Current Transformers with the 78M661x
A Maxim Integrated Products Brand Using Current Transformers with the 78M661x APPLICATION NOTE AN_661x_021 April 2010 Introduction This application note describes using current transformers (CT) with the
New Distribution Class Arrester Ground Lead Disconnector Design Enhances Detonation Reliability and Improves Arrester Performance
New Distribution Class Arrester Ground Lead Disconnector Design Enhances Detonation Reliability and Improves Arrester Performance Dennis W. Lenk, Fellow, IEEE Abstract-- This paper examines performance
Electronic timer CT-AHD.12 OFF-delayed with 1 c/o (SPDT) contact
Data sheet Electronic timer CT-AHD.12 OFF-delayed with 1 c/o (SPDT) contact The CT-AHD.12 is an electronic time relay with OFF-delay. It is from the CT-D range. With their MDRC profile and a width of only
Power measurement in balanced 3 phase circuits and power factor improvement. 1 Power in Single Phase Circuits. Experiment no 1
Experiment no 1 Power measurement in balanced 3 phase circuits and power factor improvement 1 Power in Single Phase Circuits Let v = m cos(ωt) = cos(ωt) is the voltage applied to a R-L circuit and i =
Circuits with inductors and alternating currents. Chapter 20 #45, 46, 47, 49
Circuits with inductors and alternating currents Chapter 20 #45, 46, 47, 49 RL circuits Ch. 20 (last section) Symbol for inductor looks like a spring. An inductor is a circuit element that has a large
SECTION 2 Transmission Line Theory
SEMICONDUCTOR DESIGN GUIDE Transmission Line Theory SECTION 2 Transmission Line Theory Introduction The ECLinPS family has pushed the world of ECL into the realm of picoseconds. When output transitions
Three-phase monitoring relay CM-PFE
Data sheet Three-phase monitoring relay CM-PFE The CM-PFE is a three-phase monitoring relay that monitors the phase parameter phase sequence and phase failure in three-phase mains. 2CDC 251 005 S0012 Characteristics
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
BSNL TTA Question Paper-Instruments and Measurement Specialization 2007
BSNL TTA Question Paper-Instruments and Measurement Specialization 2007 (1) Instrument is a device for determining (a) the magnitude of a quantity (b) the physics of a variable (c) either of the above
How To Understand The Electrical Power Supply Of A Power Supply System
17 Circuit diagram symbols E 18 CIRCUIT DIAGRAM SYMBOLS electrical network elements three-phase line or cable single-phase line or cable short circuit earth electrode outgoing feeder supply incoming feeder
A Simple Current-Sense Technique Eliminating a Sense Resistor
INFINITY Application Note AN-7 A Simple Current-Sense Technique Eliminating a Sense Resistor Copyright 998 A SIMPE CURRENT-SENSE TECHNIQUE EIMINATING A SENSE RESISTOR INTRODUCTION A sense resistor R S,
Automated test systems for distribution transformers Part II. Detailed analysis of the test system features EVENTS ABSTRACT KEYWORDS
TESTS EVENTS ABSTRACT Distribution transformers are used worldwide and in very large quantities as a link between regional mediumvoltage networks and local low-volt age distribution systems. To ensure
Eðlisfræði 2, vor 2007
[ Assignment View ] [ Print ] Eðlisfræði 2, vor 2007 30. Inductance Assignment is due at 2:00am on Wednesday, March 14, 2007 Credit for problems submitted late will decrease to 0% after the deadline has
Technical catalogue About KOLEKTOR ETRA has been acting as transformer manufacturer over more than 75 years. Specializing in the manufacturing of power transformers rating up to 500 MVA and 420 kv the
INTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60076-1 Edition 2.1 2000-04 Edition 2:1993 consolidated with amendment 1:1999 Power transformers Part 1: General This English-language version is derived from the original bilingual
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.
SERIES-PARALLEL DC CIRCUITS
Name: Date: Course and Section: Instructor: EXPERIMENT 1 SERIES-PARALLEL DC CIRCUITS OBJECTIVES 1. Test the theoretical analysis of series-parallel networks through direct measurements. 2. Improve skills
Let s examine the response of the circuit shown on Figure 1. The form of the source voltage Vs is shown on Figure 2. R. Figure 1.
Examples of Transient and RL Circuits. The Series RLC Circuit Impulse response of Circuit. Let s examine the response of the circuit shown on Figure 1. The form of the source voltage Vs is shown on Figure.
= (0.400 A) (4.80 V) = 1.92 W = (0.400 A) (7.20 V) = 2.88 W
Physics 2220 Module 06 Homework 0. What are the magnitude and direction of the current in the 8 Ω resister in the figure? Assume the current is moving clockwise. Then use Kirchhoff's second rule: 3.00
A wave lab inside a coaxial cable
INSTITUTE OF PHYSICS PUBLISHING Eur. J. Phys. 25 (2004) 581 591 EUROPEAN JOURNAL OF PHYSICS PII: S0143-0807(04)76273-X A wave lab inside a coaxial cable JoãoMSerra,MiguelCBrito,JMaiaAlves and A M Vallera
Lecture - 4 Diode Rectifier Circuits
Basic Electronics (Module 1 Semiconductor Diodes) Dr. Chitralekha Mahanta Department of Electronics and Communication Engineering Indian Institute of Technology, Guwahati Lecture - 4 Diode Rectifier Circuits
Voltage Regulator SPAU 341 C. Product Guide
Issued: July 1998 Status: Updated Version: D/25.04.2006 Data subject to change without notice Features Comprehensive voltage regulation for power transformers with on-load tapchangers in distribution substations
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:
Selection Guide for Conversion of Carbon Composition Resistors
Selection Guide for Conversion of Carbon Composition Resistors believes that the information described in this publication is accurate and reliable, and much care has been taken in its preparation. However,
REPORT ON CANDIDATES WORK IN THE CARIBBEAN ADVANCED PROFICIENCY EXAMINATION MAY/JUNE 2008 ELECTRICAL AND ELECTRONIC TECHNOLOGY (TRINIDAD AND TOBAGO)
CARIBBEAN EXAMINATIONS COUNCIL REPORT ON CANDIDATES WORK IN THE CARIBBEAN ADVANCED PROFICIENCY EXAMINATION MAY/JUNE 2008 ELECTRICAL AND ELECTRONIC TECHNOLOGY (TRINIDAD AND TOBAGO) Copyright 2008 Caribbean
TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets. 17th April 2012
TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets 17th April 2012 Session 2 Technological challenges to cope with in TWENTIES field tests
MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD
MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD VERY LOW FREQUENCY (VLF) - PARTIAL DISCHARGES AND TANGENT DELTA HV/EHV POWER CABLES DIAGNOSTIC AND ON-SITE FIELD TESTING WITH
EDEXCEL NATIONAL CERTIFICATE/DIPLOMA UNIT 5 - ELECTRICAL AND ELECTRONIC PRINCIPLES NQF LEVEL 3 OUTCOME 4 - ALTERNATING CURRENT
EDEXCEL NATIONAL CERTIFICATE/DIPLOMA UNIT 5 - ELECTRICAL AND ELECTRONIC PRINCIPLES NQF LEVEL 3 OUTCOME 4 - ALTERNATING CURRENT 4 Understand single-phase alternating current (ac) theory Single phase AC
Class I surge protection with sparkover gaps
for low-voltage supplies surge protection with sparkover gaps Lightning conductors with sparkover gap for lightning protection or equipotential bonding providing class I According to the requirements of
CURRENT ELECTRICITY INTRODUCTION TO RESISTANCE, CAPACITANCE AND INDUCTANCE
CURRENT ELECTRICITY INTRODUCTION TO RESI STANCE, CAPACITANCE AND INDUCTANCE P R E A M B L E This problem is adapted from an on-line knowledge enhancement module for a PGCE programme. It is used to cover
RC NETWORKS SALES GUIDE
SALES GUIDE INTRODUCTION TO Recent developments in electronic equipment have shown the following trends: Increasing demands for numerical control machines, robotics and technically advanced appliances
F05D Meeting on Damped AC Voltage Testing
October 28 th, 2008 from 03.30-5.30 pm in San Antonio, TX Agenda F05D Damped AC Voltage Testing 1 Agenda F05D Damped AC Voltage Testing Welcome: Introduction On-site testing voltages e.g. IEC 60060-3 High
CAPACITOR BANK TESTING SWP
1. PURPOSE AND SCOPE The purpose of this Standard Work Practice (SWP) is to standardise and prescribe the method for testing Capacitor Banks including capacitors, tuning reactors and inrush limiting reactors.
AMIS. Automated Metering and Information System. Integration of meters from other manufacturers
AMIS Automated Metering and Information System TD-3530/TACU30 Third-Party Device Gateway Integration of meters from other manufacturers Connection and integration of max. 3 meters from third party manufactureres
Electrical network protection. Protection guide. Guide 2003 51G 51G 51G 51G 51G. network protection solutions
Electrical network protection Protection guide Guide 2003 5 A H G G 4 D3 D2 D1 G G G 3 network protection solutions Protection guide Contents 0 Presentation 2 Power-system architecture Selection criteria
DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION
ÿþ üûúùø öõöôùóùõò CT Dimensioning DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION Application note GER3973 1 CT Dimensioning ÿþ üûúùø öõöôùóùõò GER-3973 Application note ÿþ üûúùø öõöôùóùõò
Case Studies in On-Line Measurement of PD in Motors Fed by Voltage Source PWM Drives
Case Studies in On-Line Measurement of PD in Motors Fed by Voltage Source PWM Drives G.C. Stone, I. Culbert, H.G. Sedding Qualitrol-Iris Power Mississauga, Ontario, Canada Abstract On-line partial discharge
Load Dump Pulses According to Various Test Requirements: One Phenomenon Two Methods of Generation A Comparison
Load Dump Pulses According to Various Test Requirements: One Phenomenon Two Methods of Generation A Comparison Roland Spriessler 1, Markus Fuhrer 2, 1,2 EM Test, Sternenhofstrasse 15, CH-4153 Reinach (BL),
TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin
TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin (Updated 7/19/08 to delete sine wave output) I constructed the 1 MHz square wave generator shown in the Appendix. This
IEC 1000-4-2 ESD Immunity and Transient Current Capability for the SP72X Series Protection Arrays
IEC 00-4-2 ESD Immunity and Transient Current Capability for the SP72X Series Protection Arrays Application Note July 1999 AN9612.2 Author: Wayne Austin The SP720, SP721, SP723, and SP724 are protection
Transformer Bushings for GIS
Transformer Bushings for GIS Oil to SF6 Connections GARIP RTKG 725-55 kv SQS certified ISO 91 / ISO 141 Bushings RIP - Technology for SF6 / Oil - Bushings In modern metal enclosed switchgear SF6 -gas is
Residual Current Circuit Breaker
Introduction Residual Current Circuit Breaker / ELCB The Fault current overloads and short circuits can be detected by circuit breakers like MCB s MCCB s & HRC Fuses etc. But, Circuit breakers don t detect
Trip circuit supervision relay. Type RXTCS
Trip circuit supervision relay Type RXTCS ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while
Current and voltage measuring relays
Current and voltage measuring relays RXIK 1, RXEEB 1 and Page 1 Issued June 1999 Changed since July 1998 Data subject to change without notice RXIK 1 RXEEB 1 (SE980082) (SE980081) (SE970869) Features Application
AC Generators. Basic Generator
AC Generators Basic Generator A basic generator consists of a magnetic field, an armature, slip rings, brushes and a resistive load. The magnetic field is usually an electromagnet. An armature is any number
Chapter 3. Diodes and Applications. Introduction [5], [6]
Chapter 3 Diodes and Applications Introduction [5], [6] Diode is the most basic of semiconductor device. It should be noted that the term of diode refers to the basic p-n junction diode. All other diode
HOW TO SELECT VARISTORS
HOW TO SELECT VARISTORS We have three alternatives: - selection of the varistors suitable for the operating voltage of the application - calculating the surge current, energy absorption and average power
Understanding Ignition Waveforms
FIRE IN THE HOLE Understanding Ignition Waveforms BY BERNIE C. THOMPSON The ignition waveform is a window that allows you to see what s occurring in the combustion chamber. Join us for a closer look. From
Pluggable interface relays CR-P Pcb relays
2CDC 293 034 F0004 1 2 4 3 Features 9 different supply s: DC versions: 12 V, 24 V, 48 V, 110 V AC versions: 24 V, 48 V, 110 V, 120 V, 230 V Output contacts: 1 c/o (16 A) or 2 c/o (8 A) Cadmium-free contact
Design of High Voltage Low Power Supply Device
Universal Journal of Electrical and Electronic Engineering 3(1): 6-12, 2015 DOI: 10.13189/ujeee.2015.030102 http://www.hrpub.org Design of High Voltage Low Power Supply Device Nader Barsoum *, Glenn Isaiah
ABB 1. Three-phase monitoring relay CM-PFS. Data sheet. Features. Approvals. Marks. Order data. Order data - Accessories. Application.
1SR 430 824 F9300 Features Monitoring of three-phase mains for phase sequence and failure Powered by the measuring circuit 2 c/o (SPDT) contacts 1 LED for status indication Approvals R: yellow LED - relay
Low Voltage, Resistor Programmable Thermostatic Switch AD22105
a Low Voltage, Resistor Programmable Thermostatic Switch AD22105 FEATURES User-Programmable Temperature Setpoint 2.0 C Setpoint Accuracy 4.0 C Preset Hysteresis Wide Supply Range (+2.7 V dc to +7.0 V dc)
7-41 POWER FACTOR CORRECTION
POWER FTOR CORRECTION INTRODUCTION Modern electronic equipment can create noise that will cause problems with other equipment on the same supply system. To reduce system disturbances it is therefore essential