1 PRE FEASIBILITY REPORT FOR PROPOSED NE PROJECT OF /s. Redd ica Pvt. Ltd. Survey no.: 1068, Lavad Sampa Road, At & Post : Lavad, Taluka : Dahegam, District : Gandhinagar. r. Jainam H. Agrawal - Director ob No.: reddmica@gmail.com Prepared By: T. R. Associates C-605/A, Ganesh eridian, Opp. Kargil Petrol Pump, S. G. Highway, Ahmedabad. o. No.: ID: trassociates@hotmail.com trassociates@ymail.com

2 1. Executive summary /s. Redd ica Pvt. Ltd. is proposing Project to manufacture Phenol Formaldehyde Resin, elamine Formaldehyde Resin & Urea Formaldehyde Resin at Survey No. : 1068, Lavad Sampa Road, At & Post : Lavad, Taluka : Dahegam, District: Gandhinagar, Gujarat. The total land area of company is m 2 out of which 8234 Sq. t. land will be used for greenbelt area development. The cost for proposed Resin plant is Rs. 1 Crore. Total budget allocation towards Environmental anagement Facilities for proposed project will be Rs. 25 Lacs. Total 60 persons will be employed including skilled persons, unskilled persons and office staff. /s. T. R. Associates is carried out EIA/EP studies for Environmental Clearance from SEIAA, Gujarat. Production details are given below: Sr. No. Name of Product Quantity 1 Phenol Formaldehyde Resin 700 T/ONTH 2 elamine Formaldehyde Resin 700 T/ONTH 3 Urea Formaldehyde Resin 500 T/ONTH 4 Laminated Sheets 3,00, Nos./onth Note: Resin will be used for Captive consumption for manufacturing laminated sheets as well as sale purpose.

3 Salient Features with in 10 km radius surroundings area as follows: Sr. No. Important Features Description 1 Location Survey No.: 1068, Lavad Sampa Road, Village: 2 Topomap F43A16 3 Longitude 72 52' 20.69"E 4 Latitude 23 10' 3.12"N 5 SL 79 m Lavad, Taluka : Dahegam, District: Gandhinagar 6 Nearest power station Uttar Gujarat Vij Corporation Ltd. 7 Proponent Name r. Jainam H. Agrawal Director 8 Corporate office address 304, Aditya, B/h. Sardar Patel Sewa Samaj Hall, ithakhali 6 Roads, Ahmedabad Temperature range aximum: C 10 Annual Rain fall 829 mm inimum: C 11 Nearest Road SH 69 (1.68 Km) 12 Nearest Railway station Nandol-Dahegam Railway station (5.86 km). 13 Nearest city Ahmedabad (24 km) 14 Nearest village Lavad (1.55 km) 15 National H NO N H no. 59 (6.66) K 16 State H No SH 69 (1.68 Km) 17 Seismic Zone Zone-III (Less Active) 18 National Parks / Sanctuary None within 10 Km radius.

4 2. Introduction of the project / Background information. (i) Identification of project proponent r. Jainam H. Agrawal is 22 years old & he has craft & base paper trading experience of 1 year. Now he is one of the main directors of /s. Redd ica P. Ltd. (ii) Brief description of nature of the project. It is a small scale project for production of resin which is used for making laminated sheets. (iii) Need for the project and its importance to the country and or region. Formaldehyde resins are used predominantly in the laminated sheet industry as adhesives. Growth of these resins is strongly correlated to construction/remodeling activity (which accounts for over 50% of consumption), and to a lesser degree, to the automotive industry. The proposed products like Resins (elamine Formaldehyde, Urea Formaldehyde and Phenol Formaldehyde) mainly used to produce laminated sheets. These sheets have good market demand to develop the home and office for furniture. (iv) Demand-Supply Gap. The burgeoning market demands of urban and semi-urban India are estimated at Rs 5,00, Crore. The demand-supply gap has already attracted foreign players to India; and the e-retailing boom offers immense business opportunities. But a mere 15% of India's woodworking industry is organized. Its semi-skilled carpenters, self-styled interior decorators and small-scale local manufacturers will need to be trained and organized to meet future market demands and exploit business opportunities.

5 (v) Imports v/s. Indigenous production. Indian market is open and big that is why every kind of import is booming. Indian plywood and panel trade has become global place as the consumption of different imported ply panels are on the rise. Unlike before Indians are now welcomed by plywood manufacturer of china. Earlier India was a self dependent country for commercial or high quality plywood, but sharp drop in domestic manufacturing output has resulted in material sourcing from countries like Burma, alaysia, Indonesia, China, Vietnam etc. Now Indian plywood market is somehow curtailed or competed by incoming panel products from China. Be it film face, decorative, Laminate or R plywood everything is now being imported partially or more and is sold. Indian industrialist must understand the fact that it s no more a regional shift, it is a global shift. Indian technology should be upgraded an updated at par with international standards. The working environment in India has changed tremendously. Earlier the trade fairs were hardly participated by foreign timber, lumber and plywood manufacturing companies where as now it is flooded with global suppliers. (vi) Export Possibility. e will manufacture Resin for captive consumption and sale purpose also. Resin is an intermediate product for manufacturing of laminated sheets. Liquid resins are quite expensive for export. So we have only local sale market for distribution. (vii) Employment Generation (Direct and Indirect) due to the project. This project will provide direct employment to 60 people in proposed resin unit whereas it will provide employment to many others indirectly.

6 3. Project Description (i) Type of project including interlinked and interdependent projects. ainly Resins (elamine Formaldehyde, Urea Formaldehyde and Phenol Formaldehyde) are used in production of Laminated sheets. Industry will utilize resins for captive consumption as well as for sale purpose. (ii) Location (map) & coordinates Latitude: 23 10' 3.99"N Longitude: 72 52' 21.02"E Elevation : 79 m. Google Image of project site.

7 Key Plan of project site Project site /s. Redd ica Pvt. Ltd. (iii) Alternate site considered No other sites were selected. (iv) Size or magnitude of operation Sr. No. Name of Product Quantity 1 Phenol Formaldehyde Resin 700 T/ONTH 2 elamine Formaldehyde Resin 700 T/ONTH 3 Urea Formaldehyde Resin 500 T/ONTH 4 Laminated sheets 3,00, Sheets/onth Note: Resin will be used for Captive consumption in laminated sheet production as well as sale purpose.

8 (v) Project description with process details (a schematic diagram / flow chart Showing the project layout should be given) ANUFACTURING PROCE OF NE PRODUCT 1. Phenol Formaldehyde Resin: anufacturing Process First all raw materials like phenol, formaldehyde & caustic will be added into closed vessel. Stirring & heating will be done upto 60 C. After 60 C stop heating. Reflux is done for 30 minutes upto 98 C. Vacuum distillation will be started. ater will be removed from the vessel as per the batch size. Cooling down to 40 C. Phenol Formaldehyde Resin will be ready for captive consumption & sale purpose. Reaction Chemistry OH OH CH2OH Fast Phenol Phenol Formaldehyde Resin

9 Process Flow Diagram Phenol Formaldehyde Caustic Caustic Flakes Limped Reaction Vessel Stirring and heating up to 60 C Reflux for 30 inutes Vacuum Distillation ater Cooling Dilution Product: Phenol Formaldehyde Resin

10 (2) elamine Formaldehyde Resin: anufacturing Process First all the raw materials melamine & formaldehyde will be added in Limped reaction vessel. Stirring & heating will be done upto 95 C for 1 Hr. Cooling down to 40 C. elamine Formaldehyde Resin will be ready for captive consumption as well as sale purpose. Reaction Chemistry: N H 2 N N N NH 2 + H 2 C O fast N N N NH 2 H 2 C N CH 2 melamine formaldehyde OH HO melamine formaldehyde resin Process Flow Diagram elamine Formaldehyde Limped Reaction Vessel Stirring and Heating up to 95 C for 1 hr Cooling at 40 C Finish Product: elamine Formaldehyde Resin

11 (3) Urea Formaldehyde Resin: First all the raw materials Urea & Formaldehyde will be added in Limped reaction vessel. ph will be adjusted to ph 9.0 by adding acetic acid. Stirring & heating will be done upto 95 C for 50 inutes. Heating will be continued until tolerance (10:40) is achieved. ph will be adjusted to 9 by adding Caustic. Cooling down to room temperature. Urea Formaldehyde Resin will be ready for use in captive consumption & as well as sale purpose. Urea Formaldehyde Resin

12 Process Flow Chart Urea Formaldehyde Limped Reaction Vessel Acetic Acid ph adjusted to 9 Stirring and Heating up to 95 C for 50 inutes Caustic ph adjusted to 9 Cooling Product: Urea Formaldehyde Resin

13 (vi) Raw material required along with estimated quantity L OF PROPOSED RA ATERIALS REQUIRED FOR RESIN PRODUCTION Sr. No. Name of the product Name of Raw aterials Quantity in T/onth 1 Phenol Formaldehyde Resin Phenol 660 Formaldehyde 260 ethanol 150 Caustic 3.5 Acetic acid elamine Resin Formaldehyde (37%) 420 elamine Urea Formaldehyde Resin Urea 200 Formaldehyde (37%) 300 Caustic 2.5 Acetic Acid 2.5 (vii) Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. Treated water will be recycled in cooling purpose. (viii) Availability of water its source, Energy/ power requirement and source should be given. ater source: Bore well. Proposed ater Requirement: 46.1 KL/day. Energy/power requirement: 350 KVA from UGVCL. (ix) Quantity of wastes to be generated (liquid and solid) and scheme for their anagement/disposal.

14 Solid waste generation and disposal Sr. No. Description Category Proposed Quantity ode of Disposal 1 ETP Sludge + Evaporation Residue T/onth Collection, storage and Disposal at TSDF Site 2 Used Oil T/ onth Collection, storage and used within premises as a lubricant / sold to registered recycler. 3 Discarded Plastic bags T/onth Collection, storage & sell to authorized vendor 4 aste ood T/onth Collection, storage and used as fuel of Boiler.

15 aste water generation and Disposal facility 18.8 KL/Day waste water will be generated from the washing, Boiler Blow Down, Cooling blow down, process effluent & R.O. Reject. Effluent treatment plant: Effluent from washing and process Collection Tank Photo Fenton Treatment Tank OC: RCC Nutch Filter /Filter Press Effluent from R O reject, Boiler blow down and cooling tower blow down Holding Tank Steam Based Evaporation System with Condenser Condensate to be used for Cooling Activities ZERO DISCHARGE ETP Sludge to be sent to TSDF site (x) Schematic representations of the feasibility drawing which give information of EIA purpose. The acceptability of the S.O.1533 for the expansion project was explored by considering different possibilities & provision made in the said notification. Considering the products & project s location of the proposed project, It is notified that the proposed project falls under Category 5(f) B of the schedule of EIA notification and its amendments. As per the provisions of the notification, it is necessary to get Environmental Clearance by applying to oef or SPCB, along with the Environmental Impact Assessment report for the proposed project prior to commissioning of the construction activities. Therefore the EIA is not required to conduct.

16 Site Analysis (i) Connectivity. Nearest Railway station Nandol - Dahegam 5.86 Km Nearest Airport Ahmedabad Km Nearest State highway SH Km (ii) Land Form, Land use and Land ownership. Industry wants proposed anufacturing plant of Laminated Sheets, phenol formaldehyde resin, melamine formaldehyde Resin, and urea formaldehyde Resin for new product Resin. Fig: 1 Land use pattern

17 There would not be any change in Land use/land cover activity or Topography due to construction activity after implementation of the project, 33 % area will be provided for greenbelt development. (iii) Topography (along with map). Project Site /s. Redd ica P. Ltd. (iv) Existing land use pattern. Fig: 2 legendry map of Gandhinagar district Existing land use pattern shown in fig no: 1 (v) Existing Infrastructure. (1) Nearest railway station: Nandol Dahegam Railway station is 5.86 km from the project site (2) Nearest Highway: State highway 69 is 1.68 km from the project site. (3) Nearest Airport: Ahmedabad is km from the project site. (4) Power: 350 KVA from UGVCL.

18 (5) ater: Source of the water is Bore well. (6) Basic amenities: Post office, Telephone, Bus stop & Road facilities are available in nearby village Lavad. (vi) Soil classification of District Gandhinagar North Gujarat Region consists of Banaskantha, Patan, ahesana, Sabarkantha, Gandhinagar, Surendranagar and Ahmedabad districts of Gujarat State. In this region, major area falls into 'very deep' soil. However, deep soil is in major area of Surendranagar district and in few area of Ahmedabad and Patan district. There are 'moderately deep' soils in few area of Surendranagar, Patan and Ahmedabad district and in North-East of Sabarkantha district.there are 'very shallow' to 'shallow' soil in North-East part (Sabarkantha district) and South est (Surendranagar district) part of the region. Rock outcrops are also found in some part of the region especially in North-East (Banaskantha and Sabarkantha district) & South - est (Surendranagar District) of the region. A major texture of the soil in the region is 'Loamy'. However, in South-est part (in Ahmedabad and Surendranagar district) a soil texture in few area is found to be 'Clayey'. It is also 'Sandy' soil in some area of the Northern part (Banaskantha district) of the region. ajor area of the region is having 'ell drained soil. However, in some area of region especially in central part (Adjoining area of ehsana, Sabarkantha and Gandhinagar district.) and eastern part of Banaskantha and estern part of Surendranagar district is representing 'Some what excessively' drained soil. A very few area of southern part of the region (Adjoining area of Ahmedabad and Surendranagar district) and in estern part (Patan district) is showing 'moderately well' drained soil. In few area of middle part of Ahmedabad district and Eastern part of Surendranagar district is 'Slightly Saline'. A considerable area of Eastern part of Patan and estern part of ahesana, a southern part of Ahmedabad district and North-est part of Banaskantha district is representing 'oderate salinity of the soil. Strongly saline soil is observed in South-est part of Banaskantha and

19 estern part of Patan district. Very few area have 'Severe saline soil in Southern part of Ahmedabad district. Slight sodicity is found in central part of the region (In Patan, ahesana and Ahmedabad district) and in North-East part of Surendranagar district. In west part of the region (Banaskantha, Patan, Surendranagar and Ahmedabad district). 'oderate to strong sodicity of the soil is found in the region.

20 (vii) Climatic data from secondary sources. Location of ID station : Ahmedabad ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION:- AHEDABAD YEAR: ONTH: - FEBRUARY ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR 2330 SP D 01 ENE 008 NE 008 NE 004 NNE 006 NE 012 E 008 NE 006 NE E 012 ESE 006 E 010 NE 010 E 008 NE 006 ENE 006 ENE NE 006 N 004 ENE NE S 004 N 002 N 006 S N 006 ESE 006 SE 004 N 004 NE 008 N 006 NN 004 N 004 S 006 N N 006 N N 006 N 006 N 006 N 008 N N 006 N S 010 N N NN NN N 004 N NN 006 N 012 NE 006 N 004 N 006 N 006 S 012 NN 008 E 006 SE 006 S N 008 N 006 N ENE 008 NE 012 N 006 NE 008 ESE 014 ENE 018 N 008 E E SE 006 SE 006 S 014 S S S 008 N 008 S 010 S 010 S E 002 S 006 NE 006 N 008 N 002 N 002 VRB 004 NE 004 NE 004 S ENE 008 NE 006 NE 004 NE 004 ENE 012 NE 012 NE ENE 006 E E N N NE 006 NE 010 NNE 004 ENE 010 NE 008 NE 006 ENE 006 E 006 S 004 NN 004 N N NN 004 NN 004 NE 004 N 008 N 006 NE 010 NNE 010 E 012 NE NE 012 NNE 010 NE 014 NE 014 NE 012 NE 014 N 008 N ENE 008 N S 004 ENE 004 NE 008 N 004 N 004 N 008 NN 004 SE 004 S 008 N 006 N 004

21 27 28 N 004 N N 004 E N 004 N 004 N S N 006 N LEGEND: - VRB= VARIABLE IND SPEED SPD= ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION:- AHEDABAD YEAR: ONTH: - ARCH ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E 0830 DIR SP D NNE 006 N DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR N 006 E NE 008 NE 012 NN 006 NE 004 ENE 014 N 012 E 006 NNE E 010 ESE 010 NE 004 NE 006 E 012 SE 010 N 006 VRB NE 006 NE 006 NE 004 NE 010 NE 006 E ENE 006 E 006 N 006 E 008 E 008 NNE 004 N NE 006 N 004 ENE 004 NNE 006 E 012 NE 012 NE 004 NNE NNE 012 NE 010 N 006 E 012 ENE 010 NN 004 NE ENE 012 NE 010 NE 012 NE 010 E 016 E NNE 006 NNE NE S 006 NE 004 NE 004 E 008 E 012 N 006 E 004 SP D S S 004 S 006 N N 008 N 006 N 004 N 006 N 008 NNE 006 N NNE 008 NE 006 N 006 N 008 ENE 010 NNE 006 NN 006 N NE NE S 006 NN N 006 N 006 ENE 010 ENE 006 N 006 NNE 006 SE 008 SE 006 S 004 S 006 SE N N 004 N 008 N 008 N N 006 N 006 N 008 N 008 N 004 N NE N 004 NE 010 E 008 N 004 S S 008 N 004 N 008 S 006 S S 010 NN 008 S 008 S 010 S N 004 S 008 S NE 004 S 008 SE

22 24 N 006 N 008 N 006 N 004 N 008 N 008 N N N 006 S N 006 S 004 N 004 N NN N 004 N S N N N 006 N N 008 N 010 N 008 N N 008 N 008 N 004 N 010 N 008 N N 004 S N 006 S 010 N LEGEND: - VRB= VARIABLE IND SPEED SPD= ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA N STATION:- AHEDABAD YEAR: ONTH: - APRIL ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD 01 N N 014 N 008 N N N N N 008 N L L S 012 N N 008 N 008 S 008 N 008 S 006 N N 008 N 004 N 004 NE N 006 NN NN 004 L 004 N 004 N 004 N 004 S N N 004 S S N N 008 N N S N 004 N N 004 N 004 E N 006 S 008 N 010 N 004 N S N N 008 N 008 S 006 S L S 004 N 004 N 004 N S N 008 S 006 S 006 S S 006 N 012 N 006 N 006 S N 006 N N L L L L L L S 008 S 004 N N S 006 S 006 S S S S 012 N L L 014

23 20 SE NE NE NE 006 L L NN NN SE 004 S 008 S 008 N 010 SE 012 NE 004 E 006 E 008 N N 006 NN 008 NE 008 NE 004 N N N NN 004 ESE 008 N 004 N N 008 N 006 S 004 S 004 NN 008 N 006 N N 008 S 006 N 004 N 004 S NN NN S N 004 L S N 004 N 006 NN 008 NN NN 008 L L L L L 008 S 008 S 004 N L N 008 S 008 S LEGEND: - VRB= VARIABLE SPD= IND SPEED ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION:- AHEDABAD YEAR: ONTH: - AY ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR 01 N N SP D 2330 DIR SPD 008 N S S S N S 010 S 010 S S S L 008 S 018 S N 004 N 008 S 004 S 012 S 018 S S N S N N N S S 008 N 004 SE 004 SE 004 N 004 NN L N S 006 NE 004 L S 006 SE 006 S 014 N 006 N 008 N 008 S 004 N 006 N N N 006 N 008 N 006 S 008 S 008 S S 006 S 004 S S S S 004 S 010 S S 010 S S 006 S 006 S 004 L S S L 008 S 006 S 014 L L S 010 S 008 S 010 S 012 S S 008 S 010 S 018 S 008 S 004 S S 006 S S 008 S 010 S 006 S 006 S 010 S N L S

24 17 N 006 N 006 N N 012 N NN 012 N 006 L L S 006 S 010 N 008 S N 008 N 006 N N 006 N 006 N 006 N 012 N 006 N 006 N N 006 N 006 N 010 N 010 N 010 N N 010 S 010 S N S E 004 N N S L S NN E L L 004 N 010 S 012 S 006 S S 006 S 006 N S 016 S S 004 L N 006 S N 006 N 006 N 010 S 008 S 006 S 006 SE 006 N N 006 N 004 N 006 N 004 S 004 S S 006 S 008 S S 006 S 008 S 008 L L L N 004 S 006 S 006 S 008 S 008 S 010 S S S 010 S 004 S 012 S 008 S 016 S S 004 S 006 S S 010 S 006 S LEGEND: - VRB= VARIABLE SPD= IND SPEED ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION:- AHEDABAD YEAR: ONTH: - JUNE ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR 01 S 006 S S N NN E L 030 S 006 S S 010 S 006 S 016 S 006 L L SP D S 006 S 008 S 006 DIR VR B SPD 008 S 014 S 006 S 004 S 018 S S 008 S 006 S 014 S 008 S 008 S S S S N 006 S 006 L S 006 S S 008 S 006 S 006 S S 008 S 012 S 006 S 004 S 008 S 016 S 010 S S 014 S 006 S 012 S 010 S 010 S S 008 S 014 S 010 S 006 S 006 S S 008 S S 010 S 014 S 016 S S 008 S 018 S 006 S 016 S S 010 S

25 13 S 010 S 014 S 010 S S 010 S 018 S S 010 S 012 S 012 S 012 S 010 S 010 S 010 S S 010 S 016 S 012 S 012 S 010 S 012 S 016 S E 012 S 012 S 014 S 012 E 012 S 012 S S 012 S 012 S S 010 S S 008 S 012 S 010 S 010 S 008 S 006 S 016 S S 008 S 010 S S S 010 S 010 S 014 S S 014 S 012 S 012 S 012 S 012 S S 014 S 016 S S 010 S 016 S S 012 S 014 S S 010 S 012 S S 008 S 014 S 018 S S S 010 S 014 S 012 S S 010 S 014 S 012 S 016 S S 010 S 010 S 012 S 010 S 010 S 008 S 014 S S S 012 S 018 S S S 012 S S 010 S 012 S S S S 008 S S 010 S S S 012 S S 010 S 014 S 012 S S 006 S 012 S 012 S LEGEND: - VRB= VARIABLE SPD= IND SPEED ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA S 008 STATION:- AHEDABAD YEAR: ONTH: - JULY ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E 0830 DIR SP D DIR SPD DIR SPD DIR SPD DIR SPD DIR SPD DIR 01 S 008 S S SP D DIR SPD 012 S 010 S 014 S S S 012 S S 010 S S S S S S S 006 S S S S S 008 S 008 S 010 S S S S 09 S 008 S S S S S 008 S 014 S 006 S 010 S 018 S

26 10 S S 004 L 008 S 010 S 008 S S 004 S S 012 S S 002 S 004 S 016 S 014 S 004 E 002 S 012 S NE 006 S 008 S 014 S S 010 S S 004 S 008 S S 006 E 012 S L L S 004 L S 008 S S 006 N S 004 S 014 S 006 S N 006 N S 006 S S 006 S S 010 S 004 S 012 L L S S 004 S 008 S 006 S 006 S S 010 S 008 S S S S S 012 S 012 S NN 006 S 008 S S S 004 S S 006 S 004 S 010 S S 008 S 010 S 006 S 008 S L S S 006 S S 006 S 010 S 010 S 008 S 004 S N 008 N N S 014 L 31 SE 008 SE 006 S 006 L LEGEND: - VRB= VARIABLE SPD= IND SPEED ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION:- AHEDABAD YEAR: ONTH: - AUGUST ELEENTS: - (1) IND DIRECTION & (2) IND SPEED REPORTED IN KPH D AT E 0830 DIR SP D SE 006 S DIR SPD DIR SPD DIR L 0530 SP D DIR SPD DIR SPD DIR SP D DIR SPD E 006 S 010 S 018 S S 006 S 006 S 010 S 008 S 008 S 006 E 008 E S L S 010 S 008 S 006 S 008 S S 012 S 006 S 008 S 008 S S S L L S 006 S 006 S 006 S 004 N S L

27 07 S L 004 S S 008 S 008 S 008 S S 006 S 010 S S 008 S 006 S S 008 S L S S 010 S 008 S 006 S 006 S 004 S 006 S 014 S S 010 S 006 S 012 S 008 S 008 S 008 S 006 S S 008 S 006 S 008 S 008 S 008 S 010 S 006 S S 012 S 012 S 010 S 014 S 010 S 008 S 010 S S 012 S 008 S 012 S 016 S 012 S 012 S 008 S S 006 S 008 S 012 S 010 S 006 S 012 S 004 S S 006 S S 006 S S L L N L S L N 012 L L L L L S 004 N N N N S 008 S 006 N 004 L L N 004 N 006 N L L L L L L L S S 006 S 004 N S N 004 E N S 010 S L 29 N 006 N E 004 L 31 N 004 N 004 S 008 L N S L N E 008 NE 006 S 004 S 004 E 004 N 004 S 004 L 004 N 008 SE 020 LEGEND: - VRB= VARIABLE SPD= IND SPEED L L 008 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- FEBRUARY ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

28 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- ARCH ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

29 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- APRIL ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

30 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- AY ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

31 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- JUNE ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

32 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- JULY ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

33 ETEOROLOGI CENTRE, AHEDABAD. DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH:- AUGUST ELEENT: - RELATIVE HUIDITY IN % (PERCENTAGE) DATE

34 ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH DAT E FEBRUARY ARCH AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm

35 ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH DAT E APRIL AY AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm

36 ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH DAT E JUNE JULY AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm

37 ETEOROLOGI CENTRE, AHEDABAD DAILY ETEOROLOGI DATA STATION: - AHEDABAD YEAR: ONTH DAT E AUGUST SEPTEBER AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm AXIU TEPERATU RE IN DEG C INIU TEPERATU RE IN DEG C TOTAL RAINFAL L in mm

38 (viii) Social Infrastructure available. Educational facility: -.B. College of Commerce is 5.46 km away from the project site. Hotel : Gokul Hotel is 5.27 km away from the project site. Jama asjid : 4.95 km away from project site. Post Office, Hospital are also in nearby villages.

39 4. Planning Brief (i) Planning Concept (type of industries, facilities transportation etc) Town and Country Planning/Development authority Classification. It is laminated sheet manufacturing industry located in Gandhinagar district. Total available area is sq. meter out of it 8234 sq. meter (37.6 %) area will be provided as a greenbelt area. Industry proposes to manufacture Phenol Formaldehyde Resin, Urea Formaldehyde resin and elamine formaldehyde resin used for laminated sheet manufacturing plant. Further the proposed activities will take care of all the rules and regulation of statutory authority and provide the control measures and devices to achieve the standard norms. (ii) Population Projection An official Census 2011 detail of Gandhinagar, a district of Gujarat has been released by Directorate of Census Operations in Gujarat. Enumeration of key persons was also done by census officials in Gandhinagar District of Gujarat. In 2011, Gandhinagar had population of 1,391,753 of which male and female were 723,864 and 667,889 respectively. In 2001 census, Gandhinagar had a population of 1,334,455 of which males were 697,999 and remaining 636,456 were females. Gandhinagar District population constituted 2.30 percent of total aharashtra population. In 2001 census, this figure for Gandhinagar District was at 2.63 percent of aharashtra population. There was change of 4.29 percent in the population compared to population as per In the previous census of India 2001, Gandhinagar District recorded increase of percent to its population compared to 1991

40 (iii) Land use planning (breakup along with green belt etc). 1 Built Up Area Sq mt 2 Green belt area Sq. mt 3 Open Area Sq. mt 4 Road Area Sq. mt Total Area Sq. mt (iv) Assessment of Infrastructure Demand (Physical & Social). Super Specialty and modern health facilities and medical stores are needed around. (v) Amenities/Facilities. Industry will provide 2.0 % of total profit for CSR activity.

41 5. Proposed Infrastructure (i) Industrial Area Industry will provide m 2 built up area for industrial process activity. hich provide all needed facility including proper ventilation, safe handling system, etc. (ii) Residential Area Industry will provide labor quarter for their labors and provide all basic facilities to them. (iii) Green Belt sq. meter area will be proposed for greenbelt development. (iv) Social Infrastructure. The PP proposes the following social infrastructure facilities within 10.0 km periphery of the proposed project. Education Facilities:-any Facilities for village schools like game kits, drawing kits, table-chairs; school construction (classroom/toilet/school boundary), ceiling fans/ coolers or books for school library are proposed. Health Facilities:-The PP proposes to provide assistance to existing health facilities in Nearest Hospital, for improvement in health facilities or services. (v) Connectivity (Traffic and Transportation Road / Rail / etro / ater ways etc.) The nearest city is Gandhinagar. Approaching road state highway 69 is 1.68 km away from the project site.

42 (vi) Drinking ater anagement In proposed Project, Out of 46.1 KL/day water approx 5.4 KL water will be consume for domestic purpose; 9.3 KL/day water will be consume for green belt development and 31.4 KL/ day water will be used for industrial purpose. (vii) Sewerage System. Domestic waste water 5.1 KL/day will be treated in Sewage treatment plant & treated sewage will be reused in gardening purpose. (viii) Industrial aste anagement KL/day waste water will be generated from the Industrial activity. It will be treated in effluent treatment plant and condensate water will be reused in cooling purpose. (ix) Solid aste anagement Used oil, ETP waste + evaporation residue, discarded bags/barrels & Edge cutting waste are the main solid hazardous waste generated from the proposed unit. Used oil will be reused as a lubricant within the factory premises, ETP sludge will collected, stored into solid waste storage area and disposed to authorized TSDF site. Discarded bags and containers will be sold to approved vendor. Edge cutting waste will be disposed off to common incineration facility. (x) Power Requirement & Supply / source Proposed Project power requirement: 350 KVA from UGVCL.

43 6. Rehabilitation and Resettlement (R & R) Plan Not applicable. 7. Project schedule & cost Estimates (i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given) Still construction is not started. Approximately construction work for laminated sheets will start in January (ii) Estimated project cost along with analysis in terms of economic viability of the project. Total cost of the Resin plant : Rs. 1 Crore

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR PROPOSED RESIN MANUFACTURING UNIT BY SURVEY NO:- 173/1, VILLAGE PADANA, PADANA BHIMASAR ROAD, TALUKA GANDHIDHAM, DISTRICT KUTCH, GUJARAT OF M/S. MAPLE PANELS PVT. LTD. SUMMARY

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata

Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata 1 Introduction of the Project About ITC ITC is one of India's foremost multi-business enterprise with a market capitalization of

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant

Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant Sector Agro and Food Processing Sub - sector Agro Processing Industry Project No. AF-34 Project Title Molasses Based Fuel Ethanol (Bio-Fuel) Plant Project Description The proposed project envisages setting

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

Project Description. Market and Growth Drivers. Agro and Food Processing Horticulture Infrastructure. Market

Project Description. Market and Growth Drivers. Agro and Food Processing Horticulture Infrastructure. Market Sector Sub - sector Profile No. Project Title Agro and Food Processing Horticulture Infrastructure AF-14 Project Description Onion, being high in water content, is a delicate commodity to store and requires

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

How To Use A Water Source Heat Pump

How To Use A Water Source Heat Pump Geothermal Energy Using Water-Source Heat Pumps By VIRSTAR Corporation Geothermal Expertise Since 1978 All information contained herein is the exclusive property of VIRSTAR Corporation, all rights reserved.

More information

Caring for. our. harbour

Caring for. our. harbour Caring for our harbour What s HATS? Stonecutters Island Sewage Treatment Works Harbour Area Treatment Scheme (HATS) is a major Government infrastructure project in Hong Kong. It is being implemented in

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention)

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention) Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention) August 2010 Disclaimer: The standards & regulations provided here are attributable to the named source and are

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY

APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY SIC8 SIC8DESC GRSECTOR 1810103 Mats, preseeded: soil erosion, growing of Green building 8510102 Reforestation services Environmental services

More information

TISSUE PAPER MANUFACTURING

TISSUE PAPER MANUFACTURING PROJECT PROFILE ON TISSUE PAPER MANUFACTURING Prepared by: Kerala State Industrial Development Corporation September 2012 1 TISSUE PAPER PROJECT SUMMARY 1 The Proposal : To set up a Tissue Paper Production

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

TAMIL NADU POLLUTION CONTROL BOARD FORM I

TAMIL NADU POLLUTION CONTROL BOARD FORM I TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu

More information

AMMONIA AND UREA PRODUCTION

AMMONIA AND UREA PRODUCTION AMMONIA AND UREA PRODUCTION Urea (NH 2 CONH 2 ) is of great importance to the agriculture industry as a nitrogen-rich fertiliser. In Kapuni, Petrochem manufacture ammonia and then convert the majority

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

Recover Heat from Boiler Blowdown Water

Recover Heat from Boiler Blowdown Water Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE

CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE Siddhesh Dhonde 1, Bhaskar Nadigatla 2, D.U. Dalavi 3 1,2, 3 ETC, SCSCOE, SPPU, (India), ABSTRACT In Process Industries, proper

More information

07. Asbestos Industry

07. Asbestos Industry PRTR Estimation Manual 07. Asbestos Industry January 2001 Revised: March 2002 Japan Asbestos Association Contents 1. Procedures for Calculating Releases and Transfers... 1 1.1 Procedures for calculating

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management A. AIR POLLUTION: Air Pollution sources are Transportation, Industries and

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Document No. 2015-207

Document No. 2015-207 Henan Province Environment Assessment Center Document No. 2015-207 Technical Review Report on Gushi Biomass Power Project-Environment Impact Assessment Report Henan Province Environment Protection Bureau:

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

4.2 Option 1 Expand Existing Lagoon System

4.2 Option 1 Expand Existing Lagoon System 4. WASTEWATER TREATMENT SYSTEM 4.1 of Existing Lagoons The of existing lagoon system is evaluated for future demand based on the following requirements. Existing Lagoons Anaerobic cells - Four Cells, of

More information

Saudi Aramco Project Development

Saudi Aramco Project Development Saudi Aramco Project Development Wastewater Treatment Facilities Jeddah Refinery And Marine Area December 2007 Facilities Planning Dept. OBJECTIVE: Provide an overview of the complexities of developing

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres

Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres What factors determine the energy efficiency of a data centre? Where is the energy used? Local Climate Data Hall Temperatures Chiller / DX Energy Condenser / Dry Cooler / Cooling Tower Energy Pump Energy

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

Point-wise COMPLIANCE REPORT Of the Additional Information Sought by SEAC-Gujarat

Point-wise COMPLIANCE REPORT Of the Additional Information Sought by SEAC-Gujarat Point-wise COMPLIANCE REPORT Of the Additional Information Sought by SEAC-Gujarat ON MANUFACTURING OF SYNTHETIC ORGANICS CHEMICALS Activity: 5(f), Category: B2 FOR PROPOSED PROJECT OF M/s. CHANDAN SYNTHETICS

More information

WASTE WATER TREATMENT for surface treatment applications

WASTE WATER TREATMENT for surface treatment applications WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

Each icon on this map represents the physical location of a station.

Each icon on this map represents the physical location of a station. ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors

More information

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

Business Planning for a Greenhouse Operation. Joyce Latimer, Virginia Cooperative Extension

Business Planning for a Greenhouse Operation. Joyce Latimer, Virginia Cooperative Extension Business Planning for a Greenhouse Operation Joyce Latimer, Virginia Cooperative Extension Introduction A successful business depends on a thorough business planning including consideration of the details

More information

Building Tennessee s Tomorrow: Anticipating the State s Infrastructure Needs July 2011 through June 2016

Building Tennessee s Tomorrow: Anticipating the State s Infrastructure Needs July 2011 through June 2016 Building Tennessee s Tomorrow: Anticipating the State s Infrastructure Needs July 2011 through June 2016 Glossary of Terms Basic Education Program (BEP): The programs funded by the formula adopted as part

More information

WISI - ABB Water Industrial Sector Initiative Introducing ABB Water for Process Industry. ABB Group July 29, 2009 Slide 1

WISI - ABB Water Industrial Sector Initiative Introducing ABB Water for Process Industry. ABB Group July 29, 2009 Slide 1 WISI - ABB Water Industrial Sector Initiative Introducing ABB Water for Process Industry ABB Group July 29, 2009 Slide 1 Sustainable Water Use in Process Industries What is Sustainability? Sustainability

More information

Maine Yankee INDEPENDENT SPENT FUEL INSTALLATION (ISFSI) OFF-SITE DOSE CALCULATION MANUAL CHANGE NO. 32. Approved: Approval Date: 0"/06

Maine Yankee INDEPENDENT SPENT FUEL INSTALLATION (ISFSI) OFF-SITE DOSE CALCULATION MANUAL CHANGE NO. 32. Approved: Approval Date: 0/06 Maine Yankee INDEPENDENT SPENT FUEL INSTALLATION (ISFSI) OFF-SITE DOSE CALCULATION MANUAL CHANGE NO. 32 Approved: Approval Date: 0"/06 ABSTRACT The Maine Yankee Nuclear Power Station Off-Site Dose Calculation

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION PRSENTATION ON DRAINAGE SYSTEM OF DELHI EAST DELHI MUNICIPAL CORPORATION 25.07.2014 MAP OF DELHI SHOWING MCD s, NDMC & DCB ABOUT DELHI DELHI MANIFESTS UNCONTROLLED URBANISATION POPULATION INDUSTRIALISATION

More information

Country Report, SWEDEN

Country Report, SWEDEN Country Report, SWEDEN Bo Hektor 1 & Erik Ling 2 1. Talloil AB, Klarabergsviadukten 70, D7, SE 111 64 Stockholm, Sweden, +46 70 6570043, Bo.Hektor@talloil.se 2. Sveaskog AB, 105 22 Stockholm, Sweden, +46

More information

Environmental and Social Monitoring Report

Environmental and Social Monitoring Report Environmental and Social Monitoring Report Project Number: 44932-054 July 2015 INDIA: 145 MW Grid Connected Solar Project Sand Land Real Estate Private Limited Safeguards Monitoring Report (April 2013

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Crowne Plaza Copenhagen Towers The world s greenest hotel

Crowne Plaza Copenhagen Towers The world s greenest hotel Crowne Plaza Copenhagen Towers The world s greenest hotel The new Crowne Plaza Copenhagen Towers in Copenhagen, has been designed with sustainability in top of mind. The hotel is one of the first hotels

More information

INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR

INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR PROJECT 1 Introduction The Jubilee Filed oil is of light quality and has high gas content. For every 1,000 barrels of oil that is produced, there is an

More information

Fact sheet 6: for farmers

Fact sheet 6: for farmers Fact sheet 6: for farmers Fuel Oil Storage June 2013 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The Water

More information

UTILITIES DEPARTMENT

UTILITIES DEPARTMENT UTILITIES DEPARTMENT Dear Business Owner, As a Business owner or manager you know how important it is to provide a safe and reliable service or product. Similarly, the City of Brighton Utilities Department

More information

WASTEWATER TREATMENT OBJECTIVES

WASTEWATER TREATMENT OBJECTIVES WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater

More information

Life cycle energy analysis of water use system in Ara river watershed

Life cycle energy analysis of water use system in Ara river watershed Life cycle energy analysis of water use system in Ara river watershed Hiroaki FURUMAI Professor, Research Center for Environment Technology University of Tokyo IWA Workshop on and & Loss Tokyo, 8 April

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

UNDERSTANDING CENTRAL HEATING SYSTEMS

UNDERSTANDING CENTRAL HEATING SYSTEMS UNDERSTANDING CENTRAL HEATING SYSTEMS This advice guide is part of a series of free guides produced by the Association of Plumbing & Heating Contractors Ltd. which provide consumers with essential basic

More information