PRE - FEASIBILITY REPORT
|
|
- Silas Cross
- 8 years ago
- Views:
Transcription
1 PRE - FEASIBILITY REPORT FOR PROPOSED RESIN MANUFACTURING UNIT BY SURVEY NO:- 173/1, VILLAGE PADANA, PADANA BHIMASAR ROAD, TALUKA GANDHIDHAM, DISTRICT KUTCH, GUJARAT OF M/S. MAPLE PANELS PVT. LTD.
2 SUMMARY M/s. Maple Panels Pvt. Ltd is planning to set up the resin manufacturing unit at Survey No. 173/1, village Padana, Padana - Bhimasar Road, Taluka Gandhidham, District Kutch, Gujarat. PROJECT COST The total project cost for the proposed resin manufacturing project would be around Rs crores. Total capital cost of pollution control measures will be Rs crores & recurring cost per annum will be 10 lacs. DETAILS OF PRODUCTS Details of existing and proposed products are given in following table. LIST OF PRODUCTS SR. NO PRODUCT QUANTITY MT/M 1 Urea Formaldehyde Resin Melamine Formaldehyde Resin Formalin Phenol Formaldehyde Wax 500 TOTAL 12,000 REQUIREMENTS FOR THE PROJECT LAND No new land will be acquired for the proposed project. The proposed project will come in available open space in existing particle board unit. Out of the total land area (i.e. 41,205 m 2 ) around m 2 open land area will be utilized for the proposed Resin manufacturing unit. WATER Total water requirement for the proposed project would be estimated as 129 KLD, which would be sourced from Gujarat Water Infrastructure Limited (GWIL). ELECTRICAL ENERGY Total power requirement for the proposed project will be 500 KW will be sourced from UGVCL (Uttar Gujarat Vij Company Limited). During emergency purpose D. G. Set of 400 KVA will be utilized. MANPOWER For proposed project total 30 personnel will be required. SOURCES OF AIR POLLUTION AND CONTROL MEASURES EMISSIONS FROM COMBUSTION OF FOSSIL FUELS FROM STATIONARY OR MOBILE SOURCES SR STACK ATTACHED TO Steam Boiler (2 TPH) X 2 Nos. Thermopack (10 Lac Kcal/hr) FUEL USED Coal/ Agro waste / Baggase 10 MT/Day STACK HEIGHT 30 meter 30 meter POLLUTION CONTROL SYSTEM Bag Filter Bag filter FINAL CONCENTRATI ON SPM 150 mg/nm 3 SO ppm NO X 50 ppm SPM 150 mg/nm 3 SO ppm
3 SR. STACK ATTACHED TO FUEL USED STACK HEIGHT POLLUTION CONTROL SYSTEM FINAL CONCENTRATI ON NO X 50 ppm 3. D.G Set (Stand By) 400 KVA HSD/LDO 35 Lit/Hr 07 meter Acoustic Enclosures SPM 150 mg/nm 3 SO ppm NO X 50 ppm WASTE WATER GENERATION AND IT S TREATMENT: Total wastewater i.e. 30 KLD will be generated from the proposed Resin Manufacturing project, from that 1 KLD sewage wastewater shall be generated from domestic use which will be disposed off through septic tank/soak pit system, remaining 29 KLD industrial effluent shall be treated in proposed ETP after that it will be evaporated through evaporator and condensate water will be reused. Domestic wastewater: Total 01 KLD domestic wastewater will be disposed off through Septic tank/soak pit system. NOISE POLLUTION AND CONTROL MEASURES: From the proposed manufacturing unit noise pollution will be generated which will be controlled by adopting different types of noise pollution control measures. Main sources of the noise pollution - machineries, electric motors, boiler, D. G. set and TFH, etc. Following noise control measures to be adopted in the proposed manufacturing project, Encasement of noise generating equipment. Greenbelt will be developed all around the plant boundary to act as noise attenuator. In addition personnel, working near high noise level generating sources, will be provided with ear muffs. Proper and suitable acoustic barrier will also be provided around, areas generating high noise. Effective preventive maintenance and vibration measurement of all rotating equipment will help in the improvement of plant life and also noise reduction. SOLID WASTE GENERATION AND ITS DISPOSAL METHOD The sources of solid wastes, generation and its management are as given in the following table. SR. CATEGORY METHOD OF STORAGE AND NAME OF THE WASTE QUANTITY DISPOSAL 1. Used Oil Discarded Containers/Barrels/plastic ETP Sludge Salt from Evaporator - 5. Fly ash Lit/Year 1500 Nos./Year 27.0 MT/Month 10 MT/Month 15 MT/Month Collection, storage and reuse as lubricants in the machineries within the premises only or send to authorized reprocessors. Collection, storage and send to authorized recycler after decontamination. Collection, storage and transport to TSDF site. Collection, storage and transport to TSDF site. Collection, storage and send to brick manufacturers. GREEN BELT DEVELOPMENT Company has proposed 33% of total land area for green belt development approx 13,597 m 2 land area.
4 INDEX CHAPTER 1 Introduction of the project 2 Project description 3 Site analysis 4 Planning brief 5 Proposed infrastructure CONTENT 6 Rehabilitation and resettlement (R & R) plan 7 Project schedule & cost estimates 8 Analysis of proposal
5 INTDOUCTION OF THE PROJECT CHAPTER IDENTIFICATION OF PROJECT AND PROJECT PROPONENT M/s. Maple Panels Pvt. Ltd is proposing to manufacture Urea Formaldehyde Resin, Melamine Formaldehyde Resin, Formalin, Phenol Formaldehyde Resin and Wax as products at Survey No. 173/1, village Padana, Padana-Bhimasar Road, Taluka Gandhidham, District Kutch, Gujarat. 1.2 PROMOTERS BACKGROUND Main promoters of the project are Mr. Pradeep Lohia (B.E.) 40 years of experience business and Mr. Ankur Agarwal (MBA) 5 years of experience in business. 1.3 BRIEF DESCRIPTION OF NATURE OF THE PROJECT M/s. Maple Panels Pvt. Ltd is planning to set up the resin manufacturing unit at Survey No. 173/1, village Padana, Padana-Bhimasar Road, Taluka Gandhidham, District Kutch, Gujarat. LIST OF PRODUCTS SR. NO PRODUCT QUANTITY MT/M 1 Urea Formaldehyde Resin Melamine Formaldehyde Resin Formalin Phenol Formaldehyde Wax 500 TOTAL 12, NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION. Industrial development in India has increased economic growth and improved living standards of people. Formaldehyde it is a colorless gas at room temperature and is soluble in water, alcohols and other polar solvents. Formaldehyde is usually produced close to the point of consumption since it is fairly easy to make, is costly to transport and can develop problems associated with stability during transport. Demand for these markets is greatly influenced by general economic conditions. As a result, demand for formaldehyde largely follows the patterns of the leading world economies. Formaldehyde resins are used predominantly in the wood products industry as adhesives. 1.5 DEMANDS-SUPPLY GAP As stated earlier the major end users of laminated sheets/ particle board are the building construction sector. Thus the demand for laminated sheets/ particle board is related to the expansion and growth of the building construction sector. The future demand for laminated sheets/ particle board is related to housing construction and the furniture industry whose future growth is related to the growth rate of the economy and urbanization. The rate of urbanization in the country is currently above 5 percent and the economy is growing on average at about 10%. In view of this real performance, a conservative assumption that demand for laminated sheet/ particle board will grow by 3 percent is considered in projecting the future demand. This indicates the presence of huge demand in the future and hence affirms the importance of establishing a plant that manufactures particle board. 1.6 EMPLOYMENT GENERATION For proposed project additional 30 personnel will be required. 1
6 PROJECT DESCRIPTION CHAPTER TYPE OF PROJECT M/s. Maple Panels Pvt. Ltd is planning to set up the resin manufacturing unit at Survey No. 173/1, village Padana, Padana-Bhimasar Road, Taluka Gandhidham, District Kutch, Gujarat. It is for resin manufacturing unit which requires obtaining prior environmental clearance before establishing from MoEF&CC. Industrial development in India has increased economic growth and improved living standards of people. These growths are achieved through industrialization, infrastructure development. The industrialization has played a major role in development of the country. This industrialization is also has many other benefits. Although the industrial development leads to rapid consumption of natural resources, fuel etc. in day to day operational activity. To control the pollutions from industrial activity, government has framed regulations which are governed by Ministry of Environment and Forest in India. 2.2 LOCATION M/s. Maple Panels Pvt. Ltd is planning to set up the resin manufacturing unit at Survey No. 173/1, village- Padana, Padana Bhimasar Road, Taluka-Gandhidham, District- Kutch, Gujarat. Total plot area of the project is 41,205 m 2 from which around 1,636 m 2 will be required for this project. A map showing project site is given in following figure-1 & a detailed map of the project site & surrounding is showing in following figure. Latitude '.46.41" North Longitude '38.52" East LOCATION MAP 2
7 2.3 SIZE OR MAGNITUDE OF OPERATION M/s. Maple Panels Pvt. Ltd is planning to set up the resin manufacturing unit for 12,000 MT/M resin products. LIST OF PRODUCTS SR. NO PRODUCT QUANTITY MT/M 1 Urea Formaldehyde Resin Melamine Formaldehyde Resin Formalin Phenol Formaldehyde Wax 500 TOTAL 12, PROCESS DESCRIPTION MANUFACTURING PROCESS: DETAILS OF MANUFACTURING PROCESSES 1) UREA FORMALDEHYDE RESIN: In reaction vessel urea (Technical Grade), formaldehyde and caustic are taken in desired quantity, then after it will stir and heat up to 70ºC and maintain temperature up to 1 hour. Reflux is done for 30 minutes. To control the temperature, the mixture is cooled by circulating water. ph will be adjusted up to desirable by adding Caustic. The reaction involves condensation between the nucleophilic Nitrogen of Urea with the electrophilic carbonyl Carbon of Formaldehyde. A branched copolymer is formed. Urea Formaldehyde Resin will be ready for Packing. CHEMICAL REACTION FLOW DIAGRAM Urea (T.G.) 25 Kg Formaldehyde 74.8 Kg REACTOR Condenser Caustic Soda 0.1 Kg Acetic Acid 0.1 Kg NEUTRALIZATION UREA FORMALDEHYDE RESIN 100 KG 3
8 2) MELAMINE FORMALDEHYDE RESIN The formaldehyde is charged into reaction vessel and raises it s up to 8.5 to 9.0 by adding caustic solution (NaOH Solution). Then add melamine into vessel thoroughly and maintained the ph upto 8.5 to 9.0. And start heating at 80 C to 90 C for melting of Melamine. After 15 to 20 minutes, check the ph of mixture and stop heating. Start reflux process for 40 to 50 minutes. In between the reflux process observe tolerance point. Once the required tolerance achieved, start immediate cooling. Finally, check viscosity, tolerance, ph, turbidity etc. to obtain the desired product property. CHEMICAL REACTION FLOW DIAGRAM Melamine 35.6 Kg Formaldehyde 64.2 Kg REACTOR Condenser Caustic Soda 0.2 Kg NEUTRALIZATION MELAMINE FORMALDEHYDE RESIN 100 KG 3) PHENOL FORMALDEHYDE RESIN Take required quantity of Phenol and Formaldehyde in the reactor. Start steam heating until the temperature reaches up to 60 C. The reaction being exothermic will liberate heat and temperature will rise without any further heating. Reflux process will be start at this point to achieve required water tolerance. After achieving required water tolerance, start cooling to decrease temperature up to 60 C. Once the temperature reach at 60 C stop cooling and start heating for distillation process for required quantity of resin. After achieving required amount of resins start cooling to obtain final product. Final product will be checked for the properties like Resin Viscosity, Resin ph, Resin gel time etc. The upper layer is of water and the bottom layer contains the resin. The product containing 70% solid is drained out from the reaction vessel and stored in a storage tank. 4
9 CHEMICAL REACTION FLOW DIAGRAM Condenser Phenol 44.0 Kg Formaldehyde 58.0 Kg REACTOR Caustic Soda 0.5 Kg Methanol 11.0 Kg NEUTRALIZATION Waste water to ETP Kg PHENOL FORMALDEHYDE RESIN 4) FORMALIN (FORMALDEHYDE) The methanol in the measuring storage tank is pumped up to an elevated tank by a methanol pump. After being controlled by measuring, the methanol coming out from the elevated tank flows into an evaporator for vaporization of which the temperature is controlled within 44 ~ 47 0 C and the liquid level is controlled as 50%, then the vaporized methanol gets into a super heater. The heat for the vaporization of methanol is provided by the 70 0 C circulating fluid in the 1 st formaldehyde absorber. The air is filtered by a filter before being delivered to the evaporator by a blower. It mixes with the methanol in the evaporator and enters into then super heater together. The air flow is regulated by the blower through frequency conversion to control the flow ratio of air to methanol (A/M=1.8 ~1.95). When the pressure gets stable, the vapour (0.3 MPa) gets into a mist eliminator for dehumidification through the pipeline before entering into the superheat. The flow ratio of air to methanol shall be controlled at desired level. In the formaldehyde production technique using silver as catalysis, the water vapour is an inert gas which does not participate in chemical reactions. The added water vapour changes the explosive range of the methanol and air, the production of formaldehyde thereby becomes far from the explosive area and stays safe and reliable. After the flow 5
10 rates are regulated and proportioned, the methanol, air and water vapour enter into the super heater and the superheating temperature shall be controlled at C. Then, these materials enter into a reactor. In the reactor, under the catalysis of silver at C, the methanol is dehydrated and oxidized, generating Formaldehyde. Dehydration reaction is an endothermic reaction and oxidation reaction is an exothermic reaction, but the heat release is more than that can adsorbed, therefore the reaction system is a state of heat energy surplus. The water vapour is not involved in reactions but it can absorb a lot of heat of reaction, maintaining the temperature at C. The C reaction gas leaves the reaction and gets into heat exchanger. For the heat exchanger, the medium is water. The outlet temperature of heat exchanger is C. The water absorbs heat, forming the water vapour of 0.35 MPa which will be used to arranging the raw materials for production in the super heater after its pressure stabilized. The generated gases of about C enter into 1 st and 2 nd formaldehyde absorber in proper order and get absorbed by the cooled circulating fluid through spraying. The temperature of the circulating fluid at the bottom of 1 st absorber shall be control at 70 0 C and fluid is pumped to the evaporator by circulating pump to supply the heat for the evaporation of methanol. In the 1 st absorber, the concentration shall be controlled as 37%, and temperature of the top shall be controlled at 45 0 C to 50 0 C. The circulating fluid is also a composition of the formaldehyde product by this technique. The temperature of the top of 2 nd absorber shall be controlled at 30 0 C to 35 0 C and keep adding water from top to control the release of formaldehyde. CHEMICAL REACTION CH 3 OH CH 2 O + H 2-20Kcal CH 3 OH + ½ O 2 CH 2 O + H 2 O + 38 Kcal =18Kcal 6
11 FLOW DIAGRAM Excess Energy Water Methanol Energy Generation Gases Gases l Silver Catalyst Second Column Scrubber Start up Heat Air Formaldehyde 37% Formaldehyde % 5) WAX In reaction vessel paraffin wax, Borax powder, Stearic Acid and aqueous ammonia are mixed. Reaction mass are continuous stirring and heated to prepare the product paraffin wax emulsion. Water will be added as to maintain solid content of emulsion. 7
12 FLOW DIAGRAM Paraffin Wax 43.8 kg Borax powder 1.5 kg Stearic Acid 5.8 kg REACTION VESSEL Aqueous Ammonia 1.5 kg Water 47.4 Kg PARAFFIN WAX EMULSION 100 KG 2.5 RAW MATERIALS REQUIREMENT WITH THEIR SOURCE AND TRANSPORATATION Details of Raw material consumption and Mode of Transportation are given in following table. LIST OF RAW MATERIALS SR.NO NAME OF RAW MATERIAL QUANTITY MTPM TYPE OF STORAGE MODE OF TRANSPORT 1. Phenol 220 MS Tank By Road 2. Formaldehyde 7016 MS Tank By Road 3. Caustic Soda 10.5 Bags By Road 4. Formic Acid 400 MS Tank By Road 5. Methanol 455 MS Tank By Road 6. Melamine 712 Bags By Road 7. Urea (T.G.) 1000 Bags By Road 8. Acetic Acid 4 Drum By Road 9. Paraffin Wax 219 Drum By Road 10. Borax powder 12.5 Bags By Road 11. Stearic Acid 54 MS Tank By Road 12. Aqueous Ammonia 12.5 MS Tank By Road 2.6 RESOURCE OPTIMIZATION / RECYCLING AND REUSE IN THE PROJECT Treated effluent (condensate water) will be reused in utilities and washing purpose which will reduce in fresh water intake quantity. 2.7 AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE WATER Total water requirement for the proposed expansion project would be estimated as 129 KLD, which would be sourced from Gujarat Water Infrastructure Pvt. Ltd. POWER Total power requirement for the proposed project will be 500 KW. During emergency purpose D.G. Set of 8
13 400 KVA will be utilized. Power supply shall be full-filled by UGVCL (Uttar Gujarat Vij Company Limited) WATER REQUIREMENT AND WASTE WATER GENERATION Total wastewater i.e. 30 KLD will be generated from the proposed Resin Manufacturing project, from that 1 KLD sewage wastewater shall be generated from domestic uses which would be disposed off through septic tank/soak pit system, remaining 29 KLD industrial effluent shall be treated in proposed ETP after that it will be evaporated through evaporator. Condensate water from evaporator will be reused in utilities and washing FUEL REQUIREMENT SR. DAILY FUEL SOURCE & MODE OF FUEL CONSUMPTION TRANSPORTATION Coal/ Waste wood/ From local market and transport MT/Day Baggase through truck 2. HSD/LDO 35 Lit/Hr From nearby petrol pump AIR POLLUTION EMISSIONS FROM COMBUSTION OF FOSSIL FUELS FROM STATIONARY OR MOBILE SOURCES SR STACK ATTACHED TO FUEL USED Steam Boiler (2 TPH) X 2 Nos. Coal/ Waste wood/ Baggase Thermopack 10 MT/Day (10 Lac Kcal/hr) D.G Set (Stand By) 400 KVA HSD/LDO 35 Lit/Hr STACK HEIGHT 30 meter 30 meter 07 meter POLLUTION CONTROL SYSTEM Bag Filter Bag filter Acoustic Enclosures FINAL CONCENTRATIO N SPM 150 mg/nm 3 SO ppm NO X 50 ppm SPM 150 mg/nm 3 SO ppm NO X 50 ppm SPM 150 mg/nm 3 SO ppm NO X 50 ppm SOLID WASTE GENERATION AND THEIR DISPOSAL The sources of solid wastes, generation and its management are as given in the following table. SR. NAME OF THE WASTE CATEGORY 1. Used Oil Discarded Containers/Barrels/plastic ETP Sludge Salt from Evaporator - 5. Fly ash - QUANTITY 3.0 Lit/Year 1500 Nos./Year 27.0 MT/Month 10 MT/Month 15 MT/Month METHOD OF STORAGE AND DISPOSAL Collection, storage and reuse as lubricants in the machineries within the premises only or send to authorized reprocessors. Collection, storage and send to authorized recycler after decontamination. Collection, storage and transport to TSDF site. Collection, storage and transport to TSDF site. Collection, storage and send to brick manufacturers. 9
14 SITE ANALYSIS CHAPTER CONNECTIVITY RAIL The nearest railway station is Gandhidham Railway station, which is around 10.6 km in South South West direction from the project site ROAD The site is well connected by road network to all the key places. The major highway passing near the project site is NH-8 -A which is around 2.4 km North direction from the project site and SH-6 around 1.7 km in south east direction AIR The nearest airport from the project site is Kandla Airport. The distance of airport from project site is around 9.42 km in South West direction COMMUNICATION Proposed project site is within existing company premises which is already well connected with telephone, telefax etc. all the communications facilities are well developed in the area. 3.2 TOPOGRAPHY Topography of the land is plane. 3.3 EXISTING LAND USE PATTERN There is no Forest, National park; Wild life sanctuary within a radius of 10 km. Details of existing land use is given in the following table: DETAILS OF EXISTING LAND USE SR. PARTICULAR NAME & ITS DISTANCE 1. Nearest National Highway NH-8 A at around 1.9 km 2. Nearest city Gandhidham city 10.5 km 3. Nearest River Gulf of Kutch at around 24.5km 4. Nearest Railway station Gandhidham Railway Station 10.6 km 5. National park/reserve Forest, Biosphere, etc. None within 20 km 3.4 EXISTING SOCIAL STRUCTURE Project site is located at a distance of around 10.5 km from Gandhidham city. All the infrastructures are available within city like Schools, Hospitals & community facilities. 10
15 PLANNING BRIEF CHAPTER PLANNING CONCEPT Type of industries: Laminated sheets, Particle board, etc is made from Phenol Formaldehyde Resin, Melamine Formaldehyde Resin, Urea formaldehyde Resin and different type of resins which are highly shock absorbent, resistant to abrasion, excellent impact resistance, good dimensional stability, superior machinability, non conductive, heat resistant, stain resistant and cost effective. They are resistant to solvents low absorption to humidity and water. Due to these properties, the laminated sheets prepared from these resins have huge demand in market in terms of telephone castings, electric insulators, transformer tubes, and switch gear, used to surface walls, cabinets and counters and to make decorative laminated panels, household crockery such as glasses, cups, bowls and plates. 4.2 LAND USE PLANNING The Plant General Layout has been planned considering production facilities, auxiliary and ancillary facilities and plant utilities & services. The total plot area is 41,205 sq. m. Land use shall be as build up area of buildings, Storage facility, Roads, Greenbelt, open land etc., these kinds of land use will be there. 4.3 AMENTIES / FACILITIES Adequate storage facility for Chemicals, machinery spares and consumables shall be provided. A small mechanical and electrical/ instrument workshop facilities for repairs and maintenance shall be provided. Time and security offices shall be provided in the plant. To avoid fire hazard, internal fire hydrants system in all major plant unit will be provided. 11
16 PROPOSED INFRASTRUCTURE CHAPTER INDUSTRIAL AREA The company has already acquired land area of 41,205 m 2 in which company will expand their production capacity. 5.2 GREEN BELT The main objective of the green belt is to provide a barrier between the source of pollution and the surrounding areas. The green belt helps to capture the fugitive emission and to attenuate the noise generated apart from improving the aesthetics. Development of green belt and other forms of greenery shall also prevent soil erosion and washing away of topsoil besides helping in stabilizing the functional ecosystem and further to make the climate more conducive and to restore water balance. The company has green belt area with Lawn, plants and flowers spread across about 33% of the total area. Green belt shall be developed at plant boundary, road side, around offices & buildings and Stretch of open land. The selection of tree species suitable for plantation at the industry are governed by guiding factors as stated below: The trees should be tolerant to air pollutants present in the area The trees should be able to grow and thrive on soil of the area, be evergreen, inhabitant, having minimum of leaf fall. The trees should be tall in peripheral curtain plantation and with large and spreading canopy in primary and secondary attenuation zone. The trees should posses extensive foliar area to provide maximum impinging surface for continued efficient adsorption and absorption of pollutants. The trees should be fast growing and indigenous and should maintain ecological, land and hydrological balance of the region. It is also recommended to plant few trees, which are sensitive to air pollution, as air pollution indicator. It is also recommended to carry out extensive plantation within premises. Keeping in view the climatic conditions, status of soils and vegetation types in and around the project area the species shall be selected for proposed green belt development. 5.3 SOCIAL INFRASTRUCTURE Drinking water facility, Canteen, proper sanitation, etc. will be provided to the workers working in plant. 5.4 CONNECTIVITY As discussed earlier, proposed location of the plant is already well connected with the network of road & rail. So there is no need to construct any new road or rail for the transportation. 5.5 WASTE WATER MANGAMENT Total wastewater i.e. 30 KLD will be generated from the proposed Resin Manufacturing project, from that 1 KLD sewage wastewater shall be generated from domestic uses which would be disposed off through septic tank/soak pit system, remaining 29 KLD industrial effluent shall be treated in proposed ETP after that it will be evaporated through evaporator. Condensate water from evaporator will be reused in utilities and washing. 12
17 5.7 INDUSTRIAL SOLID WASTE MANAGEMENT From the proposed project activity there shall be mainly Spent/Used Oil, ETP Sludge and Discarded containers. DETAILS OF SOLID & HAZARDOUS WASTE GENERATION DURING OPERATION SR. NAME OF THE WASTE CATEGORY 1. Used Oil Discarded Containers/Barrels/plastic ETP Sludge Salt from Evaporator - 5. Fly ash - QUANTITY 3.0 Lit/Year 1500 Nos./Year 27.0 MT/Month 10 MT/Month 15 MT/Month METHOD OF STORAGE AND DISPOSAL Collection, storage and reuse as lubricants in the machineries within the premises only or send to authorized re-processors. Collection, storage and send to authorized recycler after decontamination. Collection, storage and transport to TSDF site. Collection, storage and transport to TSDF site. Collection, storage and send to brick manufacturers. 13
18 REHABILITATION AND RESETTLEMENT (R & R) PLAN CHAPTER 6 The project is located on private land, which is already acquired and there is no habitat. So the project proposal does not involve any Rehabilitation & Resettlement. 14
19 CHAPTER 7 PROJECT SCHEDULE & COST ESTIMATES 7.1 TIME SCHEDULE FOR THE PROJECT The implementation of the project will involve major activities like preparation of specification / drawings, issue of tenders, receipt of quotations, scrutiny of tenders, placing of orders, civil & structural construction, delivery & erection of equipment, test trial runs of various items of equipment and commissioning of the plant & equipment and completion of the project will take about 6 months after the necessary clearances are available, and the funding for the project has been tied up. 7.2 ESTIMATED PROJECT COST The total cost of the proposed project would be around Rs crores. Total capital cost of pollution control measures will be Rs Crore. 7.3 BUDGETORY PROVISIONS FOR EMP Adequate budgetary provisions have been made by the management for execution of environmental management plans. The details of capital and recurring (per annum) budget earmarked for pollution control / monitoring equipment; operation and maintenance of pollution control facilities, for greenbelt development and maintenance. COST OF ENVIRONMENTAL PROTECTION MEASURES SR. PARTICULATES RS. IN LACS 1. Capital Expenditure Recurring expenditure on environmental management cell and 10 on pollution control systems per annum. 15
20 CHAPTER 8 ANALYSIS OF PROPOSAL 8.1 FINANCIAL AND SOCIAL BENEFITS The capital cost of the proposed Resin Manufacturing project is estimated at about Rs lacs for the installation of plants & machinery along with required auxiliary and balancing facilities for the production capacity of 12,000 MT/Month of PF Resin, MF Resin, UF Resin, Formalin and Wax. For the coming of this project surrounding area will get developed due to this project and through the Corporate Social Responsibility (CSR) activities, socio-economic status of the region will also get developed. 16
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates
More informationENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationCompliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter
More information(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
More informationPRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
More informationEnvironmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
More informationTERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
More informationPRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
More informationPRE FEASIBILITY REPORT FOR PROPOSED NEW PROJECT OF. M/s. Redd Mica Pvt. Ltd. Survey no.: 1068, Lavad Sampa Road, At & Post : Lavad,
PRE FEASIBILITY REPORT FOR PROPOSED NE PROJECT OF /s. Redd ica Pvt. Ltd. Survey no.: 1068, Lavad Sampa Road, At & Post : Lavad, Taluka : Dahegam, District : Gandhinagar. r. Jainam H. Agrawal - Director
More informationBirmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
More informationEnvironment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
More informationPRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
More informationProject Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
More informationM/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationPLANT LOCATION AND LAYOUT
PLANT LOCATION AND LAYOUT The Location Of The Plant Can Have A Crucial Effect On The Profitability Of A Project, And The Scope For Future Expansion. Many Factors Must Be Considered When Selecting A Suitable
More informationGenerating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:
P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
More informationIntroduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
More information5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.
413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationLong-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station
Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station MASAKI IIJIMA* 1 SHOJIRO IWASAKI* 1 SHINYA KISHIMOTO* 1 TORU TAKASHINA* 2 SUSUMU OKINO* 2 There is now a growing
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS
More informationELECTRODE BOILERS VAPOR POWER INTERNATIONAL
ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in
More informationAPPLICATION FOR EXEMPTION Assessing Authority
TO: Combined Request for Pollution Control and Recycling Property Tax Exemption and Iowa Code Section 427.1 (19) APPLICATION FOR EXEMPTION Assessing Authority IMPORTANT: The application should be filed
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
More information10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
More informationMulti-pollutant control solutions for coal based power plants
Multi-pollutant control solutions for coal based power plants By Luca Mancuso and Hans Janssen Content SOx control Wet Scrubbers Open towers Dual Flow Tray Technology Semi-Dry SDA CFB Scrubbers Dust control
More informationSulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
More informationWASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
More informationMCQ - ENERGY and CLIMATE
1 MCQ - ENERGY and CLIMATE 1. The volume of a given mass of water at a temperature of T 1 is V 1. The volume increases to V 2 at temperature T 2. The coefficient of volume expansion of water may be calculated
More informationThis fact sheet provides an overview of options for managing solid
What Is Integrated Solid Waste Management? This fact sheet provides an overview of options for managing solid waste, identifies the important issues you should consider when planning for solid waste management,
More informationBasics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology
Basics of Kraft Pulping & Recovery Process Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Outline History Goals Process Overview Kraft Pulping Process Kraft
More informationCurrent state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:
Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:
More informationLecture 35: Atmosphere in Furnaces
Lecture 35: Atmosphere in Furnaces Contents: Selection of atmosphere: Gases and their behavior: Prepared atmospheres Protective atmospheres applications Atmosphere volume requirements Atmosphere sensors
More informationREQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE
ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
More informationTAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
More informationAMMONIA AND UREA PRODUCTION
AMMONIA AND UREA PRODUCTION Urea (NH 2 CONH 2 ) is of great importance to the agriculture industry as a nitrogen-rich fertiliser. In Kapuni, Petrochem manufacture ammonia and then convert the majority
More informationPROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
More informationTRIAL CHEMICAL CLEANING OF FOULED APH BASKETS
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater
More informationTOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
More information12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS
More informationWASTE WATER TREATMENT for surface treatment applications
WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing
More information1. IDENTIFICATION of THE SUBSTANCE/PREPARATION and COMPANY
Form No : B-729 Sayfa No : 1/ 7 1. IDENTIFICATION of THE SUBSTANCE/PREPARATION and COMPANY 1.1. Trade Name : PLASTIC TRANSPARENT GLUE 1.2. Product Identification : Polyvinyl acetate essential, water based
More informationAmherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site
Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy
More informationPOLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES
POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES Ecole Nationale Supérieure de Chimie Avenue du Général Leclerc, Campus de Beaulieu 35700 Rennes, France Tel 33 (0)2 23 23 80 02 Fax 33 (0)2 23 23 81
More informationPROPOSED TOR FOR EIA STUDY
JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS
More informationNu G Medical Waste System Technology (Pyrolysis / Thermal Decomposition)
Product Description: Nu G Medical Waste System Technology (Pyrolysis / Thermal Decomposition) The NU G System uses pyrolysis thermal decomposition to treat infectious wastes typically generated in hospitals.
More informationCHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS
CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS Natural gases either from natural production or storage reservoirs contain water, which condense and form solid gas hydrates to block pipeline flow
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
More informationOptimization Design for Sulfur Dioxide Flow Monitoring Apparatus in Thermal Power Plants Hao-wei Hu 1, a, Xue Yang 1, b and Xiao-wei Song 1, c
International Conference on Information Sciences, Machinery, Materials and Energy (ICISMME 2015) Optimization Design for Sulfur Dioxide Flow Monitoring Apparatus in Thermal Power Plants Hao-wei Hu 1, a,
More informationCooking at the Speed of light!
Cooking at the Infrared Cooking & Colouring Infrabaker is a modular infrared continuous cooking system developed by Infrabaker International. The machine is designed to cook and/or put colour on a wide
More informationDIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported
DIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported 1 Field of application This standard specifies the colours for the identification of
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
More informationCHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER
CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER There are a number of technologies that are being use to remediate contaminated groundwater. The choice of a certain remediation technology
More informationContinuous flow direct water heating for potable hot water
Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
More informationENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
More informationAIR CONDITIONING - ENERGY CONSUMPTION AND ENVIRONMENTAL QUALITY
CONTENTS AIR CONDITIONING - ENERGY CONSUMPTION AND ENVIRONMENTAL QUALITY Air Conditioning - Energy Consumption and Environmental Quality - Volume 1 No. of Pages: 400 ISBN: 978-1-84826-169-3 (ebook) ISBN:
More informationAssessing the Changes Required by the Industrial Boiler MACT Regulations
Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A
More informationA discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.
A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. Richard L. Dornfeld, BSME, P.E. Staff Engineer September 25, 2014 Moisture can be a problem
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationCONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2
WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials
More informationEnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
More informationSubpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
More informationEstimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements
Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction
More informationRASHTRIYA CHEMICALS AND FERTILIZERS LTD. CHEMBUR, MUMBAI-400 074 TECHNICAL SERVICES
RASHTRIYA CHEMICALS AND FERTILIZERS LTD. CHEMBUR, MUMBAI-400 074 TECHNICAL SERVICES CIN No: L24110MH1978GOI020185 NIT NO: TS/MPNA-HPNA/E.A/2015 NIT is issued to invite the offers to line up one time Contract
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
More informationRAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT
RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT WASTE MINIMIZATION IN THE OIL FIELD - APPENDIX C NOTES RAILROAD COMMISSION OF TEXAS LIST OF E&P WASTES: EXEMPT AND NON EXEMPT
More informationA Review on Power Generation in Thermal Power Plant for Maximum Efficiency
International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation
More informationChapter 6. Solution, Acids and Bases
Chapter 6 Solution, Acids and Bases Mixtures Two or more substances Heterogeneous- different from place to place Types of heterogeneous mixtures Suspensions- Large particles that eventually settle out
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
More informationPrepared and Submitted by
Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &
More informationCommitted to make a better world
Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to
More informationhttp://www.cieplowniasiemianowice.pl/filtry.html
Oil skimmer is a device which helps remove surface oil. Skimmer is mounted in the selection location. An oil is absorbed by the teflon tape and is removed for example from bath to another external container
More informationChapter 1.3 Energy management & audit
Chapter 1.3 Energy management & audit Part I: Objective type questions and answers 1. The judicious and effective use of energy to maximise profits and enhance competitive positions. This can be the definition
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
More informationESTABLISHMENT OF 70 KLPD ETHANOL PLANT
EXECUTIVE SUMMARY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORT (Including Environmental Management Plan) ON ESTABLISHMENT OF 70 KLPD ETHANOL PLANT AT Kenganur Village, Bailhongal Taluk, Belgaum District,
More informationWater Recycles poster
Water Recycles poster The "Water ReCycles" poster is designed for students of all ages. It shows the natural water cycle and humans influence on water resources. Raincloud illustration The raincloud in
More informationSIX REASONS TO DRY BIOGAS To A LOW DEWPOINT BEFORE COMBUSTION IN A CHP ENGINE STEVEN SCOTT MARKET DEVELOPMENT MANAGER ALTERNATIVE ENERGIES
SIX REASONS TO DRY BIOGAS To A LOW DEWPOINT BEFORE COMBUSTION IN A CHP ENGINE STEVEN SCOTT MARKET DEVELOPMENT MANAGER ALTERNATIVE ENERGIES Filippo Turra Product Manager Cooling Technology INTRODUCTION
More informationNational Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction
More informationVEGETABLE OIL REFINERY
VEGETABLE OIL REFINERY 1.0 INTRODUCTION: Vegetable oil and fat resources are indispensable to mankind as a source of nutrient and industrial raw materials. Crude vegetable oil obtained from various oil
More informationSOLAR WATER PURIFICATION WITH THE HELP OF CSP TECHNOLOGY
Sci. Revs. Chem. Commun.: 3(2), 2013, 128-132 ISSN 2277-2669 SOLAR WATER PURIFICATION WITH THE HELP OF CSP TECHNOLOGY JINESH S. MACHALE *, PRACHI D. THAKUR, PIYUSH S. LALWANI and GAYATRI M. APTE Department
More informationSaudi Aramco Project Development
Saudi Aramco Project Development Wastewater Treatment Facilities Jeddah Refinery And Marine Area December 2007 Facilities Planning Dept. OBJECTIVE: Provide an overview of the complexities of developing
More informationWORKSHEET: ph and Water 23 Lab Instructor: Lab Day & Time: Student name(s): drain cleaner flat soda pop window cleaner ammonia.
WORKSHEET: ph and Water 23 Lab Instructor: Lab Day & Time: Student name(s): DATA AND ANALYSIS ph Substance ph Value Substance ph Value Substance ph Value pure water apple juice dish soap sugar water beer
More informationThe National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320
TheNationalBoardofBoilerandPressureVesselInspectors 1055CrupperAvenue Columbus,Ohio43229 614.888.8320 NB-410, Revision 3 Sept, 2015 1 1.0 GENERAL The purpose of this document is to provide basic guidelines
More informationTrace Gas Exchange Measurements with Standard Infrared Analyzers
Practical Environmental Measurement Methods Trace Gas Exchange Measurements with Standard Infrared Analyzers Last change of document: February 23, 2007 Supervisor: Charles Robert Room no: S 4381 ph: 4352
More information1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
More informationMechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
More informationGuidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
More information