VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Description Quantity Cost Total Cost

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

A. Structures Quantity Item Price $3,500 EA

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Addendum Number 1 Request for Bids # BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

FY08 SEWER POINT REPAIRS BID TABULATION

Stormwater/Wetland Pond Construction Inspection Checklist

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Request for Qualifications (RFQ) City of Farmersville, Texas Parks Planning and Development Services

City of Shelbyville Site Inspection Checklist

Unit Price Averages Reports

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

FDOT Specifications List

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

SECTION SITE PREPARATION

SECTION SELECTIVE DEMOLITION

Addendum No. 2 CHANGES TO THE CONSTRUCTION DOCUMENTS: General: Alternate #2 linetype added to delineate Alternate #2 work items.

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Storm Drain Inlet Protection - IP

SECTION EARTH MOVING

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

CONSTRUCTION PERMIT REQUIREMENTS

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

SECTION CHAIN LINK FENCES AND GATES

Storm Drain Inlet Protection

Reference Guide for Obtaining Permits and Utility Services For New Construction

32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014

GENERAL ELECTRICAL REQUIREMENTS

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

What kind of fence do I want? USU, Logan, UT

Bidding and Contract Requirements:

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Section 402. STORM SEWERS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

February 26, 2016 REQUEST FOR PROPOSAL FOR MODULAR EXPANSION PROJECT ATLANTA CLASSICAL ACADEMY FULTON COUNTY, GEORGIA

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

SECTION 4Aggegate Subbase

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SE-10 STORM DRAIN INLET PROTECTION. Objectives

How To Get A Building Permit In Florida

DESCRIPTION OF WORK:

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

NAHB PRODUCT DEFINITION

SECTION STORM DRAIN SYSTEM

Estimated Cost of Repair

New Road 11.0m Asphalt 23m ROW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

Table 4.9 Storm Drain Inlet Protetion Applicable for

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

COMPREHENSIVE PROPERTY INSPECTIONS

DIVISION EARTHWORK SECTION CLEARING RIGHT-OF-WAY

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SPECIAL SPECIFICATION 5757 Power Duct System

UNIT PRICE LIST January 2009

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

NO ADDENDA ISSUED NAME OF BIDDER VIVIANO CONSTRUCTION LLC EARTHWORKS INC. BLACK ROCK ENTERPRISES, LLC

PROPERTY EVALUATION AND RESERVE FUND STUDY

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

October 5, 2015 Dear Client,

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Gardnerville Water Company Regular Board Meeting Minutes Tuesday, April 8, :00 p.m. Board Room 1579 Virginia Ranch Rd Gardnerville, NV 89410

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

How to secure your property after a disaster

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

Lake Charles Ward 3 Recreation Improvements To University Park

Storm Drain Inlet Protection

Acceptance Codes APPENDIX - A. Acceptance Criteria

Special Specification 7021 Water Main and Sewer Line Replacements

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Transcription:

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation SITE GENERAL - Oak Hall Regional Park Phase I Rebid Leonard S. Fiore, Inc. HRI, INC. Woodstone Western Region Earth Const., Inc Tedesco Construction Company Poole Anderson Const., LLC Mountain Top Excavation, LLC. Ameron Construction Glenn O. Hawbaker, Inc. Macson Mele Mele Sons, Inc. Liberty Excavators, Inc. Dave Gutelius Excavating, Inc. S Base Bid BASE performed under this contract, as shown on the drawings and specified herein. Bid includes, but is not limited to furnishing materials and work required to construct the site improvements shown on the drawings and specified herein. Lump Sum 1 $2,540,000.00 $2,587,000.00 $2,639,000.00 $2,700,000.00 $2,807,000.00 $2,980,000.00 $3,043,245.00 $3,074,250.00 $3,114,900.00 $3,311,004.00 $4,085,000.00 $4,250,000.00 S1 Add or Deduct Alts Add Alternate #S1 - the subgrading for the Maintenance building is included in the base bid. For this alternate, add all site improvements related to the Maintenance Building under this contract including: Impervious Paving (C-1) and regulatory sign (C-16) "Authorized Personnel Only." Lump Sum 1 $12,575.00 $15,200.00 $16,838.00 $8,100.00 $17,650.00 $19,000.00 $7,210.00 $9,800.00 $20,768.00 $17,887.00 $15,000.00 $15,000.00 S2 S3 Add Alternate #S2- delete seeding of this area under the base bid and add all the site improvements shown on the drawing LP7-A and related to the plaza around the Press Box Building including concrete paving, installation of two benches purchased by the Owner, installation of one trash receptacle purchased by the Owner and installation of #189; inch water supply line and 2 inch waste line from the Press Box building. Add Alternate #S3- add compacted aggregate trail surfacing in place of the concessions wing of the building at Oak Hall Regional Park. Lump Sum 1 $19,575.00 $25,000.00 $43,983.00 $25,000.00 $17,650.00 $24,000.00 $20,356.00 $17,800.00 $15,725.00 $16,485.00 $24,000.00 $20,000.00 Lump Sum 1 $1,160.00 $1,500.00 $7,070.00 $2,500.00 $1,800.00 $3,200.00 $950.00 $2,320.00 $920.00 $1,646.00 $2,100.00 $2,000.00 S4 Deduct Alternate #S4 - delete the entire section of perimeter trail and the trails connecting to that perimeter trail as shown on drawing SA. Add seeding of deleted trail. Lump Sum 1 ($37,300.00) ($35,000.00) ($29,000.00) ($30,000.00) ($48,000.00) ($80,000.00) ($40,668.00) ($42,600.00) ($27,900.00) ($43,985.00) ($51,000.00) ($31,000.00) S5 Deduct Alternate #S5 - delete the cost associated with the footings and light poles and fixtures and wiring for the light fixtures for the three lights along the entrance road and the twelve lights in the parking lot. Leave the conduit to the footings required under the base bid to allow subsequent installation of the lighting by others. Lump Sum 1 ($68,900.00) ($63,000.00) ($66,260.00) ($61,000.00) ($36,000.00) ($61,400.00) ($69,512.00) ($44,700.00) ($80,700.00) ($64,260.00) ($48,100.00) ($63,000.00) S6 Deduct Alternate #S6 - delete the water distribution system from 10 feet outside the pump house to the field hose bibs (4 inch and 2 #189; inch lines), lateral lines to future facilities, restroom and fire hydrant vault (2 inch and 1 #189; inch lines) and all valves and other devices required to complete the water distribution system. Lump Sum 1 ($92,300.00) ($125,000.00) ($87,270.00) ($75,000.00) ($7,000.00) ($46,000.00) ($107,372.00) ($110,000.00) ($102,000.00) ($68,177.00) ($77,000.00) ($90,000.00) S7 Add Alternate #S7 - include all Sports Field light fixtures, equipment, poles, wiring and conduit from within 5 feet of the Concessions/Restroom building to the fixtures around Field OH1. Include wiring from the sports lighting into the panel box in the building. Lump Sum 1 $182,000.00 $197,500.00 $208,644.00 $184,000.00 $174,000.00 $200,000.00 $209,840.00 $237,500.00 $187,400.00 $177,390.00 $185,000.00 $171,000.00

S8 S9 S10 11 Unit Prices 12 13 14 15 16 Add Alternate #S8 - Add the cost associated with the purchase and installation of the two in-grade junction boxes and associated receptacles identified by key note #6 on drawing SE1.0.#160; The added cost shall include all wiring and final connections.#160; Leave the conduit to the junction boxes required under the base bid to allow subsequent installation of the boxes and receptacles by others. Add Alternate #S9 - the base bid defines a galvanized chain link fencing and backstop for the ball fields. For this alternate, add the additional cost for providing vinyl coated fabric, posts, rails and couplings Add Alternate #S10 - Deduct from the Base Bid for the savings incurred by allowing controlled blasting. Item No. 1: Over-excavation of unsuitable material for site grading at parking, walkways and curbs. Item No. 2: Provide PennDot #4 Aggregate placed and compacted as a backfill in over-excavated locations. Item No. 3: Provide PennDot Class IV Geotextile Fabric, installed, separating aggregate from soil for over-excavated locations. Item No 4: Provide "Flowable Fill" Lean Concrete as a backfill in over-excavated locations as an alternative to aggregate backfill. Item No. 5: Provide excavation required for a sink hole discovered during work on the site. Item No. 6: Provide and install Geosynthetic Stabilization Fabric in the sink hole excavation. Lump Sum 1 $6,000.00 $5,100.00 $6,279.00 $6,900.00 $2,162.00 $6,000.00 $5,960.00 $9,000.00 $5,900.00 $6,000.00 $2,300.00 $6,000.00 Lump Sum 1 $20,300.00 $30,000.00 $32,866.00 $31,000.00 $28,500.00 $29,000.00 $24,694.00 $31,750.00 $33,780.00 $20,000.00 $20,000.00 $31,000.00 Lump Sum 1 $0.00 ($23,000.00) $0.00 ($100,000.00) ($130,000.00) $0.00 ($209,002.00) ($385,500.00) ($160,000.00) ($550,000.00) ($1,156,000.00) ($1,470,000.00) CY 1 $27.50 $20.00 $3.14 $20.00 $31.00 $4.50 $18.48 $33.50 $28.00 $7.70 $17.00 $20.00 Ton 1 $17.00 $25.00 $41.33 $25.00 $42.00 $20.00 $29.10 $29.00 $32.00 $20.00 $19.00 $30.00 SY 1 $3.20 $2.50 $1.33 $2.30 $4.30 $2.00 $1.47 $3.75 $2.00 $2.50 $4.00 $4.00 CY 1 $156.00 $250.00 $150.00 $110.00 $260.00 $125.00 $122.64 $272.00 $180.00 $190.00 $230.00 $400.00 CY 1 $27.50 $20.00 $6.21 $20.00 $26.00 $22.00 $18.48 $56.00 $28.00 $7.70 $17.00 $30.00 SY 1 $3.50 $5.00 $1.58 $2.30 $4.30 $5.00 $1.47 $3.75 $4.00 $2.24 $4.00 $4.00 17 Item No. 7: Provide riprap into the sink hole excavation. Ton 1 $27.60 $25.00 $33.66 $35.00 $42.00 $25.00 $36.85 $148.00 $38.00 $22.00 $21.00 $60.00 18 19 Item No. 8: Provide AASHTO #1 Aggregate as portion of the backfill for the sink hole. Item No. 9: Provide PennDot compacted #2B aggregate as portion of the backfill for the sink hole. Ton 1 $16.50 $25.00 $66.93 $30.00 $42.00 $22.00 $33.64 $145.00 $32.00 $20.00 $19.00 $40.00 Ton 1 $16.30 $25.00 $66.93 $30.00 $42.00 $18.00 $30.22 $145.00 $32.00 $20.00 $18.00 $40.00 20 Item No. 10: Provide sand/topsoil mix (may use topsoil from site) as portion of the backfill for the sink hole. Ton 1 $28.50 $30.00 $14.62 $35.00 $42.00 $38.00 $33.88 $160.00 $38.00 $35.00 $40.00 $50.00 21 Item No. 11: Provide Temporary Straw Mat for erosion control. SY 1 $1.75 $3.50 $1.89 $1.70 $1.75 $2.25 $2.49 $1.70 $2.50 $2.07 $2.10 $2.00 22 Item No. 12: Provide 32 In. Dia. Filter Sock LF 1 $12.40 $11.75 $15.75 $13.00 $19.00 $13.50 $15.87 $12.00 $12.20 $13.00 $12.50 $13.50 23 Item No. 13: Provide 24 In. Dia. Filter Sock LF 1 $9.75 $9.00 $11.09 $12.00 $15.75 $9.50 $12.71 $9.00 $11.00 $9.55 $10.00 $10.50 24 Item No. 14: Provide 18 In. Dia. Filter Sock LF 1 $6.00 $5.40 $7.88 $10.00 $13.75 $7.50 $8.35 $5.50 $8.00 $7.20 $6.00 $7.75 25 Item No. 15: Provide 12 In. Dia. Filter Sock LF 1 $4.35 $3.75 $4.96 $7.00 $9.50 $3.75 $6.45 $3.75 $4.00 $3.60 $4.30 $5.25 26 Item No. 16: Provide one Deciduous tree EACH 1 $567.00 $200.00 $584.00 $400.00 $625.00 $620.00 $340.00 $450.00 $600.00 $500.00 $660.00 $540.00 Item No. 17: Provide one Pedestrian Sidewalk Light (Light 27 Fixture C - LED Light) including foundation, pole, fixture, bulbs and wiring. Lump Sum 1 $3,535.00 $4,550.00 $3,637.00 $4,100.00 $6,750.00 $4,275.00 $5,278.00 $6,000.00 $3,275.00 $3,800.00 $6,230.00 $4,000.00 28 Item No. 18: Provide 20 Ft. Ht. Chain Link Backstop Fence Lump Sum 1 $10,703.00 $7,000.00 $7,303.00 $8,000.00 $13,000.00 $6,700.00 $12,347.00 $7,000.00 $8,900.00 $8,930.00 $10,900.00 $7,300.00 29 Item No. 19: Install Dugout and 21 ft. Player's Bench and provide Chainlink Fence walls around dugout Lump Sum 1 $2,820.00 $3,000.00 $5,545.00 $16,000.00 $5,500.00 $7,500.00 $1,697.00 $3,100.00 $5,000.00 $1,795.00 $1,000.00 $25,000.00 30 Item No. 20: Provide 10 Ft. Ht. Chain Link Fence LF 1 $38.70 $34.00 $36.29 $45.00 $51.00 $32.75 $48.77 $36.00 $56.00 $30.00 $37.50 $33.50 31 Item No. 21: Provide 8 Ft. Ht. Chain Link Fence LF 1 $35.10 $24.50 $26.07 $33.00 $34.00 $23.60 $32.10 $26.00 $37.00 $27.00 $34.25 $24.25 32 Item No. 22: Provide 6 Ft. Ht. Chain Link Fence LF 1 $24.20 $22.25 $23.63 $29.00 $27.75 $21.35 $25.93 $24.00 $31.00 $19.00 $24.70 $22.00 33 Item No. 23: Provide 8 Ft. Ht. Double Leaf Gate 10 Ft. wide Lump Sum 1 $1,080.00 $750.00 $787.00 $1,100.00 $1,150.00 $725.00 $1,630.00 $800.00 $1,100.00 $850.00 $1,100.00 $750.00

34 Item No. 24: Provide Scoreboard and Solar Panel support structure and install Owner-provided scoreboard & solar panels. Lump Sum 1 $7,725.00 $9,250.00 $7,081.00 $8,500.00 $10,500.00 $12,000.00 $2,200.00 $11,000.00 $3,000.00 $3,148.00 $12,300.00 $7,000.00 35 Item No. 25: Provide compacted Aggregate Trail SY 1 $12.60 $12.40 $11.27 $17.00 $21.00 $17.00 $13.90 $25.75 $9.37 $20.00 $31.00 $12.00 36 Item No. 26: Provide Concrete Walk SY 1 $62.00 $73.00 $59.97 $72.00 $110.00 $70.00 $46.85 $73.50 $90.00 $55.00 $93.00 $70.00 37 Item No. 27: Suitable Material Fill Material CY 1 $24.25 $20.00 $22.43 $24.00 $16.00 $30.00 $14.40 $17.50 $22.00 $21.00 $22.50 $38.00

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation BUILDING GENERAL - Oak Hall Regional Park Phase I Rebid Hepco Const., Inc. Haas Building Solutions LLC Leonard S. Fiore, Inc. C.E. Wood Const., Inc. Mid State Construction Penn Installations B1 Base Bid BASE performed under this contract, as shown on the drawings and specified herein. Bid includes, but is not limited to furnishing materials and work required to construct the site improvements shown on the drawings and specified herein. Lump Sum 1 $334,911.00 $337,500.00 $372,000.00 $373,571.00 $376,738.00 $429,400.00 B2 Alternates Add Alternate #G1 - add all costs associated with the purchase of materials and labor to construct the Maintenance Building excluding those responsibilities of other prime contracts. Lump Sum 1 $58,842.00 $62,000.00 $58,400.00 $69,100.00 $70,041.00 $83,400.00 B3 Add Alternate #G2 - add all costs associated with the purchase of materials and labor to construct the Press Box Building excluding those responsibilities of other prime contracts. Lump Sum 1 $195,125.00 $235,900.00 $216,000.00 $228,624.00 $179,321.00 $249,400.00 B4 Add Alternate #G3 - add all costs associated with the purchase of materials and labor to construct the Restroom Concessions building at Whitehall Road Regional Park excluding those responsibilities of other prime contracts. Lump Sum 1 $339,878.00 $350,000.00 $372,000.00 $393,210.00 $379,375.00 $438,900.00 B5 B6 Deduct Alternate #G4.1 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Oak Hall Regional Park. (This is a deduction from the base bid price) Deduct Alternate #G4.2 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Whitehall Road Regional Park. (This is a deduction from the Add Alternate #G3 price) Lump Sum 1 ($105,135.00) ($76,000.00) ($98,000.00) ($102,000.00) ($77,749.00) ($110,500.00) Lump Sum 1 ($106,135.00) ($77,000.00) ($98,000.00) ($102,000.00) ($80,859.00) ($110,500.00)

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation BUILDING PLUMBING & MECHANICAL - Oak Hall Regional Park Phase I Rebid Allied Mechanical Electrical, Inc Montgomery Bros. Plumbing Heating, LLC McClure Company W.C.Eshenaur Son, Inc. P Base Bid BASE performed under this contract, as shown on the drawings and specified herein. Bid includes, but is not limited to furnishing materials and work required to construct the site improvements shown on the drawings and specified herein. Lump Sum 1 $91,300.00 $102,000.00 $112,000.00 $116,000.00 P1 Alternates Add Alternate #P1 - add all costs associated with purchasing and installing all plumbing and equipment work required by the Contract Documents for the Maintenance Building. Lump Sum 1 $2,180.00 $1,500.00 $4,900.00 $3,815.00 P2 Add Alternate #P2 - add all costs associated with purchasing and installing the plumbing and HVAC work required by the Contract Documents for the Press Box Building. Lump Sum 1 $12,265.00 $16,500.00 $14,300.00 $19,138.00 P3 Add Alternate #P3 - add all costs associated with the purchase of materials and labor to install the plumbing and HVAC work required by the Contract Documents for the Restroom Concessions building at Whitehall Road Regional Park excluding those responsibilities of other prime contracts. Lump Sum 1 $91,300.00 $105,000.00 $112,000.00 $116,000.00 P4 Deduct Alternate #P4.1 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Oak Hall Regional Park. (This is a deduction from the base bid price) Lump Sum 1 ($24,500.00) ($9,000.00) ($18,500.00) ($30,023.00) P5 Deduct Alternate #P4.2 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Whitehall Road Regional Park. (This is a deduction from the Add Alternate #P3 price) Lump Sum 1 ($24,500.00) ($9,500.00) ($18,500.00) ($30,023.00)

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation BUILDING ELECTRICAL- Oak Hall Regional Park Phase I Rebid Allied Mechanical Electrical, Inc Dave Kronenwetter Tra Electric, Inc. STELCO, Inc. E Base Bid BASE performed under this contract, as shown on the drawings and specified herein. Bid includes, but is not limited to furnishing materials and work required to construct the site improvements shown on the drawings and specified herein. Lump Sum 1 $67,500.00 $89,329.00 $93,375.00 $94,700.00 E1 Alternates Add Alternate #E1 - add all costs associated with purchasing and installing all electrical work required by the Contract Documents for the Maintenance Building. Lump Sum 1 $5,200.00 $6,279.00 $18,995.00 $24,000.00 E2 Add Alternate #E2 - add all costs associated with purchasing and installing all electrical work required by the Contract Documents for the Press Box Building. Lump Sum 1 $26,000.00 $21,048.00 $21,650.00 $19,500.00 E3 Add Alternate #E3 - add all costs associated with the purchase of materials and labor to install the electrical work required by the Contract Documents for the Restroom Concessions building at Whitehall Road Regional Park excluding those responsibilities of other prime contracts. Lump Sum 1 $35,000.00 $64,965.00 $93,375.00 $94,700.00 E4 Deduct Alternate E#4.1 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Oak Hall Regional Park. (This is a deduction from the base bid price) Lump Sum 1 ($10,300.00) ($19,337.00) ($24,450.00) ($29,750.00) E5 Deduct Alternate E#4.2 - deduct the savings associated with not having to purchase or install any work in the Concessions wing of the Restroom/Concessions building at Whitehall Road Regional Park. (This is a deduction from the Add Alternate #E3 price) Lump Sum 1 ($10,300.00) ($19,337.00) ($24,450.00) ($29,750.00)