1 Addendum No. 2 To: Pre-Qualified Bidders From: Russ Lassiter, Foresite Group, Inc. CC: Gregory Forthofer, Auburn University Facilities Management Date: 11/9/2012 Re: Auburn University Project No : Hutsell Track Fencing Improvements This addendum provides revised Construction Documents, which modify the original bid documents dated October 25, The contents of the Addendum shall be included in the Contract Documents and all changes are to be included in the Contractor s bid for the work indicated. CHANGES TO THE CONSTRUCTION DOCUMENTS: General: Alternate #2 linetype added to delineate Alternate #2 work items. COVER: C-0: 1. E-1: Electrical Site Plan added to Drawing Index. 1. Note added to DEMOLITION NOTES 15.) CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION, FLAGMAN, BARRICADING, AND SIGNAGE REQUIRED FOR LANE AND TRACK CLOSURE. 2. Note added in front of bleachers as a part of Alternate #3 EXISTING CONCRETE STEPS (TO BE REMOVED) (TYP.) 3. Note added in front of bleachers as a part of Alternate #3 VEGETATION AND SHRUBBERY IN FRONT OF BLEACHERS (TO BE REMOVED) 4. As a part of Alternate #2, entire concrete flume on the south side of the track shown as demolished and note added CONCRETE FLUME TO BE REMOVED AND HOLE LEFT BY FLUME BACKFILLED. 5. Note added to post and chain on the south side of the track entrance as a part of Alternate #2 POST AND CHAIN TO BE REMOVED. 6. Note on electrical manhole cover on the east side of the electrical transformers as a part of Alternate #2 changed to read ELECTRICAL MANHOLE LID TO BE REPLACED WITH ADA COMPLIANT, ELECTRICAL EMBOSSED LID FOR PROPOSED SIDEWALK.
2 7. Portions of concrete curb along Biggio Dr., south of track entrance and at intersection shown to be removed for new sidewalk and notes added as a part of Alternate #2 PORTION OF CONCRETE CURB TO BE REMOVED FOR NEW SIDEWALK and PORTION OF CONCRETE CURB TO BE REMOVED FOR NEW ACCESSIBLE RAMP 8. Note added to C-0, as part of alternate #4, EXISTING TELECOMMUNICATIONS PEDESTALS TO BE UNBOLTED BY CONTRACTOR AND TURNED OVER TO OWNER. CONDUIT TO BE CUT AND CAPPED. C-1: 1. Note added to SITE NOTES 8.) LANDSCAPE AREA DELINEATED BY HATCH SHALL BE GRADED 4 LOWER THAN FINAL GRADE TO ALLOW ROOM FOR AUBURN UNIVERSITY LANDSCAPE SERVICES TO PLACE TOP SOIL AND SOD. C-2: 2. Note added to SITE NOTES 9.) NO COOKING AND/ OR SMOKING ON SITE OR IN TREE SHADE AREAS. 3. Landscape area hatch added in front of bleachers to delineate area where contractor to leave 4 of room for topsoil and planting and note added as part of Alternate #3 HOLES LEFT BY CONCRETE STEPS TO BE BACKFILLED 4 LOWER THAN ADJACENT EXISTING GRADE TO ALLOW ROOM FOR AUBURN UNIVERSITY LANDSCAPE SERVICES TO PLACE TOP SOIL AND SOD. 4. Alternate #2, 6 wide sidewalk along Biggio Dr. shifted to 4 off the back of curb for most of the length of sidewalk header curb added to south side of track entrance as part of Alternate #2. Note added to new curb NEW HEADER CURB TO TRANSITION DOWN AND END AT THE SIDEWALK. 6. New concrete flume on south side of track entrance and additional rebar in concrete sidewalk required to span the flume deleted from plans. 7. ADA accessible ramp is no longer needed on south side of track entrance due to the demolition of the concrete flume. 8. Striped gore area extended at track entrance to space between ends of parking stalls to beginning of parking stalls. 9. Small portion of sidewalk on the north side of the track entrance on Biggio Dr. removed from plans. (See Proposed Sidewalk Detail on C-1) 10. PDS, OR APPROVED EQUAL and (Typical) added to winged privacy slats note as part of Alternate # Double gate to be relocated north of the track entrance shown swinging in. 12. Corner fence post on the north side of the field house called out as NEW CORNER POST. 1. Note added to SITE NOTES 10.) CONSTRUCTION ON ALTERNATE #2 SHALL BEGIN NO SOONER THAN DECEMBER 10, 2012 AND END NO LATER THAN JANUARY 9, WORK HOURS AND DAYS WILL NOT BE LIMITED DURING THIS TIME FRAME. 2. Note added to SITE NOTES 11.) CONTRACTOR RESPONSIBLE FOR INSTALLING ORANGE CONSTRUCTION SAFETY FENCING AT THE BACK OF CURB AND PEDESTRIAN BARRICADES (AS
3 C-3: SHOWN) WITH DIRECTIONAL SIGNAGE ALONG BIGGIO DR. DURING CONSTRUCTION OF ALTERNATE #2 TO DIVERT FOOT TRAFFIC SAFELY AROUND CONSTRUCTION. COORDINATE ALL PARKING CLOSURES AND PEDESTRIAN DETOURS WITH AUBURN UNIVERSITY PROJECT ENGINEER. 3. Grading in demolished flume area revised to reflect backfill of hole created by demolished flume. 4. Radii added to concrete sidewalk at points where sidewalk transitions from 2 off back of curb to 4. Note added BEGIN 30 TRANSITION FROM 2 OFF BACK OF CURB TO 4 WITH SMOOTH RADIUS AS SHOW. 5. Note and detail added to new 6 header curb on south side of paved driveway entrance. Note added NEW HEADER CURB TO TRANSITION DOWN AND END AT THE SIDEWALK. 6. Grading around transformers revised to minimize grading on east side of pads. 7. Contours and spot elevations revised to reflect sidewalk shift. 8. Note associated with electrical manhole cover revised to read REPLACE MANHOLE LID WITH ADA COMPLIANT, ELECTRICAL EMBOSED LID TO ELIMINATE TRIP HAZARD. 9. Striped gore area changed, same as C-1. Width of striping specified as 6 and color specified as yellow. 10. Note added to landscape areas SUBGRADE IN LANDSCAPE AREAS WITHIN LIMITS OF CONSTRUCTION TO BE 4 LOWER THAN GRADES AND SPOT ELEVATIONS SHOWN TO PROVIDE ROOM FOR TOP SOIL, SOD, AND RIP RAP TO BE INSTALLED BY AUBURN UNIVERSITY LANDSCAPE SERVICES. SEE SHEET C-1 FOR DELINEATED AREA. 11. Limits, note, and detail added to show pedestrian barricade placement along Biggio Dr. 12. Note on detectable warning strip revised to read ADA SOLUTIONS, INC., YELLOW DETECTABLE WARNING STRIP OR APPROVED EQUAL (TYP.). 13. Stormwater drainage structure changed to beehive grate inlet. Note and detail added to structure. 14. Note added to silt fence TYPE C SILT FENCE (TYP.). 1. Detail 1: concrete base on intermediate posts changed to 10 diameter and changed to 12 on end posts. 2. Detail 1: Note 1 revised to read ALL FENCING TIES SHALL BE 9 GAUGE STEEL CORE WIRE PLUS 2B BLACK VINYL COATING AND TWISTED ON BOTH ENDS. 3. Detail 3: Revised to reflect new grate inlet structure. 4. Detail 4: Detectable warning strip note revised to read ADA SOLUTIONS, INC., YELLOW DETECTABLE WARNING STRIP OR APPROVED EQUAL. 5. Detail 5: Added to provide example of approved pedestrian barricade. Contractor is to provide an equally sufficient barricade along Biggio Dr. 6. Detail 6: Added to provide an approved beehive grate. Contractor to provide grate detailed or Approved Equal.
4 7. Detail 7: Added to provide detail of concrete header curb to be constructed along south side of track paved driveway entrance. E-1: 1. Added to show site lighting plan. CHANGES TO THE PROJECT MANUAL: Attachment B Unit Prices: 1. Item 1: Fencing System, (Intermediate Posts) DELETED 2. Item 1: Fencing System, added (2 Line Posts) 3. Item 4: Man Gate, added (4 Wide Including Gate Posts) 4. Item 5: 12 Wide Double Gate changed to 12 Wide Double Gate Including Gate Posts Special Conditions 1. Note added under Builder s Risk Insurance: Contractor has 24 hours after Bid Opening to provide a reasonable DRAFT of all applicable insurance certificate documents. Technical Specifications: 1. Section Chain Link Fences and Gates a. 2.2 Fence Framing, A. Posts and Rails, 3. Horizontal Framework Members: Bottom rails removed. b. 1.2 Performance Requirements, B. Structural Performance: Section deleted c. 2.1 Chain-link fence fabric, A. General, 2. Steel Wire Fabric: Revised to read Wire with a steel core wire of (9 Gauge) d. 2.1 Chain-link fence fabric, A. General, 2. Steel Wire Fabric, b. Polymer-Coated Fabric: Class 1 changed to Class 2b e. 2.2 Fence Framing, A. Posts and Rails, 2. Heavy Industrial Strength: Revised to read Material Group 1C, round steel pipe (SS40 Type) f. 2.2 Fence Framing, A. Posts and Rails, 2. Heavy Industrial Strength: Added C. Top rail, brace rail and gate frames: 1.66 in diameter. g. 2.2 Fence Framing, A. Posts and Rails, 3. Horizontal Framework Members and 4. Brace Rails: Sections Deleted. h. 2.2 Fence Framing, A. Posts and Rails, 4. Polymer coating over metallic coating, b. Optional Supplemental Color Coating: Added. i. 2.4 Swing Gates, B. Pipe and Tubing: Section deleted. j. 2.4 Swing Gates, C. Hardware, 1. Hinges: 360 changed to 90 k. 2.4 Swing Gates, C. Hardware, 5. Closer: Section Deleted l. 2.5 Fittings, B. Finish, 2. Aluminum: Deleted m. 2.6 Privacy Slats, A. Material: Revised to read PDS Winged Slats or approved equal
5 n. 3.1 Installation, J. Privacy Slats: securely locked in place deleted and revised to read as per mfg. s instructions. 2. Section Unit Prices a. 3.1 Schedule of Unit Prices i. A. (Intermediate Posts) Deleted ii. A.1. to include 2 line posts per 20 feet. added iii. D. Changed to Man Gate including gate posts iv. E. Changed to 12 wide double gate including gate posts. RFI: 1. Question: The drawings do not indicate demolition of the scoreboard footing or footings. Is that demolition required? If so can a footing and size and depth be assumed and furnished for bid purposes along with task specific unit pricing for contract adjustment? Answer: The Construction Documents have been revised to describe the scoreboard demolition as follows, Existing scoreboard (to be removed Alternate #4 only). Cut steel posts 12 below grade at concrete footing, fill remaining steel posts with sand, and backfill holes as specified. 2. Question: Have specification sections and been re-issued. Addendum #1 includes pages 244 and 247 only. Answer: Addendum #1 only included sheets that had revisions on them. However, due to extensive revisions, Addendum #2 will re-issue Section Chain Link Fences and Gates. 3. Question: Other than disturbed area mulching are any area requiring sod or grassing? There is nothing shown on drawings yet there is a unit price. Answer: Currently there are no areas that will require sodding by the contractor. However, sod was included in unit prices to give the Auburn University Project Engineer the option to require the contractor to sod an area no larger than the quantity specified by the unit price at no additional cost to Auburn University. 4. All fencing RFIs are addressed in revised Technical Specifications in Project Manual. ATTACHMENTS: Attachment B to Proposal Form Special Conditions Technical Specification Section Technical Specification Section Revised Construction Documents
6 AU Form C-3 B November 2001 Revised by AU on July 12, 2007 ATTACHMENT B TO PROPOSAL FORM STATED ALLOWANCES AND UNIT PRICES STATED ALLOWANCE AND UNIT PRICES The following items of work are anticipated during construction of this contract; however the exact quantity of each work item may not be determinable prior to bidding. The Contractor, shall therefore, include in his Lump Sum Base and / or Alternates Bid (as applicable), an allowance for the following items in the quantities indicated: Allowance UNIT Prices include all charges for labor, materials and equipment, shoring, layout, supervision (field and home office), general expenses, taxes, insurances, overhead and profit, but not limited to, for accomplishment of the Allowance item(s). Where quantities of same items of work are defined and are quantified in the bid documents, the allowance quantities indicated hereinafter shall be in addition to those which are indicated. (Example: If the site grading plan indicates new and existing grades, the bidder shall compute the quantity of earthwork required and include that quantity of work in the bid the same as if no allowance quantity were specified. If an additional allowance quantity of earthwork is stipulated, that stipulated allowance quantity of work shall also be included in addition to the quantity computed from the bidders earthwork takeoff ). The following UNIT Prices Quoted are for increases or decreases in the above quantities included in the Lump Sum Base and/or Alternate Bids. These UNIT Prices include all charges for labor, materials and equipment, fee, layout, supervision (field and home office), general expenses, taxes, insurances, overhead and profit, but not limited to, for accomplishment of the UNIT Price item(s). Clarification Note: The UNIT Prices quoted by the Contractor shall apply to increases (additive change orders) and to decreases (deductive change orders). This requirement shall supplement the requirements of the General Conditions, and Instructions to Bidders. Changes in the contract amount which are computed using the Stated Allowances and UNIT Prices shall be figured at the same UNIT price whether additive or deductive. ITEM Fencing System (Including 2 Line Posts per 20 ) ALLOWANCE QUANTITY 20 LF Fence Posts (Tensioning Posts) 1 UNIT Sod Man Gate (4 Wide Including Gate Posts) 100 SF 1 UNIT Page 1 of 2 ALLOWANCE UNIT PRICE TOTAL
7 AU Form C-3 B November 2001 Revised by AU on July 12, 2007 ITEM ALLOWANCE QUANTITY ALLOWANCE UNIT PRICE TOTAL 12 Wide Double Gate Including Gate Posts 1 UNIT Asphalt Overlay (1 Build-up) 10 SY Demolition of reinforced concrete 5 CY Silt Fence 100 LF Wattle 1 UNIT Inlet protection 1 UNIT Staked Hay Bale 10 LF Concrete sidewalk section (as specified) to include grading, base prep., formwork, and finishing. 60 SF ALDOT Type A Concrete Header Curb, 18 tall instead of standard 14 tall, as detailed (ochre colored) 10 LF Demolition of Chain Link Fence System 20 LF Winged Privacy Slats 6 High 20 LF 0.11_Attachment B to Proposal Form, AU Form C-3B_ Page 2 of 2
8 SPECIAL CONDITIONS 1. TIME OF COMPLETION Work in this contract shall be substantially completed within 60 calendar days of the date stated in the Notice to Proceed. 2. WORKING HOURS Working hours within the existing track fenced area will be normal business hours ending at 3:00 p.m. CST. Night and weekend work within the existing track fenced area will not be allowed. 3. LAYDOWN AREA Contractor is to minimize on-site material storage as much as possible. If required, the lay down area will be located on the track so as not to block more than half the width of the track in the area under construction. 4. RAIN DAY CLASS: The rain day classification for this project is Class III due to the minimal effect of a rain event on this type of project. See the Supplemental General Conditions section in this manual for more information. 5. BUILDER S RISK INSURANCE: Contractor is responsible for providing Builder s Risk Insurance. Contractor has 24 hours after Bid Opening to provide a reasonable DRAFT of all applicable insurance certificate documents. 6. ADEM PERMITTING An ADEM permit will not be required due to the minimal amount of land disturbance involved in the scope of this project. 7. PROJECT SIGN No project sign is required. 8. MILESTONES If Alternate #2 is taken, all work associated with this alternate shall be complete before January 9, 2013.
9 SECTION UNIT PRICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for unit prices. B. Related Section: 1. Division 01 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders. 1.2 DEFINITIONS A. Unit price is a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased. 1.3 PROCEDURES A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit. B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections. C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF UNIT PRICES A. Unit Price No. 1 Fencing System UNIT PRICES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
10 1. Description: All components, hardware, and labor to install regular section of specified fence to include 2 line posts per 20 feet. 2. Unit of Measurement: Linear Feet 3. Quantity Allowance: 20 B. Unit Price No. 2 Fence Posts (Tensioning/ Corner Posts) 1. Description: All components, hardware, and labor to install one tensioning/ corner post as specified 2. Unit of Measurement: Post Unit 3. Quantity Allowance: 1 C. Unit Price No. 3 - Sod 1. Description: All material and labor required to install specified sod. 2. Unit of Measurement: Square Feet 3. Quantity Allowance: 100 D. Unit Price No. 4 Man Gate (4 Wide including Gate Posts) 1. Description: All components, hardware, and labor to install one Man Gate as specified. 2. Unit of Measurement: Man gate Unit 3. Quantity Allowance: 1 E. Unit Price No Wide double gate including gate posts 1. Description: All components, hardware, and labor to install one 12 wide double gate as specified. 2. Unit of Measurement: Double Gate Unit 3. Quantity Allowance: 1 F. Unit Price No. 6 Asphalt Overlay 1. Description: All material and labor required to install 1 build up asphalt overlay. 2. Unit of Measurement: Square Yard 3. Quantity Allowance: 10 G. Unit Price No. 7 Demolition of concrete 1. Description: All labor and material required to demolish and remove reinforced concrete 2. Unit of Measurement: Cubic yard 3. Quantity Allowance: 5 H. Unit Price No. 8 Silt Fence 1. Description: All labor and material required to install specified silt fence. 2. Unit of Measurement: Linear feet 3. Quantity Allowance: 100 I. Unit Price No. 9 Wattle 1. Description: All labor and material required to install specified, sediment control wattle. UNIT PRICES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
11 SECTION CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 SUMMARY A. Section includes chain-link fences and swing gates. 1.2 PERFORMANCE REQUIREMENTS A. Delegated Design: Design chain-link fences and gates, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated. 1.3 SUBMITTALS A. Product Data: For each type of product indicated B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. C. Samples: For each polymer-coated product and for each color and texture specified, in 6-inch lengths for components and on full-sized units for accessories. D. Delegated-Design Submittal: For chain-link fences and gate framework indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation. E. Product Certificates: For each type of chain-link fence and gate, from manufacturer. F. Product Test Reports: For framing strength according to ASTM F G. Operation and maintenance data. H. Sample of special warranty. 1.4 WARRANTY A. Special Warranty: Manufacturer's standard form in which Installer agrees to repair or replace components of chain-link fences and gates that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, deterioration of metals, metal finishes, and other materials beyond normal weathering. 2. Warranty Period: One year from date of Substantial Completion. CHAIN LINK FENCES AND GATES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
12 PART 2 - PRODUCTS 2.1 CHAIN-LINK FENCE FABRIC A. General: Provide fabric in one-piece heights measured between top and bottom of outer edge of selvage knuckle. Comply with CLFMI Product Manual and with requirements indicated below: 1. Fabric Height: 6 feet. 2. Steel Wire Fabric: Wire with a steel core wire of inch. (9 Gauge) a. Mesh Size: 2 inch. b. Polymer-Coated Fabric: ASTM F 668, Class 2b over zinc-coated steel wire. 1) Color: Black, complying with ASTM F Selvage: Knuckled at both selvages. 2.2 FENCE FRAMING A. Posts and Rails: Comply with ASTM F 1043 for framing, including rails, braces, and line; terminal; and corner posts. Provide members with minimum dimensions and wall thickness according to ASTM F 1043 based on the following: 1. Fence Height: 72 inches. 2. Heavy Industrial Strength: Material Group IA, round steel pipe, Schedule 40. a. Line Post: 1.9 inches in diameter. b. End, Corner and Pull Post: inches in diameter. c. Top Rail, Brace Rail and Gate Frames: 1.66 in diameter. 3. Metallic Coating for Steel Framing: a. Type A zinc coating. b. Type B zinc with organic overcoat. c. External, Type B zinc with organic overcoat and internal, Type D zinc-pigmented coating. d. Type C, Zn-5-Al-MM alloy coating. e. Coatings: Any coating above. 4. Polymer coating over metallic coating. a. Color: Black, complying with ASTM F 934. b. Optional Supplemental Color Coating: 3 mil polyester as per ASTM F1043, Section 7.3. CHAIN LINK FENCES AND GATES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
13 2.3 TENSION WIRE A. Polymer-Coated Steel Wire: inch- (6 ga.) finished diameter, tension wire complying with ASTM F 1664, Class 1 over zinc-coated steel wire. 1. Color: Black, complying with ASTM F SWING GATES A. General: Comply with ASTM F 900 for gate posts and single and double swing gate types. 1. Gate Leaf Width: As specified 2. Gate Fabric Height: 6 feet B. Frame Corner Construction: Welded or assembled with corner fittings. C. Hardware: 1. Hinges: 90-degree inward and outward swing. 2. Latches permitting operation from both sides of gate with provision for padlocking accessible from both sides of gate. 3. Padlock and Chain: Padlock with Best 7-PIN IC Core to meet Auburn University specifications. 4. Lock: Best 7-PIN IC Core. 2.5 FITTINGS A. General: Comply with ASTM F 626. B. Finish: 1. Metallic Coating for Pressed Steel or Cast Iron: Not less than 1.2 oz. /sq. ft. zinc. a. Polymer coating over metallic coating. 2.6 PRIVACY SLATS A. Material: PDS Winged Slats or approved equal B. Color: As selected by Owner from manufacturer's full range. 2.7 GROUT AND ANCHORING CEMENT A. Nonshrink, Nonmetallic Grout: Premixed, factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C Provide grout, recommended in writing by manufacturer, for exterior applications. CHAIN LINK FENCES AND GATES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
14 B. Erosion-Resistant Anchoring Cement: Factory-packaged, nonshrink, nonstaining, hydrauliccontrolled expansion cement formulation for mixing with potable water at Project site to create pourable anchoring, patching, and grouting compound. Provide formulation that is resistant to erosion from water exposure without needing protection by a sealer or waterproof coating and that is recommended in writing by manufacturer, for exterior applications. PART 3 - EXECUTION 3.1 INSTALLATION A. Examine areas and conditions, with Installer present, for compliance with requirements for a verified survey of property lines and legal boundaries, site clearing, earthwork, pavement work, and other conditions affecting performance of the Work. 1. Do not begin installation before final grading is completed unless otherwise permitted by Architect. B. Proceed with installation only after unsatisfactory conditions have been corrected. C. Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 500 feet or line of sight between stakes. Indicate locations of utilities, lawn sprinkler system, underground structures, benchmarks, and property monuments. D. Install chain-link fencing to comply with ASTM F 567 and more stringent requirements indicated. E. Post Excavation: Drill or hand-excavate holes for posts to diameters and spacings indicated, in firm, undisturbed soil. F. Post Setting: Set posts in concrete at indicated spacing into firm, undisturbed soil. 1. Verify that posts are set plumb, aligned, and at correct height and spacing, and hold in position during setting with concrete or mechanical devices. 2. Concrete Fill: Place concrete around posts to dimensions indicated and vibrate or tamp for consolidation. Protect aboveground portion of posts from concrete splatter. a. Concealed Concrete: Top 2 inches below grade to allow covering with surface material. G. Terminal Posts: Locate terminal end, corner, and gate posts per ASTM F 567 and terminal pull posts at changes in horizontal or vertical alignment of 15 degrees or more. H. Line Posts: Space line posts uniformly at 10 feet o.c. I. Tension Wire: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Provide horizontal tension wire at the following locations: 1. Extended along bottom of fence fabric. J. Privacy Slats: Install slats in direction indicated, as per mfg s instructions. CHAIN LINK FENCES AND GATES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
15 1. Vertically. K. Install gates according to manufacturer's written instructions, level, plumb, and secure for full opening without interference. Attach fabric as for fencing. Attach hardware using tamperresistant or concealed means. Install ground-set items in concrete for anchorage. Adjust hardware for smooth operation and lubricate where necessary. L. Gates: Adjust gates to operate smoothly, easily, and quietly, free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range. Confirm that latches and locks engage accurately and securely without forcing or binding. END OF SECTION CHAIN LINK FENCES AND GATES FORESITE GROUP, INC Controlled document is electronic file on Foresite Group server. Verify latest version. (c)
SECTION 32 31 13 CHAIN LINK FENCES AND GATES
PART 1 GENERAL 1.1 DESCRIPTION SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTES: 1. Delete or add information between //---// and any other items applicable to project. Cover any item added
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationDemo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationCHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationAIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):
SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationSECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS
1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationSECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationMERCHANTS METALS SECTION 32 31 13 ARMORLINK ALUMINIZED CHAIN LINK FENCE AND GATES 2014!
MERCHANTS METALS SECTION 32 31 13 ARMORLINK ALUMINIZED CHAIN LINK FENCE AND GATES 2014 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. DIVISION 01 - GENERAL REQUIREMENTS: Drawings, quality, product and performance
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationATLANTA MODEL SPECIFICATIONS
ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationSECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationDENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationLegacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationItem No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description
Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationSECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationSECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationThe unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationHow to secure your property after a disaster
How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,
More informationFence SpecCheck Wheatland Tube Company 800 343 0124
Fence SpecCheck Wheatland Tube Company 800 343 0124 www.wheatland.com ASTM Specifications (May 2014) www.astm.org A53/A53M-12 Schedule 40 & 80 Pipe: Specification for Pipe, Steel, Black and Hot- Dipped,
More informationBuilding, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
More informationSECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
More informationITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationCOLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationCLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationA. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.
13310 FABRIC SHADE STRUCTURES FOR PLAYGROUND AREAS ************************************************************************************************************************ SPECIFIER: CSI Master Format
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationAcceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More information1.3 SUBMITTALS Follow 01330
02830 CHAIN LINK FENCES AND GATES Specifier: This section replaces 02831 (2004). It reflects significant changes in and additions to ASTM documents in recent years that relate to chain link fence and gates.
More informationSITE IMPROVEMENT PLANS CHECKLIST
REVIEW SERVICES TEAM SITE IMPROVEMENT PLANS CHECKLIST (Also for SITE DEVELOPMENT PERMIT applications) GENERAL REQUIREMENTS This checklist applies to commercial building site work involving engineering,
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationHIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationSECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
More informationSingle Family Residential Building Permit Questions & Answers
Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday
More information11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions
11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment
More informationCity of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
More informationExhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW