LNG tank Risavika. Contract: Rodoverken AB delivered the Primary Containment Tank for LNG Storage (Inner Tank) Storage tank Volume 30 000m 3.

Similar documents
BIOGAS PRODUCTION AND USAGES IN SWEDEN

- Personal engineering with total economy

Katrineholm Logistics Centre An accommodating solution for transport, warehousing and logistics

How To Make A Gas Available In Finnish Power Plants

Chalmers Energy Conference

Certificate No SKM-AQ-1970 / 2004-SKM-AE-781/ AHSO-SWE-SWEDAC. This is to certify that. Skanska Sverige AB SWEDEN

Gröna Tåget [grœ:na 'tɔ:gɛt] to make train travel more attractive

Dear Customer, We offer products with outstanding quality and service performed with excellence.

LNG bunkering market perspectives, challenges and trends

The success of biomethane in Sweden

Groundbreaking expertise

Vertical Market Software

Biomethane as vehicle fuel

Importance of Digestate for the Biogas Industry

Welcome to Norrenergi

How To Make A Sustainable Energy Source From Waste Energy

Our dream a city free from fossil fuels

DET NORSKE VERITAS TM

BioFuels for transport production, use and cooperation. Umbrella Seminar. Arne Smedberg

Benefits and challenges of biomethane production in Sweden

Swedish Clusters. Sweden: Clusters in Focus

Swedish Search and Rescue Services. Management Mission Co-ordination Mobile Facilities

Tack för Kick uppmärksamheten! Experiences from. How to build a cluster within biogas as vehicle fuel

How does gas come to Europe in the future? Development of German-Norwegian gas sales and transport systems.

Welcome to Markbygden, Sweden. Winterwind , Piteå Eva Sjögren, Sales, ENERCON Sweden

Bioenergy Småland. Business development through biomass in the region of Småland

Latest Offshore Developments in Sweden

Good Practice Form

Water winners create financial opportunities and vice versa

Open district heating network in Greater Stockholm

We build brands in medicinal products, supplements and cosmetics.

Energy efficient office buildings Skanska Commercial Development Nordic. 1 Jonas Gräslund

Industrial Symbiosis in Helsingborg. TKMJ38 Industrial Symbiosis

How to plan green neighbourhoods? Kuidas planeerida keskkonnahoidlikku naabruskonda?

SHOPPING CENTRES IN SWEDEN. - Part of the Olav Thon Group

SLUDGE TREATMENT ENGINEERING

References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES

Biomethane in transport

Ethanol fire safety-

Service Catalog in PostNord. Dorthe Benche

Biogas as transportation fuel

Partnerskab for Grøn Skibsfart - Status og fremtidsudsigter LNG - Status på projekter og EU-initiativer

Godsetdagen 2014 Flygfrakt En förutsättning för industrin

Environmental Product Declaration EPD

Östersund - Sweden's best climate municipality

Facts about gas physical properties

Marin gas logistics. Bergen

Borås First Hotel Grand Agreement with sport life (reduced price for members)

A World Class Manufacturer of Induction Bends

Biogas as vehicle fuel - Policy case West Sweden

Sweden. Report on bi-lateral meetings with regional/national funding institutions. Christel Liljegren Avdelningschef projekt /Head of department

Eco Server Park The Responsible Power Ready Location

Biowaste Management in Norway Frame conditions and status

Fostering Breakthrough Research: A Comparative Study (

Powerformer chosen for Swedish combined heat and power plant

Biogas in the Nordic countries

Malmö Hydrogen and CNG/Hydrogen filling station and Hythane bus project

Natural gas and biomethane are complementary fuels developments in Sweden

Country: Sweden. Total number of plants: with co-firing: fossil fuels for co-firing:

SUSTAINABLE BUSINESS HUB

Year-end Report President and CEO Claes-Göran Sylvén

solarplus solar systems general features

ALLOY 2205 DATA SHEET

The Energy Systems Program Post graduate school and research program

CellaVision, April 29, Yvonne Mårtensson, CEO

CLIMATE INVESTMENT PROGRAMMES. An important step towards achieving Sweden s climate targets

Swedish Search and Rescue Services. Management Mission Co-ordination

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Stakeholder Collaboration on Light as a Service Belysningsdagen Kalmar

The regional project Biogas Väst

Experience from practice: Stockholm LNG terminal

How To Become A Member Of Sipa

TARIFF CODE and updates standard

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Design Concepts for. IMO type C cargo tanks. Dr. K.D. Gerdsmeyer. Carriers & Carriers & Offshore Units

Drain & Sewer. Cleaning. Drain and Sewer cleaning Fluid transfer solutions TRELLEBORG FLUID HANDLING SOLUTIONS

The Biogasification of Linköping A Large Technical Systems Perspective. Michael Martin

Malmö Hydrogen and CNG/Hydrogen filling station and Hythane bus project

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction

Be a WINner in sales and acquisitions

Dirty power: Sweden wants your garbage for energy

How to strengthen business ties between Norway & China?

HEAT PUMPS AS A LINK BETWEEN INDUSTRY AND DISTRICT HEATING

Specialist in Pre-Heat & Post-Heat Treatment

Interim report January March 2013

ERS Team Experience Example Risk Engineering and Loss Adjusting Projects Oil, Gas, Petrochemical

Intermodal transport in Sweden and Europe

IPR Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring

x Amount of ammonia used for producing nitric acid (0.213 NH 3 /t AN + 6% efficiency loss)

Gröna Tåget Developing an attractive and efficient high-speed train concept for the Scandinavian market

Installation and equipment for liquefied natural gas - Design and testing of loadinglunloading arms

The paper addresses the boil-off in the cryogenic industry and details the specifics of it when applied to vehicle LNG tanks.

Piping Systems for Nuclear Power Industry. Prague, October 2011

& RESTAURANT DISCOUNT S (Awarded to all Platinum & Black First Members + Black GHA Discovery members carrying a valid member card)

Unionen s income protection insurance. Security even when you are out of work

Copenhagen Malmö Port Annual Report 2002 ÅRSREDOVISNING

Electric Flow Boiler

Valmet biotechnologies and pyrolysis status update. Joakim Autio Product manager, Pyrolysis systems Valmet

Natural Gas and LNG Fundamentals

Transcription:

LNG tank Risavika Lyse Infra AS / Skangass AS LNG Base Load Plant in Risavika, outside Stavanger in Norway. The Project included a Liquefaction Plant, LNG Storage Tank, Import Pipe Line, Export Jetty and a Truck Loading Station for LNG. Rodoverken AB delivered the Primary Containment Tank for LNG Storage (Inner Tank) Storage tank Volume 30 000m 3. 85 000 000 SEK 2007 2010 Jon Martin Royrbotn Ramböll Norway Tel: +47-792864162

LNG tank Lysekil Skangass AB LNG Import Terminal in Lysekil, Sweden. EPC for full Containment LNG tank 30 000 m³ 20 000 000 2012-2014 Terje Bjørndal Skangass

Kalundborg, Denmark Energie2, new accumulator in Kalundborg, Denmark Rodoverken AB delivered the Accumulator tank including design, all equipment, insulation and external cladding. The tank has a total volume of 20 000m³ with 20m diameter and 65m height. 25 000 000 SEK 2002 Energie2

Östersund, Sweden Jämtkraft AB, new accumulator in Östersund, Sweden Rodoverken AB delivered a Accumulator tank to Jämtkraft AB at the Ski stadium in Östersund, including design, all equipment, insulation and external cladding. The tank has a total volume of 26 000m³ with 25m diameter and 55m height. 30 00 000 SEK 2004 Jämtkraft

Norrköping Ethanol Ranks Lantmännen Agroetanol AB Rodoverken AB delivered 36 tanks with volumes between 10-4200m³. The tanks was produced in material quality EN1.4162 (LDX2101) and EN1.4301. 100 000 000 SEK 2007 Kowi, Göteborg

Munksjö Oil Storage Rodoverken AB delivered two oil tanks with the volume 2500m³ each. The tanks was produced with material quality EN1.4162 (LDX2101) and are used for storeage of biooil. 15 000 000 SEK 2010 Ulrik Persson, Munksjö Paper AB, Tel: +46 36 30 33 00

Uppsala Digester / Buffer tanks Uppsala Vatten och Avfall AB Expansion work of the biogas plant. Rodoverken AB delivered one digester with a volume of 2400m³ and two Buffert tanks with a volume of 250m³ each. The Tanks were produced with material quality EN1.4436. 13 000 000 SEK 2009 Bernt Karlsson WSP Group Tel: +46 8 688 60 00

Tankfarm Vopak Skarvik 2 Vopak Sweden AB. Together with NCC, PK El and our piping department we have rebuilt Vopak Logistics Nordic AB s plant Skarvik 2. We have built two new 20 000m³ storage tanks and moved and/or rebuilt eleven other tanks with volumes between 3 000- and 20 000m³. 60 000 000 SEK 2009-2011 Lars-Åke Nikéus, Vopak Sweden AB Tel. +46-706833516

Borås Energi Accumulator Borås Energi och Miljö New Accumulator at Ryaverken power plant in Borås. Rodoverken AB delivered the Accumulator including design, all equipment, insulation and external cladding but excluding the foundation. The Accumulator was produced with a volume of 37 000 m³, 26m in diameter and the height of 70m. 60 000 000 SEK 2008-2010 Mats Hagestad, Borås Energi och Miljö AB Tel. +46-708527008

Kalmar Energi Accumulator Kalmar Energi AB New Accumulator at Moskogen Power plant in Kalmar. Rodoverken AB delivered the Accumulator including design, all equipment, insulation and external cladding but excluding the foundation. The Accumulator with a volume of 22 000 m³, 22,2m in diameter and the height of 56,7m. 24 000 000 SEK 2007-2009 Tomas Andersson, Kalmar Energi AB Tel. +46-703265950

Uddevalla Energi Accumulator Uddevalla Energi AB New Accumulator at Lillesjö Power plant in Uddevalla. Rodoverken AB delivered the Accumulator including design, all equipment, insulation and external cladding but excluding the foundation. The Accumulator with a volume of 10 100 m³, 17,3m in diameter and the height of 43m. 13 000 000 SEK 2007-2008 Lars Johansson, Uddevalla Energi AB Tel. +46-522696267

Two Pressurized Accumulator tanks with one expansion vessel Norrenergi AB Two new pressurized Accumulator tanks with an associated expansion vessels to Solna power plant. Rodoverken AB delivered the Accumulator tanks with a volume of 2150 m³ each and the expansion vessel with a volume of 949m³. All three products pressurized with 16 bar 130 C and built according to SS-EN 13445. 35 000 000 SEK 2010-2011 Mats Birgersson, Norrenergi AB Tel. +46-706750471

Öresundskraft AB Accumulator Öresundskraft AB. New Accumulator tank to the new district heating power plant Filbornaverket in Helsingborg. Rodoverken AB delivered the Accumulator tank including design, all equipment, insulation, external cladding and the connecting pipes from the accumulator to the district heating network. The tank has a total volume of 40 000m³ with 30m diameter and 56m height. 40 000 000 SEK 2011-2012 Kenneth Ekensten, Öresundskraft AB Tel. +46-704183941

Karlskrona Accumulator Affärsverken AB. New Accumulator to the power plant in Karlskrona Rodoverken AB delivered the Accumulator tank including design, all equipment, insulation and external cladding. The tank has a total volume of 21 000m³ with 22m diameter and 55m height. 25 000 000 SEK 2010-2011 Göran Johnson, Affärsverken AB Tel. +46-708783005

Stainless phosphoric acid tank Yara Norge AS Rodoverken AB delivered a phosphoric acid tank with a volume of 5000m³. The tank was built in material quality EN1.4462. 12 000 000 SEK 2012 Geir Dahlman, Yara Norge AS, +47 90672323