Asphalt Shingle Recycling Training for Post-Consumer Suppliers/Generators by: December 2014

Similar documents
Guidelines of Best Management Practices for the Operation of Post Consumer (Tear 0ff) Asphalt Shingle Recycling Facilities

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

LET ME SHINGLE YOUR ROADWAY

100 North Senate Avenue, Indianapolis, IN Phone: (317) Toll Free: (800)

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:

Addendum 1 Clarifications

Charrette Small Group Session Friday, January 27. 8:30 am 10:00 am

HANOVER COUNTY DEPARTMENT OF PUBLIC WORKS SOLID WASTE DISPOSAL SERVICES SOLID WASTE DISPOSAL REGULATIONS

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

Recycled Asphalt Shingles (RAS) RAS Facts RAS Benefits Why Now A Proven Concept Recycling Procedure Your Local RAS Station

STATEMENT OF WORK Roofing Services

Asbestos Survey Form (See Instructions)

HENRY COUNTY SOLID WASTE ORDINANCE

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

Asbestos Procedures. Asbestos Products

GENERAL PERMIT WMGM043

CITY OF SANTA CLARA FACILITIES CERTIFIED TO DIVERT AT LEAST 50% OF INCOMING MATERIALS UPDATED MAY 2009

ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS

RESIDENTIAL SERVICES. compost recycle landfill

(A) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at:

ADDENDUM #2 November 4, 2015 IFB

Characteristics/Applications

Recycling Roofing Materials: Developing Best Practices for Roofing Contractors

The Vermont Department of Health When is Asbestos a Public Health Threat? Town Health Officers (THO) Training

Vendor Selection Overview UNIT PRICES FOR ASBESTOS ABATEMENT & DISPOSAL SERVICES VARIOUS SITES

Asbestos Disposal in the Northern Territory

Work Type Definition

Overview of Illinois Roofing Industry Licensing Act

Materials and Colors

WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials

ASBESTOS MANAGEMENT PROGRAM

Owner Name: Address: City: State: Zip: Name: Address: City: State: Zip: Contact: Tel: DEMOLITION CONTRACTOR Name: Address: City: State: Zip:

Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois Project No.:

Follow the steps listed on the following pages to help eliminate the conditions that encourage rats.

ORDINANCE NO. 3 OF 2009

Zanker Recycling 675 Los Esteros Road San Jose, CA Phone: (408) Fax: (408)

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Waste Management for Hotels and Restaurants. Dan Ruben

COMMERCE REFUSE-TO-ENERGY FACILITY REFUSE DISPOSAL INFORMATION

Shingle Installation Guide

DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS

ACKNOWLEDGEMENT OF RECEIPT OF THE CITY OF DUBLIN CONSTRUCTION AND DEMOLITION DEBRIS ORDINANCE INFORMATION PACKET

Construction Debris & Recycling Program Application General Liability

Asbestos Frequently Asked Questions

CONTRACTORS LIABILITY QUESTIONNAIRE

Green Building: Recycling Construction Renovation and Reclamation. Sponsored by:

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

Residential. San Leandro. Recycling Guide

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division. CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Instructions/General Information

BURNISHED SLATE COVER PHOTO: SLATE GREY

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Building it right like in the good old days.

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

2006 Standard Application Processing Time. 10 months. 14 months

SECTION ASBESTOS ABATEMENT

Asbestos NESHAP ISSUES AND QUESTIONS

ASBESTOS AND THE HOME RENOVATOR

TurnerTalk Online Waste Tracking System User s Guide for Reviewers and Haulers. Version 3.0 Date: May 15, 2009 Turner Construction Company

Asbestos in your home

ROOFING CONTRACTORS QUESTIONNAIRE

Solid Waste Management Master Plan A Poll with Guelph Residents

Landfill/Mandatory Recycling

NDSU TABLE OF CONTENTS

Source Reduction, on-site handling and processing of Solid waste. CE 431: Solid Waste Management

THE CORPORATION OF DELTA "DELTA GARBAGE COLLECTION & REGULATION BYLAW NO. 4273, 1988"

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

Department of Public Works. Recycling policy for buildings and civil infrastructure

Fact Sheet on Asbestos

The Best Products The Best Price The Best Service...We Guarantee It!

ROOF INSPECTION REPORT

SECTION REMOVAL AND SALVAGE OF CONSTUCTION MATERIAL RECLAMATION OF RESILIENT FLOORING

Environmental Protection Information Sheet: 2. Advice on Asbestos

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS

Regulated Building Materials in Property Management. July 30, 2013

Government Policies for Increasing the Recycling of Construction and Demolition Debris

mceservices and environmental solutions at your disposal

Green Yard Waste Recycling Center

LIVING WITH FIBRO JUNE 1998 WORKCOVER NSW HEALTH AND SAFETY NOTES. WorkCover. Watching out for you.

Good Housekeeping BMP

ABOUT MACBETH THE MACBETH ADVANTAGE

WEEKLY RESIDENTIAL AUTOMATED SINGLE STREAM RECYCLING AND TRASH COLLECTION GUIDE

Asbestos in Your Home

C&D Debris Recycling Study: Final Report

Do you know how to dispose of hazardous waste?

South Carolina s Recycling Industry

New Home Construction Packet

completely closed on both Trash and Recycling toters in order to be picked up.

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

87% visibility in all search engines

City of Lake Mary Residential Solid Waste and Recycling Collection Program

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

If you think your home might have asbestos, read this pamphlet to learn some simple steps to protect your family.

Transcription:

Asphalt Shingle Recycling Training for Post-Consumer Suppliers/Generators by: December 2014

Who Must Read This Guide The generator/supplier must read this guide and fill out all paperwork before bringing a shingle load. Generators/suppliers are typically: 1) Roofing or General Contractors 2) Homebuilders 3) Homeowners 4) Permitted C&D Recycling Facilities, Waste Facilities and Landfills Note: Haulers are typically NOT a generator/supplier. The person that completes this training must be an owner or authorized agent of the generator/supplier.

Acceptable Materials: 1) Asphalt Shingles 2) Felt Attached to Shingles 3) Nails Attached to Shingles

Unacceptable Materials Loads containing more than 1% of the following materials will be rejected: 1) Household Waste / Garbage Includes bags, bottles, cans, boxes, containers, cardboard, tape, liquids, food, paper, etc.

Unacceptable Materials: Loads containing more than 1% of the following materials will be rejected: 2) Construction & Demolition (C&D) Waste Metal (including gutters and flashings) Wood (including pallets and plywood) Plastic (including plastic wrap) Paper (including house wrap)

Unacceptable Materials: Loads containing more than 1% of the following materials will be rejected: 3) Any other type of roofing shingle Wood Shingles Metal Shingles Slate Shingles Clay/Tile Shingles

Unacceptable Materials: Loads containing ANY of the following will be rejected: 4) Hazardous Materials Hazardous Wastes Asbestos Containing Material (ACM) Customers are responsible for all materials they bring to the site, even after initial inspection and acceptance. Loads are subject to asbestos testing and applicable fees.

Inadvisable Materials: We also recommend removal of the following materials: Shingles containing Mastic (typically around chimneys or pipes) Shingles that may contain or have remnants of asbestos cement. Excessively old or weathered shingles Shingles that can crumple up in your hand

Additional Regulations: Per regulations under EPA and NESHAP, the following must be true for all shingle loads: 1) Shingles are from residential buildings of four or fewer dwelling units and/or residential homes. 2) Shingles are NOT from a whole house demolition. 3) Shingles are collected separately from other general construction and demolition debris at the source. The generators/supplier will be required to fill out a Source Certification Form certifying the above statements.

Special Note: Along with shingles, our facility also accepts clean construction and demolition debris (CCDD) material (lean dirt, clay, brick, asphalt and concrete). However, all loads MUST be separated prior to arrival. *** MIXED LOADS WILL BE REJECTED ***

Before You Bring Shingles To The Facility Before bringing shingles to the Facility, an Owner or duly authorized representative of the shingles must read, complete, sign and submit the following: 1) Source Certification Form acknowledging you have read and understand this training manual and will only supply clean loads. 2) Generator/Processor Agreement 3) Certificate of Insurance (Annual) OPTIONAL: 4) Credit Application (If opening a billing account)

For Each Load For each location where shingles are extracted, the driver must bring the following: 1) Address or addresses of shingle source OPTIONAL: 2) Asbestos Testing Results By NIST/NVLAP Accredited Lab (Call for more information)

End of Guide This is the end of the guide. What to do next: 1) Find attached forms. If you did not receive any forms or think you may be missing a form, please contact us (see following page). 2) Complete, sign and submit all forms. You may do this by dropping off the forms at the facility or you may scan and email to: accounting@sextoncompanies.net * Note that all scanned forms must be legible. 3) You should receive confirmation of receipt within 1 business day. ***To avoid delays, submit all forms and receive confirmation prior to bringing loads to the facility.***

Contact Information Contact Information Main Office: Form requests, questions, submissions: Project Manager Scott Hendricks scotthendricks@sextoncompanies.net (224) 212-1250 Credit applications (questions and submissions): Accounting Department accounting@sextoncompanies.net Sexton Properties Richton Park Eco-Facility: General Manager Mark Stearns (847) 571-1270 Mark.stearns@sextoncompanies.net Ticket Office Alana Money (847) 372-6942