1 Asbestos NESHAP ISSUES AND QUESTIONS

2 FIRE-DAMAGED BUILDINGS HOW DOES THE NESHAP APPLY?

3 After the Fire Is Out Building condition can vary widely from smoke damage to complete destruction with variations in between Insurance company/owner arranges to secure the building and surroundings from entry A disaster restoration service often provides water, fire, and contents restoration services This may involve renovation and/or demolition of the structure or part of the structure

4 What is Required by the Asbestos NESHAP for Burned Structures? First, if there is no structure or building remaining, the NESHAP is not applicable There is no facility to renovate or demolish Any work performed is clean-up and disposal Usually, some load supporting structure of the burned building is left for demolition or re-building /renovation

5 What is Required by the Asbestos NESHAP for Renovation/Demolition? As we learned earlier: Thorough inspection for asbestos Notification for renovation/demolition Removal of friable asbestos-containing material (ACM) or ACM likely to become friable Work practices must be observed Waste disposal How do you comply for burned buildings?

6 How Do You Do a Thorough Inspection for Asbestos When a Fire Has Occurred? If no load supporting structure remains, no inspection is required If any load supporting structure remains for renovation or demolition, thorough inspection is required

7 How Do You Do a Thorough Inspection for Asbestos When a Fire Has Occurred? Use an Accredited Inspector (as required by NCDHHS) Inspect, sample and test suspect materials in all areas that can be accessed safely Estimate the quantity and assess the condition of the suspect material Was the suspect material burned, subject to high temperature, made friable, or was it unharmed? For suspect friable materials, do point counting if initial Polarized Light Microscopy (PLM) testing is < 10% asbestos

8 Based on the Inspection Results, How Do You Comply With NESHAP? If NESHAP quantities are present, pri0r to renovation or demolition: Unburned friable ACM (Regulated ACM or RACM) and Category II ACM must be removed Category I ACM (resilient flooring and roofing) that is heat damaged, but not burned, is friable and must be removed Non-fire damaged Category I ACM may remain in place or be removed if it will not be made friable RACM and Category I ACM that has burned has released asbestos into the structure, and the entire structure is RACM and is subject to NESHAP

9 What NESHAP Compliance Issues May Result From Areas Not Inspected? Areas not inspected are presumed to contain RACM RACM that has burned has released asbestos into the structure, and the entire structure is RACM and is subject to NESHAP

10 Based on the Pictures Below, How Must the ACM be handled to Comply With NESHAP?

11 What If the Structure is Unsafe and RACM Cannot Be Safely Removed? If the building can be made safe by shoring, bracing, adding flooring, etc., do so, then do asbestos removal in compliance with NESHAP The municipality can order demolition of the structure when imminent danger is present and/or when there are significant violations of building code standards The order must come from an agency that regulates building safety

12 Notification for Ordered Demolition If the municipality has ordered demolition: Submit a NESHAP notification as early as possible, but not later than the following working day MCAQ recommends requesting a 10-working day waiver prior to demolition so we can evaluate the circumstances and provide confirmation or denial The notification must include all of the required information (see the form), AND The name, title, and authority of the ordering agency representative; The date the order was issued; The date the demolition was ordered to begin A copy of the order must be attached to the notification

13 Work Practice Requirements for Ordered Demolitions The structure must be presumed to contain RACM because a thorough inspection for asbestos cannot be safely done Remove facility components that are covered or coated with or contain RACM that can be safely removed before demolition Prior to and during the wrecking operation, adequately wet the portion of the facility that contains RACM One supervisory person with approved current training in the provisions of the asbestos NESHAP and the means of complying with them must be present for the duration of the demolition

14 Work Practice Requirements for Ordered Demolitions All demolition debris is asbestos-containing waste material (ACWM) and must be adequately wetted after demolition and during handling and loading into the container for disposal Discharge no visible emissions to outside air All demolition debris (ACWM) must be disposed of in a NESHAP landfill ACWM does not need to be sealed in leak-tight containers or wrappings but may be transported and disposed of in bulk (lined and covered trucks, etc.)

15 Asbestos Inspection and Removal In Unsafe Structures Some burned structures are deemed to be unsafe because structural members are weak or collapsing, but demolition has not been ordered and they cannot be made safe NESHAP still requires a thorough inspection for asbestos including Category I and Category II nonfriable ACM in all areas that can be accessed safely Areas not inspected must be presumed to contain RACM because a thorough inspection for asbestos cannot be safely done

16 Asbestos Inspection and Removal In Unsafe Structures If RACM is not burned, it must be removed in all areas that can be accessed safely prior to demolition Category I ACM need not be removed if it is not friable Before and during the wrecking operation, adequately wet the portion of the facility that contains RACM RACM need not be removed before demolition if it was not accessible for testing and, therefore, was not found until after demolition began and, as a result, cannot be safely removed All debris must be considered ACWM ACWM must be kept adequately wet at all times until disposed

17 SUSPECT ACM DISCOVERY DURING DEMOLITION HOW DO YOU COMPLY WITH THE NESHAP REQUIREMENTS?

18 During Demolition You Find This! Do You Know What It Is?

19 Or You Find This! Do You Know What It Is? What Do You Do?

20 When You Don t Know STOP! First, do your machine operators know how to recognize suspect ACM? Consider adding awareness of suspect ACM to demolition operator training If the discovered material is friable or may become friable, adequately wet it and cover it until disposition is made For thorough inspection, sample and test the new suspect ACM for asbestos If it is RACM or ACM likely to be made friable, remove it in accordance with NESHAP before resuming demolition

21 ASBESTOS INSPECTION AND POINT COUNTING NESHAP REQUIREMENTS

22 What Does the NESHAP Say About Asbestos Inspection and Point Counting? The answer is: not much! 40 CFR (a): prior to the commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II nonfriable ACM 40 CFR Definitions: Friable asbestos material means any material containing more than 1 percent asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos content is less than 10 percent verify the asbestos content by point counting using PLM.

23 How Can This Benefit You? Consider the following scenario:

24 School Building for Demolition Specifications Building is 40,000 square feet Ceiling (30,000 sq.ft.) is textured skim coat 2% asbestos Flat, built-up roofing and flashing-10% asbestos Demolition job is turnkey Lowest bid gets the work What can you do (legally) to turn in the lowest possible bid?

25 NESHAP Considerations Ceiling is RACM and must be removed prior to demolition - $$$ ACWM (RACM ceiling) must be disposed of in NESHAP landfill - $$$ Roofing material in good condition may be left in place for demolition All waste except RACM ceiling can be taken to C&D landfill - $ Anything else to consider?

26 Point Counting! Demolition contractor calls the asbestos laboratory The retained ceiling sample is enough to do point counting using PLM Asbestos result by point counting is 0.75% Conclusion: Ceiling is not RACM Asbestos removal is not needed - $$$$$$ saved Contractor gets the demolition job!!

27 Summary Consider using point counting when initial asbestos test results for friable asbestos are over 1% but less than 10% The low cost of the additional test may eliminate much higher RACM removal and disposal costs Caution! Regulations other than NESHAP may need to be considered for compliance

28 NESHAP CONTACT INFORMATION MCAQ Main Telephone Number: (704) Rick Nelson: (704) Ruth Jacquot: (704)

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector Click to edit Master title style Maricopa County Asbestos NESHAP Overview Valerie Brodeur Asbestos NESHAP Inspector Click to edit Master title style Some Asbestos Facts Asbestos is a proven human carcinogen

More information

Owner Name: Address: City: State: Zip: Name: Address: City: State: Zip: Contact: Tel: DEMOLITION CONTRACTOR Name: Address: City: State: Zip:

Owner Name: Address: City: State: Zip: Name: Address: City: State: Zip: Contact: Tel: DEMOLITION CONTRACTOR Name: Address: City: State: Zip: FORSYTH COUNTY ENVIRONMENTAL ASSISTANCE & PROTECTION NOTIFICATION AND PERMIT APPLICATION ASBESTOS DEMOLITION/RENOVATION OPERATIONS 12/11 1. TYPE OF NOTIFICATION: Original Revised Courtesy 2. FACILITY INFORMATION

More information

DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements 340-248-0250. Asbestos Abatement Project Exemptions

DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements 340-248-0250. Asbestos Abatement Project Exemptions DIVISION 248 ASBESTOS REQUIREMENTS Asbestos Emission Standards and Procedural Requirements 340-248-0250 Asbestos Abatement Project Exemptions (1) Any person who conducts or provides for the conduct of

More information

Title 11, Hawaii Administrative Rules (HAR), Department of Health (DOH), Chapter 501, Asbestos Requirements.

Title 11, Hawaii Administrative Rules (HAR), Department of Health (DOH), Chapter 501, Asbestos Requirements. TO: FROM: SUBJECT: OWNERS/CONTRACTORS STATE DEPARTMENT OF HEALTH INDOOR AND RADIOLOGICAL HEALTH BRANCH ASBESTOS ABATEMENT OFFICE STATE OF HAWAII, DEPARTMENT OF HEALTH HAWAII ADMINISTRATIVE RULES (HAR),

More information

Asbestos Inspection Project Procedure

Asbestos Inspection Project Procedure EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University

More information

ASBESTOS MANAGEMENT INTRODUCTION

ASBESTOS MANAGEMENT INTRODUCTION SECTION: II. General Hygiene/ Safety Chapter: 7. Asbestos Management Revision Date: 12/05/2013 Review Date: ASBESTOS MANAGEMENT INTRODUCTION PURPOSE This policy has been developed to ensure that hazardous

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us/asbestos Martin O Malley Governor Robert M. Summers, Ph.D. Secretary

More information

(A) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at:

(A) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at: 3745-20-05 Standard for asbestos waste handling. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules, and federal statutory

More information

ARKANSAS POLLUTION CONTROL and ECOLOGY COMMISSION REGULATION NO. 21 ARKANSAS ASBESTOS ABATEMENT REGULATION

ARKANSAS POLLUTION CONTROL and ECOLOGY COMMISSION REGULATION NO. 21 ARKANSAS ASBESTOS ABATEMENT REGULATION Pollution Control and Ecology Commission # 014.00-021 ARKANSAS POLLUTION CONTROL and ECOLOGY COMMISSION REGULATION NO. 21 ARKANSAS ASBESTOS ABATEMENT REGULATION Adopted by the PC&E Commission September

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate

More information

How To Manage Asbestos From Roofing And Siding

How To Manage Asbestos From Roofing And Siding Contents Frequently Asked Questions Asphaltic Roofing and Siding Materials.... 1 Floor Tile.... 4 Non-Traditional Asbestos Abatement Work Practice Approvals.... 6 Survey Requirements.... 7 Vermiculite

More information

Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois 60452 Project No.: 1403308

Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois 60452 Project No.: 1403308 Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois 60452 Project No.: 1403308 557 West Polk Street, Suite 201 Chicago, IL 60607 312.447.1200 p 312.447.0922

More information

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT our people and our passion in every project OGS LIMITED ASBESTOS & LEAD SURVEY REPORT Building 44 Willard Drug Treatment Center 7116 County Road 132 Willard, NY Prepared for: NYSOGS 33 rd Floor, Corning

More information

North Carolina State University. Asbestos Management Plan

North Carolina State University. Asbestos Management Plan North Carolina State University 1.0 Introduction Purpose The purpose of this plan is to establish the polices and procedures to be used at North Carolina State University (NCSU) in the management of building

More information

EXHIBIT A SCOPE OF SERVICES

EXHIBIT A SCOPE OF SERVICES EXHIBIT A SCOPE OF SERVICES 1.0 INTRODUCTION Asbestos consulting services are required for Item/Segment No. 227775-1, SR-7 (US 441) from Fillmore Street to South of Stirling Road, Hollywood, Broward County,

More information

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823. ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station

More information

2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987.

2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987. Penn State University Environmental Health and Safety Asbestos Management Program I. Introduction Over the past several decades the hazards of asbestos exposure have become well known. With this influx

More information

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association Presented by: Russell E. Stauffer, PE AMEC Environment & Infrastructure, Inc. October 30, 2014 75 East

More information

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material Asbestos Policy and Criteria Policy: Pierce County Recycling Composting and Disposal (LRI) has established an

More information

NDSU TABLE OF CONTENTS

NDSU TABLE OF CONTENTS NDSU TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 DEFINITIONS AND DESCRIPTIONS 3.0 OPERATIONS AND MAINTENANCE PROCEDURES FOR ACM 4.0 FIBER RELEASE EPISODES 5.0 DEMOLITION INFORMATION 6.0 REMARKS 1.0 INTRODUCTION

More information

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.

More information

PURCHASING OFFICE 2010 N. 59 TH STREET ROOM 370 \ KANSAS CITY, KS 66104 WEB SITE: WWW.KCKPS.ORG/PURCHASING

PURCHASING OFFICE 2010 N. 59 TH STREET ROOM 370 \ KANSAS CITY, KS 66104 WEB SITE: WWW.KCKPS.ORG/PURCHASING KANSAS CITY KANSAS PUBLIC SCHOOLS / USD 500 PURCHASING OFFICE 2010 N. 59 TH STREET ROOM 370 \ KANSAS CITY, KS 66104 WEB SITE: WWW.KCKPS.ORG/PURCHASING ASBESTOS ABATEMENT GRANT ELEMENTARY SCHOOL BID NO:

More information

PRE-DEMOLITION ASBESTOS SURVEY

PRE-DEMOLITION ASBESTOS SURVEY PRE-DEMOLITION ASBESTOS SURVEY For: City of Largo PSTA Building 14840 49th Street North Largo, Pinellas County, Florida Prepared for: Collman & Karsky Architects 4301 Anchor Plaza Parkway, Suite 100 Tampa,

More information

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M Dilbert Comic (2006) Asbestos what is it? Fibrous mineral very strong, heat resistant, fire retardant Airborne hazard asbestos can be inhaled

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 JUN - 8 2012

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 JUN - 8 2012 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 JUN - 8 2012 DEPUTY ADMINISTRATOR MEMORANDUM SUBJECT: FROM: TO: U.S. Environmental Protection Agency's Notification of Rules and Regulations

More information

40 CFR, Chapter 61, Subpart M National Emission Standard for Asbestos

40 CFR, Chapter 61, Subpart M National Emission Standard for Asbestos 40 CFR, Chapter 61, Subpart M National Emission Standard for Asbestos 61.140 Applicability. 61.141 Definitions. 61.142 Standard for asbestos mills. 61.143 Standard for roadways. 61.144 Standard for manufacturing.

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan

More information

Approved by: UBC ACT Committee

Approved by: UBC ACT Committee The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy

More information

(Adopted October 6, 1989)(Amended April 8, 1994) (Amended November 3, 2006)(Amended October 5, 2007)

(Adopted October 6, 1989)(Amended April 8, 1994) (Amended November 3, 2006)(Amended October 5, 2007) (Adopted October 6, 1989)(Amended April 8, 1994) (Amended November 3, 2006)(Amended October 5, 2007) RULE 1403. ASBESTOS EMISSIONS FROM DEMOLITION/RENOVATION ACTIVITIES (a) (b) (c) Purpose The purpose

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at Bailey Hall Building #315 East Lansing, Michigan 48823

More information

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO Inspected by Grande River Environmental, LLC CDPHE CONSULTING FIRM #18631 October 15, 2014 LIMITED ASBESTOS

More information

1200 N. COLORADO WINSLOW, ARIZONA

1200 N. COLORADO WINSLOW, ARIZONA ASBESTOS HAZORD EMERGENCY RESPONSE ACT (AHERA) INSPECTION & REPORT OF FIINGS FOR IUSTRIAL ARTS 1200 N. COLORADO WINSLOW, ARIZONA Submitted to: MR. RICHARD WILLIAMS BELFOR PROPERTY RESTORATION 23610 N.

More information

Asbestos Management Plan EC 45 Page 1

Asbestos Management Plan EC 45 Page 1 Name: Asbestos and ACBM (asbestos containing building material) Management Plan Areas Affected: All buildings that contain asbestos and ACBM on campus Effective Date: 1/1/09 Reviewed/Revised: 12/15/12

More information

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS 1.0 GENERAL 1.1 SUMMARY A. The following procedures apply to the project manual and drawings for asbestos in

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

Understanding the Asbestos NESHAP

Understanding the Asbestos NESHAP Michigan Department of Environmental Quality Air Quality Division Understanding the Asbestos NESHAP Fact Sheet The Clean Air Act (CAA) requires the U.S. Environmental Protection Agency (U.S. EPA) to develop

More information

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA May 22, 2013 Robert R. Jones, Ph.D., REM, AHERA Asbestos Inspector, 5/22/13 Signature Date Asbestos Virginia

More information

For the purpose of this rule, the following definitions shall apply:

For the purpose of this rule, the following definitions shall apply: ANTELOPE VALLEY AIR QUALITY MANAGEMENT DISTRICT RULE 1403 -- ASBESTOS EMISSIONS FROM DEMOLITION/RENOVATION ACTIVITIES (Adopted: 10/06/89; Amended: 04/08/94) (a) Purpose The purpose of this rule is to specify

More information

ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS

ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS The purpose of City Code 11-4-2150-11-4-2190 is to reduce the potential risk of harm to the public's health, safety and welfare

More information

SECTION 02 8213 ASBESTOS ABATEMENT

SECTION 02 8213 ASBESTOS ABATEMENT PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections shall apply to work of this section.

More information

100 North Senate Avenue, Indianapolis, IN 46204 Phone: (317) 308-3103 Toll Free: (800) 451-6027

100 North Senate Avenue, Indianapolis, IN 46204 Phone: (317) 308-3103 Toll Free: (800) 451-6027 GUIDANCE OLQ GENERAL ID #003-02-SW INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF LAND QUALITY ASBESTOS HANDLING AND DISPOSAL REQUIREMENTS www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly

More information

Asbestos Survey Form (See Instructions)

Asbestos Survey Form (See Instructions) Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: asbestos@airquality.org 1. Purpose of Survey Renovation Demolition

More information

DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS

DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS Property Address: The Verandas @ Rocky Ridge 3741 Chesnut Ridge Inspection ordered by: Cotton Commercial USA 5443 Katy Hockley Cutoff Rd. Katy,

More information

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110228 PREPARED FOR: Stantec, Inc.

More information

ENVIRONMENTAL QUALITY

ENVIRONMENTAL QUALITY Chapter 51. Title 33 ENVIRONMENTAL QUALITY Part III. Air Comprehensive Toxic Air Pollutant Emission Control Program Subchapter M. Asbestos 5151. Emission Standard for Asbestos A. Applicability. The provisions

More information

June 27, 2013. Project GSA1570019. Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102

June 27, 2013. Project GSA1570019. Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102 June 27, 2013 Project GSA1570019 Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102 Subject: Determination of Asbestos Conditions Former USDA

More information

ASBESTOS NESHAP REGULATIONS FOR RENOVATION AND DEMOLITION ACTIVITIES

ASBESTOS NESHAP REGULATIONS FOR RENOVATION AND DEMOLITION ACTIVITIES ASBESTOS NESHAP REGULATIONS FOR RENOVATION AND DEMOLITION ACTIVITIES As per; Title 40, Code of Federal Regulations, Part 61, Subpart M, National Emission Standards for Asbestos Arizona Department of Environmental

More information

ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT 05403 AIP 78. December 16, 2011 Revised January 31, 2012

ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT 05403 AIP 78. December 16, 2011 Revised January 31, 2012 ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT 05403 AIP 78 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110226 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South

More information

Asbestos Management POLICY

Asbestos Management POLICY Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management

More information

Subpart M National Emission Standard for Asbestos. 40 CFR Ch. I (7 1 11 Edition)

Subpart M National Emission Standard for Asbestos. 40 CFR Ch. I (7 1 11 Edition) 61.140 40 CFR Ch. I (7 1 11 Edition) (C) The date of each determination of the maximum concentration point, as described in 61.139(h), and a brief reason for the determination. (ii) For each vapor incinerator,

More information

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406.

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406. Asbestos Survey for Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington May 1, 2014 Project #A2014/0406 prepared for: Port of Pasco PO Box 769 Pasco, WA 99301 prepared by: Blue Mountain

More information

Characteristics/Applications

Characteristics/Applications Facilities Operations and Development Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://fod.osu.edu The Ohio State University Asbestos Management

More information

Frequently Asked Questions Concerning Verification of Asbestos Surveys Before Issuing Building Permits

Frequently Asked Questions Concerning Verification of Asbestos Surveys Before Issuing Building Permits Frequently Asked Questions Concerning Verification of Asbestos Surveys Before Issuing Building Permits 1. Why do we need Occupations Code 1954.259/ 25 Texas Admin. Code (TAC) 295.34(l)? The Department

More information

Loss Control TIPS Technical Information Paper Series

Loss Control TIPS Technical Information Paper Series Loss Control TIPS Technical Information Paper Series Innovative Safety and Health Solutions SM Asbestos-Containing Material (ACM) In Buildings The presence of asbestos in buildings, particularly those

More information

Asbestos Licensure Law. Code of West Virginia Chapter 16, Article 32 (As amended by the 1993 Legislative Session)

Asbestos Licensure Law. Code of West Virginia Chapter 16, Article 32 (As amended by the 1993 Legislative Session) Asbestos Licensure Law Code of West Virginia Chapter 16, Article 32 (As amended by the 1993 Legislative Session) Be it enacted by the Legislature of West Virginia: That chapter sixteen of the code of West

More information

ARTICLE 18. ASBESTOS MANAGEMENT NOTE: IC 13-1 and IC 13-7 were repealed by P.L.1-1996, SECTION 99, effective July 1, 1996.

ARTICLE 18. ASBESTOS MANAGEMENT NOTE: IC 13-1 and IC 13-7 were repealed by P.L.1-1996, SECTION 99, effective July 1, 1996. ARTICLE 18. ASBESTOS MANAGEMENT NOTE: IC 13-1 and IC 13-7 were repealed by P.L.1-1996, SECTION 99, effective July 1, 1996. Rule 1. Asbestos Management Personnel; Licensing 326 IAC 18-1-1 Applicability

More information

ASBESTOS NESHAP DEMOLITION SURVEY

ASBESTOS NESHAP DEMOLITION SURVEY ASBESTOS NESHAP DEMOLITION SURVEY PERFORMED AT REDDING GARDENS APARTMENTS 419 SOUTH LOCUST AVENUE SANFORD, FLORIDA 32771 PREPARED FOR SANFORD HOUSING AUTHORITY 94 CASTLE BREWER COURT SANFORD, FLORIDA 32771

More information

Demolition Practices Under the Asbestos NESHAP

Demolition Practices Under the Asbestos NESHAP Demolition Practices Under the Asbestos NESHAP SECTION 1 DEMOLITION PRACTICES AND NONFRIABLE MATERIALS INTRODUCTION EPA revised the asbestos NESHAP regulations on November 20, 1990 (see 40 CFR Part 61

More information

Final Amendments of 310 CMR 7.15: Asbestos

Final Amendments of 310 CMR 7.15: Asbestos Final Amendments of 310 CMR 7.15: Asbestos Published in the Massachusetts Register on June 20, 2014, Typographical Corrections Published on November 21, 2014 7.00 AIR POLLUTION CONTROL Definitions Revised

More information

Regulatory Requirements for Asbestos Inspections Prior to Renovation Projects

Regulatory Requirements for Asbestos Inspections Prior to Renovation Projects Regulatory Requirements for Asbestos Inspections Prior to Renovation Projects Subject: Abstract for the 2012 Healthcare Engineering Society of Northern Illinois Mr. Kohon, having attended last yearʼs event

More information

How To Perform A Limited Asbestos Survey

How To Perform A Limited Asbestos Survey Limited Asbestos Survey Report Presented To: Barbara Wethington Project Manager Weston Solutions, Inc. 960 West Elliot Road, Suite 201 Tempe, Arizona 85284 Project: Southeast Corner of Arizona Highway

More information

Standards for Asbestos Abatement

Standards for Asbestos Abatement 19a-332a-1. Definitions Standards for Asbestos Abatement 19a-332a-1. Definitions The following definitions shall apply for the purpose of Section 19a-332a-1 to Section 19a-332a- 16 inclusive. (a) "Adequately

More information

Administrative Procedure. Asbestos

Administrative Procedure. Asbestos Administrative Procedure FT107 Asbestos Board Received: January 30, 2012 Review Date: February 2015 Accountability: 1. Frequency of Reports As needed 2. Severity Threshold As needed (eg. Ministry of Labour

More information

CHEMICAL CONTROL ORDER FOR ASBESTOS

CHEMICAL CONTROL ORDER FOR ASBESTOS DENR ADMINISTRATIVE ORDER No. 02 Series of 2000 Subject: CHEMICAL CONTROL ORDER FOR ASBESTOS Section 1. Legal Authority This Chemical Control Order (CCO) is issued on the basis of authority given to the

More information

BEFORE THE ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION ) ) ) RESPONSIVE SUMMARY FOR REGULATION NO. 21, ARKANSAS ASBESTOS ABATEMENT REGULATION

BEFORE THE ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION ) ) ) RESPONSIVE SUMMARY FOR REGULATION NO. 21, ARKANSAS ASBESTOS ABATEMENT REGULATION BEFORE THE ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION IN THE MATTER OF AMENDMENTS TO REGULATION NO. 21, ARKANSAS ASBESTOS ABATEMENT REGULATION ) ) ) DOCKET NO. 13-009-R RESPONSIVE SUMMARY FOR REGULATION

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

ASBESTOS SURVEY AND ASSESSMENT REPORT

ASBESTOS SURVEY AND ASSESSMENT REPORT ASBESTOS SURVEY AND ASSESSMENT REPORT BUILDING NUMBER: 4194 BUILDING NAME: FT. PIERCE CITGO SERVICE STATION BUILDING ADDRESS (SR/MP): 091-144 CITY/COUNTY: AGENCY: DISTRICT: DATE OF SURVEY: FT. PIERCE/ST.

More information

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

The Richard Stockton University ASBESTOS MANAGEMENT PLAN The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling

More information

SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION 028214 ASBESTOS REMEDIATION FLOOR TILE AND MASTIC

SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION 028214 ASBESTOS REMEDIATION FLOOR TILE AND MASTIC ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk

More information

ASBESTOS MANAGEMENT PLAN. Tufts University Medford, Massachusetts

ASBESTOS MANAGEMENT PLAN. Tufts University Medford, Massachusetts ASBESTOS MANAGEMENT PLAN Tufts University Medford, Massachusetts October 2008 Revised 35 New England Business Center Andover, MA 01810 (978) 557-8150 www.woodardcurran.com TABLE OF CONTENTS SECTION PAGE

More information

ASBESTOS CONTROL PLAN

ASBESTOS CONTROL PLAN ASBESTOS CONTROL PLAN POLICY It is the long term plan of Emily Carr University to have an asbestos free workplace. In the interim, The University plans to manage asbestos hazards based on prioritization

More information

How To Care For Asbestos

How To Care For Asbestos Asbestos Awareness Training 1 Please watch video https://www.youtube.com/watch?v=pgzewa0 aafu 2 Asbestos is a Hazard that has No Visible Signs. Known as the silent killer, asbestos is an odorless, colorless

More information

FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses

FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses 2 February 2011 Updated 16 March 2011 FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses This fact sheet provides advice for residents about

More information

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD

More information

IAC 7/16/08 Labor Services[875] Ch 155, p.1. CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82]

IAC 7/16/08 Labor Services[875] Ch 155, p.1. CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82] IAC 7/16/08 Labor Services[875] Ch 155, p.1 CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82] 875 155.1(88B) Definitions. Asbestos means material containing at least

More information

PROTECTING TRIBAL CHILDREN & COMMUNITY MEMBERS FROM ASBESTOS-IN-SCHOOL HAZARDS

PROTECTING TRIBAL CHILDREN & COMMUNITY MEMBERS FROM ASBESTOS-IN-SCHOOL HAZARDS PROTECTING TRIBAL CHILDREN & COMMUNITY MEMBERS FROM ASBESTOS-IN-SCHOOL HAZARDS PROTECTING TRIBAL CHILDREN & COMMUNITY MEMBERS FROM ASBESTOS-IN-SCHOOL HAZARDS 19 th Annual Tribal EPA Environmental Conference.

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

ASBESTOS MANAGEMENT AND OPERATING PLAN FOR MCCONNELL AIR FORCE BASE

ASBESTOS MANAGEMENT AND OPERATING PLAN FOR MCCONNELL AIR FORCE BASE ASBESTOS MANAGEMENT AND OPERATING PLAN FOR MCCONNELL AIR FORCE BASE LAST UPDATE 2003 TABLE OF CONTENTS TABLE OF CONTENTS... 1 GLOSSARY OF TERMS... 4 LIST OF ACRONYMS... 7 LIST OF REFERENCES... 9 1.0 INTRODUCTION...

More information

ASBESTOS INSPECTION REPORT

ASBESTOS INSPECTION REPORT ASBESTOS INSPECTION REPORT F&R PROJECT NUMBER: 65R-3125 Regarding: Hwy 295 Baseball Park Score Tower Structure 2100 Southport Road Spartanburg, South Carolina Prepared for: Spartanburg County Parks Department

More information

Restoration Specific Asbestos and Lead Based Paint Survey Report. 2503 Logan Ave Colorado Springs, CO 80909

Restoration Specific Asbestos and Lead Based Paint Survey Report. 2503 Logan Ave Colorado Springs, CO 80909 Restoration Specific Asbestos and Lead Based Paint Survey Report Property Information: 2503 Logan Ave Colorado Springs, CO 80909 Inspection Conducted By: Shannon Anderson Colorado Cert #14225 Ted Anderson

More information

The Vermont Department of Health When is Asbestos a Public Health Threat? Town Health Officers (THO) Training

The Vermont Department of Health When is Asbestos a Public Health Threat? Town Health Officers (THO) Training When is Asbestos a Public Health Threat? Town Health Officers (THO) Training Asbestos and Lead Regulatory Program 2013 When is Asbestos a Public Health Threat? Town Health Officer (THO) Training August

More information

RULE 902 ASBESTOS Adopted 6-2-75 (Amended 5-31-89, 1-14-92, 6-1-95, 10-1-98, 1-22-15, 2-26-15) INDEX

RULE 902 ASBESTOS Adopted 6-2-75 (Amended 5-31-89, 1-14-92, 6-1-95, 10-1-98, 1-22-15, 2-26-15) INDEX RULE 902 ASBESTOS Adopted 6-2-75 (Amended 5-31-89, 1-14-92, 6-1-95, 10-1-98, 1-22-15, 2-26-15) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTIONS 111 PARTIAL EXEMPTIONS 200 DEFINITIONS 201

More information

Asbestos: Regulations & Requirements presented by Kentucky Division for Air Quality visit our website at http://www.air.ky.gov

Asbestos: Regulations & Requirements presented by Kentucky Division for Air Quality visit our website at http://www.air.ky.gov Asbestos: Regulations & Requirements presented by Kentucky Division for Air Quality visit our website at http://www.air.ky.gov What Is Asbestos? fibrous silicate mineral used in >3000 products insulating

More information

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

Appendix A NESHAP Discussion of Terms and Policy Decisions. Table of Contents

Appendix A NESHAP Discussion of Terms and Policy Decisions. Table of Contents Appendix A NESHAP Discussion of Terms and Policy Decisions 1. Applicability 2. Asbestos-Containing Material (ACM) 3. Boarding Houses 4. Bricks 5. Bridges 6. Category I Nonfriable ACM 7. Category II Nonfriable

More information

Asbestos NESHAP. Uses, Health Effects and Regulations Governing Commercial Buildings and Structures

Asbestos NESHAP. Uses, Health Effects and Regulations Governing Commercial Buildings and Structures Asbestos NESHAP Uses, Health Effects and Regulations Governing Commercial Buildings and Structures Background Information on Asbestos Become familiar with history of asbestos use Recognize the characteristics

More information

BRIEFING TO THE UN STAFF

BRIEFING TO THE UN STAFF BRIEFING TO THE UN STAFF Topics History, Properties and Uses of Asbestos Important Definitions Regulatory Overview Asbestos Abatement Procedures History And Use What is Asbestos? Asbestos is a mineral

More information

Neighborhood Stabilization Program. Asbestos Abatement Services Request for Proposal (RFP)

Neighborhood Stabilization Program. Asbestos Abatement Services Request for Proposal (RFP) Neighborhood Stabilization Program Asbestos Abatement Services Request for Proposal (RFP) June 2010 REQUEST FOR PROPOSAL (RFP) ASBESTOS ABATEMENT FOR RESIDENTIAL STRUCTURES BACKGROUND Communities across

More information

Building Owners Responsibilities for Asbestos

Building Owners Responsibilities for Asbestos Building Owners Responsibilities for Asbestos August 2012 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can be provided to you in a different format (Braille,

More information

Asbestos-Containing Material Re-Inspection Report

Asbestos-Containing Material Re-Inspection Report Asbestos-Containing Material Re-Inspection Report WA032 PFC JOE E. MANN UNITED STATES ARMY RESERVE CENTER Site Code 53920 4415 North Market Street Spokane, Washington 99207 Prepared for: 88 th Regional

More information

PREPARED FOR: Branch Banking & Trust Environmental Risk Management 5130 Parkway Plaza Boulevard Charlotte, North Carolina 28217 (704) 954-1725

PREPARED FOR: Branch Banking & Trust Environmental Risk Management 5130 Parkway Plaza Boulevard Charlotte, North Carolina 28217 (704) 954-1725 WATER INTRUSION AND VISUAL MOLD ASSESSMENT & LIMITED ASBESTOS-CONTAINING MATERIALS SURVEY FREDRICK WHITE 1119 DUSTIN STREET LADY LAKE, LAKE COUNTY, FLORIDA BB&T PROJECT NO. OMS-155500-REPORT #1 PREPARED

More information

Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges

Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges Revised Environmental Site Assessment Guidelines Revised Environmental Site Assessment Guidelines Developed

More information

Miami University s Asbestos Operations & Maintenance Program Administered by

Miami University s Asbestos Operations & Maintenance Program Administered by Miami University s Asbestos Operations & Maintenance Program Administered by ENVIRONMENTAL SAFETY & RISK MANAGEMENT 529-2829 Table of Contents Purpose 2 Personnel Covered Under the Asbestos Mangement Plan

More information

May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240

May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901

More information

Why was asbestos used?

Why was asbestos used? Asbestos Awareness What is Asbestos? Why was asbestos used? Asbestos appealed to manufacturers and builders for a variety of reasons. It is strong yet flexible, and it will not burn. It conducts electricity

More information

TITLE 64 LEGISLATIVE RULE DIVISION OF HEALTH SERIES 63 ASBESTOS ABATEMENT LICENSING RULE. the director 1 of the division of health.

TITLE 64 LEGISLATIVE RULE DIVISION OF HEALTH SERIES 63 ASBESTOS ABATEMENT LICENSING RULE. the director 1 of the division of health. TITLE 64 LEGISLATIVE RULE DIVISION OF HEALTH SERIES 63 ASBESTOS ABATEMENT LICENSING RULE 64-63-1. General. 1.1. Scope. -- This legislative rule establishes procedures and standards for the licensure and

More information