Status of the ALFRED Project. Alessandro Alemberti



Similar documents
Safe ExploitAtion Related CHemistry for HLM reactors

Generation IV Fast Reactors. Dr Richard Stainsby AMEC

Fukushima Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel

NURESAFE EUROPEAN PROJECT Second General Seminar

PROPOSALS FOR UNIVERSITY REACTORS OF A NEW GENERATION

Lead-Cooled Fast Reactor BREST Project Status and Prospects

MINUTES UPEI BOARD MEETING FFPI Office, Paris Monday, 20 April h30 16h00

ECRIN General Presentation

Foreign Obligations Notification Process

LEAD-COOLED FAST REACTOR (LFR) DEVELOPMENT GAPS

ADS (Accelerator Driven Systems) e LFR (Lead Fast Reactor)

PRACE An Introduction Tim Stitt PhD. CSCS, Switzerland

Geothermal ERA NET. 7 th Geothermal ERA NET meeting Trieste, Italy September Guðni A Jóhannesson Director General, Orkustofnun, Iceland

Boiling Water Reactor Systems

DIETRISOL SOLAR WATER HEATING SYSTEMS ENERGY SAVINGS AND ECOLOGICAL BENEFITS SUSTAINED COMFORT SIMPLICITY AND RELIABILITY INNOVATIVE, MODULAR SYSTEMS

FP7 Space Research Proposal evaluation and role of the REA European Commission REA S2 Space Research

Information Sheet. Ref. No: J0-TR-51611

POLITICAL DECLARATION OF THE PENTALATERAL ENERGY FORUM

Dublin, March EPSO Network of Experts in the field of Personnel Selection 14th March 2013

Development Study of Nuclear Power Plants for the 21st Century

THE NATO-EU STRATEGIC PARTNERSHIP

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Volker Jacumeit, DIN e. V. ILNAS Workshop CSCG Presentation June 4, 2015

EINSTEIN Expert System for an Intelligent Supply of Thermal Energy in Industry - Audit Methodology and Software Tool

Market Monitoring Note n. 3

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

Fluoride and Dental Health in Europe

Healthcare Coalition on Data Protection

Dynamic Behavior of BWR

CFD Topics at the US Nuclear Regulatory Commission. Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008

Nuclear Energy: Nuclear Energy

ACOME. Complete systems for: radiant floor heating/cooling/plumbing.

Delivering on innovation and market uptake. Best-in-cases of nzeb. Ramon Pascual Bucharest May 8th, 2015

SIA CARD PROCESSING. Advanced, secure and digital payment solutions

Ústav fyziky plazmatu AV ČR, v.v.i., Praha (Institute of plasma physics AS CR, Prague)

PROBANT. Initial feedback from European Research. SRC 08 Paris 29 September Paris, 29 September. Specialist Crime Investigation Service

AREVA, an unparalleled experience in building nuclear reactors

Flow distribution and turbulent heat transfer in a hexagonal rod bundle experiment

ERMInE Database. Presentation by Nils Flatabø SINTEF Energy Research. ERMInE Workshop 2 - Northern Europe Oslo, 1. November 2006

BiogasHeat Development of sustainable heat markets for biogas plants in Europe

STW Open Technology Programme. H2020 Future & Emerging Technology. and. GRANTS WEEK 2015 October 9 th

AGENDA ITEM 4: EUROPEAN HEALTH INSURANCE CARD

SIA CARD PROCESSING. Advanced, secure and digital payment solutions

ELICIT European Literacy and Citizenship Education

Council of the European Union Brussels, 20 May 2016 (OR. en)

DRAFT AMENDING BUDGET N 6 TO THE GENERAL BUDGET 2014 GENERAL STATEMENT OF REVENUE

The TVEL Fuel Company of Rosatom CREATING FUTURE TODAY

Smart Energy Systems Energy Efficient Buildings and the Design of future Sustainable Energy Systems

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator

Technology Roadmap Update for Generation IV Nuclear Energy Systems

Renewable Energy Projections as Published in the National Renewable Energy Action Plans of the European Member States

of2o July of Transmission System Operators for Electricity

Introductions: Dr. Stephen P. Schultz

European Collaboration on Lead Cooled Nuclear Reactor Development

Electric Coolant Pumps. Always at the Correct Temperature

Quality and critical appraisal of clinical practice guidelines a relevant topic for health care?

INTERNATIONAL TRACKED POSTAGE SERVICE

TsAGI EU Scientific Cooperation National Contact Point Aeronautics

GAS TRANSPORTATION INFRASTRUCTURE DENSITY IN THE EU: CEE vs NWE

Summary technical description of the SUNSTORE 4 plant in Marstal

PRIORITY RULES ON COMPENSATION FOR NUCLEAR DAMAGE IN NATIONAL LEGISLATION

ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT

Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid

ETIP Wind Steering Committee meeting Monday 7th March :00 16:45 EWEA office, Rue d Arlon 80 6th floor Bruxelles AGENDA

AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM. (As amended 30 November 2007)

Technologies for small scale Biomass CHP-Plants an actual survey

DESIGN, SAFETY AND FUEL DEVELOPMENTS FOR THE EFIT ACCELERATOR DRIVEN SYSTEM WITH CERCER AND CERMET CORES

Akkuyu Nuclear Power Plant the first NPP plant configured on BOO principles

VDL Klima. Marine cooling solutions. Strength through cooperation

The Status of Nuclear Power in the World Before and After Fukushima

EXPO MILANO Paolo Alli Deputy Commissioner General

Qualification of In-service Inspections of NPP Primary Circuit Components

Overview of pipelines in Europe advantages and disadvantages

OECD PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) Sixth meeting of the Board of Participating Countries 1-3 March 1999, Tokyo

RENEWABLE ENERGY IN EGYPT

7.1 General Events resulting in pressure increase 5

UOP Career Development. Career development program for mechanical and civil engineers

Together towards an EU Urban Agenda

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

SC2 BIOECONOMY in Horizon 2020

IAEA 2015 INTERNATIONAL CONFERENCE ON COMPUTER SECURITY IN A NUCLEAR WORLD

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA. Call for Proposals 2014

EFFECTS+ Clustering of Trust and Security Research Projects, Identifying Results, Impact and Future Research Roadmap Topics

10 Nuclear Power Reactors Figure 10.1

COMMUNICATION FROM THE COMMISSION

PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation

Association of the Councils of State and Supreme Administrative Jurisdictions of the EU

Europæiske erfaringer med EPC og Transparense projektet

TECHNICAL MEETING ON IN-PILE TESTING AND INSTRUMENTATION FOR DEVELOPMENT OF GENERATION-IV FUELS AND STRUCTURAL MATERIALS

C. starting positive displacement pumps with the discharge valve closed.

The European Entrepreneur Exchange Programme

English Version. Security service providers - Terminology

Sustainable water heating solutions through solar systems

International Training Course on Preventive and Protective Measures against Insider Threats at Nuclear Facilities PROSPECTUS

Egyptian Renewable Energy Cluster Initiative (ERECI) (Current Status Overview)

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

C H A P T E R E U R O P E

IT Coordination Group and ECRIN Data Centers

Transcription:

Status of the ALFRED Project Alessandro Alemberti ESNII Biennial conference 17-18-19 March 2015 Brussels Belgium 1

SUMMARY ALFRED AND FALCON ALFRED CONCEPTUAL DESIGN REVIEW ALFRED AND GENERATION IV ACTIVITIES ROSATOM COOPERATION AGREEMENT 2

REACTOR CONFIGURATION FROM LEADER PROJECT Power: 300 MWth Primary cycle: 400-480 C Secondary cycle: 335-450 C FUEL ASSEMBLIES MAIN COOLANT PUMP STEAM GENERATOR MAIN COOLANT PUMP STEAM GENERATOR REACTOR CORE REACTOR VESSEL SAFETY VESSEL 3

FALCON a way to organize and find solutions FALCON consortium has been set-up on December 18 th 2013 by: Ansaldo Nucleare, ENEA and RATEN- ICN Construction Site of ALFRED is Mioveni (ROMANIA) and EU organizations have been invited to join FALCON or a technical cooperation agreement (MoA). FALCON Main activities are: Sharing of information and technical review Main activity include a technical review of ALFRED Licensing and siting preliminary review First steps with the Safety Authority Cost estimate and schedule review Overall project cost and schedule Assessment of financial instruments Pave the way for infrastructural funds Roadmap and implementation plan Overall Roadmap and ancillary facilities Promotion initiatives and coordinated actions Dissemination and coordinated actions ANSALDO ICN ANSALDO ICN ENEA ENEA 4

FALCON Status EU Organizations invited to join FALCON through a technical cooperation agreement (MoA). Procedure to sign a FALCON MoA: Contact one of the FALCON members Agree on a technical activities program Sign the MoA with the FALCON member All contributions are in-kind. The aim is to constitute a network of organizations interested in the LFR technology development and, as a closer goal, committed to ALFRED construction. MoA STATUS: CRS4 (Sardinia - Italy) MOA SIGNED NRG (Petten, The Netherlands) MoA final text agreed SRS (Rome, Italy) - MOA SIGNED IIT (Milan, Italy) - activity Agreed under signature KIT (Karlsruhe, Germany - activity Agreed under signature CIRTEN (Consortium of Universities, Italy) MOA SIGNED GRS (TSO, Germany) contacts on going SYMLOG (Paris, France) - MOA SIGNED 5

FALCON Status FALCON NEW MEMBER: CV-REZ joined FALCON and is now a full member of the consortium EU Organizations invited to join FALCON through a technical cooperation agreement (MoA). Procedure to sign a FALCON MoA: Contact one of the FALCON members Agree on a technical activities program Sign the MoA with the FALCON member All contributions are in-kind. The aim is to constitute a network of organizations interested in the LFR technology development and, as a closer goal, committed to ALFRED construction. MoA STATUS: CRS4 (Sardinia - Italy) MOA SIGNED NRG (Petten, The Netherlands) MoA final text agreed SRS (Rome, Italy) - MOA SIGNED IIT (Milan, Italy) - activity Agreed under signature KIT (Karlsruhe, Germany - activity Agreed under signature CIRTEN (Consortium of Universities, Italy) MOA SIGNED GRS (TSO, Germany) contacts on going SYMLOG (Paris, France) - MOA SIGNED 6

FALCON INITIATIVES Two main FALCON initiatives on-going: Proposal to Romania structural funds to finance the construction and testing program of several Lead facilities in Mioveni Proposal to include in the ESFRI Road map -European Strategy Forum on Research Infrastructuresa distributed research infrastructure based in: Mioveni - Romania RATEN-ICN Brasimone - Italy ENEA REZ - Czech Republic CV-REZ the proposal presented include ALFRED as one of the main facilities and demonstration activities. 7

ALFRED Conceptual Design review A number of open issues identified in ALFRED design. ACTIVITIES on going to: define a new reactor assembly configuration New conceptual design configuration identified verification Safety vessel and concrete cooling New safety vessel (no liner) New concrete cooling system SG design New design developed CFD analysis done to be refined Primary pump New design developed very promising low speed Decay Heat Removal system 2 Roof position identified - final solution not yet identified - on-going Core design Unchanged one row of dummy FAs added Flow paths in the primary pool Main goals to: - eliminate thermal stratification - eliminate stagnation zones - provide coolant to span thw whole vessel 8

ALFRED and GENERATION IV The GIF-LFR provisional System Steering Committee (pssc) has recently issued with the GIF Reactor Safety Working Group (RSWG) a White Paper on LFR Safety. The White Paper is based on ALFRED and has been reviewed by GIF expert group and published on GIF web site by RSWG Presently there are two main activities interesting for ALFRED development carried out by LFR pssc: Development of a Draft for the Terms of reference for GIF system safety assessment (requested by GIF-RSWG and endorsed by Police and Expert groups) Development of LFR Safety Design Criteria: LFR - SDC will be developed on the basis of SFR - SDC. A first draft is expect by next spring and will be distributed to ARCADIA project partners Generation IV Technology Road Map Update 2014 9

LEADER BREST Cooperation Agreement On May 2014 a Cooperation Agreement (CooA) has been signed between Ansaldo Nucleare, coordinator of LEADER project, and OJSC NIKIET, coordinator of BREST project. The CooA is based on the exchange of information between the two projects on 7 basic topics: Topic 1. Conceptual design of LFRs at various power sizes Topic 2. Nuclear Safety: Approaches and methods Topic 3. Comp. and exp. studies of neutron and physical characteristics Topic 4. Computer and exp. study of thermal and hydraulic characteristics of elements of the active core, steam generator and circulating flow pattern in the reactor Topic 5. Investigation on available materials compatible with lead coolant and possible approaches for corrosion reduction Topic 6: long term behavior of NFC (advantages and env. Impact) Topic 7: Education and training Provide a framework to grow the skills of the young engineers and scientist on LFR technology as well as scientific aspects. The CooA activities consist of a number of meetings dedicated to information exchange among experts. First meeting will take place in May 2015 - Genova JRC invited to join the discussion 10

ALFRED 11