Roadway Cost Per Centerline Mile Revised June 2014



Similar documents
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Planning Level Cost Estimation Tool. User s Manual

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

DESCRIPTION OF WORK:

Chapter 22. Lump Sum Project Guidelines

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Pavement Management Program

Maryland Invests $845 Million in New Highway and Bridge Projects

APPENDIX F. Access Management Design Standards for Entrances and Intersections

Granger Bay Boulevard and Green Point Roundabout

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

APPENDIX J TRAFFIC STUDY

Evaluation of the Shared-Use Arrow

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.

3.1 Historical Considerations


Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Public Involvement Meeting Handout

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

OVERVIEW PROJECT SUMMARY

D3 April 8, 2015 Public Hearing

Multi Modal Roadway Transportation Impact Fees and Asset Value

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013

I-25 / Rio Bravo Interchange

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Pavement Management Program

CONSTRUCTION COST ESTIMATES

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

Monitoring Highway Assets with Remote Technology

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

SECTION INLETS INLET LOCATIONS

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Relationship of Lane Width to Safety for Urban and Suburban Arterials

Surface Transportation Program (STP) Projects

Road Signs Recognition Quiz

Infrastructure assets are distinguished from other capital assets because they normally:

MAINTENANCE. Infrastructure. Introduction. Safety. Policies & Programs. Summary EXISTING CONDITIONS

VERTICAL SPEED CONTROL DEVICES

COPPER BEECH TOWNHOME DEVELOPMENT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

DOUGLAS COUNTY RESOLUTION NO CITY OF LAWRENCE RESOLUTION NO. 5094

Surface Transportation Program (STP)

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Department of Public Works P.O Box 4186, San Rafael, CA / Fax: 415/

Revised January Bicycle Policy & Design Guidelines Maryland State Highway Administration

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS

CITY COUNCIL WORKSHOP MAY 24, 2016

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)

Light Rail Transit in Phoenix

100 Design Controls and Exceptions

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

EPA Technical Assistance for Sustainable Communities Building Blocks

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts

Boulder County Multimodal Transportation Standards

RESIDENTIAL DRIVEWAYS

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

7.2 Warrants and Planning Considerations

11 p.m. to. Tuesday, June. will remain open. 14. closed

Street Audit Tool: Web 2.0 Tools

FIBER-OPTIC CABLE PLAN CHECK

Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE

Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22)

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15

Clean, Green, Fun! Cady Way. Trail

Presentation to Community Task Force July 9, 2007

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

SITE PLAN REVIEW RESOLUTION BERGEN COUNTY, NEW JERSEY

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

City of St. Petersburg Development Services. February Driveways for Residential Properties

Soapstone Connector Feasibility Study

How To Improve Safety

Delineation. Section 4 Longitudinal markings

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

For more information, visit: rethinkingstreets.com

Northern Nevada Water Planning Commission

Lincoln Downtown Master Plan Update

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

Section Two: Stanford Perimeter Trail

Action on Amendment Five to the FFYs TIP Page 1 of 8 Boston Region MPO Staff - 9/3/2015

Transcription:

Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743 $760,461 $760,461 $6,590,666 New (4-Lane Roadway) with 5' Paved Shoulders $5,449,902 $544,990 $599,489 $6,594,381 $1,648,595 $8,242,976 $1,236,446 $1,236,446 $10,715,869 New (6-Lane Roadway) with 5' Paved Shoulders $6,945,143 $694,514 $763,966 $8,403,624 $2,100,906 $10,504,529 $1,575,679 $1,575,679 $13,655,888 Milling and Resurfacing (4-Lane Roadway) with 5' Paved Shoulders $1,145,229 $114,523 $125,975 $1,385,727 $346,432 $1,732,158 $259,824 $259,824 $2,251,806 Milling and Resurfacing (6-Lane Roadway) with 5' Paved Shoulders $1,668,122 $166,812 $183,493 $2,018,428 $504,607 $2,523,035 $378,455 $378,455 $3,279,945 Add Lanes (2 to 4 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (4 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing Add Lanes (6 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $3,895,621 $389,562 $428,518 $4,713,701 $1,178,425 $5,892,127 $883,819 $883,819 $7,659,764 $4,364,817 $436,482 $480,130 $5,281,428 $1,320,357 $6,601,785 $990,268 $990,268 $8,582,321 $5,855,972 $585,597 $644,157 $7,085,726 $1,771,432 $8,857,157 $1,328,574 $1,328,574 $11,514,305 $5,489,564 $548,956 $603,852 $6,642,373 $1,660,593 $8,302,966 $1,245,445 $1,245,445 $10,793,856 Add 1 Through Lane on Inside (To Existing) with 5' Paved Shoulders $852,034 $85,203 $93,724 $1,030,962 $257,740 $1,288,702 $193,305 $193,305 $1,675,313 Add 1 Through Lane on Outside (To Existing) with 5' Paved Shoulders $1,334,043 $133,404 $146,745 $1,614,192 $403,548 $2,017,740 $302,661 $302,661 $2,623,062 Add 300' Exclusive Left Turn Lane $43,253 $6,488 $7,461 $57,203 $14,301 $71,503 $10,725 $10,725 $92,954 Add 300' Exclusive Right Turn Lane $102,384 $15,358 $17,661 $135,403 $33,851 $169,254 $25,388 $25,388 $220,030 New (2-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $4,840,624 $484,062 $532,469 $5,857,155 $1,464,289 $7,321,444 $1,098,217 $1,098,217 $9,517,877 New (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $6,832,753 $683,275 $751,603 $8,267,631 $2,066,908 $10,334,539 $1,550,181 $1,550,181 $13,434,900 New (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $8,353,372 $835,337 $918,871 $10,107,580 $2,526,895 $12,634,475 $1,895,171 $1,895,171 $16,424,818 Milling and Resurfacing (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $1,227,295 $122,729 $135,002 $1,485,027 $371,257 $1,856,283 $278,442 $278,442 $2,413,168 Milling and Resurfacing (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $1,740,670 $174,067 $191,474 $2,106,211 $526,553 $2,632,764 $394,915 $394,915 $3,422,593 Add Lanes (2 to 4 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 6 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (6 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Roadway Per Centerline Mile $4,477,530 $447,753 $492,528 $5,417,812 $1,354,453 $6,772,265 $1,015,840 $1,015,840 $8,803,944 $5,002,273 $500,227 $550,250 $6,052,750 $1,513,188 $7,565,938 $1,134,891 $1,134,891 $9,835,719 $6,581,386 $658,139 $723,952 $7,963,477 $1,990,869 $9,954,346 $1,493,152 $1,493,152 $12,940,650 $5,969,158 $596,916 $656,607 $7,222,681 $1,805,670 $9,028,351 $1,354,253 $1,354,253 $11,736,856 Add 1 Through Lane on Inside (To Existing) with 5' Sidewalk, and Curb & Gutter $894,894 $89,489 $98,438 $1,082,822 $270,705 $1,353,527 $203,029 $203,029 $1,759,585 Add 1 Through Lane on Outside (To Existing) with 5' Sidewalk, and Curb & Gutter $2,420,914 $242,091 $266,300 $2,929,305 $732,326 $3,661,632 $549,245 $549,245 $4,760,121 Add 300' Exclusive Left Turn Lane $63,013 $9,452 $10,870 $83,334 $20,834 $104,168 $15,625 $15,625 $135,418 Add 300' Exclusive Right Turn Lane $132,149 $19,822 $22,796 $174,767 $43,692 $218,459 $32,769 $32,769 $283,996 * A 15% MOT and Mobilization factor was used for exclusive left and right turn lanes. A 10% factor was used for all other figures. ** Total cost shown is derived from a standard typical section. s will need to be adjusted to account for signals, bridges, or any additional item not deemed typical. 2. These figures exclude costs for intersections/interchanges, improvements to cross streets, bridges over 20', right-of-way, landscaping, ITS, and traffic signals. 3. The figures are based on market costs for Hillsborough County. 4. s shown are present day costs. 5. The costs developed for this report are not project-specific and should be used for preliminary estimating purposes only.

Roadway Per Centerline Mile Rural Arterial Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders, 2 Traffic Signals, Highway Lighting, Fiber Based Communication Backbone, Widening 150' Low Level Bridge, and Milling & Resurfacing Existing 4 Lanes Add Lanes (4 to 6 Lanes) with 5' Sidewalk, Bike Lanes, 2 Traffic Signals, Highway Lighting, Fiber Based Communication Backbone, Widening 150' Low Level Bridge, and Milling & Resurfacing Existing 4 Lanes From LRE MOT (10%) Mobilization (10%) Subtotal Total PE Design (15%) CEI (15%) Total Project $5,974,792 $597,479 $657,227 $7,229,498 $1,807,375 $9,036,873 $1,355,531 $1,355,531 $11,747,935 $6,282,391 $628,239 $691,063 $7,601,693 $1,900,423 $9,502,116 $1,425,317 $1,425,317 $12,352,751 2. These figures exclude costs for intersections/interchanges, cross street improvements, right-of-way, ITS, and landscaping. 3. The figures are based on market costs for Hillsborough County. 4. s shown are present day costs. 5. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only.

Other Roadway Related s From LRE Intersection Traffic Signalization (Mast Arm Assembly)** MOT * Mobilization (15%) Subtotal Total PE Design (15%) CEI (15%) Total Project 2-Lane Roadway Intersecting 2-Lane Roadway $152,791 $22,919 $26,357 $202,067 $50,517 $252,583 $37,887 $37,887 $328,358 4-Lane Roadway Intersecting 4-Lane Roadway $192,772 $28,916 $33,253 $254,941 $63,735 $318,676 $47,801 $47,801 $414,279 6-Lane Roadway Intersecting 6-Lane Roadway $214,028 $32,104 $36,920 $283,052 $70,763 $353,815 $53,072 $53,072 $459,959 Bicycle and Pedestrian Facilities Sidewalks Per Mile (5' Width - 1 Side) $88,939 $4,447 $14,008 $107,393 $26,848 $134,242 $20,136 $20,136 $174,514 Sidewalks Per Mile (6' Width - 1 Side) $106,726 $5,336 $16,809 $128,872 $32,218 $161,090 $24,164 $24,164 $209,417 Multi-Use Trail Per Mile (12' Width - 1 Side) $170,032 $8,502 $26,780 $205,314 $51,329 $256,643 $38,496 $38,496 $333,635 Stormwater Retention Facilities 1 Acre Pond Site (6' Depth) $217,722 $10,886 $34,291 $262,899 $65,725 $328,624 $49,294 $49,294 $427,211 Median Retrofit Convert 14' Center Turn Lane to 14' Raised Median (Per Mile) Cross Street Improvements Widen 1-Leg of Existing Rural 2-Lane Cross Street to Accommodate 2 Receiving Lanes, Dual Left Turn lanes, and Exclusive Right Turn Lane (Approximate Length of 0.25 Miles) $189,476 $28,421 $32,685 $250,582 $62,646 $313,228 $46,984 $46,984 $407,197 $1,156,434 $173,465 $199,485 $1,529,384 $382,346 $1,911,730 $286,760 $286,760 $2,485,249 * A 15% MOT factor was used for Traffic Signals, Median Retrofit, and Cross Street Improvements. A 5% factor was used for all other figures. **The cost of traffic signalization assumes the installation of mast arms on all four legs of an intersection. To obtain the cost of signalizing a four-lane roadway intersecting a two-lane roadway, divide the signal cost of a four-lane roadway by two and add this figure to the signal cost of the two-lane roadway divided by two. Notes: 2. The figures are based on market costs for Hillsborough County. 3. s shown are present day costs. 4. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only. From LRE Interchange MOT (10%) Mobilization (10%) Subtotal Total PE Design (15%) CEI (15%) Subtotal Project Single Point Urban Interchange (SPUI) $ 19,832,201.63 $1,983,220 $2,181,542 $23,996,964 $5,999,241 $29,996,205 $4,499,431 $4,499,431 $38,995,066 1. was derived from an LRE estimate to modify the existing diamond interchange at I-75/SR 54 to a single point urban interchange. 2. shown is for construction only. Does not include Design, CEI, and right-of-way.

Bridge Per Square Foot Per Square Foot New 2014 Low Level $120 Mid Level $145 High Level $170 Overpass (Over Roadway) $155 Bascule $1,900 Pedestrian Overpass $335 Widening 2014 Low Level $150 Mid Level $170 High Level $205 Overpass (Over Roadway) $185 Bridge Removal 2014 Concrete Bridge $50 1. Figures are for construction costs per square foot of deck area. 2. All figures exclude costs for right-of-way, bridge approaches, and approach slabs. 3. Figures account for recent increases in concrete and steel, and the effects of labor and material shortages in the construction industry. 4. The costs developed for this report are not site-specific and should be used for preliminary estimating purposes only.

Roadway Per Centerline Mile Comparison June 2013 versus June 2014 s LRE Model 2013 2014 Percent Difference Rural Arterial New (2-Lane Roadway) with 5' Paved Shoulders $6,220,090 $6,590,666 5.96% New (4-Lane Roadway) with 5' Paved Shoulders $9,974,786 $10,715,869 7.43% New (6-Lane Roadway) with 5' Paved Shoulders $12,689,060 $13,655,888 7.62% Milling and Resurfacing (4-Lane Roadway) with 5' Paved Shoulders $2,185,199 $2,251,806 3.05% Milling and Resurfacing (6-Lane Roadway) with 5' Paved Shoulders $3,201,091 $3,279,945 2.46% Add Lanes (2 to 4 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $7,534,764 $7,659,764 1.66% Add Lanes (4 to 6 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $8,395,445 $8,582,321 2.23% Add Lanes (4 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $11,155,949 $11,514,305 3.21% Add Lanes (6 to 8 Lanes) with 5' Paved Shoulders (Includes milling and resurfacing of existing $10,559,816 $10,793,856 2.22% Add 1 Through Lane on Inside (To Existing) with 5' Paved Shoulders $1,664,859 $1,675,313 0.63% Add 1 Through Lane on Outside (To Existing) with 5' Paved Shoulders $2,663,500 $2,623,062-1.52% Add 300' Exclusive Left Turn Lane $92,096 $92,954 0.93% Add 300' Exclusive Right Turn Lane $222,566 $220,030-1.14% Total $76,559,221 $79,655,779 4.04% New (2-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $8,798,189 $9,517,877 8.18% New (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $12,387,472 $13,434,900 8.46% New (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $15,170,760 $16,424,818 8.27% Milling and Resurfacing (4-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $2,351,378 $2,413,168 2.63% Milling and Resurfacing (6-Lane Roadway) with 5' Sidewalk, and Curb & Gutter $3,337,039 $3,422,593 2.56% Add Lanes (2 to 4 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 6 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (4 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing Add Lanes (6 to 8 Lanes) with 5' Sidewalk, and Curb & Gutter (Includes milling and resurfacing existing $8,942,637 $8,803,944-1.55% $9,968,284 $9,835,719-1.33% $13,169,187 $12,940,650-1.74% $11,879,482 $11,736,856-1.20% Add 1 Through Lane on Inside (To Existing) with 5' Sidewalk, and Curb & Gutter $1,683,088 $1,759,585 4.55% Add 1 Through Lane on Outside (To Existing) with 5' Sidewalk, and Curb & Gutter $4,500,989 $4,760,121 5.76% Add 300' Exclusive Left Turn Lane $127,134 $135,418 6.52% Add 300' Exclusive Right Turn Lane $274,245 $283,996 3.56% Total $92,589,884 $95,469,645 3.11%