The Follo Line Project



Similar documents
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

The Gotthard Base Tunnel

2008 On track for More! Photo: RuneFossum,Jernbanefoto.no

2013 On track for more!

Member Nation Report 2010 from Denmark.

2012 On track for more!

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Tendering of passenger rail traffic in Norway

Membrane for tunnels and underground construction

How will the construction of the City Line affect you? English

TBM CROSSING OF STATIONS

Transport planning in the Stockholm Region

Background to the Norwegian Ministry of Transport and Communications support for the measures

Environment Committee 11 January 2016

Wilmington to Newark Commuter Rail Improvement Project

Preparing for the Fornebu Metro Line. Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016

Alphington sewer replacement

Tunnelling & Underground. Specialists

Newsletter: Construction Information, No June 2010

Alignment design for Citybanan in Stockholm

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

TRAFFIC MANAGEMENT PLAN

LVT System for. AlpTransit Gotthard AG

Banebranchen New line Copenhagen-Ringsted

Track and Track Drainage Renewals Programme

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

Opportunities. Railway Transportation (Engineering and Operations) Areas of Study. University of Kentucky

How To Increase Vehicle Height Of A Tunnel In Daugherd Port

Three minutes about the City Line the commuter train tunnel that will make life easier and greener

Cathkin Relief Road Planning Statement

Stouffville Corridor Rail Service Expansion

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland , 2006

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Policies and progress on transport access, including access for the rural population and low-income households

OPENING THE DOOR TO EUROPE AND THE WORLD

E6 Trondheim-Stjørdal, the Trondheim section.

fëëìé=m~ééê aê~ñí=`çêéçê~íé=mä~å=omms=ó=omnm= 1. Issue Name 2. Contributors

SYSTEMWIDE REQUIREMENTS

PROJECT PREPARATORY TECHNICAL ASSISTANCE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Introduction to. Aalborg s Sustainability Strategy

CONSTRUCTION SEQUENCE & PROGRAMME

Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø

Granger Bay Boulevard and Green Point Roundabout

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

This is why the Swedish Transport Administration was formed

The Norwegian High Speed Rail Assessment

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Railway Business Strategy and R&D in Europe

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

The future is already here

TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company

Traffic Management During Construction

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

Key figures Norwegian Public Roads Administration

Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

MELBOURNE METRO RAIL NEWSLETTER

Milan M5 metro extension the construction of Lotto station

Speed Limit Policy Isle of Wight Council

Success with three networks: SBB Infrastructure. InnoTrans 2012.

A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

The Norwegian Point of View

Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too

ROSTHERNE TO MANCHESTER PICCADILLY

A targeted market strategy for tram and metro in Oslo?

Promote sustainable development and energy conservation. Facilitate the operation and use of public transport.

Why build the Silvertown Tunnel?

GTA Cordon Count Program

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

LETBANE PÅ RING 3. Information about the public procurement process

The complete provider for. Gauging Products and Measurement Systems

The future development of air transport in the UK Make your views known

INVITATION FIA EUROPEAN TRAFFIC EDUCATION CONTEST (ETEC) 5 7 SEPTEMBER 2014 LILLESTRØM, NORWAY

Working together to improve beach water quality. Fixing our. public and private. sewers

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

701.14AP Route Planning

SUMMARY OF HYDROGEN STRATEGY AKERSHUS AND OSLO

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE

Guidelines for Attractive Public Transport with a Focus on BRT

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

BEST VALUE REVIEW WINTER MAINTENANCE SERVICE

Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.

Entreprenørdagen 14. mars 2011

Proven Methods and state-of-the-art technology. Tunnelling & Underground Structures

State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work

Company Profile.

4 SPADINA SUBWAY EXTENSION UPDATE

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

PROPOSAL FOR A EUROPEAN ACCESSIBILITY ACT DIRECTIVE: UITP COMMENTS

2. Project Context Background TJHD Scope Previous Engagement with Businesses... 9

Transcription:

The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1

2 the follo line project

The project The Follo Line Project is currently the largest transport project in Norway and will include the longest railway tunnel in the Nordic countries. The new double track rail line forms the core part of the InterCity development southwards from the capital. The Follo Line tunnel will be Norway s first long twin tube rail tunnel and one of the first to be constructed using tunnel boring machines. The project includes: new double track line between Oslo Central Station and the public transport hub at Ski 20 km long twin rail tunnel extensive work at Oslo Central Station construction of a new station at Ski and surface alignment necessary realignment of the existing Østfold Line, both on the approach to Oslo Central Station (with a new tunnel), and between the new Ski Station and the future tunnel for the Follo Line The main construction work will start in 2015, with completion in the end of 2021. Important preparatory work with the alignment of the new line and the construction sites, are soon to be finished. the follo line project 3

4 the follo line project

Overview Efficient and forward-looking The Follo Line Project in total will comprise around 64 km of new railway tracks. The new double track line from Oslo to Ski will be 22 km long, and designed for speeds up to 250 km/h. The line will make it possible to reduce the journey time between Oslo and Ski by 50 % (from 22 to 11 minutes). The double track line will be an efficient, safe and environmentally-friendly transport system. From a railway engineering perspective, constructing new lines in the densely trafficked metropolitan area around Oslo Central Station is a major challenge. Much of the work will be undertaken without disruption to the daily flow of traffic to and from this busy station. An urban challenge The Follo Line Project comprises four tracks to Oslo Central Station, which is Norway s largest public transport hub. Trains on the new Follo Line will run directly between Oslo and the public transport hub at Ski. In tandem with the Østfold Line, which currently runs between Oslo and Ski, the Follo Line will give improved service to passengers. Growth and the environment The Østfold Line has reached its capacity limit. Simultaneously, a population growth of at least 30 % is anticipated in this region by 2025. The Follo Line will link residential and working areas together effectively and contribute to development in the region. A large scale project The Follo Line Project is comprehensive. Several different operations will be undertaken simultaneously, deadlines will need to be met and the project faces exciting challenges in terms of logistics and management. During the construction phase, a large scale project of this nature will affect people, nature and the environment. It is required to cause as little impact as possible. Properties that might be affected are monitored. Groundwater is monitored electronically. Thorough planning is essential in order to restrict the negative impact on the surroundings. Meanwhile progress and costs must be closely monitored. From road to rail The Follo Line will provide capacity for more freight trains. Around 80 % of land-based transport of heavy goods in and out of the country passes through the county of Østfold. The bulk of this traffic is currently handled by freight vehicles. One freight train can transport the same volume as around 24 heavy goods vehicles. the follo line project 5

Challenges and requirements The Follo Line Project construction areas: Oslo Central Station: Between Oslo Central Station and the tunnel, construction of the Follo Line must accommodate other rail traffic in and out of Oslo Central Station. The line will be constructed with connections to several platforms. The line will be constructed with connections to several platforms. In addition restrictions concerning the Medieval Park in Oslo must be taken into account, as this is of great archaeological and historical significance. The Directorate for Cultural Heritage in Norway, Oslo Municipality and the Norwegian National Rail Administration have reached a joint solution for conservation measures regarding both the introduction of the new Follo Line and the new tracks for the Østfold Line through an area known as Klypen. This will provide the opportunity to establish a park area almost twice the current size. The tunnel: The bored section of the tunnel represents 19.5 km. The tunnel, which will pass beneath the Ekeberg Hill in Oslo, is about to become the longest railway tunnel to date in the Nordic countries. 6 the follo line project

Excavation shall be performed by means of four hard rock shielded tunnel boring machines (TBM). This will be one of the first railway tunnels in Norway to be excavated by TBM, a technology that is otherwise common in the excavation of long tunnels in Europe. In addition, drill & blast techniques will be utilised for some of the tunnel work on the Follo Line Project. Important criteria for the long tunnel: impermeable and safe long service life minimum maintenance requirements maximum up-time (to ensure reliable traffic) minimum impact on the local environment during the construction and in operation willingness to embrace technological solutions, skills upgrading and development The tunnel will comply with inter-european safety requirements for long tunnels with cross passages approx. every 500 metres to be used as escape routes. The life expectancy of the tunnel will be at least 100 years. the follo line project 7

8 the follo line project

TBMs are well suited for the construction of this tunnel due to: the tunnel s length the rock characteristics generally adequate cover/overburden access to a large rigging area suitably located in relation to the tunnel and to the main road system limits the number of cross cut tunnels in populated areas The tunnel will become the first long rail tunnel in Norway with twin tubes to facilitate: access to future operation and maintenance optimum train/traffic handling safety-evacuation TBM technology Drill & blast is the most common method used in tunnel construction in Norway. In the 70s and 80s, tunnel boring machines were also utilized although these were less complex and mainly used to excavate hydro-electric power tunnels. The decision to use TBM paves the way for alliancebuilding, skills upgrading and innovation as both national and international participation is most likely in this project. Quality and rock conditions Tunnel boring is a system comprising precast impermeable concrete elements installed in a closed ring to ensure protection from rock fall, as well as water and frost. The space behind the concrete elements is filled with cement grout to seal the gap between the rock face and the ring. Production and installation of concrete elements will form part of an industrialised process. This will help ensure a high and consistent quality of components, as well as the actual installation process. From a life cycle perspective, precast concrete elements in a closed ring will require less maintenance than the more traditional form of rock support using bolts and shotcrete. Choosing machinery that is suited to the ground conditions and a crew experienced in operating under similar rock conditions, is essential. Extensive knowledge of ground conditions is an important prerequisite to success. One major construction site The rig area at Åsland, a rural site on the outskirts of Oslo, will include facilities for production of precast concrete segments. From the rig area two TBMs The decision to use TBMs paves the way for alliancebuilding, skills upgrading and innovation. the follo line project 9

The new Ski Station will be built with six tracks and three central platforms, a new pedestrian underpass, a new road bridge, bus terminal and enlarged car park. will be working towards Oslo Central Station to be connected to convensionally blasted tunnels in the Ekeberg Hill. A further two TBMs will be working in a southerly direction toward Ski to be connected to a future cut and cover section. The entire TBM tunnel constructions will be accessed and supplied via two access tunnels at the rig area. All four TBMs will be launched from assembly caverns constructed at the bottom of these access tunnels. Together, the access tunnels will cater for traffic to and from the main tunnel, as well as removal of excavated material by belt conveyors to the rig area. The tunnels are also important to secure air supply to the main tunnel. The assembly chambers for the TBMs will be reused as future rescue and evacuation facilities. The TBM assembly chambers and the access tunnels will be constructed utilizing drill & blast techniques. The tunnel sub-project comprises all conventional made tunnels in the Follo Line Project, i.e. the relocation of the inbound Østfold Line, inner part of the twin tunnel, a number of crossings with existing tunnels and roads and a three-track tunnel at the interface with the work to be made at the Oslo Central Station. Open section and the new Ski Station: The Follo Line will run along a 1.5 km open section south of the tunnel before reaching the public transport hub at Ski. Retaining walls and culverts (concrete tunnels) will be built along this section, and it will be necessary to realign the Østfold Line in order to achieve efficient train operation. Within the station area itself, the new Ski Station will be built with six tracks and three central platforms, a new pedestrian underpass, a new road bridge, bus terminal and enlarged car park. Accessibility, efficient transport and integration into the urban landscape are important factors to the Norwegian National Rail Administration. 10 the follo line project

the follo line project 11

Excavated materials a resource During construction of the Follo Line, around 10-11 million tons of rock spoil will be removed within a period of around 3-3.5 years. Contractors are required to reuse excavated material. This will include the use of suitable excavated materials for segment production. From an environmental and social perspective, it is important to achieve the most effective utilisation of resources. A minimum of transport and safe transport of excavated material is necessary in order to minimize the impact on the local environment. From an environmental perspective, it is advantageous if excavated materials can be of use at Åsland, or be transported from this rig area, which has direct access to the E6 European highway. Contractors will be required to maximise the reuse of excavated material wherever possible. More sustainable transport Trains are the most environmentally friendly mode of transport we have, if we disregard cycling and walking. However, the construction of rail lines burdens the environment. Therefore the Follo Line Project imposes environmental requirements, in accordance to Norwegian laws, regulations and the corporate goals of the Norwegian National Rail Administration. The main requirements are aimed at transport of the excavated material, noise protection during the construction phase and considerations regarding vulnerable species and the groundwater. The best contractors The Follo Line Project has invited to tender for four EPC contracts, both nationally and internationally, in addition to the Signal contract (frame agreement). EPC is an acronym for engineering, procurement and construction. This is a recognized contracting arrangement within the construction industry, adapted for the Norwegian National Rail Administration by the Follo Line Project. All contracts are scheduled to be signed in 2015. The project is split into the following EPC contracts: Oslo Central Station, conventional blasting of rail tunnels in the Ekeberg Hill, TBM excavation of the twin tube rail tunnel, Ski station/open section and Signal. Important preparatory work with the alignment of the new line and the construction sites will be completed in summer 2015. Based on the size of the project, a suitably adapted contract strategy has been formulated. General contractors will be used as much as possible. Simultaneously the Norwegian National Rail Administration s expertise will be leveraged and the role as developer will be cultivated. The Norwegian National Rail Administration would like to encourage cooperation and competence building that may benefit the further construction of rail lines in the InterCity triangle and further strengthen Norwegian tunnel-building expertise on the international stage. The Follo Line Project is developed by the Norwegian National Rail Administration under commission from the Ministry of Transport and Communications. 12 the follo line project

The Follo Line Project: Five EPC contracts Oslo S Tunnel Langhus-Ski D&B TBM EPC contract no. 1 EPC contract no. 2 EPC contract no. 3 EPC contract no. 4 Civil work Civil work Civil work Civil work + Railway systems + Railway systems + Railway systems Signal (Frame-agreement) the follo line project 13

Facts about the Follo Line Project currently Norway s largest transport project 22 km new double track line from Norway s capital to the Ski public transport center will comprise a 20 km long tunnel; Norway s longest railway tunnel to date and the first long railway tunnel to have separate tubes one of the first railway tunnel in Norway to be excavated with tunnel boring machines (TBM) the project includes extensive works at Oslo Central Station and the construction of a new station at Ski includes the necessary realignment of tracks for the existing Østfold Line on the approach to Oslo Central Station and between the tunnel and the new Ski Station will comprise the construction of around 64 km new railway tracks provides increased traffic capacity to/from Oslo will enable a 50 % reduction in journey time Oslo-Ski designed for speed up to 250 km/h important preparatory work started in 2013 main construction phase commence in 2015 scheduled for completion in 2021 forms the core part of the InterCity development southwards from Oslo may be combined with a possible high-speed line to the continent 14 the follo line project

the follo line project 17

Jernbaneverket/Norwegian National Rail Administration The Follo Line Project P.O. Box 217, Sentrum N-0103 Oslo Telephone: (+47) 05280 Design: REDINK Photo/Ill.: Jernbaneverket Hilde Lillejord/Øystein Grue / The Swedish Transport Administration / Herrenknecht AG / Ostra / Metropolitan Transportation Authority / AlpTransit Gotthard AG February 2015 2 the follo line project www.jernbaneverket.no/follobanen