State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work
|
|
- Daisy Davis
- 8 years ago
- Views:
Transcription
1 Description of work Sicily Tunnel Caltanissetta Year: 2013 In progress Client: Anas s.p.a. Contractor: Empedocle 2 s.c.p.a. Total length: 28 km Works amount: ,00 Activities: Construction design and technical assistance Main works: - 5 artificial tunnels - 4 natural tunnels - 13 viaducts - 10 overpasses Design speed: Km/h Longitudinal slope: Max 4.2% Bending radius: Min. 800 m
2 Technical features Caltanissetta natural tunnel length Diameter Final inner diameter Cover about 3900m for each tube Ø15.08 m Ø13.60 m min.15 m max.130 m
3 Geomechanics tunnel profile SLN GER TRB TRVB GLT1 SLN - Lannari s sand GER - Geracello s marneous clay TRBA/B - Trubi GLT1 - Bedrock limestone TRVA/B - Marneous clay and clayey marne
4 Geotechnical tunnel data The following tables show the main parameters used in the project deriving from surveys along the route layout. Hydrogeological parameters Geotechnical parameters
5 Final design Excavation works using a TBM diameter 13,40 m + Stop emplacements every 600m obtained through traditional widening excavation More reinforcement D.M. 5/11/2001 Par According to italian D.M. 5/11/2001, tunnels longer than 1000m must have stop emplacements every 600m for each driving direction.
6 Modification for technical improvement Excavation works using a TBM diameter 15,08 m + Continuous hard shoulder D.Lgs. n 264/2006 Par If the construction features of the tunnel do not allow the realization of stop emplacements, or it turns out to be very expensive, then emplacements can be replaced with another lane.
7 THE ART METHOD ANALYSIS OF TECHNICAL RISK FOR THE TUNNEL PROJECT THE ACQUISITION AND EVALUATION OF GEOLOGICAL AND GEOMECHANICAL DATA IDENTIFY AND EVALUATE THE PRINCIPAL RISK FACTORS AND THE DIVISION OF THE UNDERGROUND IN UNIFORM SECTIONS STATISTICAL PROCESSING OF SIGNIFICANT GEOTECHNICAL PARAMETERS Cost (euro) Area of responsibility of the Contractor times-costs 4 VARIABILITY PROGRESS SPEED OF TBM Time (day) 5 MONTE CARLO METHOD 6 GRAPHICAL REPRESENTATION OF TIME AND COSTS
8 State Route 640 ANALYSIS OF RISK ZONES ALTERNATIVE BETTER TECHNOLOGY FINAL DESIGN Tunnel realized with TBM (diameter of 15,08 m) Time % Time % Tunnel realized with TBM (diameter of 13,40 m) Cost % simulation excellent Cost % bad good simulation excellent bad good
9 ANALYSIS OF RISK ZONES Comparing tunnel with diameter 15,08 m and tunnel with diameter 13,40 m Time % Cost % Tunnel Tunnel Tunnel Time Cost Tunnel Time Cost
10 FINAL LINING PRECAST CONCRETE SEGMENTS - LOADS Casting the lining segments Removal of the forms Handling TBM trust Standard Assembly of ring Transport Assembly defect Storage Earth loads Fire loads Vibration The forces acting on the segments in a tunnel are the result of both transitory conditions such as those of the transport, placing and thrust of the jacks, and permanent forces such as the earth pressure when in service or the fire load generated as the result of an accident.
11 SEGMENTS FEM MODELLING TBM TRUST Finite element analysis (FEM) was performed on the stressstrain state under the different load conditions to which the prefabricated components are subjected during their normal life. In this situation the concrete segments are subjected to very strong loads which are borne under poorly defined conditions due to unavoidable irregularities in the plane in which they bear against the previous ring and to possible assembly faults already mentioned.
12 Analysis of the thrust phase under theoretical and therefore optimum conditions. SEGMENTS FEM MODELLING TBM TRUST In presence of assembly defects and/or exceptionally high thrust values. ASSEMBLY DEFECTS DEFORMATION DEFORMATION STRESS STRESS TRACTION TRACTION
13 CONCRETE SEGMENTS FIRE RESISTANCE POLYPROPYLENE FIBRES The polypropylene fibres low resistance to fire can be exploited as an advantage to reduce the problem of spalling in high strength concretes.
14 FIRE EXPERIMENT WITH THE BODY OF A CARRIAGE FROM LINE C OF THE ROME METRO An experiment was conducted at the Montelibretti school for fire-fighters designed to seek the best solution from the viewpoint of fire resistance and consequently of safety for tunnel users in cases of emergency.
15 FIRE EXPERIMENT WITH THE BODY OF A CARRIAGE FROM LINE C OF THE ROME METRO FIRE EXPERIMENT WITH THE BODY OF A CARRIAGE FROM LINE C OF THE ROME METRO The test tunnel was constructed, partly using prefabricated concrete some of which containing fibre additives, and partly using segments cast in situ in order to test different lining combinations. The design specifications for the part of the tunnel (14 segment rings) in which the carriage body to be sacrificed was positioned were as follows: 6 rings with completion of the upper half-ring cast in situ; 8 rings constructed using different types of concrete containing steel bars and/or polypropylene fibre additives; 7 rings starting from the centre protected with Fireshield the fire resistant mortar.
16 State Route 640 FINAL LINING PRECAST SEGMENTS RENFORCEMENTS PLAN CONTRAST TO EARTH LOADS FIRE LOADS SECTION B-B DETAILS CONTRAST TO TBM TRUST
17 THE TBM OPERATION STAGE 1. SHIELD 2. CUTTERS AND FOAM INJECTORS 3. EXCAVATION CHAMBERS UNDER PRUSSURE 4. HYPERBARIC CHAMBER 5. JACKS 6. AUGER FOR SPOIL REMOVAL 7. ERECTION SYSTEM 8. PRECAST SEGMENTS A TBM consists of a rotating cutterhead within a cylindrical steel shell that is pushed forward along the axis of the tunnel while excavating the ground through the cutterhead. The steel shield supports the excavated ground as required until the final tunnel lining is built in the rear of the shield. The shield is propelled using hydraulic jacks that thrust against the erected tunnel lining system. Earth Pressure Balance Machines (EPBMs) are shield machines specially designed for operation in soft ground conditions containing water under pressure Pressure-face TBMs that are capable of exerting a balancing pressure against the tunnel face are used to control excavation rates and groundwater inflow, as well as to maintain stability of the tunnel face.
18 State Route 640 THE TBM TBM FEATURES THE FEATURES SHIELD DIAMETER 15,03 m ROTATING HEAD 0-1,9 rpm MAXIMUM TORQUE KNm MOTORS 21 JACKS 51 MAXIMUM THRUST KN EXCEPTIONAL THRUST KN MOTORS POWER 348 KW TOTAL POWER 7656 KW NUMBER OF CUTTERS 516 MAX WORKING PRESSURE 5,5 bar BACKUP 5 TRACKS BACKUP WEIGHT >850 TON
19 THE TBM FEATURES THE TBM FEATURES TBM pictures from the construction site.
20 State Route 640 MONITORING SYSTEM Natural tunnel Current section Special monitoring type 1(MS1) Natural tunnel Current section Special monitoring type 2(MS2) Natural tunnel Current section Final lining monitoring (MD) Cross section Legend Total pressure cell Strain gauges Piezometer
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
More informationMilan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy giuseppe.lunardi@rocksoil.com Luca MANCINELLI, Rocksoil S.p.A., Italy, luca.mancinelli@rocksoil.com Massimiliano
More informationThe Performance Prediction of a TBM in Tuzla - Dragos Sewerage Tunnel
The Performance Prediction of a TBM in Tuzla - Dragos Sewerage Tunnel N.Bilgin, C.Balcı, Ö.Acaroğlu, H.Tunçdemir & Ş.Eskikaya Department of Mining Engineering, Technical University Of İstanbul, Turkey.
More informationTunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
More informationHIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAYS AND TUNNEL LININGS. HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAY AND ROAD TUNNEL LININGS.
HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAYS AND TUNNEL LININGS. HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAY AND ROAD TUNNEL LININGS. The vehicle developed by Euroconsult and Pavemetrics and described
More informationSPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
More informationMINIMIZING DEFECTS OCCURRENCES ON SFRC TUNNEL SEGMENT OF KLANG VALLEY MRT PROJECT
Journal of Engineering Science and Technology Special Issue on 4th International Technical Conference 2014, June (2015) 13-23 School of Engineering, Taylor s University MINIMIZING DEFECTS OCCURRENCES ON
More informationStructural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel Lining Segments
International Journal of Scientific and Research Publications, Volume 5, Issue 7, July 2015 1 Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel
More informationMETHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
More informationModelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring
Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring Giona Preisig*, Antonio Dematteis, Riccardo Torri, Nathalie Monin, Ellen Milnes, Pierre Perrochet *Center for Hydrogeology
More informationTBM CROSSING OF STATIONS
TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important
More informationSany Tunnel Boring Machines
Sany Tunnel Boring Machines 3 CORPORATE CULTRUE Mission Build a top Company, Foster top employees, Make top contributions Spirit Progress constantly, Develop national industry Core Value Morality first,
More informationby Morgan Anamoah & Martin Feeney
The Lee Tunnel - TBM Launch one of the most complicated TBM launches ever undertaken to prevent 16m cubic metres of storm water and sewage being discharged annually by Morgan Anamoah & Martin Feeney T
More informationCEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
More informationDESIGN AND EXECUTIVE ASPECTS OF THE CONSTRUCTION OF THE LINE 1 OF THE NAPLES METRO
DESIGN AND EXECUTIVE ASPECTS OF THE CONSTRUCTION OF THE LINE 1 OF THE NAPLES METRO Pietro Lunardi 1, Giovanna Cassani 2, Claudio De Giudici 2 1 Lunardi s Geoengineering Office, Milan, Italy 2 Rocksoil
More informationThe Performance Prediction of A TBM in Difficult Ground Condition
The Performance Prediction of A TBM in Difficult Ground Condition Nuh BİLGİN, Cemal BALCI, Hakan TUNÇDEMİR, Şinasi ESKİKAYA Department of Mining Engineering, Technical University of İstanbul, Turkey. Mustafa
More informationCompany Profile. www.totospa.it
www.totospa.it Table of contents 1 Toto Group Structure 2 Toto S.p.a. Costruzioni Generali: Overview 3 Business Interests 4 5 6 7 8 Toto s Strength: Know How Toto s Technological Assets The Construction
More informationLymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety
More informationINSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
More informationRisk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy
Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy ITA CBT Seminario SAT2008 Sao Paolo, June 25 2008 1 Contents Peculiar aspects of Tunnelling in urban areas
More informationChapter 5 Bridge Deck Slabs. Bridge Engineering 1
Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid
More informationEstimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
More informationSTRUCTURAL HEALTH MONITORING AT ROME UNDERGROUND, ROMA, ITALY
Ref: WhP_Rome_vA STRUCTURAL HEALTH MONITORING AT ROME UNDERGROUND, ROMA, ITALY WHITE PAPER Summary: This white paper shows how Structural Health Monitoring (SHM), helps to improve the quality in the construction
More informationGOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
More informationDMU 75 / 95 monoblock
www.dmgmori.com Five-axis universal milling machines DMU 75 / 95 monoblock High tech as standard Five-axis simultaneous machining at the best price. DMU 75 / 95 monoblock Top features for five-axis simultaneous
More informationMonitoring of cutting tools in TBM S
Monitoring of cutting tools in TBM S Thomas Edelmann Herrenknecht AG Tunnelbauforschung in Leoben, Schwanau und Bochum Workshop am, Ruhr Universität Bochum) CONTENT A. Introduction B. Cutting tools C.
More informationHow To Calculate Tunnel Longitudinal Structure
Calculation and Analysis of Tunnel Longitudinal Structure under Effect of Uneven Settlement of Weak Layer 1,2 Li Zhong, 2Chen Si-yang, 3Yan Pei-wu, 1Zhu Yan-peng School of Civil Engineering, Lanzhou University
More informationTUNNEL boring was originally attempted over 150 years
The advantages of tunnel boring : a qualitative/quantitative comparison of D&B and TBM excavation by Peter J Tarkoy, PhD, Geotechnical and Tunnel Construction Consultant and James E Byram, PhD, Senior
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationCIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
More informationGUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
More informationWorldwide network in over 40 countries.
Worldwide network in over 40 countries. April 2012 56 rue de Neuilly 93136 Noisy le Sec Cedex - France Tel : +33 (0)1 49 42 72 95 Fax : +33 (0)1 48 44 00 02 E-mail : contact@ptc.fayat.com PTC s vibrodrivers
More informationPrecision Miniature Load Cell. Models 8431, 8432 with Overload Protection
w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force
More informationSettlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
More informationA CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
More informationCurrent opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction
Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and
More informationFlowtite Jacking Pipe
U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe
More informationINDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
More informationDrained and Undrained Conditions. Undrained and Drained Shear Strength
Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained
More informationSYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things
More informationIntroduction of Duplex Pump HPD71+71 and Short-Stroke Pump HPV112+112
Shin-ichi Kamimura Komatsu has come up with a high-pressure, large-capacity, duplex swash plate pump, HPD71+71, as the main pump for PC160-7 and a short-length, tandem swash plate pump (short-stroke pump),
More informationTechnical Specification for Model RSK2503 (Z)-06A IR Belt Solar Cell Firing Furnace
Technical Specification for Model RSK2503 (Z)-06A IR Belt Solar Cell Firing Furnace TECHNICAL SPECIFICATION Model RSK 2503(Z)-06A IR Belt Solar Cell Firing Furnace Temperature Range 1. Max Temperature.
More informationLEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
More informationDevelopment of Tunnel Electrical Resistivity Prospecting System and its Applicaton
Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton HEE-HWAN RYU 1, GYE-CHUN CHO 2, SUNG-DON YANG 3 and HYUN-KANG SHIN 4 1 Professor, Korea Advanced Institute of Science
More informationMessina Bridge History MULTI-BOX STEEL DECKS AND SUSPENSION SYSTEM FOR VERY LONG SPAN BRIDGES THE STRAIT OF MESSINA CROSSING 1968 International competition of ideas announced by the Italian national roads
More informationSpecification for tunnelling third edition. The British Tunnelling Society and The Institution of Civil Engineers
Specification for tunnelling third edition The British Tunnelling Society and The Institution of Civil Engineers Published by Thomas Telford Limited, 40 Marsh Wall, London E14 9TP, UK. www.thomastelford.com
More informationTitan Makina Ltd. Şti. 1160. Sok. No: 9 Ostim 06370 Ankara Tel: + 90 312 354 9977 Fax: + 90 312 385 5611 Web: www.titanltd.com.
IS26 Concrete Spraying Machine IS26 Concrete Spraying Machine TECHNICAL SPECIFICATIONS Manipulator Max. vertical spraying reach : Max. horizontal spraying reach : Working lights : Spraying Head Rotation
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
More informationIntegrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects
Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects K. Chmelina 1, G. Krusche 1, G. Hesina 2 1 Geodata Ziviltechnikergesellschaft mbh, Leoben, Austria; 2
More informationKWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
More informationTBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company
TBMs for Norwegian Hydropower projects Sindre Log The Robbins Company Who am I? Sindre Log M.Sc. Civil engineering, NTNU Specializations in tunneling, geology and Project management Working out of Oslo,
More informationBUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
More informationInternational Journal of Engineering Research-Online A Peer Reviewed International Journal Articles available online http://www.ijoer.
RESEARCH ARTICLE ISSN: 2321-7758 DESIGN AND DEVELOPMENT OF A DYNAMOMETER FOR MEASURING THRUST AND TORQUE IN DRILLING APPLICATION SREEJITH C 1,MANU RAJ K R 2 1 PG Scholar, M.Tech Machine Design, Nehru College
More informationA study on the causes of troubles in shield tunneling site with numerical analysis
A study on the causes of troubles in shield tunneling site with numerical analysis 1 B.K. Rho, 2 S.Y. Choo, 2 M.K. Song Korea Rail Network Authority, Daejeon, Korea 1 ; Danwoo E&C Co., Ltd., Sungnam, Korea
More informationVerification Experiment on Cooling and Deformation Effects of Automatically Designed Cooling Channels for Block Laminated Molds
International Journal of Engineering and Advanced Technology (IJEAT ISSN: 2249 8958 Volume-4 Issue-5 June 2015 Verification Experiment on Cooling and Deformation Effects of Automatically Designed Cooling
More informationDIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More informationThe Kobold marine turbine: from the testing model to the full scale prototype
The Kobold marine turbine: from the testing model to the full scale prototype Guido Calcagno INSEAN Italian National Institute for Naval Architecture Studies and Testing (Rome Italy) Alberto Moroso Ponte
More informationIntegrated Manhole Ladder System
Application: This innovative product has been designed to provide safe access and egress to precast concrete manholes and inspection chambers. It can also be used within any other underground concrete
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationCHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
More informationHow to Design Helical Piles per the 2009 International Building Code
ABSTRACT How to Design Helical Piles per the 2009 International Building Code by Darin Willis, P.E. 1 Helical piles and anchors have been used in construction applications for more than 150 years. The
More informationNew construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations
from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and
More informationDUGARD. Machine Tools Since 1939. Dugard 400 Slant Bed High Precision CNC Lathe. www.dugard.com
DUGARD Machine Tools Since 1939 Dugard 400 Slant Bed High Precision CNC Lathe www.dugard.com Superb Performance, Maximum Stability, Maximum Reliability Precision, Power and Capacity Make the Dugard 400
More informationEngineering Survey System for TBM (Tunnel Boring Machine) Tunnel Construction
Engineering Survey System for TBM (Tunnel Boring Machine) Tunnel Construction, Hong Kong Key words: TBM, Tunnel Guidance System, Zigzag Traverse. SUMMARY For a TBM tunnel project, it is essential to establish
More informationSubminiature Load Cell Model 8417
w Technical Product Information Subminiature Load Cell 1. Introduction... 2 2. Preparing for use... 2 2.1 Unpacking... 2 2.2 Using the instrument for the first time... 2 2.3 Grounding and potential connection...
More informationMASTER DEGREE PROJECT
MASTER DEGREE PROJECT Finite Element Analysis of a Washing Machine Cylinder Thesis in Applied Mechanics one year Master Degree Program Performed : Spring term, 2010 Level Author Supervisor s Examiner :
More informationDynamic Load Testing of Helical Piles
Dynamic Load Testing of Helical Piles ANNUAL KANSAS CITY SPECIALTY SEMINAR 2014 JANUARY 10, 2014 Jorge Beim JWB Consulting LLC Pile Dynamics, Inc. Main Topics Brief description of the Dynamic Load Test
More informationWisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
More informationIncrease the efficiency of your rotating machines by optimizing your bearing lubrication
Increase the efficiency of your rotating machines by optimizing your bearing lubrication I. Introduction When designing oil lubrication systems for bearings, the classical criteria are the necessity for:
More informationThe Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
More informationREPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
More informationSJT / SJM / SJP Large Vertical Pumps
SJT / SJM / SJP Large Vertical Pumps The Heart of Your Process SJT, SJM, SJP Large Vertical Pumps Product Overview SJT Turbine Ns 1800 < 5000 nq 35 < 110 SJM Mixed Flow Ns 5800 < 8300 nq 113 < 161 SJP
More informationValue of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective
Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning
More informationB.TECH. (AEROSPACE ENGINEERING) PROGRAMME (BTAE) Term-End Examination December, 2011 BAS-010 : MACHINE DESIGN
No. of Printed Pages : 7 BAS-01.0 B.TECH. (AEROSPACE ENGINEERING) PROGRAMME (BTAE) CV CA CV C:) O Term-End Examination December, 2011 BAS-010 : MACHINE DESIGN Time : 3 hours Maximum Marks : 70 Note : (1)
More informationDATA MANAGEMENT SYSTEM FOR TUNNELLING
DATA MANAGEMENT SYSTEM FOR TUNNELLING A working tool for data acquisition, visualization AND Reporting 2 IRIS Integrated Risk and Information System A single software solution for integrated data management
More informationTechnical feasibility of the reconfiguration of 8-m class telescopes
Bulletin de la Société Royale des Sciences de Liège, Vol. 74, 5-6, 2005 Technical feasibility of the reconfiguration of 8-m class telescopes M. Kraus European Organisation for Astronomical Research in
More informationrhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr HUESKER HUESKER HUESKER HUESKERHUES Product- Portfolio HUESKER Engineering with Geosynthetics
HUESKER Engineering with Geosynthetics rhuesker HUESKER Product- HUESKER HUESKER HUESKER HUESKERr SKER HUESKER Portfolio HUESKER HUESKER HUESKER HUESKERHUES Engineering with Geosynthetics HUESKER Synthetic
More informationWhy measure in-situ stress?
C. Derek Martin University of Alberta, Edmonton, Canada Why measure in-situ stress? Engineering analyses require boundary conditions One of the most important boundary conditions for the analysis of underground
More informationTiguan Haldex All-Wheel Drive
Service Training Self Study Program 861803 Tiguan Haldex All-Wheel Drive Volkswagen of America, Inc. Volkswagen Academy Printed in U.S.A. Printed 3/2008 Course Number 861803 2008 Volkswagen of America,
More informationIntroduction. Eurocodes. Specification. Cost
Introduction Eurocodes Specification Cost Structural Eurocodes BS EN 1990 (EC0): BS EN 1991 (EC1): Basis of structural design Actions on Structures BS EN 1992 (EC2): BS EN 1993 (EC3): BS EN 1994 (EC4):
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationHow To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China (chenkezi@163.com, lujianming@263.net) Summary Analysis System for Bridge Test (Chinese
More informationFree Stall Cleaner System with Cable. A new generation of equipment and systems. GEA Farm Equipment Houle
Free Stall Cleaner System with Cable A new generation of equipment and systems GEA Farm Equipment Houle engineering for a better world GEA Farm Technologies SW Series Cable Drive Unit A new series of cable
More informationWORK SCOPE. Domains in which we work:
WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial
More informationIntroduction to JIGS AND FIXTURES
Introduction to JIGS AND FIXTURES Introduction The successful running of any mass production depends upon the interchangeability to facilitate easy assembly and reduction of unit cost. Mass production
More informationCardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
More information3D MODELLING OF GEOLOGICAL STRUCTURES FOR UNDERGROUND CAVERNS : A NEW AND SIMPLE METHODOLOGY
N 250 3D MODELLING OF GEOLOGICAL STRUCTURES FOR UNDERGROUND CAVERNS : A NEW AND SIMPLE METHODOLOGY P. VASKOU (Géostock) J. MORRUZZI (Géostock) 6 th ARMS (Asian Rock Mechanic Symposium) 23-27 October 2010
More informationChallenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
More informationOn-line Certificate in Tunneling
The University of Texas at Austin Presents On-line Certificate in Tunneling Endorsed By AT LEAST Director: FULVIO TONON Start date: September 1, 2011 25 CEUs (PENDING APPROVAL) http://lifelong.engr.utexas.edu/certificate.cfm
More informationOutline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.
MICROPILES SUBJECT TO LATERAL LOADING Dr. Jesús Gómez, P.E. Micropile Design and Construction Seminar Las Vegas, NV April 3-4, 2008 Outline When are micropiles subject to lateral load? How do we analyze
More informationGetec. The Geo Structural Monitoring Experts
Getec The Geo Structural Monitoring Experts Getec Getec specialises in providing instrumentation and monitoring solutions for a wide range of applications. We focus on producing reliable, repeatable data
More informationUnit 24: Applications of Pneumatics and Hydraulics
Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 2 HYDRAULIC AND PNEUMATIC CYLINDERS The material needed for outcome 2 is very extensive
More informationHow To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
More informationKuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany.
Herrenknecht All Around Multi-mode TBM Story Page 1 / Story Kuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany. Author: Adrian Greeman Photography: Ming Thein
More informationPositive Displacement Motors (PDM)
Positive Displacement Motors (PDM) 2 www.micon-drilling.de phone +49.5144.493671 MICON Downhole-Tools GmbH Breite Horst 19 29336 Nienhagen Germany Tel. +49.5144.493671 Fax +49.5144.493677 service@micon-drilling.de
More informationTRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES
TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION PIPEJACKING AND MICROTUNNELING NEW VERSION AUGUST 2005 1 OVERVIEW Pipe jacking and microtunnelling, including pilot
More informationWastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
More informationTool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014. 0414/Rö
Tool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014 0414/Rö Disclaimer The illustrations in this documents may deviate from the delivered product. We reserve the right to make changes due to errors
More information