1 Entreprenørdagen 14. mars 2011
2 Program Velkommen og litt å bite i Dagsorden 1200 Info om Fellesprosjektet v/ PL Taale Stensbye 1230 Entreprisene v/ Byggelederne 1330 Kontrakter/anleggsbetingelser v/ Ass PL Jan Ausland 1400 Vel hjem
3 Informasjonsmøte The travel time from Hamar to Oslo will (by full development of road and railway) be reduced by half an hour. Travel time train: about 1 hour Travel time by car: About 1 h and 20 min.
4
5 Upcoming projects E6 Stage 1 1,7 bil ,3 bil The Joint Project 3,9 bil Kolomoen Moelv 3,4 bil Ny Mjøsbru 1,0 bil? Dovrebanen Stage 1 The Joint Project 3,9 bil Kleverud Steinsrud 4,2 bil Amount new projects 14 bil
6 The Joint Project Informasjonsmøte - 3th. stage E6 - Gardermoen - Kolomoen - 1th. stage Dovrebanen - Eidsvoll Hamar - 21 km four-lane section of E6 road/17 km double track section of railway - Cost : 7,9 billion NOK - Early works in Construction of the main contracts starts in April The E6 opens in October The Dovre railway opens in October Compensatory works in 2016
7 Scope of work - 21 km four-lane E6-17 km double track railway - 3,7 km twin tube road tunnels - 4,6 km double track railway tunnels - 28 culverts/bridges - 17 km secondary road - 17 km pedestrian road (Mjøstråkk) - 2 service areas - Shoreline works parking/piers/access areas - Earth and rock excavation: about 6 mill. m3 Cost: 7,9 billion NOK Construction time: The E6 30 months/ The Dovrebane 42 months
8
9 Contracts
10 Time schedule and contracts 2011: Early works for Railway Technic spring : 3 civil works contracts, execution : electrical work, execution : Railway Technic, execution : Compensatory works, execution
11 Minnesund north
12 3D presentation by/ Henning Johnsen Design leader
13 Presentasjon entrepriser Grunnentreprise 1 v/ Byggeleder Kåre Nordsjø 2 v/ Byggeleder Elin H. Havik 3 v/ Byggeleder Terje Halbakken Jernbaneteknikk Forberedende arbeider v/ ass. prosjektleder Jan Ausland Jernbaneteknikk Hovedkontrakter v/ Jan Ausland
14 FP1 Langset-Brøhaug
15 FP1 Langset-Brøhaug 6,2 km four-lane E6 including the 630 m long Korslund tunnel (2 twin tube tunnels T9,5 profile).water- and frost protection with concrete elements. 5,1 km civil works for double track railway including the 610 m long Molykkja tunnel. Water- and frost protection with membrane and in-situ cast concrete lining Open cut and portal at the Ulvin tunnel (railway) The Langset crossroad flyover including bridge crossing the E6. 3 culverts crossing the road and railway about 6 km parallell secondary road, about 6 km pedestrian road on the rebuilt railway line and several access roads.
16 FP1 Langset-Brøhaug about 1,7 mill (design solid rock) volume of soil and rock excavation including tunnels about 0,8 mill (design solid rock) volume, soil and rock surplus will be used for noise barriers, landscaping and future railway south of Minnesund. Design and contract procedure Design is ongoing, performed by Vianova Plan og Trafikk Contract is assumed announced in early January 2012 (8 tender period) Contract award is assumed in the end of April 2012.
17 FP2 Brøhaug-Strandlykkja 5,7 km four-laned E6 included the Morskog tunnel, 2,3 km (Twin tube tunnel T 9,5 profil). Water- and frost lining with concrete elements. 6,6 km civil works for double track at the Dovre Railway included the 4,0 km long Ulvin tunnel and the 150 m long Morstu tunnel (ekskl. jernbaneteknikk) Water- and frost protection with membrane and in-situ cast lining. 2 access tunnels, total length 0,9 km and 2 pressure equalization shafts total length 260 m (the Ulvin tunnel) The access tunnels and the cuttings for road and railway tunnels will be built during early works in tunnel portals
18 FP2 Brøhaug-Strandlykkja 1 bridge for the E6 and 4 culverts under the road and railway Various works on secondary roads, access roads about 2,5 mill (design solid rock) volume, rock and soil excavation in cuttings and tunnels, minimal soil overburden. about 1 mill (design solid rock) volume, soil and rock in surplus. This has to be transported out of the area Design and contract procedure Design is ongoing by Norconsult Contract is assumed announced in early October 2011 (8 weeks tender period) Signing of contract in the middle of January 2012
19 FP3 Strandlykkja-Kleverud/Labbdalen 10,5 km four-lane E6 including the 690 m long Espa tunnel (Twin tube tunnel T9,5 profile), the southern part as cut and cover section. Waterand frost protection with concrete elements. 5,0 km civil works for the double track Db Strandlykkjakrysset flyover including bridge crossing the E6. Hestneskrysset flyover including a 110 m long bridge crossing the E6. Labbdalen bridges, 2 parallel bridges, width 11 m 4 tunnel portals
20 FP3 Strandlykkja-Kleverud/Labbdalen 10 culverts crossing the road and the railway, 1 pedestrian road crossing the E6 and 1 secondary road bridge over the Dovre railway at Strandlykkja. about 7 km parallel secondary road, and more acces roads. about 1,8 mill (design solid rock) volume of soil and rock excavation including the tunnel. about 1,5 mill (design solid rock) volume of soil and rock in surplus, has to be transported out of the area. Design og contract procedure Design is ongoing by Cowi AS Contract is assumed announced in medio November 2011 (10 tender period) Contract award planned early in March 2012
21 Early works Start Rock excavation along the Dovrebane in weekends when the trains are stopped. Estimate about mill. 2. Excavation of two access tunnels, shifting of secondary road (950 m) and preparing for rig area at Brøhaug (totalt 950m). Estimate mill. 3. Civil works for RA4 (watertreatment plant) and building of a new secondary road at Solheim. Estimate 4-6 mill 4. New secondary road on Hestnes. Estimate mill
22 Early works Railway Technic summer 2011 spring 2012 Aprox. 70 temporary foundations/masts Rearranging of contact line system included cross arms, anchoring wires, tensionings ++ Moving of one draining transformer. Moving of about 300 m return wire and bridging feeder Moving of about 1 contact line cut-out. Closing down Molykkja crossing track.
23 Main contracts Railway Technic Tracks : 16,6 km double tracks, 2 crossovers included.8 point switchers and 2 transition switchers (one in each end of the section) Contact line : system 25.with tower structures, AT-construction for both tracks, 4 locations for autotransformers, earthing systems along the section Power low-voltage/tele communication: power high voltage cables along the section divided on 11 transformers and electrical supply for technical buildings with installations. Similarly for tele communication along the section with fiber. Divided via tele communication buildings inside the technical buildings. Rearranging of GSM-R in new sections/tunnels. Control systems: ERTMS- compatible
24 Material delievered by employer : Track: rail, sleepers, switch sleepers included point drives, derailers. Contact line system : towers/travers, rail sontact line, carrying cable, Insulators for Tower Structures / Poles, breakers for contact line, autotransformer, AT-lines, cables. Tele communication equipment: GSM-R equipment Control systems: Construction in connection with temporary arrangements.
25 Contract strategy: FP 1, FP 2 og FP 3 (civil works) : Norwegian Standard 8406 unit price contracts Railway Technic contracts: Early works. Contracting by negotiation Contact line system and tracks. Contracting by negotiation Control system: Contracting by negotiation Power low voltage/tele communication. Contracting by negotiation Early works (civil works): Norwegian Standard 8406 unit price contracts
26 Progress FP1: Announced in January 2012, contract April 2012 E6 finished in November 2014, Dovre Railway finished 2015 and complementary works 2016 FP2: Advertising in October 2011, contract January 2012 E6 finished in November 2014, Dovrebanen finished 2015, complementary works finished 2016 FP3: Advertising in November 2011, contract March 2012
27 Terms and conditions Traffic on the E6 and the Dovre railway during construction Adjusted infrastructure for mass transport in fillings (DB) Restrictions for blasting close to the Db, always contact with safety person /train leader White hours Saturday night (about 6 hours) can be used for special works. Temporary arrangements at the Db at certain times (spring 2012, autumn 2013 and autumn 2014) Rearrangement of the E6 temporarily,closing during blasting for shorter periods Rearrangement of the E6 for permanent road through the Korslund tunnel Regulation for noise T 1442 applies. Safety regulations for work near/on tracks applies Main rig area will most probably be placed at Minnesund. Rig and landfill areas along the section
Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund
Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation
The Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016 Nina Tveiten Norwegian National Rail Administration The study has been conducted on behalf of: The Ministry of Transport and Communications The Municipality
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Preparing for the Fornebu Metro Line. Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016
Preparing for the Fornebu Metro Line Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016 Sporveien Norway s largest supplier of public transportation Unibuss AS Buss Revenue: 1 468 million Employees. 1
Coastal Highway Route E39 Project
Coastal Highway Route E39 Project Teknologidagene 22th September 2015 Trondheim Kjartan J Hove/ Jørn Arve Hasselø/ Harald I. Johnsen Norwegian Public Roads Administration Coastal Highway Route E39 E39
Scope of EN 1090-1 Clarification Document
Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
ERTMS - National implementation plan
ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release 09.07.2013 KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
Ordinance on Railway Infrastructure. General provisions. Article 1
Based on article 15, par. 4 of the Railway Law (Narodne Novine no. 123/03 and 30/04), the Minister of the Sea, Tourism, Transport and Development has issued Ordinance on Railway Infrastructure General
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
COWI s Role in the Copenhagen Metro Project
COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in
Slab Track Austria. System ÖBB-PORR elastically supported slab
Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.
Transmission Foundations Case History : Helical piles Hydro One Networks Inc.
Transmission Foundations Case History : Helical piles Hydro One Networks Inc. www.hubbellpowersystems.com Late in 2008, an aerial patrol discovered three 500kV towers with partially-collapsed foundations
Estimation of electrical losses in Network Rail Electrification Systems
Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE
Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November 2013. Juha Hyvärinen, Senior Scientist
InfraFINBIM / buildingsmart Infra Seminar 19 November 2013 Inframodel 3 (4-5) Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 2 The Finnish Inframodel To improve information exchange
WATERVIEW CONNECTION PROJECT. Ground Settlement WATERVIEW CONNECTION TEAM
WATERVIEW CONNECTION PROJECT Ground Settlement WATERVIEW CONNECTION TEAM Settlement What is it? Settlement is the lowering of ground level caused by a volume change or movement within the soil Shrinking
E6 Trondheim-Stjørdal, the Trondheim section.
Tendering processes E6 Trondheim-Stjørdal, the Trondheim section. ENGLISH october 2008 www.vegvesen.no/e6ost Contents 1 INTRODUCTION 1.1 Prequalification 1.2 National transportation plan 1.3 Resolutions
A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru
International Timber Bridge Conference Lillehammer, Norway September 12-15, 2010 A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru A summary of a workshop study Presented by : Ove Solheim
MILJØPAKKEN: Greener Trondheim Partnership for sustainable transport
MILJØPAKKEN: Greener Trondheim Partnership for sustainable transport 13th March 2013 Henning Lervåg Head of Miljøpakken 10 concrete, verifiable goals 1. Minimum 20 % reduction in CO 2 emissions from transport
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
ERTMS for a competitive railway
ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized
CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions
CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions Ove Solheim MSc - Norwegian Public Roads Administration ABSTRACT Feasibility studies
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
Application Form - Contracting Firm
Application Form - Contracting Firm This form is for civil construction and general contracting companies to apply for membership of Civil Contractors New Zealand Company s details CCNZ Branch you want
High Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
Project Portfolio. Tunnels & Shafts
Project Portfolio Tunnels & Shafts TUNNELS AND SHAFTS Southern Water Dover U.K. Foul water sewer interceptor tunnel, 1.6km long, turn key design and construct sub-contract using NATM technique value 1.1m
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY The term capitalized fixed assets includes land, improvements to land, easements, buildings, building improvements, vehicles, machinery, furniture,
Power transformers. Special transformers Railway
Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together
Coastal Highway Route E39 Project Overview
Project Briefing in Bergen 20 th January 2012 Coastal Highway Route E39 Project Overview Project Manager Olav Ellevset Norwegian Public Roads Administration (NPRA) but challenges abound The World s Longest..
Roadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
The Gotthard Base Tunnel
The Gotthard Base Tunnel The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually
TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company
TBMs for Norwegian Hydropower projects Sindre Log The Robbins Company Who am I? Sindre Log M.Sc. Civil engineering, NTNU Specializations in tunneling, geology and Project management Working out of Oslo,
Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014
Maliakos Kleidi Project Construction & Challenges faced Presentation to ELAC 2014 Dimosthenis Papakrivopoulos, Civil Engineer, Deputy Project Director of MKCJV 09.05.2014 Index Introduction The Project
The Mersey Gateway Project
The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes
IV. INDUSTRIAL TRACK DESIGN
IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
The Norwegian High Speed Rail Assessment
The Norwegian High Speed Rail Assessment February 2010 February 2012 Tom Stillesby 19th. May 2010 The Mandate The Norwegian National Rail Administration (NNRA) has been given a mandate by the Minister
Banebranchen New line Copenhagen-Ringsted
Banebranchen New line Copenhagen-Ringsted 11th May 2011 High speed Copenhagen-Ringsted High speed Copenhagen Ringsted first phase of The one-hour target Caracteristics Denmark s first High-Speed railway,
Discussion on Products under the Scope of EN 1090-1 and proposed CEN/TR to clarify the scope
CEN/TC 135 N 686 European Committee for Standardization Comité Européen de Normalisation Europäisches Komitee für Normung CEN/TC 135 Execution of steel structures and aluminium structures N 686 Secretariat:
Concept Evaluation, Cost Estimate and Uncertainty Analysis
High-Speed Railway Lines in Norway Concept Evaluation, Cost Estimate and Uncertainty Analysis Report 1: Basic assumptions and methodology, and calculations for the corridor Trondheim Oslo Report to Jernbaneverket
Operating Instructions
VMD202 Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the VMD202 as a safety reversing or presence detection system. The VMD202 requires that a vehicle be moving for detection.
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
Ontario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
Condition monitoring and condition-based railway Asset Management for High Speed lines
Fast track to Sustainable Mobility Condition monitoring and condition-based railway Asset Management for High Speed lines Stasha Jovanovic & Giuseppe Aurisicchio MER MEC S.p.A. Italy 1 Activities Object
Thoughts on Warm Mix Asphalt production (..among other things!)
Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate Contents of presentation Brief status for road maintenance
Member Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
Permissible ambient temperature Operation Storage, transport
The Sitras PRO combined DC protective unit and controller is used in the power supply for DC railways in mass transit and main-line systems up 3,000 V DC. It protects DC switch gear and contact line systems
Building Electrical Infrastructure
Building Electrical Infrastructure Industrial & Commercial Connections, Industrial / Urban Residential Development, Asset Relocation, Street Lighting Our Company Our vision is to combine electrical engineering
Dulles Corridor Metrorail Project
Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million
ATHENS METRO. Past, Present & Future ATHENS METRO LINES. 46 th ECCE Meeting Athens, 19 October 2007. Dr. G. Leoutsakos ATTIKO METRO S.A.
ATHENS METRO Past, Present & Future 46 th ECCE Meeting Athens, 19 October 2007 Dr. G. Leoutsakos ATTIKO METRO S.A. ATHENS METRO LINES HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING AND PUBLIC
GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)
GUARDRAIL CHECKLIST (most of this information can be found in the Design Scene) - When Salvaging Guardrail you need to pay attention to the pay item and what is actually being salvaged. (see other section
Brandangersundet Bridge A slender and light network arch
Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway [email protected] Rolf Magne Larssen, born 1958, received his Ph.D. in structural
Key figures 2006. Norwegian Public Roads Administration
Key figures 2006 Norwegian Public Roads Administration Table of contents About NPRA 4 Financial 7 Road sector challenges 8 Roads and traffic factsheet 2006 10 Principal activities 2006 13 Roadworks contractors
Tendering of passenger rail traffic in Norway
Tendering of passenger rail traffic in Norway Rail passenger service tender 1: «Sør» Overview of current services and traffic Sørlandsbanen line Jærbanen line Arendalsbanen line Rail passenger service
Norwegian Public Roads Administration. Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH
Norwegian Public Roads Administration Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH Golden Gate 1937 - Norwegian parliament 2006 It s 1937: The longest suspension bridge in the world, the Golden
M&EE Networking Group
COP0007 Issue 5 May 2014 Code of Practice for On and Off Tracking of Road-Rail Vehicles M&EE Networking Group No COP0007 M&EE Networking Group Code of Practice for Issue 5 On and Off Tracking of Road-Rail
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
ELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current
Spring Cage Feed-Through Terminal Blocks ST
Spring Cage Feed-Through Terminal Blocks ST The product family ST with the new spring cage system "mini spring" is extremely space-saving. Space is saved thanks to a clearly smaller spring system without
REGISTRATION OF INTEREST
A B C Adhesives and Sealants Advertising Air Cargo Transport Air Conditioners Air Conditioning Installation or Maintenance or Repair Services Air Filters Ambulance Services Arborist Services Architectural
CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE
CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE 8.1 SYSTEM 8.1.1 Armoured, screened underground cables are used for control communication in electrified areas to limit induction effect. 8.2
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015
On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015 Jernbaneverket is adopting new technology and new working methods in an increasing number of fields. A Norwegian railway tunnel is now being bored
NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)
NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors) tes: Where the words you, your or yours appear in this application, they mean the individual signing as applicant and the
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction
Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and
The following components are common to most cubicles; this example is an ABB HK cubicle.
4.0 CIRCUIT BREAKER CUBICLE Learning Objectives The circuit breaker cubicle is the component of the switchgear that holds the circuit breaker, and the controls and cabling for the distribution system.
Marketing day Bybanen in Bergen building stage 3
Marketing day Bybanen in Bergen building stage 3 Ole W. Mortensen Acting Director of Construction Hordaland Fylkeskommune Predictability Availability Quality The meeting today.. Is not a tender conference
World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India
World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India Rehabilitation of concrete lined tunnels using a composite sprayed liner with sprayed concrete and sprayable
PIPELINE / WIRE LINE PROCESS INSTRUCTIONS
PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the
Circuit Breaker LTB D with Motor Drive. Motor Drive. ABB PP/H/HV - Page 1. Ed 2006-04
Circuit Breaker LTB D with Motor Drive Motor Drive ABB PP/H/HV - Page 1 Ed 2006-04 Technology Traditional technology Traditional spring operating mechanism: Closing mechanism ABB PP/H/HV - Page 2 Tripping
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
TRAFFIC MANAGEMENT PLAN
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India SIX LANING OF CHANDIKHOLE JAGATPUR BHUBANESWAR SECTION OF NH-5 FROM KM 414.000 TO 419.000 AND FROM KM 0.000
Spatially Enabling an Asset Management Database
Spatially Enabling an Asset Management Database John Woollett, GIS Manager (Operations) Tube Lines Ralph Diment Intergraph UK Helen Neaves Intergraph UK Bruce Aquila Intergraph Introduction Background
INVITATION FIA EUROPEAN TRAFFIC EDUCATION CONTEST (ETEC) 5 7 SEPTEMBER 2014 LILLESTRØM, NORWAY
INVITATION FIA EUROPEAN TRAFFIC EDUCATION CONTEST (ETEC) 5 7 SEPTEMBER 2014 LILLESTRØM, NORWAY Brussels, 20 March 2014 Dear Friends, Children are one of the most vulnerable road users not only as passengers,
CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
Transit Oriented Development and Value Capture Hong Kong
UNESCAP Regional Expert Group Meeting on Sustainable and Inclusive Transport Development and 2 nd Asia BRTS Conference, 29 Sep 1 Oct 2014, Ahmedabad Transit Oriented Development and Value Capture Hong
Söderströmtunnel: immersion in downtown Stockholm, Sweden
Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion