CSA Z32 TESTING GUIDELINE AND PROCEDURES



Similar documents
Electrical Safety Tester Verification

INSTALLATION & SERVICE MANUAL. Display Panel

Essential Electrical Concepts

Arc Fault Circuit Interrupters Frequently Asked Questions

Fig. 1 Analogue Multimeter Fig.2 Digital Multimeter

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

Construction Electrical Terminology. Electricians

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Resistance, Ohm s Law, and the Temperature of a Light Bulb Filament

Polarity. Electrical Quals

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Parallel Circuits. Objectives After studying this chapter, you will be able to answer these questions: 1. How are electrical components connected

1587/1577. Insulation Multimeters. Technical Data. Two powerful tools in one.

Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers

User Guide. Model Insulation Tester / Megohmmeter

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Inch PowerVent LED Indicator Explanations & Troubleshooting Table

Test Before Touch Easier Said Than Done. Ken Crawford, DuPont Kent Haggerty, Dupont

Lab E1: Introduction to Circuits

Load Cell Troubleshooting

Electrical Safety Plugs What are the different types of plugs? Extension Cords What are some potential hazards involving extension cords?

Lab 3 - DC Circuits and Ohm s Law

i410/i1010 AC/DC Current Clamp

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

How Much Voltage Drop Is Acceptable?

November Stray Voltage Test Procedure for Electrical Contractors

Instruction / Installation Sheet DataComm Electronics WH-KIT Flat Panel TV Cable Organizer Kit with Duplex Power Solution

PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS

Technical Update TAA.TU Rev. 1

Electrical Grounding. Appendix C

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

ELECTRICAL INSPECTION BULLETIN (Effective )


Physics 3330 Experiment #2 Fall DC techniques, dividers, and bridges R 2 =(1-S)R P R 1 =SR P. R P =10kΩ 10-turn pot.

Contents. Document information

Experiment #3, Ohm s Law

Time Propane Pressure Drop Test Sign-Off Sheet

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

10 Multimeter. Users Manual

ELECTRICIAN TRADE REGULATION

CHAPTER 4 UTILITY SYSTEMS ELECTRICAL. Utility Systems Electrical. Main Panel

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Tankless Electric (RTE) Troubleshooting

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

PHYSICS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits

7. What is the current in a circuit if 15 coulombs of electric charge move past a given point in 3 seconds? (1) 5 A (3) 18 A (2) 12 A (4) 45 A

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

Title: Grounding and Bonding Rev-01

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

TC Grounding and Bonding for Telecommunications Systems

Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Parts list and Notes for making a 10 hp 240V single phase to 240V 3-phase converter.

Best Methods for Safe Hipot Testing

INSTALLATION GUIDE LOW VOLTAGE TRANSFORMER

OHM S LAW AND RESISTANCE

3 740 Wrist strap + shoe tester

Trouble-shoot and repair faults in low voltage electrical apparatus and circuits

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

City of Riverside Building & Safety Division Phone: (951)

Ground Resistance Clamp On Tester

VCE VET ENGINEERING STUDIES

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

M 140i. Multifunction Calibrator. Operation Manual

Equipment: Power Supply, DAI, Transformer (8341), Variable resistance (8311), Variable inductance (8321), Variable capacitance (8331)

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS

Loop Calibration and Maintenance

A Practical Guide to Dielectric Testing

Owner s Manual & Safety Instructions

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Square D Clipsal C-Bus Network Analyzer

Inspection and testing of portable electrical equipment

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements

ELECTRICAL SAFETY RISK ASSESSMENT

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Experiment #5, Series and Parallel Circuits, Kirchhoff s Laws

Tutorial on Safety Standard Compliance For Hipot Testing

Power Supplies. Overview. Measuring Electricity. Understanding Electricity. Two Types of Current. Powering the PC

Insulation resistance testing. A complete solution for every person.

Residential Electrical System Aging Research Project. Dave Dini Sr. Research Engineer Underwriters Laboratories

Troubleshooting and Diagnostics

County of Riverside Building and Safety Department

Lesson Plan. Parallel Resistive Circuits Part 1 Electronics

User's Guide. True RMS Industrial Multimeter

Section B: Electricity

Dielectric Withstand and Ground Bond Testers For Production Line Safety Agency Compliance Testing

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

Magnetic and Hydraulic-Magnetic Circuit Breaker 8340-G2...

Auto-ranging Digital Multimeter INSTRUCTION MANUAL

Current Transformers

Service Guide 12/27/03 TESTING, SERVICE & REPAIR GUIDE (For SH Space Heating Models & RA Water Heating Models)

HIGH VOLTAGE SHORE CONNECTION

5-Slot Housing and FrameSaver 9000 Series Access Carrier AC Power Supply Installation Instructions

ANALOG AND DIGITAL METERS ANALOG VS. DIGITAL METERS VOLTMETERS ANALOG AND DIGITAL

Testing Accessories. Test PaddleS. Insulated Socket Wrench Jumper Strips Test Lead Kit. Test Paddle Attachment Clips Plugs Binding Posts

October Safety Subject

Chapter 22 Further Electronics

Mobile Home Pre-Inspection Checklist

ELECTRICAL SAFETY Information Bulletin

Transcription:

PO Box 20020 Red Deer, AB T4N 6X5 Phone: 403.986.2939 Web: www.908eng.com July 9, 2012 CSA Z32 TESTING GUIDELINE AND PROCEDURES This document is intended to outline the various tests, procedures and preparations required to perform a successful CSA Z32 test. The code references noted refer to Canadian Standards Association Z32 09, Electrical Safety and Essential Electrical Systems in Health Care Facilities. This guide is not intended to be a detailed wiring reference or contractor field guide. Refer to your specific facility design drawings and specifications for further installation details. FACILITIES REQUIRED TO MEET CSA Z32: According to the Alberta Building Code STANDATA CEC-24 Canadian Electrical Code, Section 24 Patient Care Areas : Section 24 rules are to be applied to health care facilities beyond the traditional hospital locations including but not limited to dental clinics, physician s offices, and chiropractic clinics. Contractors should reference CAN/CSA-Z32 and consult with the facility practitioners, or the licensing body to determine the different patient care areas in a facility, when these areas have not been designated by an engineer CSA Z-32 refers to the following areas as patient care areas : (a) basic care area: a patient care area where body contact between a patient and medical electrical equipment is neither frequent nor usual. Examples include (i) patient examination rooms; (ii) patient rooms in a long-term care facility; and (iii) patient rooms in general, specialty, and rehabilitation hospitals where body contact between a patient and medical electrical equipment is neither frequent nor usual; (b) intermediate care area: a patient care area where body contact between a patient and medical electrical equipment is frequent or normal. Examples include (i) wards and treatment and examination rooms in general, specialty, and rehabilitation hospitals; (ii) renal dialysis units; (iii) areas for non-invasive electrodiagnosis (ECG, EEG, EMG); (iv) patient preparation areas; (v) physiotherapy departments;

(vi) ultrasound suites; (vii) dental clinics; (viii) chiropractic clinics; (ix) physicians offices; and (x) patient bedrooms; and (c) critical care area: a patient care area where the induction and maintenance of general anaesthesia routinely occurs in connection with the examination or treatment of patients, or where cardiac contact between a patient and medical electrical equipment is frequent or normal. Examples include (i) angiographic laboratories; (ii) cardiac catheterization laboratories; (iii) cardiac care units; (iv) emergency trauma units; (v) intensive care units; (vi) intensive care neonatal units; (vii) operating rooms; and (viii) burn units. If your facility falls under any of the above noted uses, Z32 design and testing is likely required. Z32 testing is typically performed on all receptacles and circuits serving the patient care areas. Receptacles outside of the patient care areas (ie. corridors, staff rooms, receptions, etc.) are usually not included as part of the Z32 tests. Contractors should refer back to their designer for specific requirements for installation and testing. As part of the Z32 testing, 908 Engineering Personnel will perform the following six tests generally in the order presented.

TEST #1: INSULATION RESISTANCE Using a megohmmeter, the insulation on each current carrying conductor associated with circuits supplying receptacles in patient care area is tested. The megohmmeter applies a high voltage supply (500VDC) to the conductor and measures the insulation resistance in Ohms (Ω). This test is performed at the breaker box. The ground side of the meter is connected to the ground bus bar and the live (hot) side of the meter is applied to the line and then then neutral circuit conductors. The measured insulation resistance is recorded and compared to the acceptable range. remove the breaker box cover(s) identify all circuits and circuit conductors supplying receptacles in patient care areas remove the neutral conductors from the ground bus bars and leave hanging if applicable, remove all ground fault interrupters (GFI) from the circuits to be tested Equivalent Test Circuit: (N/A) Fluke 1587 Insulation Digital Multimeter (2012) o ± (1.5% + 5 counts) accuracy o 0.1MΩ resolution o 0 2GΩ range not less than 10kΩ for the neutral conductor not less than 500kΩ for the line conductor. CSA Z-32-09: 5.3.2

TEST #2: CIRCUIT BREAKERS MECHANICAL OPERATION and IDENTIFICATION Each circuit breaker supplying receptacles in patient care areas is switched on and off at least 3 times to verify proper mechanical operation. The panel label and panel directory are also checked for completeness and accuracy. identify and label all circuit breakers supplying receptacles in patient care areas Equivalent Test Circuit: (N/A) (N/A) The breaker successfully makes and breaks the connection on each switch cycle The panel is labelled correctly and uniquely The panel directory is complete, accurate and accessible CSA Z-32-09: 5.5, 5.7.3, 5.7.4, 5.7.5

TEST #3: RECEPTACLE LABEL, COLOUR, GRADE, RETENTIVE FORCE and POLARITY Each receptacle in patient care areas will be noted for their label, colour, and grade. Corresponding circuit breakers are then switched to ensure circuit labels are correct. Each blade of each receptacle is then individually tested using a specialty force gauge to determine if the mechanical retention is within acceptable limits. Lastly each receptacle is subjected to a simple Line Neutral Ground polarity test to determine if each wire has been connected properly. permanently install and label all receptacles in patient care areas excluding cover plates Equivalent Test Circuit: (N/A) Standard generic incandescent receptacle polarity checker (TENMA 72-6862 or similar) SafePlug Electrical Retention Tester (Model 1700, calibrated daily) Receptacle label should include the circuit number and panel board Receptacle label shall be placed in a position where it is visible when the cover plate is in place, not likely to be painted over, and not placed on the cover plate itself Only plugs fed from an essential electrical system (ie. backup power) shall be red All receptacles shall be hospital grade and identified by a green dot on the face Ground pin retentive force shall be not less than 1.1N Each individual ungrounded blade retentive force shall not be less than 2.2N The combined two ungrounded pin retentive force shall not be less than 13N The live conductor shall be connected to the brass screw and the neutral conductor shall be connected to the silver screw. The bare bonding conductor shall be connected to the green / bare ground terminal CSA Z-32-09: 5.6.2, 5.6.5, 5.6.6 Canadian Electrical Code (CEC) 24-106 (5) & (6)

TEST #4: VOLTAGE DROP TEST UNDER LOAD Each receptacle in patient care areas is placed under a temporary load of 80% of the circuit breaker rating (12A on 15A circuits and 16A on 20A circuits). The loaded and unloaded voltages are recorded and a percentage voltage drop is calculated. The voltage drop percentage is then compared to the maximum allowable voltage drop as called for in the CEC. permanently install all receptacles in patient care areas excluding cover plates Equivalent Test Circuit: Voltmeter (V) Fluke 1587 True RMS Digital Multimeter (2012) o ± (2% + 3 counts) accuracy o 0.1mV resolution o 0 1000V range Ammeter (A) Fluke 375 True RMS AC/DC Clamp Meter (2012) o 2% ± 5 counts accuracy o 0.1A resolution o 0 600A range Voltage drop shall not exceed 5% of the unloaded voltage (3% preferred) CSA Z-32-09: 5.4.3 Canadian Electrical Code (CEC) 8-102

TEST #5: GROUND RETURN PATH VOLTAGE RISE Under no load, the ground to neutral voltage of each receptacle is measured and compared to the maximum allowable voltage difference by code. Also unloaded, the ground terminal to a local ground reference point is measured and compared to the maximum allowed voltage difference allowed by code. The ground to neutral terminal of each receptacle is then placed under a temporary load of 80% of the circuit breaker rating (12A on 15A circuits and 16A on 20A circuits). Under load, the voltage of the ground terminal to the local ground reference point is measured and compared to the maximum loaded voltage rise permitted by code. permanently install all receptacles in patient care areas excluding cover plates Equivalent Test Circuit: Voltmeter (V1 and V2) Fluke 1587 True RMS Digital Multimeter (2012) o ± (2% + 3 counts) accuracy o 0.1mV resolution o 0 1000V range Ammeter (A) Fluke 375 True RMS AC/DC Clamp Meter (2012) o 2% ± 5 counts accuracy o 0.1A resolution o 0 600A range Unloaded voltage V1 shall be less than 2V Unloaded V2 shall be less than 20mV Loaded V2 shall be less than 3V CSA Z-32-09: 5.9, 5.10.2

TEST #6: EXPOSED METAL PARTS BONDING VERIFICATION All metal parts installed within the patient care environment should be bonded to ground. This includes all electrical boxes, communication boxes, metal sinks, plumbing, medical gas lines, air / vacuum lines, light fixtures, air vents, etc.. Firstly, using the local ground reference as a base, continuity to ground is confirmed with an ohmmeter. Secondly, the voltage difference between the ground reference and the measurement point is measured and compared to the maximum allowed by code. completely install all bonding to all equipment in the patient care area remove cover plates including voice / data / CATV outlets in the patient care area Equivalent Test Circuit: (N/A) Voltmeter Fluke 1587 True RMS Digital Multimeter (2012) o ± (2% + 3 counts) accuracy o 0.1mV resolution o 0 1000V range Ohmmeter Fluke 1587 True RMS Digital Multimeter (2012) o ± (0.9% + 2 counts) accuracy o 0.1Ω resolution o 0 50MΩ range All exposed metal parts within the patient care area should have full continuity to ground The voltage difference from the ground reference shall be less than 20mV CSA Z-32-09: 5.9