Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components



Similar documents
Building Condition Assessment Report

17,280 square feet Overview:

Building Condition Assessment Report

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

October 5, 2015 Dear Client,

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Nominal Life Expectancy for Building Components

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Estimating Database Checklist

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

BUNKER HILL ELEMENTARY SCHOOL

Vision Home Inspection

Seattle Public Schools Building Excellence IV Projects Under Construction

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

MURCH ELEMENTARY SCHOOL

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

Facility Assessment Report, Montgomery Independent School District

Facility Assessment for East Main Street, Huntley, IL

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

KIEWIT CM/GC Enabling/Utilities

DRAPER ELEMENTARY SCHOOL

Near North District School Board. Condition Assessment. M A Wittick Jr PS, Building ID

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

How To Check For A Deficiency

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

Inspecting to a higher standard.

Property Condition Assessment

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

NAHB PRODUCT DEFINITION

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Slavic Village Building Condition Review

FORENSIC INVESTIGATION QUESTIONNAIRE

Chicago Public Schools

Estimated Useful Life (EUL) Tables

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

How To Plan A Building

Think Of Us First! When It s Time to Distribute Your Plans

Special Use Commercial Properties

PATTERSON ELEMENTARY SCHOOL

GENERAL PROVISIONS

Saint Cloud Business Center

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC TEL: (202) INITIAL PROJECT COST ANALYSIS

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION

Architectural Inspection Site Structures

INDUSTRIALS COLD STORAGE FACILITIES

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

PLUMMER ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

EAST LYME HIGH SCHOOL

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

NORTH PENN HIGH SCHOOL RENOVATIONS

MEMORANDUM. General: Foundation:

SECTION 3 ONM & J STRUCTURAL ANALYSIS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Crawford Inspection Services C.C.B. #

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

Project Close Out Summary

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

REPLACEMENT COST ESTIMATOR FORM

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

How to report a repair

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Transcription:

Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development Landscaping LKS 0//4 LKS 0//4 LKS 0//4 LKS 0//4 New Denny parking lot is on the north side of the Sealth/Denny lot. Asphalt pavement with concrete curbs and wheel stops. Lot striping and marking is in good condition. Concrete sidewalks, steps and ramps. Asphalt sidewalk around play field area. Chain link fencing around perimeter of school lot and at various locations. Painted steel railings near main entrance. Site has some grass, lots of trees and shrubs. Artificial turf at play field. Site Electrical utilities Exterior Lighting TAL 0//4 New style light fixtures at parking area and on building exterior walls. Print Date: 07/3/4 Page of

Facility Size - Gross 38,778 Construction Type Medium Year Of Original Construction 0 Year Of Last Renovation n/a Facility Use Type Middle School Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments A Substructure.0 Foundations Standard Foundations LKS 0//4 Typical spread concrete footing. Slab On Grade LKS 0//4 Conventional slab on grade. B Shell. Superstructure Floor Construction LKS 0//4 Steel beams with metal deck and concrete topping which are supported by steel columns and reinforced masonry walls. Roof Construction LKS 0//4 Open web steel joist with metal roof deck throughout except acoustical metal roof deck at the Gym. Exterior Closure Exterior Walls LKS 0//4 Metal stud wall, rain screen system with " air gap and exterior high pressure laminate composite panels. Bricks veneer and a small section of exposed cast in place concrete. Exterior Windows LKS 0//4 Double glazed aluminum window system with light shelf on the inside. Occupied spaces have operable windows. Exterior Doors LKS 0//4 Hollow metal doors and frames with ADA hardware. HM door frames are installed in the aluminum storefront system. Roofing Roof Coverings LKS 0//4 Hot rolled/mopped SBS roofing with green roof at some locations. Green roof areas have concrete pavers for walking path. Roof Openings LKS 0//4 Translucent fiberglass panel skylights. Projections LKS 0//4 Aluminum sunscreen on the outside. Print Date: 07/3/4 Page of 3

C Interiors.8 Interior Construction Fixed and Moveable Partitions LKS 0//4 Metal stud wall system with brick veneer at some location. Interior Doors LKS 0//4 Hollow metal doors and frames on corridors, utility, storage rooms and Gymnasium. Wood doors on hollow metal frames with ADA hardware, and stainless steel kick plates. Specialties LKS 0//4 Phenolic toilet partitions. Staircases Stair Construction LKS 0//4 Main stairs are steel structures with precast concrete treads. Other stairs are steel structure with concrete filled steel pan treads. All stairs have painted steel railing and handrails. Stair Finishes LKS 0//4 Sealed precast concrete on main open stairs, and sheet rubber flooring on other stairs. Interior Finishes Wall Finishes LKS 0//4 Painted gypsum wall boards with sheet vinyl wall coverings, MDF wainscots, and brick veneer. Some wood paneling at the upper portions of the Cafeteria. Cast in place concrete and tectum in Gym. Floor Finishes LKS 0//4 Carpet in dry classrooms, offices, and Library. Resilient sheet flooring on main circulation area, wet classrooms, and workrooms. Sealed concrete in Cafeteria and utility areas. Ceramic tiles on restrooms and kitchen. Hardwood floor in Gym. Ceiling Finishes LKS 0//4 Gypsum board ceiling, Suspended wood slat ceiling system, and typical suspended acoustical ceiling tile system. Print Date: 07/3/4 Page of 3

D Services.0 Vertical Transportation Elevators and Lifts TAL 0//4 The building id served by a 5-stop hydraulic elevator. Plumbing Plumbing Fixtures Domestic Water Distribution Sanitary Waste Rain Water Drainage TAL 0//4 TAL 0//4 TAL 0//4 TAL 0//4 Restroom fixtures are standard institutional type china. Most sinks are stainless steel. Science room sinks are acid resistant type. Water piping is all copper. Piping system assumed to be cast iron. Flat roof areas have roof drains piped to sewer. Sloped roof areas have gutters and downspouts piped to sewer. HVAC Distribution Systems Terminal and Package Units Controls and Instrumentation TAL 0//4 TAL 0//4 TAL 0//4 Heating water is piped from a central boiler room located at Sealth High School in copper and steel pipes. Classrooms are conditioned by -pipe fan coil units located in closets in the classrooms. Larger rooms are conditioned by central station VAV air handling units. Temperature control system is a modern DDC type. Fire Protection Fire Protection Sprinkler Systems Fire Protection Specialties TAL 0//4 TAL 0//4 The building is fully sprinklered by a wet pipe system. Wall mounted fire extinguishers Electrical Electrical Service and Distribution Lighting and Branch Wiring Communication and Security Systems Special Electrical Systems TAL 0//4 TAL 0//4 TAL 0//4 TAL 0//4 Electrical service is sub-fed from the main electrical room located at Sealth High School to -600AMP panels located on the first floor of the middle school. Lighting is mostly pendant or recessed direct/indirect type with various types of accent lighting. All low voltage systems are new and in excellent condition. Emergency egress lighting appears to be connected to an emergency generator located at Sealth High School. E Equipment and Furnishings.0 Equipment Fixed Furnishings and Equipment TAL 0//4 Casework, including Library shelving, is new and in excellent condition. Kitchen is partially shared with Sealth High School and is all stainless steel in excellent condition. Print Date: 07/3/4 Page 3 of 3

Detailed Assessment w/o Archived Deficiencies Site: Material Cond. Useful Life Deficiency Condition Notes Action Qty Unit Cost Unit Cost Facility: System: Electrical Total Cost: $9,50 Special Electrical Systems Basketball backstop controls 0 The electronic control system that raises and lowers the six Gym backstops does not function and apparently has never functioned properly. While attempting to use it, it repeatedly tripped the breaker that controls it. Repair or replace the control panel..00 $9,50.00 LS $9,50 Note: Cost estimates shown are raw construction costs and do not include any mark-ups or escalation. Print Date: 07/3/4 Page of