(I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in the Schedule 7(d) Common hazardous waste Treatment, Storage and Disposal Facilities (TSDFs) 3 Proposed capacity / area / length / tonnage to be handled /command area / lease area / number of wells to be drilled 1.5 Million KCal/hr, 500 kg/hr Considering if we feed Waste having average calorific value of 3000 Kcal/Kg. 4 New / Expansion / Modernization New 5 Existing Capacity / Area etc. Total Area of 0.75 Acres. 6 Category of Project i.e. A or B Category- A (All integrated facilities having incineration & landfill or incineration alone) 7 Does it attract the general conditions? If yes, please specify 8 Does it attract the Specific conditions? If yes, please specify 9 Location Corner # Plot / Survey / Kharsa Plot 31. Village Amapur ladha Tehsil Hapur District Ghaziabad State Uttar Pradesh 10 Nearest railway station / airport along with distance in kms 11 Nearest town, city, district headquarters along with distance in kms 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with Latitude (rth) Longitude (East) 1 28 39'21.25" 77 33'50.06 2 28 39'22.22" 77 33'52.08 3 28 39'20.83 77 33'52.94" 4 28 39'19.86" 77 33'50.94" The location map, 10 Km radius Topo Map & Google Image of the proposed project are enclosed as Annexure-I. Dasna Railway Station 5.0 km (NNW) Safdarganj Airport 34 km (SW) Delhi International Airport 45 km (SW) Nearest a) Village: Dinanthpur puthi - ~1 Km (W) b) City : Ghaziabad ~9 km (WNW) Village Panchayat: Amapur ladha Zilla Parishad: Ghaziabad telephone nos, to be given) 13 Name of the applicant M/s Ramky Enviro Engineers Ltd 14 Registered Address 13 th Floor, Ramky Grandiose, Ramky Towers complex, Gachibowli, Hyderabad, Telangana state. 15 Address for Correspondence
S. Item Details Name Sivanaga Madhu G Designation (Owner/Partner/CEO) Manager Address 13 th Floor, Ramky Grandiose, Ramky Towers complex, Gachibowli, Hyderabad, Telangana state. Pin Code 500032 E-mail sivanagamadhu.g@ramky.com Telephone no 95735 70706 Fax no 16 Details of Alternate Sites examined, if Village District State any. Location of these sites should be alternate sites are examined. shown on a Topo sheet 17 Interlinked Projects 18 Whether separate application of interlinked project has been submitted 19 If yes, date of submission t Applicable 20 If no, reason t Applicable 21 Whether the proposal involves approval / clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22 Whether there is any Government Order / Policy relevant / relating to the site 23 Forest Land involved (hectares) 24 Whether there is any litigation pending against the project and / or land in which the project is proposed to set up? (a) Name of the Court (b) Case (c) Orders / directions of the court, if any and its relevance with the proposed project. II. Activity: Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.,)
S.. Information/Checklist 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? / quantities /rates, wherever possible) with source of information data The proposed incinerator will be established within the premises of existing Common Bio Medical Waste Treatment Facilities (CBWTF) The Proposed Hazardous waste incinerator is Upgradation of existing Bio medical waste incinerator. 1.3 Creation of new land uses? The Purpose of Proposed Project is to set up and operate Hazardous waste incinerator facility at the existing CBWTF 1.4 Pre-construction investigations e.g. bore houses, soil testing? Geological investigations will be Carried out 1.5 Construction works? During erection of Incinerator, Solid Permanent Construction structures will be set up. 1.6 Demolition works? Replacement of existing Bio medical Waste incinerator to Hazardous Waste Incinerator 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? t Applicable. 1.11 Dredging? t Applicable. Temporary shelters for construction workers are not required as majority of labor will be hired from the surrounding locations/villages. During erection of Incinerator, Solid Permanent Construction structures will be set up. Underground works or mining or tunneling proposed. 1.12 Offshore structures? t Applicable. 1.13 Production and It is only treatment facility. Hazardous waste and manufacturing processes? Biomedical waste will be incinerated. 1.14 Facilities for storage of Hazardous waste material shall be stored in goods or materials? storage sheds complying with all applicable regulations/guidelines, considering the storage 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? compatibility etc. Proposed project itself is the Waste Management for Hazardous waste treatment and disposal facility.
S.. Information/Checklist 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of water courses or aquifers? / quantities /rates, wherever possible) with source of information data Facilities are proposed for long term housing of operational workers. New road, rail or traffic is proposed during construction or operation. New road, rail, Air waterborne or other transport routes are proposed. The site is well connected with Road and Rail. closure or diversions of existing transport routes are proposed. New electrical transmission line to be installed. Impoundment, damming, culverting, realignment or other changes to the hydrology of water courses or aquifers are proposed. 1.22 Stream crossings? stream crossings 1.23 Abstraction or transfers of Groundwater drawn through borewell/tankers water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Changes in water bodies or the land surface affecting drainage or run-off. Construction material will be transported via the existing infrastructure. long-term dismantling or decommissioning or restoration works. Impact due to Ongoing activity during decommissioning on environment Only during construction, temporary manpower influx is expected.
S.. Information/Checklist / quantities /rates, wherever possible) with source of information data Introduction of alien species. 1.29 Introduction of alien species? 1.30 Loss of native species or loss of native species or genetic diversity. genetic diversity? 1.31 Any other actions? ne 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist 2.1 Land especially undeveloped or agricultural land (ha) / quantities /rates, wherever possible) with source of information data The proposed incinerator will be established in an existing CBWTF site 2.2 Water (expected source & competing users) unit: KLD Water requirement for the proposed Hazardous waste incinerator setup is 5 KLD 2.3 Minerals (MT) t Applicable 2.4 Construction material Only minor civil work is envisaged. stone, aggregates, sand / soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units). t Applicable With proposed Incinerator Power Load 250 KW Fuel: Furnace Oil/HSD t Applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist Use of substances or materials, which are hazardous (as per MSIHC 3.1 rules) to human health or the environment (flora, fauna, and water supplies) / quantities/rates, wherever possible) with source of information data All precautionary measures will be followed to control any kind of accidents during operation of the incinerator.
3.2 3.3 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Affect the welfare of people e.g. by changing living conditions? Changes in occurrence of disease or affect disease vectors. Positive change. Through employment generation to the local people. 3.4 3.5 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Any other causes Primary Government School is in Dinanthar puthi Village, which is approximately 1 km from the site. ne 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist / 4.1 Soil, overburden or mine wastes t applicable 4.2 Ash/Municipal waste (domestic and or commercial wastes) quantities/rates, wherever possible) with source of information data Fly Ash : 50 Kg/hr (From Cyclone) Bottom Ash: 50 Kg/hr (Rotary Kiln Discharge) Bag Filters: 20 Kg/ hr (From Bag House) Spray Dried Salt: 20-25 Kg/ hr (From Spray Dryer) The Ash is finally disposed in Secured Landfill. 4.3 Hazardous wastes (as per Proposed facility itself is for treatment of Hazardous Waste Incinerable hazardous wastes. Management Rules) 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge t Applicable from effluent treatment 4.7 Construction or demolition During construction some amount of wastes construction debris may be generated which will be segregated and whatever is re-saleable will be sold to buyers and rest of the waste will be used for filling up of low lying areas and development of internal roads and boundary walls. 4.8 Redundant machinery or Scrap equipment 4.9 Contaminated soils or other materials 4.10 Agricultural wastes t Envisaged Contaminated soils or other materials are anticipated 4.11 Other solid wastes other solid wastes.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste / quantities/rates, wherever possible) with source of information data Diesel/Furnace Oil/Pet Coke etc. will be utilized. However, all emissions will be controlled using appropriate APCDs. Minimal emissions are expected. Minimal emissions are expected. The main emissions during the construction will be SPM from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fossil fuels from vehicles. The particulate matter will be mainly generated from loading and unloading of the material at the site during construction. Water sprinkling will be done to reduce dust emissions. Construction labour will be provided with proper sanitation to avoid any unhygienic conditions. Therefore no odour generation is expected. The emissions which are generated from the incineration process shall be sent to spray drier / evaporative cooler for cooling followed by Gas cleaning equipment. The gases are passed through multi cyclones for removal of particulates. Then dry lime and activated carbon are injected for neutralization of acidic gases and removal of organic constituents if any. The flue gases then passed through bag filters for complete removal particulates and then through wet alkaline scrubber for neutralization. The flue gases after completely cleaned in all respects shall be sent out through a 30 m stack. Treated flue gas emissions discharge through stack to atmosphere shall always be less than or equal to the
S. Information/Checklist 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources / quantities/rates, wherever possible) with source of information data following parameter-specific emission standards. material will be openly burnt in air emission from any other sources. 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / quantities/rates, wherever possible) with source of information data with source of information data ise levels are generated from Rotary Kiln, Spray drier, Scrubber and DG sets etc., Expected noise level is less than 75dB (A), necessary PPEs (Ear Muffs, closed chambers) will be provided for the personnel working in those areas. ii) Most of the equipment structures are static. The vibration effect of these will be only local and the design of supports and foundations will nullify the intensity of vibration. iii) Light emissions are not envisaged in the project. iv) Heat emissions are not envisaged in the project as the system is fully closed operation. 6.2 From industrial or similar processes 6.3 From construction or demolition Excavation, drilling and welding during construction/erection of incinerator which are temporary in nature 6.4 From blasting or piling t Envisaged 6.5 From construction or operational traffic ise levels will be less than 75dB (A) are anticipated during daytime due to the vehicular movement and construction and operation activities, but it will be of temporary in nature. 6.6 From lighting or cooling systems To limited extent 6.7 From any other sources From DG set less than 75dB (A) noise is anticipated but this will be for a very short period of time during the power
S.. Information/Checklist / quantities/rates, wherever possible) with source of information data with source of information data failures only. More over DG sets will be acoustically enclosed. 7. Risks of contamination of land or water from release of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Information/Checklist S. 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water / 7.4 From any other sources ne 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? quantities/rates, wherever possible) with source of information data Very Minimal risk. Care shall be taken while handling, hazardous waste during contaminations. Spill control measures shall be in place. direct discharge of sewage or other effluents from the facility. Air emissions will be treated in several stages and then let into the atmosphere. untreated waste waters will be let on to the land or into the surface water body therefore no risk of any contamination. Approved Environmental Management Plan (EMP) shall be prepared and followed. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / 8.2 From any other causes ne quantities/rates, wherever possible) with source of information data During the operational phase firefighting systems will be installed and safety precautions will be followed as per the safety rules. Secondly during construction phase, no explosions and spillages or production of hazardous waste will take place in the proposed project.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? The project site is situated in Seismic Zone- IV therefore high damage will be there due to earthquakes. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Information/Checklist S.. 9.1 Lead to development of supporting. Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects quantities/rates, wherever possible) with / source of information data Due to this project some positive development is envisaged, as the socioeconomic conditions of the local population will improve. t envisaged Development of local community Cumulative impact of proposed and existing projects will be in the statutory limits. (III) Environmental Sensitivity S.. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary other areas protected under international conventions, national or local legislation for their ecological, landscape,
S.. Areas 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name/ Identity Khichira Lake Upper Ganga Canal Hasanpur Lake Hindan River Yamuna River Aerial distance (within 15 km.) Proposed project location boundary cultural or other related value are present within 15 Km radius. 1.23 km N 1.63 km NE 1.2 km S 14.8 km SW 28 km SW ne in the study area t Applicable 5 State, National boundaries t Applicable 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas NH-24 NH-91 3.8 km N 8.4 km SW 7 Defence installations t Applicable 8 Densely populated or built-up area Ghaziabad 9 km WNW 9 Areas occupied by sensitive manmade land uses (hospitals, schools, All are available in Ghaziabad places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems Khichira Lake Ganga Canal Hasanpur Lake Hindan River Yamuna River Forest near surjapur Agricultural activity is observed in study area. 1.23 km N 1.63 km NE 1.2 km S 14.8 km SW 28 Km SW 16 km SW t Applicable The project site is situated in Seismic Zone-IV therefore high damage
S.. Areas (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary will be there due to earthquakes. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: 01.07.2016 Place: Hyderabad Signature of the applicant