Certified TIA-942 Tier IV Data Center

Similar documents
Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Data Center Management. Didik Partono Rudiarto CDCP, ITIL-F, COBIT5, CITM

Building a Tier 4 Data Center on a Tier 1 Budget

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

19 Site Location, Design and Attributes. Site Location, Design and Attributes

Digital Chicago. 600 south FeDeraL - chicago grand ave - FranKLin ParK 350 east cermak - chicago

Datacentre South London Data sheet

Introduction to Datacenters & the Cloud

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

Datacentre South Gyle 1 Data sheet

How to Build a Data Centre Cooling Budget. Ian Cathcart

RAGINGWIRE. THE WORLD S MOST TECHNOLOGICALLY ADVANCED DATA CENTERS!

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Assessment of Existing Data Centers for Critical Facilities Round Table Group

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

How To Write An Infrastructural Standard For Data Center Infrastructure

Datacentre Reading East 2 Data sheet

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

Green Computing: Datacentres

Statement Of Work Professional Services

OPERATOR - FACILITY ADDRESS - DATE

Greening Commercial Data Centres

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

Data Center Commissioning: What you need to know

X-tier Data Facility. Prepared by X-tier SAE Corporation

Data Center Overview Document

Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup

BICSI 002 / TIA 942 / Uptime

World s Greenest High Performance Data Center

Green Computing: Datacentres

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance. Chapter 8: 8 Guide for assessing GHG emissions of Data Centers

DATA CENTER ASSESSMENT SERVICES

Data Center Site Infrastructure Tier Standard: Topology

HKEx Hosting Services

Datacentre Maidenhead P1 Data sheet

Building a data center. C R Srinivasan Tata Communications

Specialty Environment Design Mission Critical Facilities

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

Subject: County of Los Angeles Data Center Space Requirement

Five Nines and Infrared (IR) Testing at Data Centers

Sovereign. The made to measure data centre

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Only a matter of power supply and air conditioning? Joachim Faulhaber TÜV Informationstechnik GmbH

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

Data Centre Infrastructure

European Code of Conduct for Data Centre. Presentation of the Awards 2014

Data Centers. Mendel Rosenblum. CS142 Lecture Notes - Data centers

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

Strategic Data Centre Site Profiles Data Centre Co-Location London North

Chicago 1 (CHI-1) Data Center

Data Centre Testing and Commissioning

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

NO-BREAK KS 7e. Concentrated Energy kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM

Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy

GREEN DATA CENTER DESIGN

Tier Classification of Data Centres. Eric Maddison Senior Consultant, The Uptime Institute

Thermal Storage System Provides Emergency Data Center Cooling

Data center outages impact, causes, costs, and how to mitigate

THE DATA CENTER COMPLIANCE ACRONYMS YOU NEED TO KNOW

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

Scalable. Affordable. Flexible. Fast.

colocation. perfected.

colocation. perfected.

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

How To Visit An Internet Data Center

CyrusOne Global Data Center Solutions

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

WORLD CLASS, GLOBALLY CERTIFIED, HIGH AVAILABILITY DATA CENTRE INTELLICENTRE 2 MACQUARIE PARK, SYDNEY

Data Center Site Infrastructure Tier Standard: Topology

Reference Guide: SmartDesign Approach: Common Data Center Challenges:

Data Centers Efficiency

Applications for Infrared Thermography at Computer Centers

COMMODITIZING THE DATA CENTER MARKET

san francisco//usa data center specifications tel: fax: internet + intellectual property + intelligence

International Standards for Data Centre Electrical Design. Developed from The Uptime Institute & TIA942 concepts

Data Center Components Overview

HealthcareBookings.com Security Set Up

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Datacenter Clarity LC for colocation owners and tenants. The Data Center Infrastructure Management (DCIM) solution from Siemens. siemens.

Experience Matters...

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

EXECUTIVE REPORT. Can Your Data Center Infrastructure Handle the Heat of High Density?

Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group

Microsoft s Datacenter Best Practices. Darryl Chantry Datacenter Solutions Architect Worldwide Datacenter Center of Excellence

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

deadly data centre sins.

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

Datacenter Hosting and Cloud Computing Services

ASX Australian Liquidity Centre. ASXCoLo

Transcription:

Certified TIA-942 Tier IV Data Center Beltsville, MD AiNET 11710 Montgomery Road Beltsville, MD 20705 USA www.ai.net

Data Center Standard TIA-942 Developed by Telecommunications Industry Association Leading, 600 member, trade assn. for global information and communications technology industries (www.tiaonline.org) Accredited by American National Standards Institute (ANSI) Standards development a key activity TIA-942: specification of minimum requirements for telecommunications infrastructure of (multi-tenant Internet hosting) data centers Defines four data center tiers; Tier IV (or 4) most stringent Leading hallmarks of an ultra-reliable Tier IV data center: Concurrent maintainability, and Fault tolerance of a major system failure 2

Beltsville, MD TIA-942 Tier IV Data Center TIA-942 Tier IV certifications in 2006, 2010. Notable ultra-reliability features include: Dual main power feeds from diverse substations 2N power redundancy; 2N generator redundancy Unique power protection by patented power quality management technology Fully independent A, B and C power feeds delivered 7-Day on site supply of generator fuel Dual cooling/heat rejection loops 3N chiller redundancy; 3N cooling tower redundancy Full maintenance bypass protections 3

System Block Diagram Beltsville, MD TIA-942 Tier IV Data Center No single point of failure; at least full redundancy of all systems; fully maintainable; protected against subtle shortcomings in power quality. Batteries A Main Feed Substation 1 Tie Transformer Transfer Generator 1 Tie UPS A Batteries B Transformer Fully Independent Working Voltages Main Feed Substation 2 7-Day Fuel Supply Sensors/Controls Generator 2 Transfer UPS B Batteries C UPS C Patented Critical Protection Supervisor (CPPS) Maintenance Bypass CPPS Sensor/Control 4

Comments on System Main power feeds from diverse, independent power substations provides a level of reliability in main power. 13.2 KV, 3Φ Main Feed Substation 1 Main Feed Substation 2 Tie 7-Day on-site fuel supply. Fuel freshness maintained. Longest main power outage 5 days, Hurricane Isabel no service impact. Also backed by 1 hour SLA refueling contract with multiple suppliers.. Main power feeds are phased matched and both are active, which eliminates power hits upon loss of one feed. On-site tie switch and main transformers maintained by AiNET at higher level than provided by power utility company. Transformer 480V, 3Φ 7-Day Fuel Supply Patented power system technology protects against a class of power problem that afflict all other data centers worldwide. Eventually all data centers will implement it. Transfer Generator 1 Generator 2 Transfer Tested weekly, and monthly under load, either generator can power the entire facility. 2N redundancy. Sensors/Controls Patented Critical Protection Supervisor (CPPS) Tie 480V, 3Φ Maintenance Bypass CPPS Sensor/Control Batteries A UPS A Batteries B UPS B Independence means no shared elements (like PDUs, STS, etc.) in the A, B and C power feeds. This leads to better reliability and Batteries better C PUE (less power loss). UPS C All batteries replaced every three (3) years. Transformer Fully Independent Working Voltages AiNET UPS s ha e their o n fault sensing and internal and external bypass. Condition is monitored by CPPS. 5

System Block Diagram Beltsville, MD TIA-942 Tier IV Data Center Utility Water Gravity-Fed Water Tank On-Site Well Tower 1 Chiller 1 CRAC 1 CRAC 2 Tower 2 Chiller 2 CRAC 3 Tower 3 Redundant Heat Rejection Loops Chiller 3 Redundant Loops CRAC n Maintenance Bypass 6

System Block Diagram Beltsville, MD TIA-942 Tier IV Data Center Three sources of supply for water, including an on-site well with indefinite runtime. Water deliver contract with multiple providers with 1 hour SLA. Utility Water Gravity-Fed Water Tank On-Site Well Chillers: one on, one in warm stand-by, one off. Rotated weekly. Any single chiller can carry the data center: 3N redundancy. Full redundancy of cooling/heat rejection loops with full maintenance bypasses in place is the only way to provide full operational maintainability and fault tolerance in the cooling system. Tower 1 Tower 2 Tower 3 Any single cooling tower can carry the data center: 3N redundancy. Redundant Heat Rejection Loops Chiller 1 Chiller 2 Water loops are chemically treated and completely closed to ensure zero foreign particle entry. Chiller 3 Raised floor with hot/cold row separation Redundant Loops CRAC 1 CRAC 2 CRAC 3 CRAC n Maintenance Bypass With fluids involved, these critical cooling/heat rejection loops need maintenance. Only redundant loops with bypasses can ensure operational maintainability. 7

Other Certifications Beltsville, MD TIA-942 Tier IV Data Center Other certifications of Beltsville site include: SAS 70 Type II (operational security) DCID 6/9 (physical security) ICD 705/ICS 705.2 (physical security) HIPAA and EHNAC (medical privacy) PCI-DSS (secure financial operations) SOX (business and financial operations) r171011 8