Applications for Infrared Thermography at Computer Centers
|
|
|
- Dustin McGee
- 10 years ago
- Views:
Transcription
1 Applications for Infrared Thermography at Computer Centers By Eric Stockton CompuSCANIR, a division of Stockton Infrared Thermographic Services, Inc Adams Farm Road Randleman, NC SCAN ABSTRACT Downtime at Computer Centers is not an option! The equipment is expensive and even more important, the downtime created by a failure can be extremely costly much more than the average office building or factory. Electrical and mechanical infrared predictive maintenance (IR/PM) is a must for the safe, continuous operation of the facility and the steady flow of information. The electrical switchgear, UPS, ATS and Server Systems should be checked with infrared thermography and other testing means on a regular basis. These are specialized systems and the infrared thermographer needs to be familiar systems and the operation of the center. This paper describes the need, different applications, methodology and equipment required to perform IR surveys at computer centers. PERFORMING THE IR SURVEYS Computer centers have normal loads like any other building that feed the non-critical items in the building, but the data systems are specialized systems. These are: Dual-power technology requires at least two completely independent electrical systems. These dual systems supply power via diverse power paths to the computer load by effectively moving the last point of electrical redundancy from the uninterruptible power supply (UPS) system downstream to a point inside the computer hardware itself. Mr. Kenneth Brill s intuitive conclusion has since been confirmed by The Uptime Institute s research that has determined that 98% of all site infrastructure failures occur between the UPS and the computer load. Resistive loads are used to fully simulate and test all equipment before it is put on-line on the computer floor. Any problems that are encountered must be completely repaired and the system rechecked fully before putting the equipment on-line. All panel covers (as well as the dead fronts) need to be removed before the test, so pertinent components may be evaluated under load. Risk managers may resist removing panel covers and dead fronts to complete the infrared survey, so they must be in agreement that this is necessary. Automatic transfer switches (ATS) must be checked on the Emergency Source (usually a back-up generator) as well as the Normal Source. Much of this work must be done during maintenance windows -a time where the usual transfer of data is reduced or eliminated, usually a Sunday morning (Midnight until 8 AM). Battery back-up systems must be checked in a real-time battery discharge situation to fully simulate an actual loss of the Normal Source as well as the Emergency Source.
2 There must be a total accountability of all infrared survey results, especially all of the equipment associated with the UPS and computer/server systems. This can be accomplished by recording the entire survey on videotape and/or snapping fully-radiometric images of all equipment whether problems exist or not. In either case a data log of all equipment surveyed must be created including a time/date stamp reference for all equipment. Uniform cooling of all data center server, storage, and computer equipment is essential for proper operation. The American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. has provided Thermal Guidelines for Data Processing Environments as a reference. EXAMPLE THERMOGRAPHIC FINDINGS ON COMPUTER CENTER EQUIPMENT Figure 1. Thermograph and photograph showing lug connection on UPS Module Inverter Assembly. Figure 2. Thermographs showing heat distribution patterns on a server racks.
3 Figure 3. Thermograph and photograph showing fuse lug connection on an UPS Module. Figure 4. Thermograph showing fuse lug on UPS Module input filter fuse.
4 Figure 5. Thermograph showing overloaded breaker on a power distribution unit (PDU) on the computer floor. Phase Left Side Amps Right Side Amps Total Amps % Load % Load Normal Max Two Feeder Max 275 Amps 525 Amps A % 38% B % 37% C % 37% Table 1. Measured current on inverted Y 23 KV oil circuit breaker line side switches, each leg and total. OTHER CONSIDERATIONS The computer room floor cooling system must be designed and engineered to provide uniform cooling of all computer components. The objective of the design of the cooling system is to provide a clear path from the source of the cooled air to the intakes of the servers. The heat from the equipment must also be efficiently returned to the return air duct of the CRAC (Computer Room Air Conditioning) Unit. Infrared thermography can be performed to ensure proper and even cooling of the room. All Mechanical Systems have the same stringent requirements that the electrical system. This is achieved by redundancy and failure prevention engineering. The Federal Reserve Board (Board), the Office of the Comptroller of the Currency (OCC) and the Securities and Exchange Commission (SEC) are publishing an Interagency Paper on Sound Practices to Strengthen the Resilience of the U.S Financial System. The paper identifies three new business continuity objectives that have special importance in the post-september 11 th
5 risk environment for all financial firms. The paper also identifies four sound practices to ensure the resilience of the U.S. financial system, which focus on minimizing the immediate systemic effects of a wide-scale disruption on critical financial markets. The agencies expect organizations that fall within the scope of this paper (like infrared) to adopt the sound practices within the specified implementation timeframes, as described in more detail in the paper. SUMMARY Computer Data Center Systems Require 100% Uptime. To achieve this, it is essential that the thermographer: Record all IR work and be accountable for the complete infrared survey. Be expert in the IR applications of computer equipment. Be knowledgeable of the different test scenarios and equipment operability. Be willing to work off-shift on weekends, etc. Understand how to work with the electricians and computer technicians so that the equipment can be tested with a resistive load in a real-time situation at 100% expected loads. REFERENCES 1) W. Pitt Turner IV, P.E., John H. Seader, P.E. and Kenneth G. Brill; Industry Standard Tier Classifications Define Site Infrastructure Performance ; pp. 1-4; The Uptime Institute, Inc. 2) Thermal Guidelines for Data Processing Environments ; The American Society of Heating, Refrigerating and Air-Conditioning Engineers Inc. 3) Interagency Paper on Sound Practices to Strengthen the Resilience of the U.S. Financial System ; U.S. Securities and Exchange Commission.
Five Nines and Infrared (IR) Testing at Data Centers
Five Nines and Infrared (IR) Testing at Data Centers By Gregory R. Stockton 99.999% uptime five nines. That is what IT (information technology) customers are looking for. Uptime or availability at data
The Application of Circuit Breakers to Reduce Downtime in Datacentres
The Application of Circuit Breakers to Reduce Downtime in Datacentres Tim Campbell BEng MIET. Marketing Manager, Terasaki Electric (Europe) Ltd. Abstract Circuit breakers fulfil several functions in the
Data Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
Statement Of Work. Data Center Thermography Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Thermography Assessment Data Center Thermography Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits
Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features
Using thermal mapping at the data centre
Technical Using thermal mapping at the data centre by Gregory Stockton, CompuScanIR.com Cooling the servers in data centres efficiently is critical to increasing IT reliability, maintaining high performance,
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Data Center Site Infrastructure Tier Standard: Topology
U P T I M E I N S T I T U T E, L L C Data Center Site Infrastructure Tier Standard: Topology Prepared by Uptime Institute Professional Services, LLC Copyright 2010 by Uptime Institute, LLC 20 West 37th
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria
Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center
The Anatomy of a. High-Availability Rack. November 2009. Online Tech, Inc. 220 E. Huron Ann Arbor, MI 48104 (734) 213-2020. www.onlinetech.
Online Technologies Corporation September 2008 If you have questions, please contact: The Anatomy of a Onl (734) 213-2020 phone High-Availability Rack November 2009 Online Tech, Inc. 220 E. Huron Ann Arbor,
How to Meet 24 by Forever Cooling Demands of your Data Center
W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Energy Management Services
February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the
Data Center Site Infrastructure Tier Standard: Topology
U P T I M E I N S T I T U T E, L L C Data Center Site Infrastructure Tier Standard: Topology Prepared by Uptime Institute Professional Services, LLC Copyright 2009-2012 by Uptime Institute, LLC 20 West
Green Computing: Datacentres
Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material
Green Computing: Datacentres
Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material
Reliability requires consulting engineers and end users to grasp design, maintenance basics. By Reza Tajali, P.E. Square D Power Systems Engineering
LOW VOLTAGE CIRCUIT BREAKER GUIDELINES FOR DATA CENTERS Reliability requires consulting engineers and end users to grasp design, maintenance basics By Reza Tajali, P.E. Square D Power Systems Engineering
Designed for uptime. Defining data center availability via a tier classification system
Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application
Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application by Reza Tajali, P.E. Square D Company ABSTRACT In modern data centers, Uninterruptible Power Supplies (UPS)
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications
W H I T E P A P E R Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications Executive Summary One of the fundamental decisions in the design of data centers, server rooms
Managing Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
Tier Standards. Eric Maddison CEng. CEnv. MBA MSc. MCIBSE MEI. Consultant EMEA
Tier Standards Eric Maddison CEng. CEnv. MBA MSc. MCIBSE MEI Consultant EMEA Uptime Institute Unbiased and vendor neutral Global thought leadership for the data center industry Founded 1993 Standards and
Power to the adaptable data center
Business Unit Manager, Data Center Solutions, Eaton s electrical group IT managers have more options than ever to tailor the power infrastructure to their unique data center and business requirements.
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
Use your troubleshooting superpowers for good Application Note
Use your troubleshooting superpowers for good Application Note Unleash your full troubleshooting powers with innovative new tools from Fluke. You ve got skill. You ve got experience. Now you have some
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise. A White Paper from the Experts in Business-Critical Continuity
Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise A White Paper from the Experts in Business-Critical Continuity Executive Summary Today s data centers are changing rapidly,
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME 2 AGENDA SESSION -1 What is Data Center? SESSION -2 Equipment and Components SESSION -3 Standard in designing Data Center
Optimizing Power Distribution for High-Density Computing
Optimizing Power Distribution for High-Density Computing Choosing the right power distribution units for today and preparing for the future By Michael Camesano Product Manager Eaton Corporation Executive
Tier Classifications Define Site Infrastructure Performance
By W. Pitt Turner IV, P.E., John H. Seader, P.E., and Kenneth G. Brill Widely accepted within the uninterruptible industry, The Uptime Institute s Tier Performance Standards are an objective basis for
HealthcareBookings.com Security Set Up
HealthcareBookings.com Security Set Up Introduction... 2 Overview of the process for using HealthcareBookings.com... 2 Professionals... 2 Patients... 3 Passwords... 4 Hosting Security... 4 Overview of
Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive
Co-Location Services Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive optimum performance 24x7. SERVICE
PX100 MBP with Configurable Distribution
PX100 MBP with Configurable Distribution High-performance, right-sized, 3-phase power protection with industry-leading efficiency, availability, and performance for small and medium data centers July 2012
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
by Metagyre, Inc. September 27, 2010
NewCo Data Center Assessment by September 27, 2010 Metagyre Account Manager Contact Paul Thompson 1249 NW Arcadia Ct. Suite 300 Poulsbo, WA 98370 voice - 360 697-3386 fax 360 697-6676 [email protected]
Introduction to Datacenters & the Cloud
Introduction to Datacenters & the Cloud Datacenter Design Alex M. Hurd Clarkson Open Source Institute March 24, 2015 Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud March 24, 2015 1 / 14 Overview
Qualitative Analysis of Power Distribution Configurations for Data Centers
Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,
Distributing Power to Blade Servers
Distributing Power to Blade Servers Ten steps to selecting the optimal power distribution design With the growth in blade servers with dual or triple power supplies, a single rack of equipment can easily
Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com
Cooling Small Server Rooms Can Be Inexpensive, Efficient and Easy - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Server Rooms Description & Heat Problem Trends
Tier Classification of Data Centres. Eric Maddison Senior Consultant, The Uptime Institute
Tier Classification of Data Centres Eric Maddison Senior Consultant, The Uptime Institute Uptime Institute Unbiased and vendor neutral Global thought leadership for the data center industry Founded 1993
21 st Century Facilities
Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer
Data Center Power Overload Protection: Circuit breakers and branch circuit protection for data centers
Data Center Power Overload Protection: Circuit breakers and branch circuit protection for data centers 2009, Raritan Inc. Introduction Over the past few years, average power consumption per server has
Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems
NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Data Center Infrastructure & Managed Services Outline
Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Tier Classifications Define Site Infrastructure Performance
By W. Pitt Turner IV, P.E., John H. Seader, P.E., and Kenneth G. Brill Widely accepted within the uninterruptible industry, The Uptime Institute s Tier Performance Standards are an objective basis for
Overcoming the Causes of Data Center Outages
Overcoming the Causes of Data Center Outages Executive Summary A data center s main function should be to provide constant uptime for the mission-critical applications it houses. However, unplanned outages
A Quick Primer on Data Center Tier Classifications
A Quick Primer on Data Center Tier Classifications What You Should Know Before Starting a Data Center Project White Paper Abstract Data center facility projects are often driven by the Uptime Institute
Energy Efficient High-tech Buildings
Energy Efficient High-tech Buildings Can anything be done to improve Data Center and Cleanroom energy efficiency? Bill Tschudi Lawrence Berkeley National Laboratory [email protected] Acknowledgements California
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
Airflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
Statement Of Work Professional Services
Statement Of Work Professional Services Data Center Electrical Efficiency Assessment Data Center Electrical Efficiency Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0
Part 1 System Modeling & Studies for Existing Systems
Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures
Redundancy and Reliability for an HPC Data Centre
Available online at www.prace-ri.eu Partnership for Advanced Computing in Europe Redundancy and Reliability for an HPC Data Centre Erhan Yılmaz* 1 Ladina Gilly** 2 * National High Performance Computing
FOXAIR 60/50 ALL MODELS
FOXAIR 60/50 ALL MODELS OPERATION AND SERVICE MANUAL UNIT WEIGHT - ALL MODELS APPROX. 300 POUNDS FOXTRONICS, INC. 38 L x 28 W x 24 H Love Field-Dallas TX MADE IN THE USA 3448 West Mockingbird Lane Dallas,
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Data Center Designs and Hospital Operations
Data Center Designs and Hospital Operations Designing for Data Center Availability and the Effect on Daily Operations Joe Harris, PE, RCDD Senior Engineer, AECOM Data Centers and Hospitals June 10, 2015
19 Site Location, Design and Attributes. Site Location, Design and Attributes
1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile
PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions
PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy
How To Improve Energy Efficiency In A Data Center
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.
SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.
ELECTRICIAN TRADE REGULATION
Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation
Energy Efficiency and Availability Management in Consolidated Data Centers
Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal
Data Center Uninterrupted efficiency, guaranteed reliability and continuous modularity. ABB solutions always work.
Data Center Uninterrupted efficiency, guaranteed reliability and continuous modularity. ABB solutions always work. Data security is first of all electrical Maximizing security while providing efficiency
Arc Flash Energy Mitigation Techniques
Arc Flash Energy Mitigation Techniques When short circuits occur on an electrical distribution system, an arc flash event usually forms. These arc flash events can cause dangerous and potentially fatal
Specialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015
S c h n e i d e r E l e c t r i c BUSINESS IMPACT Datacenter means business - create the bridge between IT en Facilities. Jack Hack Enterprise System Engineer 19 November 2015 1 Your ability to compete
Five Essential Components for Highly Reliable Data Centers
GE Intelligent Platforms Five Essential Components for Highly Reliable Data Centers Ensuring continuous operations with an integrated, holistic technology strategy that provides high availability, increased
The Pros and Cons of Modular Systems
The Pros and Cons of Modular Systems Kevin Brown, Vice President Global Data Center Offer Schneider Electric Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Desired characteristics of pre-fabricated
CUSTOMER EXPERIENCE CENTER
v CUSTOMER EXPERIENCE CENTER ABOUT THE CUSTOMER EXPERIENCE CENTER MAKE YOUR DATA CENTER AS DYNAMIC AS YOUR BUSINESS Emerson Network Power continuously strives to provide the best solutions by working collaboratively
BICSI 002 / TIA 942 / Uptime
BICSI 002 / TIA 942 / Uptime Which Data Center Standard Should I Follow Phil Isaak, PE, P.Eng., RCDD, DCDC President, Master Instructor Isaak Technologies Inc. Standards Who are these People Standards
Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS
Upgrading the PRS datacentres: space requirement S. S. Mathur, GM-IT, CRIS PRS / UTS scenario: then and now Year 2000 PRS: 600 locations UTS: 0 locations Year 2008 PRS 1600 locations E-ticketing Passengers
Electrical Systems. <Presenter>
Review Root Causes of Energy Inefficiency Roadmap to Maximize Energy Efficiency Best Practices Alternative Energy Sources Controls Take Aways Seek Professional Help. ENERGY INEFFICIENCY OF
Data center solutions Medium & large enterprise, multi-tenant and hyperscale. Energize your data center, maximize the value of your investment
Data center solutions Medium & large enterprise, multi-tenant and hyperscale Energize your data center, maximize the value of your investment We serve the needs of data centers of all sizes, around the
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
WHAT IS INFRARED (IR) THERMOGRAPHY
WHAT IS INFRARED (IR) THERMOGRAPHY IR Thermography is the technique of producing pictures called from the invisible thermal radiation that objects emit. This is a non-contact means of identifying electrical
Optimizing your Infrastructure for Cloud Computing
Optimizing your Infrastructure for Cloud Computing Best practices for managing a cloud IT environment By Chris Loeffler Data Center Applications Manager, Distributed Power Solutions Eaton Corporation Executive
Offshore oil platform power and control system
Offshore oil platform power and control system Summary I. Background II. Customer challenges III. Proposed solution IV. Customer benefits V. Conclusion Schneider Electric - Division - Name Date 2 I. Background
BLUESTAR INFRARED. Description: Thermal Properties Comparison. Project Location: Client: 759 South Federal Hwy 225 Bayshore Drive 800-216-1820
BLUESTAR INFRARED We Bring Bad Things to Light SERVING ALL OF FLORIDA Infrared Inspection Services 24 Hour Emergency Service I n f r a r e d I n s p e c t i o n R e p o r t 772-215-8794 Description: Thermal
IT@Intel. Thermal Storage System Provides Emergency Data Center Cooling
White Paper Intel Information Technology Computer Manufacturing Thermal Management Thermal Storage System Provides Emergency Data Center Cooling Intel IT implemented a low-cost thermal storage system that
Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime
Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure for Business-Critical Continuity Are you deploying a remote site faster than you can
Ten Errors to Avoid When Commissioning a Data Center
Ten Errors to Avoid When Commissioning a Data Center By Paul Marcoux White Paper # 149 Executive Summary Data center commissioning can deliver an unbiased evaluation of whether a newly constructed data
Opportunity of Energy Saving in electrical path is lesser as compared to other areas
Data Centre Power Map ` Energy Optimization Techniques Data Center Power Chain Venkat Rao B Country Manager Power Products Data Center Power Draws Cooling About 35 40 % Sources of Energy Waste Fans / Blowers
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled