1 Data Center Combined Heat and Power Benefits and Implementation Justin Grau, Google Inc. Sam Brewer, GEM Energy
2 Data Center Challenges Electric Load Densification Thermal Dissipation Requires constant cooling Power limits from utility Electric costs Unreliable electric grid Moore s Law
3 Market Fundamentals Energy has been very inexpensive traditionally A wasteful energy economy has evolved that is running into limits to growth As limits are approached or exceeded, energy prices become expensive and reliability decreases Growth in population and standard of living puts pressure on our energy system Environmental degradation issues are related to our energy system Regulatory bias against clean energy technologies is being removed
4 Risk Electric supply availability and quality is the key variable for data operations Current planning does not adequately address reliability for long duration electric outages (48 hours+) Computers run almost everything Diesel reciprocating generators are not reliable for long duration events Standby diesel generator have high emissions due to the costs of adding emission reducing equipment
5 Legacy Electrical Distribution Model
6 Current Legacy Data Center Normal Operation Diesel Fuel Storage Utility Provides Electric Power UPS provides quality control of electricity Diesel Generators Battery System Central Grid Utility Switchgear UPS PDU IT Equipment Infrastructure Chillers DX Units Pumps Lights Cooling Interface / Infrastructure Key Raw Electricity Clean Electricity Fuel Chilled Water
7 Current Legacy Data Center Emergency Operation Diesel Fuel Storage Utility is absent UPS components fail because of generator output quality Diesel Generators provide power Diesel Generators Battery System Central Grid Utility Switchgear UPS PDU IT Equipment Infrastructure Chillers DX Units Pumps Lights Cooling Interface / Infrastructure Key Raw Electricity Clean Electricity Fuel Chilled Water Cooling system becomes less reliable because of power quality and switching Reliability decreases to ~0 after 1 2 weeks
8 Distributed Generation Model 50% fewer links in the distribution chain Resource Recovery Gas Distribution End User Gas Drilling Company Gas Utility You
9 On Site Power Generation Technology Needs a primary fuel Must operate unattended and be reliable Must be cost effective Must be less polluting than the utility
10 Benefits of CHP over 1MW Legacy Data center Increased Reliability Tier 4 data center (Uptime Institute) 4 hour outage in any 5 year period 48 minute outage in any 1 year period CHP Data Center (US EPA) CHP + 1 utility feed provides for an expected 43 minute outage in any 1 year period CH + 2 utility feeds provides for an expected 7 minute outage in any 1 year period
11 Green Data Center CHP Retrofit Reduces Operational Costs Additional network deliverable fuel source Alternate cooling technology Environmentally friendly
12 Green Data Center New Build
13 Green Data Center New Build 2
14 Benefits of CHP over 1 MW Legacy Data center Reduced annual electricity costs Utility= $1,350,000 CHP= $390,000 Decreased annual emissions (metric tons) Utility CO2= 10,800 Nox= 12.5 CHP CO2= 5,300 NOx= 1.6
15 University of Toledo Project Summary Modular Construction Project Vitals Type Data Center Year 2012 Location Function Reason Electric Heat Cooling Toledo, OH Mission Critical Cost Reduction 260 kw 1.0 MMBTU/hr 100 Tons Backup Level 1 Configuration CPS M C Savings $150,000+
16 Syracuse University Project Summary Project Vitals Type Data Center Year 2010 Location Function Reason Electric Heat Syracuse, NY Mission Critical Cost Reduction 780 kw 4.0 MMBTU/hr Cooling Backup Level Tons Chilled Water Configuration Savings IPS M c(2) $300,000+/year
17 Questions? Contact Information: Justin Grau Sam Brewer
Data Center Combined Heat and Power (CHP): Benefits and Implementation
Data Center Combined Heat and Power (CHP): Benefits and Implementation by Sam Brewer Justin Grau Page 1 of 14 I. Common Causes of Failure Major trends in the United States have reached an intersection
Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies
Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single
How To Evaluate Cogeneration
Power topic #7018 Technical information from Cummins Power Generation Inc. Evaluating cogeneration for your facility: A look at the potential energy-efficiency, economic and environmental benefits > White
Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres
What factors determine the energy efficiency of a data centre? Where is the energy used? Local Climate Data Hall Temperatures Chiller / DX Energy Condenser / Dry Cooler / Cooling Tower Energy Pump Energy
ABSTRACT DCMCCT PROJECT OVERVIEW
Title: Case Study of the Austin Energy Dell Regional Children s Medical Center of Central Texas Packaged Hybrid CHP Energy Plant in Austin, Texas Authors: Mr. Ed Mardiat, Burns & McDonnell Mr. Jim Teigen,
Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010
Combined Heat & Power Discussion with Connecticut Energy Advisory Board February 23, 2010 Discussion Topics Introduce NRG Thermal Representative NRG Thermal projects District Energy Combined Heat and Power
World s Greenest High Performance Data Center
World s Greenest High Performance Data Center EcoDataCenter Sustainability for future generations Our Services Colocation Data Center for Mission Critical Requirements Lockable racks, cages, private rooms
University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008
University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 Contents Welcome and Introduction Chapter 1: Data centre energy recap Chapter 2: Co-generation Chapter 3: CTC case study
Micro-Turbine Combined Heat & Power Generators (CHP) Cold Climate Applications 2014 Polar Technology Conference Richard S.
Micro-Turbine Combined Heat & Power Generators (CHP) Cold Climate Applications 2014 Polar Technology Conference Richard S. Armstrong, PE DISTRIBUTED CO-GENERATION DEFINED Electricity and Heat production
Recommendations for Measuring and Reporting Overall Data Center Efficiency
Recommendations for Measuring and Reporting Overall Data Center Efficiency Version 2 Measuring PUE for Data Centers 17 May 2011 Table of Contents 1 Introduction... 1 1.1 Purpose Recommendations for Measuring
High Natural Gas Prices and the Updated Market For CHP
High Natural Gas Prices and the Updated Market For CHP World Energy Engineering Congress Paul Lemar, President E.J. Honton, Director Resource Dynamics Corporation 8605 Westwood Center Drive Vienna, Virginia
University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012
University of Maryland College Park District Energy System IDEA Campus Energy Conference February 9, 2012 UMCP District Energy System The University of Maryland district energy system consists of a well
DOE Data Center Energy Efficiency Program
DOE Data Center Energy Efficiency Program Paul Scheihing U.S. Department of Energy Energy Efficiency and Renewable Energy April 2009 1 DOE Industrial Technologies Program Worki king to improve th e energy
Recommendations for Measuring and Reporting Overall Data Center Efficiency
Recommendations for Measuring and Reporting Overall Data Center Efficiency Version 1 Measuring PUE at Dedicated Data Centers 15 July 2010 Table of Contents 1 Introduction... 1 1.1 Purpose Recommendations
Data Center Industry Leaders Reach Agreement on Guiding Principles for Energy Efficiency Metrics
On January 13, 2010, 7x24 Exchange Chairman Robert Cassiliano and Vice President David Schirmacher met in Washington, DC with representatives from the EPA, the DOE and 7 leading industry organizations
Source: EIA Natural Gas Issues and Trends 1998
7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it
ICT and the Green Data Centre
ICT and the Green Data Centre Scott McConnell Sales Manager c/o Tanya Duncan MD Interxion Ireland Green Data Centres Our Responsibility Data centre greenhouse gas emissions are projected to quadruple by
CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS. Thomas Jacobsen October 2012
CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS Thomas Jacobsen October 2012 ELEMENT MARKETS US Emissions House of the Year Launched in
DEMONSTRATION OF COMBINED HEAT AND POWER TECHNOLOGY AT A DATA CENTER
E n e r g y R e s e a r c h a n d Development Division F I N A L P R O J E C T R E P O R T DEMONSTRATION OF COMBINED HEAT AND POWER TECHNOLOGY AT A DATA CENTER Prepared for: Prepared by: California Energy
CHP Strategies and Options / Stored Energy. 2014 ENERGY SYMPOSIUM April8, 2014 Reading Country Club
CHP Strategies and Options / Stored Energy Jim Freihaut, Ph.D. Director, DOE Mid Atlantic CHP Technical Assistance Partnership Director, Indoor Aerosol Laboratory Professor, Architectural Engineering 104
Scalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
CRITICAL COOLING FOR DATA CENTERS
IDEA 100 th Annual Conference & Trade Show CRITICAL COOLING FOR DATA CENTERS Presented by Ron Johanning, PE, LEED AP Mission Critical Market Leader Agenda EPA Report Data Center Energy Trends IT Best Practice
Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup
Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: [email protected] Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210
GREEN DATA CENTER DESIGN
Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A
Wesleyan University. Electrical Power Study
1 Wesleyan University Business Continuity Planning Electrical Power Study 2 October 2011 snow storm 80% of Connecticut lost power including Wesleyan Wesleyan buildings were without power 3-6 days Without
Combined Heat & Power (CHP) UGI Webinar. Presented By: Barry Wentzel, UGI Utilities Eric Burgis, Energy Solutions Center June 18, 2013
Combined Heat & Power (CHP) UGI Webinar Presented By: Barry Wentzel, UGI Utilities Eric Burgis, Energy Solutions Center June 18, 2013 Topics to Discuss What is CHP and CCHP? What is the CHP System and
Fuel Cell Systems for Telecom Backup Power
Fuel Cell Systems for Telecom Backup Power Shanna Knights Manager, Research January 28, 2014 Smarter Solutions for a Clean Energy Future Ballard - Who We Are Ballard is the global leader in clean energy
Richard Sweetser, Principal Investigator, EXERGY Partners Corp. Email: [email protected], Phone: 703.707.0293
Richard Sweetser, Principal Investigator, EXERGY Partners Corp. Email: [email protected], Phone: 703.707.0293 U.S. DOE Industrial Distributed Energy Portfolio Review Meeting Washington, D.C.
AbSTRACT INTRODUCTION background
february 20, 2007 GREEN GRID METRICS: Describing Datacenter Power Efficiency Technical Committee White Paper white paper 1 Abstract The Green Grid is an association of IT professionals seeking to dramatically
DISTRICT HEATING & COOLING INTEGRATION OF CHP. BURNS & MCDONNELL October 2014
DISTRICT HEATING & COOLING INTEGRATION OF CHP BURNS & MCDONNELL October 2014 INTRODUCTION: SCOTT CLARK TIM BURKHALTER PROJECT DEVELOPMENT REPRESENTATIVE PROJECTS CANADA PROJECTS Chevron Refueler Inspection
Data Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
Metrics for Data Centre Efficiency
Technology Paper 004 Metrics for Data Centre Efficiency Workspace Technology Limited Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB Telephone: 0121 354 4894 Facsimile: 0121 354
California Air Resources Board s Distributed Generation Program
California Air Resources Board s Distributed Generation Program 6 th Annual Microturbine Applications Workshop January 17, 2006 Air Resources Board California Environmental Protection Agency Overview California
Five Nines and Infrared (IR) Testing at Data Centers
Five Nines and Infrared (IR) Testing at Data Centers By Gregory R. Stockton 99.999% uptime five nines. That is what IT (information technology) customers are looking for. Uptime or availability at data
How To Build A Power Line From A Single Campus To A Power Plant
Combined Heat Power Supported Microgrids: Essential for the Evolution of Distributed Generation October 16, 2012 Joe Sullivan, VP, Energy Policy & Development Concord Engineering District Energy CCHP Historic
Electrical Systems. <Presenter>
Review Root Causes of Energy Inefficiency Roadmap to Maximize Energy Efficiency Best Practices Alternative Energy Sources Controls Take Aways Seek Professional Help. ENERGY INEFFICIENCY OF
CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense
CarbonDecisions The green data centre Why becoming a green data centre makes good business sense Contents What is a green data centre? Why being a green data centre makes good business sense 5 steps to
Enabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
David Mezzacappa, P.E. SCS Engineers Contractor to U.S. EPA on LMOP
LMOP Workshop: LFG Collection & LFG Energy Technologies David Mezzacappa, P.E. SCS Engineers Contractor to U.S. EPA on LMOP Introduction Goal convert LFG into a useful energy form Technologies include:
Introducing UNSW s R1 Data Centre
Introducing UNSW s R1 Data Centre R1-DC Our New High Density Data Centre Right here Right now - Welcome to our newest UNSW Data Centre R1-DC R1 Location on UNSW Randwick campus. Keeping it in the family
Columbia University Master Planning & Optimization
Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Gas Absorption Heat Pumps. Future proofing your heating and hot water
Gas Absorption Heat Pumps Future proofing your heating and hot water Gas Absorption Heat Pumps 1 Contents Gas Absorption Heat Pumps (GAHPs) The heating solution What is a Gas Absorption Heat Pump? How
ENERGY STAR Data Center Infrastructure Rating Development Update. Web Conference November 12, 2009
ENERGY STAR Data Center Infrastructure Rating Development Update Web Conference November 12, 2009 Web Conference Tips Background Noise Please mute your phone until you are ready to speak. Hold & Music
Your partner of choice for integrated energy solutions
E.ON Connecting Energies Your partner of choice for integrated energy solutions Would you like to reduce your company s energy costs? Do you have ambitious environmental objectives? Are you concerned about
IT@Intel. Thermal Storage System Provides Emergency Data Center Cooling
White Paper Intel Information Technology Computer Manufacturing Thermal Management Thermal Storage System Provides Emergency Data Center Cooling Intel IT implemented a low-cost thermal storage system that
UTILITIES AND ENERGY MANAGEMENT
UTILITIES AND ENERGY MANAGEMENT University of Texas at Austin increases investment in co-generation to achieve greater utility reliability and economy. ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS Power plant
Energy Efficient High-tech Buildings
Energy Efficient High-tech Buildings Can anything be done to improve Data Center and Cleanroom energy efficiency? Bill Tschudi Lawrence Berkeley National Laboratory [email protected] Acknowledgements California
GENERATOR RATINGS AND THE IMPLICATIONS FOR DATA CENTERS
Systems POWER SYSTEMS TOPICS 109 GENERATOR RATINGS AND THE IMPLICATIONS FOR DATA CENTERS By Todd Matte Manager - Corporate Accounts Project Management Group KOHLER Systems Understanding how generator ratings
Siemens turbine solutions for urban cogeneration
BRUSSELS GREENTECH Siemens turbine solutions for urban cogeneration Restricted Siemens AG 2013 All rights reserved. Agenda Introduction Company in short Gas turbines Steam turbines Urban cogeneration references
Powering the world s energy infrastructure
GE Energy Gas Engine Waukesha * gas engines Powering the world s energy infrastructure GE Energy s Waukesha* gas engines power the world s energy infrastructure Waukesha engines are hard at work powering
ENERGY SERVICES ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS
ENERGY SERVICES University of California Los Angeles reduces operating costs and air pollution with landfill gasfueled cogeneration and creative financing. ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS Reduced
Guideline for Water and Energy Considerations During Federal Data Center Consolidations
Guideline for Water and Energy Considerations During Federal Data Center Consolidations Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Energy Efficiency and Availability Management in Consolidated Data Centers
Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX March 10, 2009 Agenda DFW Capital Development Program
Data Center Infrastructure & Managed Services Outline
Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
scalable data centre energy management solution
scalable data centre energy management solution scalable data centre energy management solution EcoMeasure - Scalable Data Centre Energy Management & Efficiency Measurement Solution by Workspace Technology
DATA CENTER ASSESSMENT SERVICES
DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to
Two-Phase Evaporative Precision Cooling Systems
Two-Phase Evaporative Precision Cooling Systems For heat loads from 3 to 300kW Using non-conductive refrigerant fluid, our patented Next-generation, two-phase evaporative precision cooling systems enable
Boilers and cogeneration/trigeneration. Abhi Sawant Business Development Manager Simons Green Energy
Boilers and cogeneration/trigeneration Abhi Sawant Business Development Manager Simons Green Energy HEATING - COOLING - SUSTAINABLE ENERGY ENERGY EFFICIENCY IN BOILERS, COGENERATION & TRIGENERATION Presented
BRUNS-PAK Presents MARK S. EVANKO, Principal
BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations
Princeton University Microgrid
Princeton University Microgrid IDEA evolvingenergy Conference Toronto, Canada 28th 30th October 2014 Edward Ted Borer, PE [email protected] Overview Campus Energy Demands Energy Plant Equipment Combined
Understanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM)
Understanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM) Salim Janbeh Physical Infrastructure Consultant [email protected] PANDUIT You Can t Manage What You Don t Measure:
CRM Sample Questions
CRM Sample Questions 1. What are the CO 2 emissions for a facility in Miami that uses 1,000,000 kwh/year? 2. What are the CO 2 e emissions for the facility in question 1? 3. You install a solar PV panel
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Tim Facius Baltimore Aircoil
Presented By: Tim Facius Baltimore Aircoil Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for the benefit of
BCA-IDA Green Mark for New Data Centres Version NDC/1.0
BCA-IDA Green Mark for New Data Centres Version NDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
Combined Heat and Power (CHP) En Banc Hearing October 7, 2014, University of Pittsburgh
Combined Heat and Power (CHP) En Banc Hearing October 7, 2014, University of Pittsburgh Thomas G. Bourgeois Deputy Director (914) 422 4013 [email protected] CHP in the Northeast States CT, MA, NY recognize
POD S in Data Centres. The Frame Group Pty Ltd
Presented by: Greg Goode The Frame Group Pty Ltd DATA Centres? POD SOLUTIONS REFERRED TO AS: Cells Modular Rooms High Density Zones Portable Modular Data Centres (Containers) Multiple Interpretations Varied
Designed for uptime. Defining data center availability via a tier classification system
Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center
Green Development of Infrastructure and Campus: Modern Practice and Approach in District Heating and Cooling System
Green Development of Infrastructure and Campus: Modern Practice and Approach in District Heating and Cooling System Hongxi Yin, Ph.D. School of Civil Engineering January 22, 2009 Page 1 The Impacts of
Big Buildings lead to big savings
GE Power & Water Distributed Power Big Buildings lead to big savings GE s combined heat and power solutions for commercial buildings and data centers can reduce your costs and emissions. Saving energy,
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units
NO-BREAK KS 7e. Concentrated Energy. 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM
NO-BREAK KS 7e Concentrated Energy e 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM Data Centre owners, operators and designers are required to meet ever increasing and
Data Centres A complete solution to noise control and acoustic packages
Data Centres A complete solution to noise control and acoustic packages Introduction World class noise control. Expertise you can trust. IAC Acoustics is world-renowned for providing cost effective solutions
PHOENIX ENERGY of NEVADA, LLC (PENV) (PENV)
PHOENIX ENERGY of NEVADA, LLC (PENV) INDUCTION FIELD ENERGY POWERED INDUCED FEED WATER RE-HEAT ING STEAM WASTE HEAT ENERGY RECOVERY DRY COOLING REVERSE CONDENSER REGENERATIVE STEAM CYCLE ELECTRIC POWER
CHICAGO S PREMIERE DATA CENTER
CHICAGO S PREMIERE DATA CENTER White City collocation was founded in June, 2010 by a highly experienced industry executive in conjunction with several investment companies. The strategy of White City is
Strategic Data Centre Site Profiles. Data Centre Co-Location London East
Strategic Data Centre Site Profiles Data Centre Co-Location London East Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 5 Contents 1. LONDON EAST...3 1.1 LOCATION...3 1.2 TECHNICAL
Green Data Centers. Jay Taylor Director Global Standards, Codes and Environment (512) 818-2073
Green Data Centers Jay Taylor Director Global Standards, Codes and Environment (512) 818-2073 The energy dilemma: With Me, Without Me The facts The need Energy demand By 2050 Electricity by 2030 Source:
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
This presentation is posted for public use. ACEEE does not endorse any product or service.
This presentation is posted for public use. ACEEE does not endorse any product or service. ACEEE accepts no responsibility for any facts or claims this presentation may contain. SOLAR Solar Water Heating
Datacentre Reading East 2 Data sheet
Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.