1 EXECUTIVE REPORT Can Your Data Center Infrastructure Handle the Heat of High Density?
2 If you re losing sleep wondering how your company can migrate to high density computing architectures, you re not alone. According to research compiled by Gartner, Deloitte Consulting and other analysts, by 2012 roughly half of existing in-house data centers will be forced to relocate to new facilities, retrofit an existing facility or outsource various high-performance applications. It s a forced migration, for the simple reason that high density computing is no longer a future trend it s here, and it s being used aggressively to enhance business and operations for companies of virtually every size and industry worldwide. According to IDC research data, approximately 75 percent of medium-to-large enterprise companies are in the process of implementing high density computing platforms. By 2012, this number will approach 100 percent. High density computing is today s standard in best-in-class performance and availability, and those that fail to keep pace or fall behind will find themselves no longer competitive in today s markets. Initial Considerations re: High Density Architectures Migrating from a traditional data center to a high density data center requires an understanding of newer protocols, hardware and architectures. We all know that high density data centers consume far more power than traditional centers. In addition to consuming greater power, high density environments also generate more heat. This places greater emphasis on air flow and temperature controls. High density data centers typically use a computational fluid dynamics, or CFD, simulation to engage the entire layout of the data center and run through all the what if scenarios to identify hot spots and potential problem areas. The sub-floor ventilation and perforated tiles are designed and laid out using engineering-driven schematics that maximize output and availability for any emergency overheating situation. Ventilation in a high-density environment requires a minimum three-foot raised floor to accommodate necessary sub-floor equipment. Racks are set up in a hot aisle/cold aisle configuration with dual air flow designed to effectively disperse cold air into the cold rows and to pull hot air off the hot aisles minimizing the mix of cold and hot air. The resulting effect is a highly effective cooling strategy designed to maximize the efficiency of the CRAC units. CFD simulations are also highly effective at identifying the strategic placement of CRAC units to ensure that optimal airflow can be diverted and/or increased to any potential hot zones. 2
3 High density/high availability applications are consolidated, hosted and managed primarily on blade servers, which require less physical space than traditional servers and can be condensed into ultra high-performance racks that deliver unprecedented performance. These modular racks take up little space and are relatively easy to update or reconfigure. Blade servers are designed for maximum processing ability, and this increased performance comes at a hefty cost, literally blade servers consume, typically, 10 times more total power than conventional rack servers, and require at least a four-fold increase in cooling capacity. As a result, according to a recent Uptime Institute study, power consumption in data centers has increased sevenfold (over 600 percent) in just seven years. In fact, companies today are confronting dramatic cost increases across the board in terms of building and operating a high density, high availability infrastructure. According to The Uptime Institute, building a Tier 3 or greater facility with 25,000 square feet of raised white floor at 100 watts per sq foot can cost more than $60 million. High density server technologies require 200+ watts per square foot, scaling these costs even further. Beyond the rising building costs, capacity planning is also a challenge for companies. Overbuilding an infrastructure, where white floor space is under-utilized, can be detrimental to the return on the investment. Underbuilding or poorly retrofitting an infrastructure that is obsolete and doesn t meet user-demand creates additional problems. Assessing Your Current Data Infrastructure Although some in-house data centers are currently equipped to manage high density server and storage requirements, the majority are not. In fact, most data centers have an inherent probability of failure by design of percent within 5 years. Advances in data center technology and high density performance/scalability have emerged and matured so quickly that many in-house infrastructures are obsolete, or dangerously close to being so. CIOs and IT managers working with traditional data centers are faced with three choices: Build a new data center; Retrofit an existing data center; Utilize a Colocation vendor. To make the best decision, a detailed functional analysis is required. The essential first step to understanding your infrastructure s ability to handle high density requirements is to perform a thorough comparative evaluation. This can be done by assessing your current data center environment, then comparing it to a similarlysized, fully-equipped high density data center. 3
4 During this process, you will need to address five key areas that directly impact both your data center infrastructure and business as a whole: 1. Identify the weakest points in your infrastructure and focus there. 2. Understand the risks associated with an inadequate infrastructure. 3. Research and document all aspects of the risks you ve identified. 4. Work from the inside out. Start with internal processes and structural changes that can be made and work toward external solutions or products that you may need to integrate, in order to make your migration plan successful. 5. Prioritize your solutions. Use your cost of downtime as a way to prioritize and justify change and investments. Side-by-side Comparison As we can see from Figure 1, migrating from a traditional data infrastructure to a high density environment at an industry-typical 5,000 square feet requires changes and considerations across the board. Square footage within the data center becomes reprioritized, power and cooling requirements increase, redundancy protocols become paramount and additional mechanical yard space is needed. Existing Data Center Existing Space Expanded to 250 Watts/Foot Notes 5000 Sq ft 5000 Sq Ft You will loose 948 useable feet because of adding PDUs and CRACs 100 Watts/Foot 250 Watts/Foot 2NDesign 2NDesign KVAPDUs PDUs Adding 8-225KVAPDUs KVAPDUs KVAUPSs Adding 2-800KVAUPS*Must have Mechanical Space KVA UPSs 2 - Switch Gear 4 - Switch Gear Adding 2 Switch Gear * Must have Mechanical Space 2 - ATSs 4 - ATSs Adding 2 ATS * Must have either Mechanical Space or Mechanical Yard Space 1 - Fuel Tank 2 - Fuel Tank Adding one fuel tank * Must have Mechanical Yard Space meg Gens Meg Gens Adding 2-2 Meg Gens * Must have Mechanical Yard Space Meg Gens ton Air Chillers ton Air Chillers ton Air Chillers Adding ton air chillers * Must have Mechanical Yard Space * Must have 3 foot raised floor to go to 250 Watts a Foot. * Must have appropriate water loop pipe size. 4
5 Square Footage Many IT managers worry about the rapid loss of square footage in the data center, as new equipment is added to the floor. In a high density environment, some square footage is conserved or even reduced through the use of blade servers, which operate at far higher densities than conventional servers and storage equipment. However, high density architectures require additional PDUs and CRAC units, thus offsetting these gains. In a typical conversion, you will sacrifice nearly 1,000 square feet through the addition of power and infrastructure hardware necessary to manage the power and cooling requirements of a high density environment. Keep in mind, however, that properly-installed high density architectures maximize every available square foot and virtually eliminate the need for surplus white space to accommodate future growth. Scalability is achieved through various protocols that leverage existing high density hardware including virtualization and cross-platform optimization. Increased Watts per Square Foot Traditional data centers operate at approximately 100 Watts per square foot. High density infrastructures require an average of 250 Watts per foot. This means more power, more cooling, greater fault tolerance and higher operating expenses. For example, high density blade servers operate at 50 amps, a major increase over previous server generations that typically ran at 20 amps. As a general rule of thumb it takes $1 (of utility power) to cool every dollar in direct consumption in a high density data center. 2N Design Historically, not all high availability applications required a high density computing environment. Also not all high density applications required a high availability platform. In its earliest form, dense computing was used only by seismic processing and reservoir modeling applications requiring an N+1 power infrastructure, at best. Although these systems required more power and cooling, it was acceptable for them to be restarted in the event they overheated or in the event power was distributed. 5
6 Today s high density infrastructures require full 2N redundancy supported by expansion of uninterruptible power supply (UPS), power distribution units (PDU) and automatic transfer switches (ATS). That s because the concept of high availability/high density computing is engineered specifically to accommodate always on applications that require robust processor speeds and vast data storage capabilities. With a 2N protocol in place, the impact of system failure is virtually eliminated, as each server or storage device is configured with A/B backup availability at every point of risk within the data center (ie: power, connectivity, hardware). That means if the power fails or a cooling unit falters, a reserve generator or unit picks up immediately at the moment of failure, with zero interruption. If a server fails or overheats, redundancy protocols transfer the workload to an alternate server, ensuring that business continuity is achieved with zero downtime. In many enterprise-scale ERP models, applications must be deployed with maximum (ie: permanent) availability for thousands of users across global geographies. Only carefully configured high density computing and data center environments can deliver this level of global availability and productivity. Mechanical and Yard Space Perhaps the most significant upgrade for most data centers is the upgrade in equipment to support increased power and cooling requirements and related backup redundancy measures. Additional mechanical and/or external yard space is needed to support the increase in heavy hardware. This includes doubling the number of many existing components including UPS units, switch gear, ATS units, fuel tanks, high-powered generators, and air chillers. Additionally, the number of PDUs and CRAC units increase by a factor of two. In many instances, the additional hardware is higher powered than existing units, translating into even greater power and cooling costs. The costs associated with these upgrades can reach seven figures. Making the Right Decision Once your assessment is complete, you will have a better understanding of your existing infrastructure and whether or not expansion or retrofitting is viable. For most data centers, it isn t an option high build costs, restricted mechanical/yard space and increased power and cooling burdens present huge obstacles for most. 6
7 Another related issue is the fluctuation of utilities costs. While infrastructure and design challenges can be anticipated with near certainty, power and cooling requirements cannot. The principal challenge moving forward is to develop data center models that can mitigate these increasing costs. IDC anticipates that annual cooling and power costs could exceed 70 percent of high density computing expenses, far outweighing the purchase cost of hardware and components. This places an even greater premium on data center design that optimizes power and cooling distribution with maximum utility efficiency. High density infrastructure is essential to running high density applications, thus these costs are unavoidable and must be approached with new protocols to minimize the impact on IT budgets. The alternative is no less than the proverbial 800-pound gorilla colocating data and applications with a data hosting provider, typically within a Tier 3 or greater data center that is designed and dedicated for high density requirements. It s an obvious choice for many CIOs and IT managers, as best-in-class hosted data facilities help achieve cost certainty while ensuring maximum performance and availability of high density applications through future-proof design and planning. For example, CyrusOne s Dallas Technology Center provides 192,000 square feet of data center floor space with 85 acres for future build-to-suit and footprint expansion. This is more than ample for a wide variety of enterprise companies needs. The data center provides optimal redundancy and scalability, with an on-site electrical substation to provide full 2N redundancy, two independent power grids, three separate substations, two 42 MVA transformers within on-site substations and a tie breaker to further reinforce 2N reliability and seamless productivity. The facility s cooling infrastructure is supported by four 1500-ton Trane chillers and one 650-ton Carrier chiller. Communications capabilities feature unlimited bandwidth capabilities, upgradeable to OC-192. Connectivity is secured through a dual sonet ring powered by AT&T and Verizon. This facility offers the most advanced resources and architecture, presenting a stellar example of best-in-class colocation. Most colocated data centers are expressly designed from the ground up, with deeply integrated infrastructures, dedicated built-in redundancies and abundant external space for installing and expanding power and cooling units. In doing so, they help achieve perhaps the greatest factor of all peace of mind knowing that your data and applications are secure and your business is free to run and grow, unimpeded by technology demands. 7
8 About CyrusOne With over two dozen data centers across the globe, CyrusOne helps many of the world s largest global businesses including 9 of the global Fortune 20 companies and over 135 of the Fortune 1000 and companies of all sizes take advantage of the latest data center technology and realize top operational efficiencies through: Flexible, Scalable Solutions Receive flexible data center solutions that readily scale to match the needs of your growing business. Proven, Innovative Technology Benefit from the latest data center innovations CyrusOne expert technicians can put to work for your IT environment. Exceptional Service Enjoy personalized, consultative service through all stages of the relationship - design, build, installation, management, and reporting. CyrusOne National IX Offers low-cost metro connectivity and city-to-city transport in an ever growing number of cities across the US. About the Author Scott Brueggeman oversees the management of CyrusOne s global marketing, product development, inside sales, and corporate communications including branding, demand creation, and public relations. His 20 years of marketing and sales experience includes Fortune 50 firms, as well as smaller high-growth companies. Prior to CyrusOne, he spent several years with running marketing at a data center hosting and managed services company, as well as Chief Marketing Officer at PEAK6 Investments, an international financial services firm. Prior to that he was VP Marketing for CareerBuilder, and also held leadership positions at AT&T and PepsiCo. Brueggeman serves on several advisory boards. CyrusOne (855) cyrusone.com 8
Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades
Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades Can Your Data Center Infrastructure Handle the Heat of High
More informationCIOs Rising in Performance Needs
EXECUTIVE REPORT 5 Colocation Most Significant Addresses Challenges Oil & Gas Companies Facing CIOs Rising in Performance 2013 Needs Built for Tomorrow. Ready today. 1649 W Frankford 1649 Frankford Rd,
More informationHow to Select a Colocation Provider Offering High Performance Computing
EXECUTIVE REPORT How to Select a Colocation Provider Offering High Performance Computing How to Select a Colocation HPC computing infrastructures can t use traditional computing environments. Due to the
More informationEXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy
EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers
More informationEXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider
EXECUTIVE REPORT The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider Executive Summary Even through challenging economic times, the need for physical data center capacity continues
More informationHigh Performance Computing (HPC) Solutions in High Density Data Centers
EXECUTIVE REPORT High Performance Computing (HPC) Solutions in High Density Data Centers How s Houston West data center campus delivers the highest density solutions to customers Overview With the ever-increasing
More informationEXECUTIVE REPORT. Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center
EXECUTIVE REPORT Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center Overview Data center industry trends are changing the way businesses spend money and invest in IT initiatives.
More informationInterconnection for Financial Services
EXECUTIVE REPORT 5 IT Most Service Significant Challenges Management Facing CIOs Framework in 2013& Interconnection for Financial Services Built for Tomorrow. Ready today. 1649 W Frankford 1649 Frankford
More informationCARFAX Selects Data Center for Connectivity & Redundancy
CASE STUDY CARFAX Selects Data Center for Enterprise Deploys New IT Footprint in Data Centers Interconnected from Across the U.S. Abstract CARFAX is America s leading provider of vehicle history reports
More informationHow T-Systems Solved Its Data Center Challenges to Offer Dynamic Services to the U.S.
Case study How T-Systems Solved Its Data Center Challenges to Offer Dynamic Services to the U.S. The Company T-Systems, part of Deutsche Telekom Group (DT), delivers Information and Communication Technologies
More informationScalability & Capacity Planning: Build vs. Buy
EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers
More informationCASE STUDY. Nirvanix, Inc. Finds a Secure and Reliable Data Center and a Strategic Partner for Cloud Services at CyrusOne
CASE STUDY Nirvanix, Inc. Finds a Secure and Reliable Data Center and a Strategic Partner for Cloud Services at CyrusOne The Company Nirvanix, Inc. is the leading provider of enterprise-class cloud storage
More informationCASE STUDY. CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation
CASE STUDY CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation Abstract To handle the administrative needs of America s fourth-largest city, the City
More informationHigh Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.
High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white
More informationAvoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation
EXECUTIVE REPORT Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation Overview CIOs today face a litany of challenges and risks when it comes to meeting the goal of making the
More informationCYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY.
CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. ABOUT CYRUSONE GLOBAL DATA CENTER FACILITIES. A Global Leader 24 high performance data centers worldwide Servicing 9 of top 20 Global Fortune
More informationManaging Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
More informationEXECUTIVE REPORT. 4 Critical Steps Financial Firms Must Take for IT Uptime, Security, and Connectivity
EXECUTIVE REPORT 4 Critical Steps Financial Firms Must Take for IT Uptime, Security, and Connectivity When Millions of Dollars of Financial Transactions are On the Line, Downtime is Not an Option The many
More informationCASE STUDY. FuelQuest, Inc. Achieves 100% Uptime for their Cloud-Based Fuel Inventory and Tax Solutions at CyrusOne s Data Center
CASE STUDY FuelQuest, Inc. Achieves 100% Uptime for their Cloud-Based Fuel Inventory and Tax Solutions at CyrusOne s Data Center The Company FuelQuest, Inc. is the leading provider of software solutions
More informationEnergy Management Services
February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the
More informationEXECUTIVE REPORT. Why Healthcare Providers Seek Out New Ways To Manage and Utilize Big Data
EXECUTIVE REPORT Why Healthcare Providers Seek Out New Ways To Manage and Utilize Big Impact of Healthcare Regulations on the Center The HIPAA and HITECH acts, along with the Affordable Care Act, are changing
More informationEMC PERSPECTIVE Managing Energy Efficiency in the Data Center
EMC PERSPECTIVE Managing Energy Efficiency in the Data Center A tactical approach can deliver immediate problem resolution plus long-term savings and efficiencies Managing Energy Efficiency in the Data
More informationDesign Best Practices for Data Centers
Tuesday, 22 September 2009 Design Best Practices for Data Centers Written by Mark Welte Tuesday, 22 September 2009 The data center industry is going through revolutionary changes, due to changing market
More informationHigh-performance. High-density. Highly committed. Built for tomorrow. Ready today.
High-performance. High-density. Highly committed. Built for tomorrow. Ready today. Built for tomorrow. Ready today. In today s environment, the focus should be on investing time in your company and not
More informationHPC TCO: Cooling and Computer Room Efficiency
HPC TCO: Cooling and Computer Room Efficiency 1 Route Plan Motivation (Why do we care?) HPC Building Blocks: Compuer Hardware (What s inside my dataroom? What needs to be cooled?) HPC Building Blocks:
More informationPower and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
More informationEnabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
More informationEXECUTIVE REPORT. 6 Key Considerations for Financial Firms to Improve Security and Scalability of Mobile Banking Services
EXECUTIVE REPORT 6 Key Considerations for to Improve Security and Scalability of Mobile Banking Services Consumers Demand Mobile Banking, So Financial Companies Need Best-in- Class Security and Scalable
More informationHigh-performance. High-density. Highly committed.
High-performance. High-density. Highly committed. 4211 Southwest Freeway, Houston, TX 77027 + Built for tomorrow. Ready today. In today s environment, the focus should be on investing time in your company
More informationHow to Obtain the Uptime, Security and Robust Connectivity Financial Services Firms
EXECUTIVE REPORT How to Obtain the Uptime, Security and Robust Connectivity Financial Services IT Service Management Framework & Interconnection for Financial Services The many different entities that
More informationEducation Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room
More informationOptimizing Power Distribution for High-Density Computing
Optimizing Power Distribution for High-Density Computing Choosing the right power distribution units for today and preparing for the future By Michael Camesano Product Manager Eaton Corporation Executive
More informationBenefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
More informationWhat to Consider When Designing Next-Generation Data Centers
Research Publication Date: 10 September 2010 ID Number: G00201044 What to Consider When Designing Next-Generation Data Centers David J. Cappuccio Leading-edge data centers are designed for flexibility,
More informationData Center Equipment Power Trends
Green field data center design 11 Jan 2010 by Shlomo Novotny Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp. explores water cooling for maximum efficiency - Part 1 Overview Data
More informationManaging Today s Data Centers Avoiding the Impending Crisis
Managing Today s Data Centers Avoiding the Impending Crisis Steven Yellen Aperture Research Institute EXECUTIVE SUMMARY Organizations are facing an impending data center management crisis. The constant
More informationReducing Data Center Energy Consumption
Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate
More informationData Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions
Data Centers Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions 1 Introduction The growing speed and footprint of data centers is challenging
More informationStrategies for Deploying Blade Servers in Existing Data Centers
Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling
More informationHow To Improve Energy Efficiency In A Data Center
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
More informationEXECUTIVE REPORT. Big Data and the 3 V s: Volume, Variety and Velocity
EXECUTIVE REPORT Big Data and the 3 V s: Volume, Variety and Velocity The three V s are the defining properties of big data. It is critical to understand what these elements mean. The main point of the
More informationBRUNS-PAK Presents MARK S. EVANKO, Principal
BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations
More informationPredictive Data Center Infrastructure Management (DCIM)
Predictive Data Center Infrastructure Management (DCIM) A toolset to maximize the return on capital expenditure in the physical data center Sherman Ikemoto, Matt Warner, Akhil Docca, Hassan Moezzi 11/21/2012
More informationGreening Commercial Data Centres
Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling
More informationBrought to you by. Colocation Solutions BROUGHT TO YOU BY. www.yourwebsite.com. www.ingrammicro.com
Brought to you by Colocation Solutions BROUGHT TO YOU BY www.yourwebsite.com Overview IT LEADERS ARE CAUGHT IN THE PERFECT STORM. Today, IT executives struggle with several critical issues including new
More informationPower and Cooling Capacity Management for Data Centers
Power and Cooling Capacity for Data Centers By Neil Rasmussen White Paper #150 Executive Summary High density IT equipment stresses the power density capability of modern data centers. Installation and
More informationIntegrated Infrastructure Solutions. Building a Data Center for the Future
Integrated Infrastructure Solutions Building a Data Center for the Future Apps DATA CENTER STACK Information Technology Infrastructure Facilities DB OS VM Compute Storage Network Connectivity Rack Power
More informationConverged Infrastructure Solutions. Building a Data Center for the Future
Converged Solutions Building a Data Center for the Future :: Traffic in data centers is growing at an unprecedented rate, with network traffic growing at 25+% and enterprise storage at 50+% annually, 1
More informationBlade Servers and Beyond: Adaptive Cooling for the Next Generation of IT Systems. A White Paper from the Experts in Business-Critical Continuity
Blade Servers and Beyond: Adaptive Cooling for the Next Generation of IT Systems A White Paper from the Experts in Business-Critical Continuity Executive Summary In enterprise data centers, designers face
More informationCHICAGO S PREMIERE DATA CENTER
CHICAGO S PREMIERE DATA CENTER White City collocation was founded in June, 2010 by a highly experienced industry executive in conjunction with several investment companies. The strategy of White City is
More informationData Center & IT Infrastructure Optimization. Trends & Best Practices. Mickey Iqbal - IBM Distinguished Engineer. IBM Global Technology Services
Data Center & IT Infrastructure Optimization Trends & Best Practices Mickey Iqbal - IBM Distinguished Engineer IBM Global Technology Services IT Organizations are Challenged by a Set of Operational Issues
More informationAEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
More informationIncreasing Energ y Efficiency In Data Centers
The following article was published in ASHRAE Journal, December 2007. Copyright 2007 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes
More informationEnergy Efficiency and Availability Management in Consolidated Data Centers
Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal
More informationThe New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,
More informationImproving Data Center Performance Through Virtualization of SQL Server Databases
Improving Data Center Performance Through Virtualization of SQL Server Databases Contents Abstract. 1 SQL Server s Role Inside SMBs. 2 IT s Biggest Data Center Concerns. 2 Virtualization is the Solution.
More informationCarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense
CarbonDecisions The green data centre Why becoming a green data centre makes good business sense Contents What is a green data centre? Why being a green data centre makes good business sense 5 steps to
More informationData center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
More informationSmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity
SmartDesign Intelligent, Integrated Infrastructure For The Data Center Solutions For Business-Critical Continuity Prepare Your Data Center For What s Next Efficiency. Availability. Capacity. Control. One
More informationabstract about the GREEn GRiD
Guidelines for Energy-Efficient Datacenters february 16, 2007 white paper 1 Abstract In this paper, The Green Grid provides a framework for improving the energy efficiency of both new and existing datacenters.
More informationAlternative data center power
Alternative data center power A quantitative TCO comparison of 400V AC and 600V AC power systems Abstract Power efficiency has become a critical focus for IT and facilities managers as they struggle to
More informationData Centre Outsourcing a Buyer s Guide
Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine
More informationModernizing Vintage Data Centers
Modernizing Vintage Data Centers Improving the reliability, efficiency and effectiveness of older computing facilities by upgrading their power and cooling systems By John Collins Segment Manager, Data
More informationVirginia Tech. Background. Case Summary. Results
Background Virginia Tech When Virginia Tech initiated plans to build a supercomputer by clustering hundreds of desktop computers, it had ambitious goals for the performance of the new system and a very
More informationColocation Selection Guide. Workspace Technology Ltd
Colocation Selection Guide Workspace Technology Ltd Technology House 5 Emmanuel Court Reddicroft Sutton Coldfield West Midlands B72 1TJ Tel 0121 354 4894 Fax 0121 354 6447 www.workspace-technology.com
More informationData Center Optimization: Beware of the Power Density Paradox
DATA CENTER OPTIMIZATION: BEWARE OF THE POWER DENSITY PARADOX 1 Data Center Optimization: Beware of the Power Density Paradox Avoid the trap balance high density deployments with available power, cooling
More informationDatacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
More informationTHE GREEN DATA CENTER
GREEN IT THE GREEN DATA CENTER WHERE ECOLOGY MEETS ECONOMY We truly live in an information age. Data Centers serve a very important purpose they provide the global community with nearly unlimited access
More informationWHITE PAPER Server Innovations: Examining DC Power as an Alternative for Increasing Data Center Efficiency and Reliability
Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com WHITE PAPER Server Innovations: Examining DC Power as an Alternative for Increasing Data Center Efficiency
More informationData Centers That Deliver Better Results. Bring Your Building Together
Data Centers That Deliver Better Results Bring Your Building Together 1 Meeting the high demands of your data center Meeting the increasing heat loads associated with growing computational needs requires
More informationUnified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
More informationCASE STUDY. How T-Systems Solved Its Data Center Challenges to Offer Dynamic Services to the U.S.
CASE STUDY How T-Systems Solved Its Data Center Challenges to Offer Dynamic Services The Company T-Systems, part of Deutsche Telekom Group (DT), delivers Information and Communication Technologies (ICT)
More informationOverview of Green Energy Strategies and Techniques for Modern Data Centers
Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.
More informationMicrosoft Technology Center: Philadelphia
A Customer Success from the Experts in Business-Critical Continuity TM. Background Microsoft Technology Center: Philadelphia Microsoft Technology Centers are collaborative, state-of-the-art facilities
More informationGREEN FIELD DATA CENTER DESIGN WATER COOLING FOR MAXIMUM EFFICIENCY. Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp.
GREEN FIELD DATA CENTER DESIGN WATER COOLING FOR MAXIMUM EFFICIENCY Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp. Overview Data centers are an ever growing part of our economy.
More information100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
More informationHPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.)
HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.) Felipe Visbal / March 27, 2013 HPPR Data Center Technologies Team Services Data Centers: Thermal Assessments
More informationData Center Trend: Distributed Power in the White Space
Data Center Trend: Distributed Power in the White Space By Jason Anderson Product Line Manager Eaton Executive summary Cloud computing vendors and colocation data centers make every effort to maximize
More informationAisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings
WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,
More informationIT@Intel. Thermal Storage System Provides Emergency Data Center Cooling
White Paper Intel Information Technology Computer Manufacturing Thermal Management Thermal Storage System Provides Emergency Data Center Cooling Intel IT implemented a low-cost thermal storage system that
More informationIs your data center ready for virtualization?
Is your data center ready for virtualization? Important power considerations for virtualized IT environments By Chris Loeffler, Global Applications Manager, Distributed Power Solutions Eaton Corporation
More informationPower Consumption and Cooling in the Data Center: A Survey
A M a r k e t A n a l y s i s Power Consumption and Cooling in the Data Center: A Survey 1 Executive Summary Power consumption and cooling issues in the data center are important to companies, as evidenced
More informationOptimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
More informationAPC APPLICATION NOTE #92
#92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center
More informationDealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges
More informationIT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS
IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center
More informationSpecialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
More informationCombining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
More informationIncreasing Data Center Efficiency through Metering and Monitoring Power Usage
White Paper Intel Information Technology Computer Manufacturing Data Center Efficiency Increasing Data Center Efficiency through Metering and Monitoring Power Usage To increase data center energy efficiency
More informationAdaptive Cooling in Data Centers. Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009
Adaptive Cooling in Data Centers Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009 Maximizing Cooling Efficiency in a Concurrently Maintainable and Fault
More informationUsing CFD for optimal thermal management and cooling design in data centers
www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,
More informationDatacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
More informationIs an energy-wasting data center draining your bottom line?
Abstract Is an energy-wasting data center draining your bottom line? New technology options and power distribution strategies can dramatically reduce the cost and carbon footprint of your data center.
More informationOur data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
More informationLEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
More informationOPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
More informationData Center Power Consumption
Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling
More informationBuilding a data center. C R Srinivasan Tata Communications
Building a data center C R Srinivasan Tata Communications Introduction Data Center as defined by TIA 942 A building or a portion of a building whose primary function is to house a computer room and its
More informationSanjeev Gupta Product Manager Site and Facilities Services
IBM Global Technology Services IBM Project Big Green Delivering Client Value Sanjeev Gupta Product Manager Site and Facilities Services Data centers are at a tipping point and energy use and cost is the
More informationData Center of the Future. Is it possible to be Efficient, Reliable and Cost Effective?
Data Center of the Future Is it possible to be Efficient, Reliable and Cost Effective? Data center challenges: Navigate budget constraints need solutions with a low TCO Avoid downtime need higher availability
More information