2.1 Development of Risk-Based Asset Management Framework



Similar documents
SANITARY SEWER SYSTEM ASSESSMENT

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

Appendix J: Pipe Evaluation and Replacement Options and Costs

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Using GIS to Track and Prioritize Your Assets

ITD Pipe Materials Selection & Specification Procedures. July 2011

SPR PE Steel Reinforced Liner

Rehabilitation or Replacement? That Is The Question

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Stormwater Infrastructure Asset Management Plan

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

CHAPTER 11 STORM DRAINAGE

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

X Planning X Quality X Maintenance & Operations

SECTION 3 SANITARY SEWER DESIGN

See Appendix A for additional information, or contact ASTM directly.

Bridges & Culverts Condition by Quantity

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Township of Enniskillen. Asset Management Plan

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Water and Sewer Utilities

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

CLEANING, INSPECTION, AND TESTING OF SEWERS

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

City of Mill Valley Sewer Capital Improvement Plan

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

Sewer System Management Plan

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Emerging Technologies in Wastewater Collection Systems

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

COLLECTION SYSTEM SETTLEMENT AGREEMENT

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Asset Management: A Best Practice

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

Even Cowboys Need Good Data City of Pendleton GIS Development

Design Criteria & Service Goals

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets

The city of Odessa, Texas,

CHAPTER 2 HYDRAULICS OF SEWERS

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program

GIS in Wastewater Collection System Master Planning

Master Planning and Hydraulic Modeling

Appendix B: Uniform Color Code & Marking Guidelines

Asset Management Plan

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Section 2100-Trenching and Tunneling

SECTION STORM DRAINAGE TABLE OF CONTENTS

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

DIVISION 4300 STORM DRAINAGE

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION STORM DRAINAGE SYSTEM

Appendix A: Acceptable pipe and fitting materials

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions

Storm Sewer Pipe Material Technical Memorandum 3 rd Edition. Urban Drainage and Flood Control District. for. July 13, Project No.

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

SECTION FACILITY STORM DRAINAGE PIPING

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 724 PIPE CULVERTS

DRAFT Public Outreach Document for What s an SSMP?

Pipeline Asset Management: From Assessment to Prioritized Projects List

SANITARY SEWER SPECIFICATIONS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

SECTION STORM DRAIN SYSTEM

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

SECTION 5: SANITARY SEWER SYSTEM DESIGN

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION

CHAPTER 8 CIVIL DESIGN

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

Sanitary District No. 1 of Marin County Infrastructure Asset Management Plan

FY08 SEWER POINT REPAIRS BID TABULATION

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

Chapter 9 Storm Sewers

CHAPTER 11 STORM DRAINAGE

SEWER LINE EXTENSION DESIGN CHECKLIST

SECTION 603 SANITARY SEWER FORCE MAINS

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

Sewer Rehabilitation Design Requirements

Repair or Replacement - Band-Aids vs. Surgery

Close-Out Documents... 9

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

NEVADA IRRIGATION DISTRICT DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS GENERAL

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Transcription:

SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework to augment its current asset management practices. With this new framework, operations and maintenance (O&M) activities and capital investments are evaluated and ranked by priority in terms of risk posed by an asset s failure. Risk is measured in terms of the consequence, which is evaluated by the impact on levels of service, and in terms of likelihood, which is the possibility that the asset will fail. The level of service categories defined for WES are: Health and safety of the public and employees Financial impact Public confidence Environmental compliance System reliability Likelihood of failure was evaluated based on physical condition of the asset, performance, external and internal physical factors affecting the asset, O&M protocols, and reliability history. The consequences of failure categories are assessed individually as negligible, low, moderate, or severe. The likelihood categories are rated as negligible, unlikely, possible, likely, and very likely to contribute to asset failure. With this approach, the likelihood and consequence scores are combined to determine a risk score for each asset. The relative order of risk established by this evaluation is used to guide decisions about operating and maintenance activities, rehabilitation and replacement of system components, and establishing priorities for capital improvement projects. Adopting a risk-based asset management approach to assessing its infrastructure will allow WES to continue to make effective, defensible and reproducible decisions regarding capital rehabilitation and replacement projects, as well as refining its operation and maintenance protocols. With a focus on maintaining its levels of service at the lowest life-cycle cost, WES will create efficiency at all levels of planning and operations. For more information about the asset management framework developed refer to Technical Memorandum 5.1, Pipeline and Pump Station Condition Assessment Evaluation (provided in Appendix E). CCSD1_SSMP_063009.DOC 2-1

2.2 Recommendations To ensure WES receives the most value for the resources invested in this risk-based approach, the following recommendations are offered: Undertake detailed condition assessments of those interceptor segments and subbasins having unacceptable risk, giving priority to those with highest risk. Incorporate condition assessments into planned maintenance activities. Update risk scores based on the most recent condition and performance assessments. Revisit consequence scoring at periodic intervals, no greater than every 5 years, but more frequently as demographics, customer issues, and regulations change. Update asset hierarchy as new assets are added to the system and when assets are removed from the system. Use computerized maintenance management system (CMMS) and geographical information system (GIS) to store consequence and likelihood data, and retrieve the data to perform periodic analysis when preparing capital improvement program (CIP) and revising O&M protocols. Incorporate a risk-based approach into operational and business processes and train staff in its use. Expand the risk-based approach to treatment facility assets. 2.3 Existing System Characterization CCSD #1 is served primarily by gravity-flow sewage collection systems that terminate at the Kellogg Creek Water Pollution Control Plant (WPCP). Pump stations provide service to areas at the edge of the gravity flow basin boundaries. In total, CCSD #1 includes fifteen pump stations and approximately 1.6 million linear feet of collection system pipeline. The existing collection system is briefly characterized in Figures 2-1, 2-2, and 2-3 in terms of pipeline diameter, construction material, and year of installation based on WES data. As shown in Figure 2-1, most the collection system pipelines are 8 inches in diameter. 2-2 CCSD1_SSMP_063009.DOC

FIGURE 2-1 Summary of CCSD #1 Collection System Pipelines by Diameter 1,400,000 1,200,000 Quantity of Pipe in Linear Feet 1,000,000 800,000 600,000 400,000 200,000 0 4 6 8 10 11 12 15 16 18 20 21 24 27 30 33 36 42 45 48 54 72 84 Pipe Diameter in Inches CCSD1_SSMP_063009.DOC 2-3

The currently available inventory of CCSD #1 collection system pipeline materials accounts for approximately 40 percent of the existing system. As shown in Figure 2-2, the majority of the inventoried system is made of concrete pipe. Based on general system knowledge, CCSD #1 staff indicates that most of the un-inventoried portion of the system is probably constructed of PVC. FIGURE 2-2 Summary of Inventoried CCSD #1 Collection System Pipelines by Type of Construction Material 400,000 350,000 300,000 Quantity of Pipe in Linear Feet 250,000 200,000 150,000 100,000 50,000 0 ACP CCP CIP CSP DI HDPE NCP PE PVC RCP RPVC STL Type of Pipe Material ACP = asbestos cement pipe; CCP = concrete culvert pipe; CIP = cast iron pipe; CSP = cement sewer pipe; DI = ductile iron; HDPE = high density polyethylene; NCP = concrete pipe; PE = polyethylene; PVC = polyvinyl chloride; RCP = reinforced concrete pipe; RPVC = reinforced PVC; STL = steel. 2-4 CCSD1_SSMP_063009.DOC

The construction history of the collection system is summarized by linear feet in Figure 2-3. As shown, nearly a third of the system was constructed in 1974. The primary elements of the system were constructed from 1971 to 1976, including approximately 80,000 feet of interceptor sewer lines. Since that time the system has been expanded incrementally to accommodate community growth. FIGURE 2-3 Summary of CCSD #1 Collection System Pipeline by Construction Year 600,000 500,000 Pipeline in Linear Feet 400,000 300,000 200,000 100,000 0 Unknown 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 Pipeline Construction Year 2.4 Data Development Needs Inventory data to support the modeling of the collection system were found to be available and of high quality for the portion of the system analyzed. Invert and ground elevations, pipe slope, diameter and material were all provided by WES from their GIS. No supplemental survey data were required to complete the system model. While portions of the system have been inspected using closed-circuit television (CCTV) techniques, the physical condition data are not compiled into a comprehensive database that is available for analysis. To complement the hydraulic capacity analysis that is the focus of this master plan, the structural condition should be added to future system evaluations. The condition data would also support a pipeline replacement plan consistent with an asset management system. CCTV information would help inform the condition component of the asset management risk scores, and the condition scores in WES s GBA Master Series software system can be determined from future field condition assessments conducted using the approach developed for the pump station evaluation. CCSD1_SSMP_063009.DOC 2-5

Flow monitoring data should continue to be gathered to support future refinements to the system model and to gage potential increases in RDII over time. The asset management information compiled during the pump station and conveyance elements of the master plan project should be incorporated in the GBA software system. GBA can then be used as an asset management tool. Condition assessment should be used to establish a base reference index score that can then be used to establish replacement/repair priorities. Land use data in the Hoodland area was not as complete as the Metro database used in the rest of the service area. Area contributing sanitary sewer flow for existing and future land use conditions would enhance the ability to predict future existing and future peak flow for the design storm conditions. 2-6 CCSD1_SSMP_063009.DOC