COLLECTION SYSTEM SETTLEMENT AGREEMENT
|
|
|
- Colleen Chandler
- 10 years ago
- Views:
Transcription
1 COLLECTION SYSTEM SETTLEMENT AGREEMENT Wastewater Collection System Rehabilitation and Replacement Report and Plan A deliverable of the Settlement Agreement and Final Order between the city of Los Angeles and Santa Monica Baykeeper et. al. June 30, 2006 City of Los Angeles DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION Wastewater Engineering Services Division tto prottectt publliic healltth and tthe enviironmentt
2
3 City of Los Angeles Department of Public Works Bureau of Sanitation Wastewater Engineering Services Division Wastewater Collection System Rehabilitation and Replacement Report and Plan A deliverable of the Settlement Agreement and Final Order between the City of Los Angeles and Baykeeper et. al. Final Report June 2006
4 Table of Contents Table of Contents EXECUTIVE SUMMARY... 1 SECTION 1 - INTRODUCTION Role of Plan in Spill Reduction Program Previous Rehabilitation and Replacement Initiatives Settlement Agreement Requirements... 5 SECTION 2 METHODOLOGIES AND APPROACHES CCTV Inspection Program Approach and Prioritization CCTV Inspection in Support of Operations and Maintenance Capital Improvement Program Inspections Defect Coding System Condition Ranking CCTV Inspection Data Quality Control Structural Condition Assessment, Needs Identification, and Project Development Emergency/Expedited Process Primary Sewer Planning Process Secondary Sewer Planning Process Project Prioritization Project Implementation SECTION 3 IDENTIFYING AND FORECASTING REHABILITATION AND REPLACEMENT PROJECTS Method to Identify Repair, Rehabilitation and Replacement Projects for Reaches with a Condition Ranking of D or E Identifying Additional Rehabilitation and Replacement Projects Method to Identify Rehabilitation and Replacement Projects in the Secondary Basin Planning Program Forecasting Rehabilitation and Replacement Projects for Years 4 through 10 of the Settlement Agreement Forecasting Future Rehabilitation and Replacement Projects from Primary Basins Forecasting Future Rehabilitation and Replacement Projects from Secondary Basins Forecast of Future Rehabilitation and Replacement Projects Plan for Gravity Sewer Rehabilitation and Replacement Projects (Year 4 through Year 10) List of Pipes Known to be in Condition D or E Rehabilitation and Replacement Report and Plan Page i
5 Table of Contents SECTION 4 - PROGRESS MEASUREMENT AND REPORTING Annual Progress Report Annual Summary Report Annual Detailed Progress Report Explanation of any Deviations from the Original Plan Description of Significant Changes to the Rehabilitation and Replacement Report and Plan SECTION 5 - REFERENCES Appendices Appendix A List of Pipes Known to Date to be in Condition D or E Figures Figure 1-1. City of Los Angeles Sewer Overflows - Fiscal Years 2000 to Tables Table 2-1. Basin Groups and Spill Factors... 8 Table 2-2. Sewer Condition Ranks Table 2-3. Definition of Risk Categories for Basin Group Table 2-4. Summary of Secondary Sewer Renewal Program Guidelines by Risk Category for Basin Group Table 2-5. Definitions of Risk Categories for Basin Groups 2, 3, and Table 2-6. Spill Factors for Basin Groups 2, 3, and 4 for Reaches in Risk Categories Table 2-7. Summary of Revised Secondary Sewer Renewal Program Guidelines by Risk Category and Basin Group Table 2-8. Number of Secondary Basins Planned by Settlement Agreement Year Table 3-1. Rehabilitation and Replacement (R&R) Projects Completed Since 1994 or Currently Planned Table 3-2. Forecast of Rehabilitation and Replacement Projects for the Remainder of the City's Wastewater Collection System Table 3-3. Target Gravity Sewer Rehabilitation and Replacement Quantity Year 4 Through Year 10 of the Settlement Agreement Table 4-1. Example - Annual Summary Report for the Rehabilitation and Replacement Report and Plan Table 4-2. Example - Annual Detailed Progress Report for the Rehabilitation and Replacement Report and Plan Rehabilitation and Replacement Report and Plan Page ii
6 Executive Summary Executive Summary Background and Introduction The City of Los Angeles entered a Collection System Settlement Agreement (Settlement Agreement) with the United States Department of Justice and the United States Environmental Protection Agency in August The primary intent of the Settlement Agreement is to reduce sanitary sewer overflows (SSOs). A key requirement of the Settlement Agreement is the development of a Rehabilitation and Replacement Report and Plan for the gravity sewer system. This document fulfills this requirement. This Rehabilitation and Replacement Report and Plan (Plan) identifies the methodology for how rehabilitation and replacement projects have been identified and also summarizes how rehabilitation and replacement projects will be identified and planned in the future. This Plan also identifies the quantity of gravity sewer rehabilitation and replacement to be completed from Year 4 through Year 10 (July 1, 2007 through June 30, 2014) of the Settlement Agreement. Methodologies and Approaches The City is aggressively identifying structural condition deficiencies to address the deterioration of the collection system. The goal is to reduce the occurrence of sewer overflows that are caused by factors that are difficult to address through sewer cleaning or root treatment by implementing sewer rehabilitation and replacement projects. The rehabilitation and replacement program consists of four main components: 1. CCTV Inspection (with priority given to sewer basins with the highest number of SSOs per 100 miles). 2. Structural Condition Assessment and Needs Identification 3. Project Development and Prioritization 4. Project Implementation The City s general approach to each of these components is described in this Plan. By the end of Year 10 of the Settlement Agreement, the City will plan rehabilitation and replacement projects in 100 of the 218 secondary sewer basins (sewer basins with pipe less than or equal to 15 inches in diameter). The City plans to have 75 of the secondary sewer basin plans developed by the end of Year 7 of the Settlement Agreement. Rehabilitation and Replacement Forecast While some rehabilitation and replacement projects have been identified, gravity sewer inspection and condition assessment will continue for many years into the future. However, the City has attempted to forecast the quantity of sewer rehabilitation and replacement projects with three basic methods: 1. Projects that have already been identified through inspection and condition assessment. Rehabilitation and Replacement Report and Plan Page 1
7 Executive Summary 2. An estimate of the yield of rehabilitation and replacement projects based on analyzing the type and quantity of defects found in reaches that have been inspected but have not been through a full project planning process. 3. A long-term forecast of rehabilitation and replacement projects based on a statistical projection of rehabilitation and replacement yield rates in sewer reaches that have been inspected onto the population of sewer reaches that have not yet been inspected. Utilizing these three basic techniques, the City has prepared a long-range sewer rehabilitation and replacement forecast. This approach has resulted in an estimate of 420 miles of rehabilitation and replacement in the Primary Sewers and the first 75 secondary sewer basins that will be planned by the end of Year 7 of the Settlement Agreement. The City estimates that this is the amount of rehabilitation and replacement mileage that can reasonably be constructed by the end of Year 10 of the Settlement Agreement since approximately 3 years are necessary to accomplish construction once secondary planning is completed. This results in a plan of 60 miles of rehabilitation and replacement per year for Year 4 through Year 10 of the Settlement Agreement. This forecast will be refined as additional inspection data is collected and as condition assessment efforts progress. Measurement and Reporting The Annual Progress Report for the Rehabilitation and Replacement Plan will include the following: 1. An Annual Summary Report, 2. An Annual Detailed Progress Report including an overview map of all reaches that have been repaired, rehabilitated or replaced during the previous fiscal year, 3. An explanation of any deviations from the original Plan, and 4. A description of any significant changes to the Rehabilitation and Replacement Plan. The format for the Annual Summary Report and the Annual Detailed Progress Report has been included in Section 4 of the Plan. Rehabilitation and Replacement Report and Plan Page 2
8 Section 1 Introduction Section 1 - Introduction The City owns, operates, and maintains an extensive collection and conveyance system that collects sewage over a 470 square miles area from the 4,000,000 residential customers as well as commercial, institutional, and industrial enterprises within the City and conveys the sewage to one of the City s four treatment facilities. The collection system ranges in diameter from 6 inches to 150 inches and consists of approximately 6,700 miles of primary and secondary sewers which includes approximately 130 miles of abandoned sewers and approximately 70 miles of sewers within City limits and owned by other agencies. This plan focuses on approximately 6,470 miles of City-owned sewer that are currently in service. Of these 6,470 miles, approximately 5,820 miles are secondary sewers (sewers ranging in diameter from 6 inches to 15 inches) that collect flow from building laterals and convey the sewage to the primary sewer system. In addition, approximately 650 miles of primary sewers (sewers greater than 15 inches in diameter) convey sewage from the secondary sewers to treatment facilities. Important attributes of the sanitary sewer system include: Approximately 63 percent of the total length is greater than 50 years old. Approximately 86 percent of the total length is constructed from vitrified clay pipes (VCP) and over 10 percent is constructed from concrete pipe. Approximately 77 percent of the total length are 8 inches in diameter. This Rehabilitation and Replacement Report and Plan (Plan) will discuss the methodologies the City employs to identify collection system structural condition deficiencies within the 6,470 miles of City-owned sewers that are in service. The Plan will process the City will follow to create and prioritize rehabilitation and replacement projects to address these deficiencies. This Plan will also forecast the quantity of gravity sewer rehabilitation and replacement to be completed from Year 4 through Year 10 of the Settlement Agreement. 1.1 Role of Plan in Spill Reduction Program The City has a mature spill reduction program. The spill reduction program has four main components: 1. An aggressive maintenance program to manage Sanitary Sewer Overflow (SSOs) caused by factors that can be influenced by periodic maintenance; 2. An aggressive Fats, Oils, and Grease (FOG) Control Program to minimize the introduction of FOG into the collection system; 3. A comprehensive capacity assurance program to identify and correct capacity deficiencies in the collection system, and; Rehabilitation and Replacement Report and Plan Page 3
9 Section 1 Introduction 4. An aggressive capital improvement program to identify and remove collection system defects that can cause SSOs and that can not be managed effectively using a periodic maintenance program. Over the past six years these programs have proven to be highly effective and have resulted in a 47 percent reduction in the annual number of sewer overflows from Fiscal Year 2000 to Fiscal Year 2005 as shown in Figure 1-1. Figure 1-1. City of Los Angeles Sewer Overflows - Fiscal Years 2000 to Number of Sewer Overflows Fiscal Year Two of the most effective overflow reduction programs to date are the City s sewer cleaning and root control programs. Analysis of sewer overflows shows that sewer reaches on the program had 38.1 sewer overflows per year per 100 miles prior to introduction into the Root Control Program. During Calendar Year 2005, these same sewer reaches now have approximately 7.3 sewer overflows per year per 100 miles after introduction to the Root Control Program. This program has proven to be highly effective at reducing the risk of sewer overflows in sewer reaches with known root problems. This Plan focuses on the fourth component of the spill reduction program and will describe the City s plan to focus capital improvement projects on sewer reaches that have defects and other factors that are known to increase the occurrence of sewer overflows and that cannot be effectively managed by an aggressive maintenance program. Rehabilitation and Replacement Report and Plan Page 4
10 Section 1 Introduction 1.2 Previous Rehabilitation and Replacement Initiatives In addition to this Plan, the City has other ongoing sewer rehabilitation and replacement initiatives that have not been included in detail in this Plan. The City s other ongoing sewer rehabilitation initiatives include: Cement Sewer Replacement Program (CSRP) Accelerated Sewer Replacement Program (ASRP) These previous initiatives to address known system deficiencies date back to the early 1990 s. The City originally began a program to rehabilitate and replace deteriorated cement sewers as part of the CSRP until this program was interrupted by the Northridge Earthquake in January After the Northridge Earthquake, the CSRP was placed on hold to address structural deficiencies caused by earthquake damage as part of the Accelerated Sewer Replacement Program which is still ongoing. More recently, the City reinitiated the Cement Sewer Replacement Program and began incorporating projects into the capital improvement program to address deteriorated cement sewers. Projects that were planned to be completed as part of the CSRP and the ASRP between July 1, 2004 and June 30, 2007 were incorporated into the Settlement Agreement to be completed in Year 1 through Year 3 of the agreement. All gravity sewer rehabilitation and replacement projects planned for implementation after Year 3 of the Settlement Agreement have been incorporated into this Plan. 1.3 Settlement Agreement Requirements The Settlement Agreement requires the City to submit a Rehabilitation and Replacement Report and Plan. The following paraphrases the requirements identified on Page 27 of the Settlement Agreement 1. The Rehabilitation and Replacement Report and Plan shall: 1. Utilize a comprehensive and systematic inspection and structural condition assessment methodology which enables the City to identify sewers requiring rehabilitation and replacement and to prioritize necessary rehabilitation and replacement projects. 2. Focus on sewers targeted for rehabilitation and replacement based on overflow history, age (with particular attention to sewers constructed prior to 1960), material of construction, maintenance factors, and other factors deemed appropriate by the City. 3. Project the necessary rehabilitation and replacement work for Year Four through Year Ten of the Settlement Agreement. This projection shall specify the number of miles of sewer reaches to be rehabilitated or replaced on an annual and Three- Year Rolling Average basis. The rehabilitation and replacement mileage proposed in the Rehabilitation and Replacement Report and Plan for Years Four through Ten shall not be less than a minimum of 50 miles per Year on an annual Rehabilitation and Replacement Report and Plan Page 5
11 Section 1 Introduction basis and a minimum of an average of 60 miles per Year on a Three-Year Rolling Average basis. 4. Be consistent with the City s methodologies that call for timely rehabilitation and replacement of reaches in Condition D and E, in accordance with City procedures, and provide for the rehabilitation and replacement of other reaches necessary to reduce the risks of SSOs and ensure the long-term sustainable renewal of the City s infrastructure. 5. Include a list of reaches known to date to be in Condition D or E and describe the City s strategies for addressing the other reaches in the targeted sewers. Rehabilitation and Replacement Report and Plan Page 6
12 Section 2 Methodologies and Approaches Section 2 Methodologies and Approaches The overall goal of the City s Rehabilitation and Replacement Program is to support the long-term sustainability of the collection system infrastructure. The City has already implemented and is currently optimizing an aggressive sewer cleaning, root control, and fats, oils, and grease control program to reduce and minimize the occurrence of sewer overflows from the collection system. Over the next decade, the City is also aggressively identifying and addressing structural condition deficiencies and collection system deterioration to reduce the occurrence of sewer overflows that are caused by factors that are difficult to address using sewer cleaning or root treatment approaches. The rehabilitation and replacement program consists of four main components: 1. CCTV Inspection 2. Structural Condition Assessment and Needs Identification 3. Project Development and Prioritization 4. Project Implementation Each of these program components are discussed in detail in the following sections. 2.1 CCTV Inspection CCTV inspection provides essential information leading to the determination of an appropriate rehabilitation and replacement decision and solution. The City has CCTV inspection crews that perform CCTV inspections in support of operational activities. The City also has private contractors performing CCTV inspections to support the rehabilitation and replacement program. CCTV inspections are performed by trained inspectors employing a defect coding system to document and categorize system appurtenances, structural, and condition defects. CCTV inspection videos are recorded for review by City personnel to support planning and design processes Program Approach and Prioritization Rehabilitation and replacement program CCTV inspections are performed as part of a comprehensive and systematic program that is closely coordinated with the system-wide sewer cleaning program. Sewers that are 15 inches in diameter and less have been divided into 218 secondary sewer basins (secondary basins). Sewers greater than 15 inches in diameter have been divided into 25 primary basins. Secondary basins are first cleaned and then inspected in priority order. The original basin cleaning and inspection priority was determined using an analysis of stoppage and spill history, miles of concrete pipe, maintenance cleaning findings, and pipe age. These factors were, and are currently, accurate indicators of sewer overflow risk from the City s collection system. The effectiveness of this approach can be illustrated by the fact that approximately 45 percent of the collection system has been inspected, and the sewer Rehabilitation and Replacement Report and Plan Page 7
13 Section 2 Methodologies and Approaches basins that have been inspected accounted for approximately 73 percent of the City s sewer overflows from 2000 through Secondary basin cleaning and inspection priorities are reviewed on an annual basis and modified based on analysis of best available information. The City has grouped secondary sewer basins into the five groups listed in Table 2-1: Basins 1-20 (Basin Group 1), Basins (Basin Group 2), Basins (Basin Group 3), Basins (Basin Group 4), and the remaining basins. Basin Group 1 through Basin Group 4 will be planned by Year 10 of the Settlement Agreement. Table 2-1 lists each of these Basin Groups along with a total of SSOs from January 2000 through December 2005, percent of total SSOs, percent of miles in the Basin Group versus total system miles, and a calculation of the Spill Factor. For a specified time period, the Spill Factor is calculated for a group of reaches using the following formula: Basin Group Spill Factor = (SSOs from the Basin Group / SSOs from the Entire System) (Miles in the Basin Group / Miles in the Entire System) The Spill Factor can also be calculated by dividing the number of sewer overflows per 100 miles from a group of reaches by the average number of sewer overflow per 100 miles from the entire system. Table 2-1 shows that the first 75 basins that will be planned constitute 33 percent of the system and will address where 63 percent of the sewer overflows occurred over the past six years. Additionally, Table 2-1 shows that the first 100 basins planned will address deficiencies and needed improvements in areas where 76 percent of the sewer overflows occurred over the past six years. Table 2-1. Basin Groups and Spill Factors Basin Group Basins Total SSOs 1 %oftotal SSOs %oftotal Miles Basin Group Spill Factor % 10.5% % 13.7% % 8.5% % 12.7% 1.02 Remaining % 54.6% 0.44 Grand Total % 100.0% 1 1 through % 33% through % 45% From January 2000 through December Table 2-1 shows the City is focusing cleaning, inspection, and capital program resources on locations in the City that are causing the majority of sewer overflows. Rehabilitation and Replacement Report and Plan Page 8
14 Section 2 Methodologies and Approaches CCTV Inspection in Support of Operations and Maintenance CCTV inspections supporting operations and maintenance activities are primarily performed by City crews. These inspections are performed mainly to identify the cause of sewer overflows or, at the request of City crews, to identify the cause of system issues encountered during sewer maintenance activities. These inspections often lead to corrective actions in the form of rehabilitation and replacement projects or maintenance program modifications Rehabilitation and Replacement Program Inspections Rehabilitation and replacement program inspections are performed primarily by CCTV inspection contractors as part of a systematic program to inspect the entire collection system before the end of Year 10 of the Settlement Agreement. Similar to operational inspections, information collected during these inspections is used to assess the condition of the system and identify reaches requiring rehabilitation or replacement as well as to support maintenance program modifications Defect Coding System The City developed a defect coding system for identifying and categorizing sewer defects. These standard defects are used by both City CCTV crews and CCTV contractors to document defects identified during sewer inspections. A list of the City s current defect codes is included in the technical memorandum titled Sewer Condition Categories, dated March The City is currently evaluating the possibility of using the NASSCO defect coding system in the future. The main reason for this potential migration to the NASSCO defect coding system is to adopt the emerging national standard for sewer defect coding used by all CCTV inspection contractors in the United States and eliminate the need for specialized training and costly information system modifications charged by contractors to handle customized defect coding systems Condition Ranking Each sewer defect has a numerical score associated with each point defect or a score per lineal foot for each continuous defect. The City utilizes the sum of these scores divided by the length of the sewer reach to calculate a normalized score per lineal foot for each sewer reach. The City uses the score per lineal foot for a sewer reach to develop a condition ranking for each reach that places the reach into one of five condition ranks ranging from A to E. This process is described in detail in the technical memorandum titled Sewer Condition Categories, dated March The general condition description of each of the five condition ranks is shown in Table 2-2. Rehabilitation and Replacement Report and Plan Page 9
15 Section 2 Methodologies and Approaches Table 2-2. Sewer Condition Ranks Condition Rank Description Action Identified A B C D E Very Good Condition is almost like-new sewer reach. Good Light Cracks localized Light Corrosion localized Light Roots localized Fair Moderate Cracks/Fractures Moderate Corrosion continuous Moderate Infiltration continuous Moderate Roots continuous Poor Severe Cracks/Fractures Broken Reach with Holes Severe Corrosion Severe Infiltration/Roots Emergency Collapsed Pipe (PX) Dirt Pipe (CPD) Crown of Pipe Gone (CPC, CG) Void in Backfill around pipe Full Flow Obstruction/Blockage No Repairs Future routine inspection No Immediate Repairs Routine Maintenance Program. Schedule next inspection in the order of sewer system priority. Routine Repairs as Needed Includes planning, environmental documentation, technical investigations, design, reviews, bid and award following established priorities. Repairs Includes regular bid and award, fast track construction, accelerate planning/design, and monitoring. Emergency Repair Initiate Special Order Procedure " Urgent Necessity " CCTV Inspection Data Quality Control The City has a comprehensive quality control program to review and correct the accuracy of inspection data. CCTV inspection data is collected and stored in a database that utilizes data validation queries to flag simple database errors that result from nonconformance with data collection and data entry standards. Database errors are reviewed and corrected as part of the CCTV inspection review process. CCTV review is performed on all reaches where CCTV contractors have identified any number of major or minor structural defects and on a random sampling of reaches where the CCTV contractor has not identified any major or minor structural defects and the reach has ranked B or better. 2.2 Structural Condition Assessment, Needs Identification, and Project Development The City has a comprehensive process to analyze and categorize CCTV inspection information to identify rehabilitation and replacement needs. The process was originally developed in the early 1990 s and documented in the technical memorandum titled Sewer Condition Categories, in March More recently, the City updated this process Rehabilitation and Replacement Report and Plan Page 10
16 Section 2 Methodologies and Approaches based on the best available information and practices developed in the industry over the past decade. This has resulted in three distinct processes that can result in the identification of repair, rehabilitation, and replacement needs of sewer reaches and the development of rehabilitation and replacement projects. These processes are: 1. Emergency/Expedited Process; 2. Primary Sewer Planning Process, and; 3. Secondary Sewer Planning Process Emergency/Expedited Process The City has a process to identify and expedite repair, rehabilitation and replacement on sewer reaches that have defects deemed as high risk and that could lead to imminent system failures or sewer overflows. The emergency/expedited process begins with the review of incoming CCTV data. As described previously, CCTV data is received by the City and uploaded into a CCTV database. During CCTV inspection data quality control review, the CCTV reviewer will identify sewer reaches containing defects that create either an emergency condition or high-risk of sewer overflow. These defects are placed on a list of reaches that are reviewed by the Project Development Team (PDT). The PDT is comprised of City and consultant staff representing operations, planning, and design divisions. The PDT meets once per week to review reaches identified as candidates for the emergency or expedited process and determines an appropriate action. This emergency/expedited process provides the City with a means to identify and expedite repair, rehabilitation, and replacement on emergency and critical sewer reaches years faster than through the traditional basin planning process Process for Selection of Reaches for PDT Review In addition, sewer reaches that have a condition E ranking are placed as highest priority for CCTV review and are reviewed immediately. Condition E ranked reaches will have one of four critical defects that include: Crown Gone (CG) Corrosion Pipe Crown Gone (CPC) Corrosion Pipe Dirt Pipe (CPD) Pipe Collapsed (PX) Other defects that are not considered critical may result in a reach being selected for PDT review. These defects include: Alignment Vertical Severe (AVS) Corrosion Pipe Soil Exposed (CPE) Corrosion Pipe Invert Gone (CPI) Corrosion Pipe Severe (CPS) Rehabilitation and Replacement Report and Plan Page 11
17 Section 2 Methodologies and Approaches Infiltration Joint Severe (IJS) Infiltration Pipe Severe (IPS) Joint Broken (JB) Joint Open (JO) Joint Offset Severe (JSS) Pipe Broken (PB) Pipe Cracks (PCL, PCM, PCR, PCS) Pipe Deformed (PD) Pipe Fractures (PFL, PFM, PFR, PFS) Pipe Hole (PH) Lateral Protruding Severe (PS) The CCTV Reviewer will evaluate these defects and will decide which reaches to forward to PDT PDT Review and Referral Process The PDT reviews CCTV inspection reports and videos forwarded by the CCTV reviewers. The PDT determines whether to move forward with repair, rehabilitation, or replacement of the reach using existing contract vehicles for emergency or expedited projects or to refer the reach to the primary or secondary sewer planning process. Reaches selected by the PDT for action are submitted to the Bureau of Engineering for expedited design and construction Primary Sewer Planning Process The process for sewer master planning of the primary system is described in detail in the Capacity Report and Plan 3. The main focus of primary sewer planning is the anticipation and identification of future capacity needs and the development of primary sewer projects to address these needs. In addition to identifying capacity needs and capacity-related projects, the primary sewer planning process includes a review of CCTV inspection data and sewer condition ranking to determine if a repair, rehabilitation, or replacement project is necessary in primary sewer reaches. Each primary sewer reach with a D condition ranking is evaluated to determine an appropriate repair, rehabilitation, or replacement project to restore the reach to a C ranking or better. Each primary sewer reach with a C condition ranking is evaluated on a case-by-case basis to determine whether a repair, rehabilitation, or replacement project is necessary Secondary Sewer Planning Process In March 2005, the City updated the guidelines for identifying rehabilitation and replacement needs as described in Section The City began using these revised Rehabilitation and Replacement Report and Plan Page 12
18 Section 2 Methodologies and Approaches guidelines as the basis for identifying rehabilitation and replacement needs in Basin Group 1 with the understanding that these guidelines would again be updated prior to planning Basin Groups 2, 3, and 4. The City is currently in the process of updating secondary basin planning guidelines for identifying rehabilitation and replacement needs as described in Section The City will begin using these revised guidelines to perform secondary basin planning beginning with Basin 21, the first basin in Basin Group 2. The City will also continue to update and optimize the guidelines based on asset management principles and approaches Summary of Project Planning Guidelines for Basin Group 1 Reaches in the first 20 secondary sewer basins to be planned have been categorized by the existence of major defects and obsolete structures. The major defect and obsolete structure categories that are currently evaluated for rehabilitation or replacement are summarizedintable2-3. These renewal guidelines are included in each of the Secondary Sewer Plan reports that have been created by the City. Each of these plans include a general structural and hydraulic assessment of the sewer basin as well as a detailed description of the defect criteria and scoping process used to identify rehabilitation and replacement needs and development of project packages. An example of one of these reports is titled Secondary Sewer Plan H30, Hollywood 4 created July Table 2-3. Definition of Risk Categories for Basin Group 1 Risk Category B, C, or D - Roots C - Concrete C or D - Structural 6-inch - Roots 6-inch Non-Roots Metal > 30 Years Obsolete Structures Definition of Risk Category Reaches that are condition ranked B, C, or D and have at least one medium or severe root defect at a joint. Concrete reaches that are condition ranked C that may be fairly or substantially corroded. Reaches that are condition ranked C or D with structural defects. 6-inch diameter reaches that have at least one medium or severe root defect at a joint. 6-inch diameter reaches that do not have any medium or severe root defects. Metal reaches (cast iron or ductile iron) greater than 30 years old. Reaches that include terminal lampholes, clean-outs, non-operational flush tank mechanisms, chimney risers, or 6-inch drop connections. Rehabilitation and Replacement Report and Plan Page 13
19 Section 2 Methodologies and Approaches Secondary sewer basin planners apply these risk categories to each sewer reach through analysis of defect codes and the existence of indicators of elevated sewer overflow risk such as roots, structural defects, etc. Planners then use this categorization to identify a repair, rehabilitation, or replacement solution by applying the Secondary Sewer Renewal Program Guidelines that are summarized in Table 2-4. Table 2-4. Summary of Secondary Sewer Renewal Program Guidelines by Risk Category for Basin Group 1 Risk Category B - Roots C - Roots D - Roots C - Concrete C - Structural D - Structural 6-inch - Roots 6-inch - Non-Roots Metal > 30 Years Obsolete Structures Planning Guideline Line. Renew. Replace. Renew. No action required. Renew. Evaluate. Replace with 8-inch if roots cannot be managed through maintenance. Evaluate. Replace with 8-inch if necessary. Analyze each case and replace accordingly. Evaluate. Replace if adjacent to a pipe rehabilitation or replacement project Summary of Project Planning Guidelines for Basin Groups 2, 3, and 4 The City is currently in the process of revising the project planning guidelines for Basin Groups 2, 3, and 4. Each Basin Group has been analyzed separately to determine the types of risk categories that most accurately identify reaches with elevated sewer overflow risk categories in each Basin Group. Analysis of sewer overflows in these Basin Groups has shown that the risk categories listed in Table 2-5 are the most effective at predicting the risk of sewer overflows within these basins. These risk categories were developed by analyzing CCTV data, age, material, and maintenance data to isolate factors that indicate elevated sewer overflow risk. Table 2-6 summarizes the Spill Factor for each risk category in each basin group. A Spill Factor greater than 1 indicates that the group of reaches has an above average risk of sewer overflows. Rehabilitation and Replacement Report and Plan Page 14
20 Section 2 Methodologies and Approaches Table 2-5. Definitions of Risk Categories for Basin Groups 2, 3, and 4 Risk Category Metal > 30 Years D or worse Major Defects Severe Roots >50%Medium Roots Obsolete Structures 1 Definitions of Risk Category Cast Iron, Ductile Iron, or Steel pipe greater than 30 years old. Reaches with a Condition Ranking D or E. Reaches that have at least one major defect. Major defects are primarily structural defects and include: Severe bends, sags, and pipe deformation All defects indicating missing pipe, broken pipe/joints, collapsed pipe, fractures, or large holes in the pipe Open joints and severe offset joints Severe corrosion Severe infiltration Severe protruding laterals Reaches that have at least one severe root defect in the pipe or at a joint. Reaches with medium roots defects in the pipe or at joints along more than 50 percent of the total reach length. Reaches that include terminal lampholes, clean-outs, non-operational flush tank mechanisms, chimney risers, or 6-inch drop connections. 1. The existence of an obsolete structure is not an indicator of elevated sewer overflow risk. Obsolete structures do hinder maintenance efforts and are targeted for removal when in proximity to a planned sewer reach rehabilitation or replacement project. Table 2-6. Spill Factors for Basin Groups 2, 3, and 4 for Reaches in Risk Categories Risk Category Basin Group 2 (Basins 21-50) Basin Group 3 (Basins 51-75) Basin Group 4 (Basins ) Grand Total Metal > 30 Years "D" or worse Major Defects Severe Roots > 50% Medium Roots Table 2-6 shows that Spill Factors are well above 1 for each risk category in Basin Group 2. In Basin Groups 3 and 4, the Spill Factor for the Severe Roots category is below 1. Additionally, for Basin Group 4, the Spill Factor for the >50% Medium Roots category is also below 1. For each Basin Group, the City will plan to address reaches in risk categories that have a Spill Factor greater than 1 with a rehabilitation and replacement solution. The City will not plan to rehabilitate or replace reaches in the Severe Roots risk category in Basin Groups 3 and 4 or reaches in the >50% Medium Roots risk category in Basin Group 4 with a rehabilitation or replacement solution. In these cases the City will continue aggressive sewer cleaning and root control practices. Rehabilitation and Replacement Report and Plan Page 15
21 Section 2 Methodologies and Approaches This approach is validated by analysis of the City s sewer cleaning and root control program as discussed in Section 1.1. The City s sewer cleaning and root control program has proven to be highly effective at reducing the risk of sewer overflows in sewer reaches with known root problems. The City recently performed an asset management-based analysis of reaches with root-related defects and determined that sewers with no major structural defects and severe or medium root defects located at the pipe joint or in the pipe can be effectively addressed through aggressive maintenance practices and root control techniques. In addition, the City has analyzed the cost-benefit of root control approaches versus rehabilitation and replacement approaches and has found that maximizing the useful life of reaches with root problems using maintenance and root control techniques provides the best overall value to the customer when root-related sewer overflows can be effectively controlled. As a result of these analyses, the City will aggressively maintain and monitor reaches with known root defects and will select individual reaches for renewal if it is determined that factors leading to sewer overflows cannot be effectively managed through maintenance. Table 2-7 summarizes the revised guidelines for secondary sewer renewal planning by the risk categories defined in Table 2-5 and by Basin Group. Table 2-7. Summary of Revised Secondary Sewer Renewal Program Guidelines by Risk Category and Basin Group Basin Group Risk Category Planning Guideline 2, 3, and 4 Metal > 30 Years Analyze each case and replace accordingly. 2, 3, and 4 D or worse Replace if 6-inch or if more than 1 point repair per 100 feet. Point repair or line if feasible. 2, 3, and 4 Major Defects Replace if 6-inch or if more than 1 point repair per 100 feet. Point repair or line if feasible. 2 Severe Roots Point repair or line. 2, 3 > 50 % Medium Roots Line. 2, 3, 4 Obsolete Structures Evaluate. Replace if adjacent to a pipe rehabilitation or replacement project Secondary Basin Planning for Basins 101 Through 218 Secondary basin planning for Secondary Basins 101 through 218 will occur after Year 10 of the Settlement Agreement and will not be addressed as part of this Plan. Reaches in Basins 101 through 218 that contain critical defects or other high risk factors will be identified during the PDT process as described in Section These defects will be addressed if deemed to be an emergency situation or worthy of an expedited project Watermark Analysis and Flow Gauging The secondary sewer basin planners also perform a watermark analysis on reaches within a sewer basin to identify reaches that have a flow depth greater than 50 percent of the diameter of the reach. Reaches that are identified during the watermark analysis are Rehabilitation and Replacement Report and Plan Page 16
22 Section 2 Methodologies and Approaches selected for flow gauging and these results are incorporated into the rehabilitation and replacement decision-making process. This process is described in detail in the example secondary basin planning report titled Secondary Sewer Plan H30, Hollywood, created July Project and Plan Development The final step of the secondary sewer basin planning process is the grouping of reaches selected for renewal into project packages. The result of the entire planning process is the development of a Secondary Sewer Plan that identifies all reaches selected for renewal along with pertinent information to support design as well as identification of groupings of selected reaches into project areas. The City s goal is to complete all secondary sewer basin planning for 100 of the secondary sewer basins by Year 10 of the Settlement Agreement. Table 2-8 shows a high-level schedule for the completion of secondary basin planning by Basin Group and Settlement Agreement Year. Table 2-8. Number of Secondary Basins Planned by Settlement Agreement Year Settlement Agreement Year Basin Group Number of Basins Cumulative Number of Basins Total Basin Miles 1 Miles per Basin Total This is the total secondary basin miles that will be assessed. 2.3 Project Prioritization Each of the four processes described in Section 2.2 result in the creation of sewer rehabilitation and replacement projects. The emergency projects are addressed immediately through existing emergency services contracts. The expedited projects are dispatched and addressed in a matter of months and are completed in the order the projects are dispatched. The primary and secondary sewer projects are placed into the wastewater capital improvements program and are scheduled for design and construction in the same order as planned since primary sewers and secondary sewer basins are planned in priority order. Rehabilitation and Replacement Report and Plan Page 17
23 Section 2 Methodologies and Approaches The City has a process to review project priorities on an annual basis as part of the Wastewater Capital Improvements Program (WCIP) annual reviews and to accelerated or decelerated project schedules if deemed necessary. Additionally, the City has a Program Review Committee (PRC) that meets monthly to review and modify project scope and schedule if deemed necessary. 2.4 Project Implementation Planned and prioritized emergency, primary, and secondary sewer projects are delivered to the Bureau of Engineering for implementation. Reaches selected for emergency action are submitted to the Bureau of Engineering for expedited design and construction. Projects planned as part of the primary or secondary planning process are designed and constructed by the Bureau of Engineering in the order projects are received unless reprioritized by the PRC. The Bureau of Engineering reviews all information provided with project plans and performs field investigations and alternatives analysis to determine the final repair, rehabilitation, or replacement solution for each reach selected for renewal. Modifications to the renewal solution are communicated to the primary and secondary basin planners for final approval. This information is utilized during the Renewal Guidelines revision process to identify opportunities to modify and optimize the planning process to generate rehabilitation and replacement solutions that more closely align with final design solutions. Rehabilitation and Replacement Report and Plan Page 18
24 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects The Rehabilitation and Replacement Forecast in this Plan is for the repair, rehabilitation and replacement of gravity sewers during Year 4 through Year 10 (Fiscal Year (FY) 2008 through FY 2014) of the Settlement Agreement. As described in the following sections, the Rehabilitation and Replacement Forecast validates the City s Plan for FY 2008 through FY 2014 for the completion of a minimum of 50 miles per year in any given year and a three-year rolling average of 60 miles per year. This equates to a plan for the repair, rehabilitation or replacement of approximately 420 miles of gravity sewers over this 7-year period. 3.1 Method to Identify Repair, Rehabilitation, and Replacement Projects for Reaches with a Condition Ranking of D or E The Settlement Agreement requires the City to rehabilitate or replace all sewer reaches that have a D or E condition ranking. To identify repair, rehabilitation, and replacement projects for reaches with a condition ranking of D or E, the City utilizes the following basic process: Step 1: All sewer reaches with a condition ranking of D and E are identified. The City s condition ranking process is summarized in Section Step 2: All reaches with a condition ranking of E are referred for emergency repair via the emergency/expedite process described in Section The City intends to continue this practice in the future, ensuring all emergency repairs will be completed for the City s entire system, not for just the basins that will be planned through Year 10 of the Settlement Agreement. Step 3: All reaches with a condition ranking of D are currently referred to the Bureau of Engineering for repair, rehabilitation or replacement via the primary and secondary sewer planning processes or through the emergency/expedite process as described in Section Identifying Additional Rehabilitation and Replacement Projects In addition to gravity sewers with a Condition Ranking of D or E, the City has identified other rehabilitation and replacement projects for implementation both prior to Year 4 of the Settlement Agreement and during Years 4 through 10 of the Settlement Agreement. The existing projects were identified utilizing the following methods: 1. Other Rehabilitation and Replacement Programs as discussed in Section 1.2. Since 1994, the City has identified, planned and/or constructed approximately miles of rehabilitation and replacement projects under these other programs. This quantity of rehabilitation and replacement projects is shown in Table 3-1. Rehabilitation and Replacement Report and Plan Page 19
25 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects 2. Existing Rehabilitation and Replacement Projects that have already been identified by the City. This consists of approximately 83.5 miles of projects that have been identified and planned for construction after Year 3 of the Settlement Agreement. 3. Rehabilitation and Replacement Projects identified in Basins 1 through 20 of the Secondary Basin Planning Process. This process is discussed in more detail in Section Method to Identify Rehabilitation and Replacement Projects in the Secondary Basin Planning Program The City s gravity sewer rehabilitation and replacement project identification process for Basin Group 1 of the secondary basin planning program is summarized in Section Utilizing this project identification process on Basin Group 1 (Basins 1 through 20) of the Secondary Basin Planning program identified a potential total of miles of rehabilitation and replacement projects that were referred to the City s Bureau of Engineering for further analysis and design. The results of the secondary planning process for Secondary Basins 1 through 20 are summarized in Tables 3-1. Table 3-1. Rehabilitation and Replacement (R&R) Projects Completed Since 1994 or Currently Planned Item Number Description of Projects 1 Previous Rehabilitation and Replacement Efforts (Prior to Settlement Agreement or Included in Years 1 Through 3 of the Settlement Agreement) - See Section Year 4 Rehabilitation and Replacement Projects - See Section Rehabilitation and Replacement Projects Identified in Basins 1 through 20 of the Secondary Basin Planning Process 4 Total Miles of Gravity Sewer Rehabilitation and Replacement Projects Currently Identified Since 1994 (Sum of Item 1 + Item 2 + Item 3): 5 Total Miles of Gravity Sewer Rehabilitation and Replacement Projects Currently Identified for Years 4 Through 10 of the Settlement Agreement (Sum of Item 2 + Item 3): Miles of Rehabilitation and Replacement Projects Currently Planned Rehabilitation and Replacement Report and Plan Page 20
26 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects 3.3 Forecasting Rehabilitation and Replacement Projects for Years 4 through 10 of the Settlement Agreement While some rehabilitation and replacement projects have already been identified, gravity sewer inspection and condition assessment will continue for many years into the future. To develop a more realistic Plan, the City has attempted to forecast the quantity of sewer rehabilitation and replacement projects that will be identified utilizing the following methods: 1. A forecast of rehabilitation and replacement projects that will result from the Primary Basin Planning Process. This process is discussed in Section An estimate of the yield of rehabilitation and replacement projects for Basins 21 through 100 of the Secondary Basin Planning Program based on analyzing the type and quantity of defects found in reaches that have been inspected but have not been through a full project planning process. This process is described in Section A long-term forecast of rehabilitation and replacement projects for Basins 21 through 100 of the Secondary Basin Planning Program based on a statistical projection of rehabilitation and replacement yield rates in sewer reaches that have been inspected onto the population of sewer reaches that have not yet been inspected. This process is described in Section Utilizing these methods, the City has prepared a Gravity Sewer Rehabilitation and Replacement Forecast for the basins that will be evaluated through Year 10 of the Settlement Agreement. This forecast will be refined and adjusted as additional inspection data is collected and as the City s planning efforts progress Forecasting Future Rehabilitation and Replacement Projects from Primary Basins The City s Primary Basin Planning process is detailed in Section For the purposes of forecasting the quantity of rehabilitation and replacement projects that will be identified during the Primary Basin Planning process, the City will refer all condition D or worse reaches for rehabilitation or replacement. While all reaches with a TV Rank of C will be evaluated and will be referred for rehabilitation or replacement only if necessary, these reaches were included in the rehabilitation and replacement forecast shown in Table 3.2. The actual quantity of rehabilitation and replacement projects for the Primary Basins will be adjusted based on the outcome of the detailed evaluation of reaches with a TV Rank of C Forecasting Future Rehabilitation and Replacement Projects from Secondary Basins The City has prepared a sewer rehabilitation and replacement project identification process for use in Secondary Planning Basins 21 through 100 of the Secondary Basin Planning program. This process is summarized in Section Rehabilitation and Replacement Report and Plan Page 21
27 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects While basins 21 through 100 have not entered the secondary basin planning process, the City wants to forecast the total quantity of sewer rehabilitation and replacement that will be required in these remaining basins. This forecast has been divided into two parts: 1. An estimate of the yield of rehabilitation and replacement projects based on analyzing the type and quantity of defects found in reaches that have been inspected but have not been through a full project planning process, and 2. A forecast of rehabilitation and replacement projects based on a statistical projection of rehabilitation and replacement yield rates in sewer reaches that have been inspected onto the population of sewer reaches with similar age and material characteristics that have not yet been inspected. The results of this forecast are presented in Table 3-2. Table 3-2. Forecast of Rehabilitation and Replacement Projects for the Remainder of the City's Wastewater Collection System Item Number Reaches Evaluated When Preparing the Forecast 1 Total Miles of Gravity Sewer Rehabilitation and Replacement Projects Currently Planned for Years 4 Through 10 of the Settlement Agreement (See Item 5 in Table 3-1): 2 All Reaches in Primary Planning Basins That Have Been Inspected as of April 5, 2006 But Have Not Been Through the full Primary Planning Process 3 All Reaches in Secondary Planning Basins 21 through 50 That Have Been Inspected as of April 5, 2006 But Have Not Been Through the Secondary Basin Planning Process 4 Remaining Reaches in Secondary Planning Basins 21 through 50 That Have Not Been Inspected as of April 5, All Reaches in Secondary Planning Basins 51 through 75 That Have Been Inspected as of April 5, 2006 But Have Not Been Through the Secondary Basin Planning Process 6 Remaining Reaches in Secondary Planning Basins 51 through 75 That Have Not Been Inspected as of April 5, All Reaches in Secondary Planning Basins 76 through 100 That Have Been Inspected as of April 5, 2006 But Have Not Been Through the Secondary Basin Planning Process 8 Remaining Reaches in Secondary Planning Basins 76 through 100 That Have Not Been Inspected as of April 5, 2006 Forecast of Miles of Rehabilitation and Replacement Projects Cumulative Forecast of Gravity Sewer Rehabilitation and Replacement Projects (Miles) Rehabilitation and Replacement Report and Plan Page 22
28 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects Forecast of Future Rehabilitation and Replacement Projects Table 3-2 summarizes all of the forecasts for sewer rehabilitation and replacement in the Primary Basins and in the Secondary Planning Basins 21 through 100. The methods utilized to prepare these forecasts are detailed in Sections and Plan for Gravity Sewer Rehabilitation and Replacement Projects (Year 4 through Year 10) This Plan is for Years 4 through 10 of the Settlement Agreement (FY 2008 through FY 2014). The City has set an annual target of 60 miles per year of rehabilitation and replacement for Years 4 through 10 of the Settlement Agreement based on the following reasons: The City will complete the planning for Secondary Basins 21 through 75 by the end of Year 7 of the Settlement Agreement (see Table 2-8 for the Secondary Basin Planning Schedule). The City forecasts that approximately miles of rehabilitation and replacement projects will be identified through existing projects, Primary Basin planning, and through the planning of Secondary Basins 1 through 75 (see Item 6 of Table 3-2). Once rehabilitation and replacement projects are identified by the City s planning process, the City requires approximately 3 years to complete design, bidding and construction of these projects. As a result, projects planned after Year 7 of the Settlement Agreement can not reasonably be completed by the end of Year 10 of the Settlement Agreement. The City will reasonably be able to accomplish construction of approximately 420 miles of gravity sewer rehabilitation and replacement by the end of Year 10 of the Settlement Agreement. This results in a plan for a total of approximately 60 miles per year of rehabilitation and replacement during years 4 through 10 of the Settlement Agreement. The target quantity of rehabilitation and replacement for Year 4 thru Year 10 are detailed in Table 3-3. Rehabilitation and Replacement Report and Plan Page 23
29 Section 3 Identifying and Forecasting Rehabilitation and Replacement Projects Table 3-3. Target Gravity Sewer Rehabilitation and Replacement Quantity Year 4 Through Year 10 of the Settlement Agreement Settlement Agreement Year City of Los Angeles Target Quantity of Rehabilitation & Settlement Agreement Requirement for 3-Year Fiscal Year Replacement Rolling Average of (Miles) 1 Rehabilitation & Replacement (Miles) N/A N/A Total While the City s target gravity sewer rehabilitation and replacement quantity each year will be 60 miles, the Settlement Agreement states that the minimum quantity of sewer rehabilitation and replacement per year is 50 with a 3-year rolling average of 60 miles per year. 2. The Settlement Agreement requires that a 3-year rolling average of 60 miles per year of rehabilitation and replacement must be maintained. During Years 4 and 5, a 3-year rolling average will not be available. Beginning in Year 6, the City will begin reporting a 3-year rolling average as required by the Settlement Agreement. 3.5 List of Pipes Known to be in Condition D or E As required by the Settlement Agreement, this report includes a list of all reaches known to be in Condition D or E. The list is included in Appendix A on a compact disc in Adobe Acrobat TM (.pdf) format. This list was generated from CCTV dated that was available on April 5, Rehabilitation and Replacement Report and Plan Page 24
30 Section 4 Progress Measurement and Reporting Section 4 - Progress Measurement and Reporting Beginning in 2008, an Annual Progress Report will be prepared summarizing the gravity sewer rehabilitation and replacement projects completed during the previous fiscal year. This report will be issued each year on or before September Annual Progress Report The Annual Progress Report for the Plan will include the following: 1. An Annual Summary Report, 2. An Annual Detailed Progress Report including and overview map of all reaches that have been repaired, rehabilitated or replaced during the previous fiscal year, 3. An explanation of any deviations from the original Plan, and 4. A description of any significant changes to the Plan. A brief description of each section of the Annual Progress Report is included in the following sections Annual Summary Report The Annual Progress Report will include an Annual Summary Report of all gravity sewer repair, rehabilitation and replacement projects completed during the previous calendar year including the mileage of sewer reach rehabilitation and replacement associated with these projects. See Table 4-1 for an example of the format for the Annual Summary Report for the Plan Annual Detailed Progress Report In addition to the Annual Summary Report, the City will provide an Annual Detailed Progress Report for the Rehabilitation and Replacement Plan. The Annual Detailed Report will include a summary of all reaches that have been repaired, rehabilitated, or replaced during the previous fiscal year. See Table 4-2 for and example format for the Annual Detailed Progress Report for the Rehabilitation and Replacement Plan. In addition to the information shown in Table 4-2, the Annual Detailed Progress Report will include an overview map depicting the location of each sewer reach that has been repaired, rehabilitated, or replaced during the previous fiscal year. Rehabilitation and Replacement Report and Plan Page 25
31 Section 4 Progress Measurement and Reporting Table 4-1. Example - Annual Summary Report for the Rehabilitation and Replacement Report and Plan Settlement Agreement Year 1. City of Los Angeles Fiscal Year 2. Target Rehabilitation & Replacement Quantity (Miles) 3. Actual Mileage of Rehabilitation & Replacement (Miles) 4. Surplus or Shortfall this Year vs. Plan (Column 3 Minus Column 2) Year Rolling Average of Rehabilitation & Replacement (Miles) 2 5. Surplus or Shortfall During this Year Based on 3-Year Rolling Average (Column 4 Minus 60 Miles per year) N/A N/A N/A N/A While the City s target gravity sewer rehabilitation and replacement quantity each year will be 60 miles, the Settlement Agreement states that the minimum quantity of sewer rehabilitation and replacement per year is 50 with a 3-year rolling average of 60 miles per year. 2. During Years 4 and 5, a 3-year rolling average will not be available. Beginning in Year 6, the City will begin reporting a 3-year rolling average as required by the Settlement Agreement. The Settlement Agreement requires that a 3-year rolling average of 60 miles per year of rehabilitation and replacement must be maintained. Table 4-2. Example - Annual Detailed Progress Report for the Rehabilitation and Replacement Report and Plan Project Name Reach Identification Number Type of Renewal (Repair, Rehabilitation or Replacement) Length (ft) Reach Material Reach Diameter Original Installation Date Sewer Condition Rank Prior to Renewal Rehabilitation and Replacement Report and Plan Page 26
32 Section 4 Progress Measurement and Reporting Explanation of any Deviations from the Original Plan If the Annual Summary Report indicates that the City has not achieved the required mileage of sewer line rehabilitation and replacement (either on annual or three-year rolling average basis), the Annual Progress Report will identify and explain the reasons why the mileage requirements were not achieved. If the City exceeded the required mileage of sewer line rehabilitation and replacement (either on an annual or Three Year Rolling basis), the City is eligible to bank the excess mileage as provided for by Paragraphs 28 and 29 of the Settlement Agreement. The Annual Progress Report shall identify the number of miles the City proposes to bank and document the basis for the City s position that it has exceeded the mileage requirements in this Settlement Agreement. Sewer repair, rehabilitation and replacement mileage that is banked in accordance with Paragraphs 28 and 29 of the Settlement Agreement may be counted towards the City s target mileage of repair, rehabilitation and replacement in a future year Description of Significant Changes to the Rehabilitation and Replacement Report and Plan Since the Settlement Agreement covers many years, unforeseen conditions may arise that require an adjustment to the detailed programs included in the City s Plan. If significant changes are made, the City will document the changes in the Annual Progress Report. Rehabilitation and Replacement Report and Plan Page 27
33 Section 5 References Section 5 - References 1. Settlement Agreement and Final Order, EPA/Baykeeper Settlement Agreement. 2. Sewer Condition Categories, March 1994, Technical Memorandum, City of Los Angeles. 3. Wastewater Collection System Capacity Report and Plan, June 2006, City of Los Angeles. 4. Secondary Sewer Plan H30, Hollywood, July 2005, City of Los Angeles. Rehabilitation and Replacement Report and Plan Page 28
34 APPENDIX A List of Reaches Known to be in Condition D or E The list of reaches known to be in Condition D or E is included on the attached compact disc in Adobe Acrobat TM (.pdf) format. This list was generated from CCTV dated that was available on April 5, 2006.
SEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
City of Mill Valley Sewer Capital Improvement Plan 2012 2016
City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan
and Condition Assessment Plan 4.1 Introduction 4.1.1 Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005
REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United
Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets
*Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; [email protected] Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes
Sewer System Management Plan (SSMP) Development Guide
J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
Interactive Decision Tree Automates Sewer Rehabilitation Planning
Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.
McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: [email protected] RICHARD D. McGOEY, P.E. (NY &
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
City of Los Altos Sewer System Management Plan
City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
Gravity Line Preventative Maintenance Program
Gravity Line Preventative Maintenance Program Lexington-Fayette Urban County Government Department of Environmental Quality Division of Water Quality December 2011 Gravity Line Preventative Maintenance
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
See Appendix A for additional information, or contact ASTM directly.
DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.
Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why
CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall
CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
VERIFICATION TESTING GUIDELINES FOR CONTRACTORS
Public Works Department Engineering Division VERIFICATION TESTING GUIDELINES FOR CONTRACTORS CITY OF BERKELEY PRIVATE SEWER LATERAL ORDINANCE BMC Chapter 17.24 Effective November 3, 2014 A consent decree
STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT
STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049
Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
FY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1
CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) INDEX PAGE 1. Scope of Work SS7-1 2. Contractor Certification SS7-1 3. Flushing
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
REQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE CITY OF CLAYTON SEWER SYSTEM MANAGEMENT PLAN (SSMP) PROPOSALS MUST BE RECEIVED BY: FRIDAY, 01/17/2014 AT 4:00 PM SSMP Request for Proposal Released 12/18/2013
Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention
Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
Final Report. Sacramento County Sanitation District No. 1. Engineering Sustainability of Piping Materials
Final Report Sacramento County Sanitation District No. 1 Engineering Sustainability of Piping Materials Vitrified Clay Pipe (VCP) and Polyvinyl Chloride (PVC) Pipe: A Comparison By: Kurt N. Ohlinger, Ph.D.,
At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from
Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
DEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016
11 Clearwater Drive Little Rock, AR 72204 SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016 Section 1 Procedure Background information At the recommendation of
CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing
CCTV INSPECTION OF SEWER LINES PART 1 GENERAL 1.1 SECTION INCLUDES A. CCTV Inspections 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02731 Sanitary Gravity Sewer Line Testing
Dry Weather Flow from Footing Drains and Service Connections
Wastewater Master Plan DWSD Project No. CS-1314 Dry Weather Flow from Footing Drains and Service Connections Technical Memorandum Original Date: May 2, 2002 Revision Date: September 2003 Author: CDM Table
City of Suisun City. Sewer System Management Plan
City of Suisun City Sewer System Management Plan FEBRUARY 2014 Table of Contents INTRODUCTION... I I. GOALS... I-1 II. ORGANIZATION... II-1 III. LEGAL AUTHORITY... III-1 IV. OPERATION & MAINTENANCE PROGRAM...
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
SEWER SYSTEM MANAGEMENT PLAN
EL TORO WATER DISTRICT SEWER SYSTEM MANAGEMENT PLAN STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ OCTOBER 2014 TABLE
CITY OF ALHAMBRA. Sewer System Management Plan
CITY OF ALHAMBRA Sewer System Management Plan Updated April 2014 This page intentionally left blank Table of Contents INTRODUCTION... 2 SECTION I: GOALS... 3 SECTION II: ORGANAZATION... 4 SECTION III:
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate
AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies
Sewer System Management Plan (SSMP)
Sewer System Management Plan (SSMP) City of Santa Ana Water Resources Division 4/10/2014 Prepared Under the Supervision of: Nabil Saba, P.E. Water Resources Manager Table of Contents/Definitions/Abbreviations
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Collection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment