1 Master Planning and Hydraulic Modeling Shay Ralls Roalson, PE Saša Tomić, Ph.D., PE, BCEE Collection Systems Webinar WEAT Collections Committee May 15, 2013

2 Why Prepare a Master Plan? Identify existing capacity constraints in your system Identify growth areas and improvements needed to serve them A well-prepared master plan results in a CIP that Is validated Is defensible Uses a common cost basis

3 Data Collection WWTP flow records Lift station pumping records GIS or other mapping of existing system Existing land use, such as Low Density Residential High Density Residential Commercial Industrial Other (hospitals, university campuses, etc.) Flow monitoring Select locations to help quantify flow projections by land use

4 Master Planning Steps Determine existing system flows and geographic distribution WWTP and lift station records Dry and wet weather flow monitoring Establish planning horizon and develop growth projections Regional planning Land use planning Known development projects Develop a model of your system and load flow projections Use available information such as GIS Field verify where needed

5

6 Modeling Philosophy A successful modeling project delivers a tool that provides a continuous Return on Investment (ROI) To deliver the continued ROI, a model needs to be 1. Accurate and Applicable 2. Maintainable and Adaptable 3. Accepted and Used A hydraulic model can pay for itself the first time it is actually used by the Owner.

7 IMPORT -Rain gage data -Flow monitor data -Subcatchments EXPORT -RTK -Unique Subcatchment IDs -Subcatchment Polygons -Wastewater Loads -RDII (if different) -Area/Contributing Area -Land Use -Population -Wastewater Profile -Additional Flow (WW Profile Applies) -Trade Flow (TradeProfile Applies) -RTK Subcatchments -Parcel Data -Land Use/Zoning -Elevation/Contours -Basin Boundaries -Pipe Network -Water Billing Data -Wastewater Flow Data Scenario Parameters (e.g. days, duration)) -Unique Manhole ID (UID) -Coordinates -Rim Elevation -Ground Elevation -Width -Design -Bottom Elevation -Shelf Elevation -Type (e.g. stored, sealed) Nodes (e.g. manholes ) Infoworks Network -Utility GIS/CAD Data -As-Builts -Survey Data -In-house knowledge NOT CALIBRATED: ModifyNetwork and Components Based on Calibration Results -Unique Pipe ID -Manhole UIDs (Up/Down) -Material -Length -Inverts (Up/Down) -Diameter -Roughness Type and Coefficients Conduits (e.g. pipes) Project Rain Gage Data Infoworks Run Calibration Analyze Data -Storm Types (e.g. Observed, 2-Year, 10-Year) -Time series data -Manhole UID Rainfall Group National/State Rain Gage Data Flow Monitor Data Project Rain Gage Data Flow Monitor Data Wastewater Group (Patterns) -Diurnal Patterns Zoning and Land Use Data Trade Group (Patterns) Direct Inflow to Manholes Modeling Process 1. Goals Definition and Software Selection 2. Model Creation / Update 3. Model Calibration 4. Knowledge Transfer 5. Model Use DATA RAINFALL DERIVED INFLOW AND INFILTRATION (RDII) SSOAP WASTEWATER SYSTEM MODELING PROCESS USING INFOWORKS AND SSOAP PROCESSED DATA INFOWORKS MODEL VALIDATION & ANALYSIS CALIBRATED Apply modeling philosophy principals at every step of a modeling project.

8 Modeling Software Selection

9 Modeling Software Selection Questions to ask Project vs. owner software Complexity vs. accuracy Static vs. dynamic Design vs. analysis Things to remember Start with your needs Select the software that will serve you, not the project needs.

10 Modeling Software Selection Software Products C R I T E R I A R A T I N G S Software Ranking

11 Model Creation / Update Questions to ask All-mains vs. trunk-mains One-to-one correlation Data accuracy vs. model goals Things to remember Software tools Future model needs Model maintenance Model your system, not the asset database.

12 Model Creation / Update Traditional Approach GIS GIS-Update Approach GIS Hydraulic Model Hydraulic Model Data Cleanup Data Cleanup Model Calibration OK? NO YES Model Calibration Simulation and Model Use Simulation and Model Use Build the model so it can be maintained.

13 Model Calibration Questions to ask Flow variation Calibration goals Data quality Things to remember Calibration vs. validation Know when to stop Model QC Only through validation can we assert model accuracy.

14 Knowledge Transfer Questions to ask Who will do modeling? Who will use results? Software vs. model training What else can the model do? The best way to learn something is to do it.

15 Model Use Questions to ask Do I need modeling software? Can I use simpler version of the software? Things to remember Master planning Integrated approach Green infrastructure And many, many more The most expensive model is the one that is not used.

16 Alternative Approach Modeling results can be used without any modeling software.

17 From a Model to a Plan Execute existing and future conditions models Identify capacity constraints Evaluate potential solutions Coordinate with condition assessment Identify potential capacity improvements Parallel pipes Transferring flow between basins New WWTP(s) in high growth areas Lift station elimination

18 Recommended Improvements It s an iterative process! Look for solutions that work for the long-term Avoid stranded infrastructure wherever possible Utilize life cycle cost estimates to compare alternatives Compare apples to apples

19 Presenting the Plan A good master plan is a desktop reference Explain assumptions Summarize data from other sources Provide charts and graphs Put tables of data in the appendix Recommend improvements by planning year Present construction cost estimates No door stops!

20 Questions / Discussion Shay Ralls Roalson, PE HDR Engineering, Inc shay.roalson@hdrinc.com Saša Tomić, Ph.D., PE, BCEE HDR Engineering, Inc sasa.tomic@hdrinc.com

Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL

Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL What is JCW s strategy for meeting wet weather performance targets? SSO s Basement Back-ups Serving Johnson

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems.

The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems. The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems. K.Fair 1, B.F Loubser 1, H.E.Jacobs 2 *, J van der Merwe 1 1 GLS (Pty) Ltd, 11 Electron Street, Technopark,

More information

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Proceedings of 2013 IAHR World Congress Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Anil Kumar Senior Engineer, ARUP, Level

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? Derek Vogelsang 1, Alana Duncker 1, Steve McMichael 2 1. MWH Global, Adelaide, SA 2. South Australia Water Corporation, Adelaide, SA ABSTRACT

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting Rainfall Derived Infiltration/Inflow

Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting Rainfall Derived Infiltration/Inflow 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,

More information

Sanitary Sewer Maintenance Plan City of Imperial Beach

Sanitary Sewer Maintenance Plan City of Imperial Beach Sanitary Sewer Maintenance Plan City of Imperial Beach June 2008 Audit Report Update May 2010 (Chris Helmer) Audit Report Update June 2012 (Chris Helmer) Audit Report Update October 2014 (Chris Helmer)

More information

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K. CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung,, H. Kainz and K. König 1 Linz AG Wastewater, Wiener Straße 151, A-41 Linz, Austria Municipality

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

Sewer System Master Plan FINAL

Sewer System Master Plan FINAL Sewer System Master Plan February 2006 City of Waterford Sewer System Master Plan Final Report Prepared by: Water and Environment February 17, 2006 Table of Contents Chapter 1 Introduction...1-1 1.1 Background

More information

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM 3 Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM Eric White, James Knighton, Gary Martens, Matthew Plourde and Rajesh Rajan A geoprocessing routine was used for the development

More information

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX In reference to the Request for Proposals for Geographic

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Interactive Decision Tree Automates Sewer Rehabilitation Planning

Interactive Decision Tree Automates Sewer Rehabilitation Planning Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer City of Largo Agenda Item 24 Form Revision Date: 10/19/09: Meeting Date 08/03/10 Presenter: Leland Dicus, P.E., City Engineer Department: CD Community Development TITLE: GIS PROGRAM UPDATE The implementation

More information

Municipal Risk Assessment Tool

Municipal Risk Assessment Tool Municipal Risk Assessment Tool ICLR, Basement Flooding Symposium May 26, 2011 Robert Tremblay Director, Research Introduction Risk is changing. Both insurers and municipalities, need for tools to better

More information

SANITARY SEWER SYSTEM ASSESSMENT

SANITARY SEWER SYSTEM ASSESSMENT SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.

More information

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) City Council Agenda: 10/13/14 5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) A. REFERENCE AND BACKGROUND: City Council is asked to approve the City of

More information

Managing sewer flood risk

Managing sewer flood risk Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

Flood risk assessment through a detailed 1D/2D coupled model

Flood risk assessment through a detailed 1D/2D coupled model CORFU Project Barcelona Case Study Final Workshop 19 th of May 2014 Flood risk assessment through a detailed 1D/2D coupled model Beniamino Russo Aqualogy Urban Drainage Direction Introduction and general

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows

Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows Kevin L. Enfinger, P.E. and Patrick L. Stevens, P.E. ADS Environmental Services 494 Research Drive Huntsville,

More information

SSO Modeling and Calibration for SSO Case Studies

SSO Modeling and Calibration for SSO Case Studies Wastewater Master Plan DWSD Project No. CS-1314 SSO Modeling and Calibration for SSO Case Studies Technical Memorandum Original Date: January 17, 2003 Revision September 2003 Author: CDM September 2003

More information

Sanitary Sewer Design and Modeling Workshop

Sanitary Sewer Design and Modeling Workshop Sanitary Sewer Design and Modeling Workshop Featuring Bentley Systems SewerGEMS Slavco Velickov, PhD Bentley Systems Scope Steady hydraulics Model building Unsteady hydraulics Hydrology Dry weather loading

More information

Sewer System Management Plan (SSMP) Development Guide

Sewer System Management Plan (SSMP) Development Guide J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional

More information

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system

More information

SECTION 01 78 29 AS-BUILT DOCUMENTATION

SECTION 01 78 29 AS-BUILT DOCUMENTATION SECTION 01 78 29 AS-BUILT DOCUMENTATION PART 1: GENERAL 1.01 AS-BUILTS Where identified as a product of the Work, provide as-built drawings adhering to the criteria provided here and in the special conditions.

More information

Guidelines for Performing Infiltration/Inflow Analyses And Sewer System Evaluation Survey

Guidelines for Performing Infiltration/Inflow Analyses And Sewer System Evaluation Survey COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION ONE WINTER STREET, BOSTON, MA 02108 617-292-5500 Guidelines for Performing Infiltration/Inflow

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

WEFTEC 2007 COMPREHENSIVE FLOW MONITORING PROGRAM THE BALTIMORE CITY APPROACH

WEFTEC 2007 COMPREHENSIVE FLOW MONITORING PROGRAM THE BALTIMORE CITY APPROACH WEFTEC 2007 COMPREHENSIVE FLOW MONITORING PROGRAM THE BALTIMORE CITY APPROACH Author: Carlos A. Espinosa, P.E. KCI Technologies, Inc. 10 North Park Drive - Suite 200 Hunt Valley, MD 21032 Co-author: Gary

More information

Even Cowboys Need Good Data City of Pendleton GIS Development

Even Cowboys Need Good Data City of Pendleton GIS Development Even Cowboys Need Good Data City of Pendleton GIS Development Presenters: Bob Patterson, P.E., City of Pendleton David Stangel, P.E., Murray, Smith & Assoc. Inc. Project Overview Create GIS Databases for

More information

Water Demand Forecast Approach

Water Demand Forecast Approach CHAPTER 6 2009 REGIONAL WATER SUPPLY OUTLOOK Water Demand Forecast Approach 6.1 Introduction Long-range water demand forecasting is a fundamental tool that water utilities use to assure that they can meet

More information

Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems

Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems Ali Ghadami Firouzabadi 1 and Majid Arabfard 2 1. Ali Ghadami

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

City of Pacifica Collection System Master Plan Final Report. Prepared by:

City of Pacifica Collection System Master Plan Final Report. Prepared by: City of Pacifica Collection System Master Plan Final Report Prepared by: October 2011 Table of Contents No table of contents entries found. Chapter 1 Introduction... 1-1 1.1 Background and Study Objectives...

More information

REQUEST FOR PROPOSALS # RFP #P09.2015

REQUEST FOR PROPOSALS # RFP #P09.2015 Procurement Department 450 Cowie Hill Rd. Halifax, NS B3P 2V3 Telephone: (902) 490-4998 REQUEST FOR PROPOSALS # RFP #P09.2015 Wastewater Flow Monitoring Network Sealed proposals submitted in a vendor identified

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Durango Migrates its Infrastructure GIS to an Asset Management System

Durango Migrates its Infrastructure GIS to an Asset Management System Durango Migrates its Infrastructure GIS to an Asset Management System Rick Szmajter, GISP City of Durango Colorado ESRI International User Conference San Diego, CA July 22, 2015 rick.szmajter@durangogov.org

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

From Civil 3D, with Love

From Civil 3D, with Love From Civil 3D, with Love Download the zip file containing the files needed for the exercise. Extract the files to a convenient location on your hard drive before you begin. The files associated with this

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service. After the Flush Published: July 14, 2011 Sewage or wastewater is something we rarely think or talk about. The wastewater from our toilets, showers, washing machines and dishwashers quickly departs our

More information

Ground Truthing Infiltration & Inflow

Ground Truthing Infiltration & Inflow Ground Truthing Infiltration & Inflow using Trenchwater Piezometers, Electro Scan and CCTV Presented by: Gordon Henrich, D.M. Robichaud Randy Kowal, D. M. Robichaud Nov. 30, 2015 Robichaud About D. M.

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM SECTION 3.1 INTRODUCTION... 1 (a) Objectives...1 (b) Applicability...1 (c) Drafting

More information

HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS

HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS JAMES LI (1) & CELIA FAN (2) (1) Department of Civil Engineering, Ryerson University, Toronto, Canada, jyli@ryerson.ca

More information

Innovative I/I Analysis Leads to Sustainably Program

Innovative I/I Analysis Leads to Sustainably Program Innovative I/I Analysis Leads to Sustainably Program Heart of the Valley Metropolitan Sewerage District Kaukauna, Wisconsin Mark Surwillo, HOVMSD District Manager Tammy Kuehlmann, PE, Donohue & Associates

More information

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets *Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes

More information

Leak detection in virtual DMA combining machine learning network monitoring and model based analysis

Leak detection in virtual DMA combining machine learning network monitoring and model based analysis Leak detection in virtual DMA combining machine learning network monitoring and model based analysis Author Dr. Gangl Gerald*, Raúl Navas ** * Dr. Gerald Gangl, Kriegsbergstraße 31, 70327 Stuttgart, Germany,

More information

Impact of rainfall and model resolution on sewer hydrodynamics

Impact of rainfall and model resolution on sewer hydrodynamics Impact of rainfall and model resolution on sewer hydrodynamics G. Bruni a, J.A.E. ten Veldhuis a, F.H.L.R. Clemens a, b a Water management Department, Faculty of Civil Engineering and Geosciences, Delft

More information

Risk and vulnerability assessment of the build environment in a dynamic changing society

Risk and vulnerability assessment of the build environment in a dynamic changing society Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. linmei.nie@sintef.no

More information

TOWN OF MEREDITH Administrative Services 41 Main Street, Meredith, New Hampshire 03253-5861 Telephone (603) 279-4538 Fax (603) 279-1042

TOWN OF MEREDITH Administrative Services 41 Main Street, Meredith, New Hampshire 03253-5861 Telephone (603) 279-4538 Fax (603) 279-1042 TOWN OF MEREDITH Administrative Services 41 Main Street, Meredith, New Hampshire 03253-5861 Telephone (603) 279-4538 Fax (603) 279-1042 REQUEST FOR PROPOSAL 2010 HYDRAULIC MODEL I. General Information:

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

HM Manager Overview. Applies to the spatial version of Netbase. Integrates Netbase with Water Distribution Modelling Software

HM Manager Overview. Applies to the spatial version of Netbase. Integrates Netbase with Water Distribution Modelling Software Model Build INTRODUCTION HM Manager Overview Applies to the spatial version of Netbase Provides the complete modelling solution: Fully integrated with EPAnet & Piccolo Integrates Netbase with Water Distribution

More information

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment Prefill and Water Balance Criteria Division of Water Quality Municipal Wastewater Treatment December 2010 Authors Brett Ballavance, P.E. Gene Erickson Nathan Groh Pamela Meyer, P.E. Dave Sahli, P.E. Vinod

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM LeifBasherg (1) OlujZejlllJul Jessen (1) INTRODUCTION The current paper is the

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir *

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir * GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING Robert J. Muir * ABSTRACT: In recent years, GIS applications in water resources management have become widespread and diverse in the Province of Ontario,

More information

GIS in Wastewater Collection System Master Planning

GIS in Wastewater Collection System Master Planning Page 1 of 6 GIS in Wastewater Collection System Master Planning Brad Roeth, EIT Stanley Consultants, Inc. This paper presents the use of GIS in a wastewater collection system master plan. The master plan

More information

ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM

ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM Jerrod Frederking, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: twisterj@gmail.com.

More information

Collection Systems 2005 Sustaining Aging Infrastructure: System, Workforce and Funding

Collection Systems 2005 Sustaining Aging Infrastructure: System, Workforce and Funding Collection Systems 2005 Sustaining Aging Infrastructure: System, Workforce and Funding FINAL MANUSCRIPT GETTING MORE FROM FLOW MONITORING - INTERPRETING SEWER FLOW DATA TO YIELD THE MAXIMUM BENEFIT Paul

More information

CDM. City of Jacksonville Master Stormwater Management Plan (MSMP) Update. December 2008 Update. Agenda. 1. Data Collection. 2.

CDM. City of Jacksonville Master Stormwater Management Plan (MSMP) Update. December 2008 Update. Agenda. 1. Data Collection. 2. City of Jacksonville Master Stormwater Management Plan (MSMP) Update December 2008 Update CDM Agenda 1. Data Collection 1. GIS/LiDAR 2. Survey 2. Water Quantity 1. SWMM Modeling 2. FEMA 3. Water Quality

More information

11th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 2008 MONITORING EQUIPMENT AND RESULTS The flow monitoring and sampling programme was conducted over two one week periods, with

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Unauthorized Discharges and Sanitary Sewer Overflows

Unauthorized Discharges and Sanitary Sewer Overflows TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental

More information

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL

More information

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage HEC-1 Leçon 11 This lesson will focus on how WMS can be used to develop HEC-1 modeling parameters and not on the fundamental hydrologic principles simulated by HEC-1. 1 Vue D Emsemble Utilisés Couramment

More information

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability

More information

Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs)

Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs) Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs) ABSTRACT Brian L. Tripp, PE, BCEE, 1 Jeremy Brashears, PE, 1 & Mark Fisher, PE, 2 1 WK Dickson

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data ABSTRACT Patrick L. Stevens, PE ADS Environmental Services 9 S. Cloverdale St., Suite B Seattle, WA 988 It is a natural desire

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

Stormwater Best Management Practices (BMP) Performance Analysis

Stormwater Best Management Practices (BMP) Performance Analysis Stormwater Best Management Practices (BMP) Performance Analysis Revised Document: March 2010 (Original Document: December 2008) Prepared for: United States Environmental Protection Agency Region 1 5 Post

More information

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy Prepared by: AECOM 410 250 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975

More information

Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009)

Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009) Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009) The following are examples of key additions and/or modifications of issues and practices

More information

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where

More information

Tutorial Creating a regular grid for point sampling

Tutorial Creating a regular grid for point sampling This tutorial describes how to use the fishnet, clip, and optionally the buffer tools in ArcGIS 10 to generate a regularly-spaced grid of sampling points inside a polygon layer. The steps below should

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

Best Practices in Model Development and Maintenance Adam Rose (adam.rose@xpsolutions.com), Product Manager, XP Solutions

Best Practices in Model Development and Maintenance Adam Rose (adam.rose@xpsolutions.com), Product Manager, XP Solutions Best Practices in Model Development and Maintenance Adam Rose (adam.rose@xpsolutions.com), Product Manager, XP Solutions adopted from Best practices for software development projects Mike Perks (mperks@us.ibm.com),

More information