SCOTTSDALE TRANSPORTATION COMMISSION REPORT



Similar documents
Transportation Management Plan Template

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

I-25 / Rio Bravo Interchange

EARLY ACQUISITIONS ASSOCIATED WITH THE I-10 EXPANSION STUDY. Paula Gibson, ADOT Chief R/W Agent Dave Edwards, R/W Project Coordinator

The Need for Traffic Incident Management

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

Maryland Invests $845 Million in New Highway and Bridge Projects

SR-18 Corridor Improvements in Wood County

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

INDOT Long Range Plan

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Monitoring Program Results and Next Steps

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

ARIZONA-SONORA BORDER MASTER PLAN

Light Rail Transit in Phoenix

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

8+ %!0"% 8+1!%"'$%,$"$

PRIORITIZATION PROCESSES

US-95 Northwest Corridor Project Management Plan

John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Chapter 3 - GPS Data Collection Description and Validation

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

PUBLIC INFORMATION MEETING SUMMARY

PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES. Pinal County, Arizona. Scoping Information and Opportunity to Comment

General Obligation Bond Projects FYE

Chapter 22. Lump Sum Project Guidelines

Update on Previous Related Transportation Enhancement Grants

FY 2009 Economic Stimulus List

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Draft Transportation Management Plan for Via Verdi Repair Project

AZTech TRAFFIC MANAGEMENT AND OPERATIONS PERFORMANCE INDICATORS BOOK 2013

Public Involvement Meeting Handout

Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012

Arizona Department of Transportation

Statewide Traffic Flow Data: Probe Vehicle Study for Iowa DOT

Economic and Real Estate Consulting MEMORANDUM

Capital Action Plan Status Thru Dec 2015

Eastern RTMC.

the interchange of business

TRANSPORTATION MANAGEMENT PLAN

Surface Transportation Program (STP) Projects

Transportation Improvement Program FY

Pima Regional Remote Sensing Program

KEEPING NEVADA CONNECTED: Future Mobility in the Silver State

Multi Modal Roadway Transportation Impact Fees and Asset Value

How To Build A City Of Virginia Beach Arena

Belmont Street Bridge Rehabilitation Project

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

Consultant s Name: HSQ GROUP INC. Street Address: 1489 W. Palmetto Park Road, Suite 340. City: Boca Raton State: FL Zip: 33486

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL

Introduction & Welcome

Central Regional Traffic Management Center


MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX)

Project Name: All Electronic Tolling (AET) Design Services. Consultant s Name: The Heimburg Group, Inc.

LBJ Express Project (LBJ Managed Lanes Project)

Corridor Goals and Objectives

Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report

Exhibit A Scope of Work

Dallas ICM Conception to Implementation

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project.

Transcription:

SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF Action: Information Purpose: Representatives of the Arizona Department of Transportation (ADOT) and their consultants will present the plans for the addition of one-lane-per-direction for SR-101. Information: Ms. Jennifer Grentz, ADOT Community Relations Project Manager, Mr. Ron McCally, ADOT Project Manager, Mr. Avi Schmerer, URS Design Consultant, and Mr. Ahmad Omais, Kimley- Horn Design Consultant, will be providing the presentation. The project involves lane additions for the 11-mile segment from SR-202 to Shea Boulevard; 1.5 miles of which is within the city limits of Scottsdale. The construction is anticipated to occur from summer 2014 to 2016. Restrictions of freeway travel lanes will result in periodic traffic volume increases on Scottsdale streets primarily Hayden Road. Staff Contact: Paul Basha, (480) 312-7651, pbasha@scottsdaleaz.gov

Loop 101: General Purpose Lane Widening Shea to the Loop 202 Scottsdale Transportation Commission September 19, 2013 ADOT Project No. 101L MA 041 H8484; Federal Aid No. ID 101 B(NFA) ADOT Project No. 101L MA 046 H8499; Federal Aid No. ID 101 B(NFA) 1

Welcome and Agenda Project Team Project Overview Project History Project Purpose Project Schedule Improvements Current Activity Traffic Management Additional Projects in Corridor Public Outreach Q&A 2

Project Representatives Jennifer Grentz Community Relations Project Manager Ron McCally Project Manger Avi Schmerer URS Design Consultant Ahmad Omais Kimley Horn and Associates Design Consultant 3

Project Overview Project spans 11 miles (1.3 miles in City of Scottsdale) Project is from Shea Boulevard to SR 202L Interchange New general purpose lanes will be constructed 4

Project History Regional Transportation Plan (November 2004, Proposition 400) Public Outreach (2008 Public Information Meetings, 2011 Commission) Design Concept Report (2007 2010) FDCR 2010 Environmental Document (2010, CE) Final Design (2012 2014) 5

Project Purpose Improve freeway capacity Reduce congestion of future traffic volumes Improve traffic flow at Loop 202 to northbound Loop 101 Implement Regional Transportation Plan 6

Project Schedule Final Design October 2013 Bid Advertisement Spring 2014 Construction Late summer 2014 2016 7

Project Improvements Add one general purpose lane in the SB direction from Shea Boulevard to McKellips Road Add one general purpose lane in the NB direction from Shea Boulevard to McDowell Road Add two general purpose lanes in the NB direction from McDowell Road to the SR101L/SR202L TI entrance ramp Add auxiliary lanes in each direction between Indian Bend Road and McDonald Drive Rubberized asphalt will be used on the widened roadway surfaces. 8

Project Highlights Typical Improvements Chaparral Road TI Improvements Relocation of Catch Basins Addition of Storm Drains Landform Graphics Maintain Existing Theme 9

Current Activity Stage IV Design (95%) Roadway Structural Design Drainage Design Landscape Design Traffic Analysis and Design Lighting Freeway Management System Utilities Environmental 10

Transportation Management Plan Lays out a set of strategies for managing the work zone impacts to project. Provides for safe mobility for traveling public and construction workers Compliments temporary traffic control plan Addresses traffic operations and public information. 11

12

13

14

15

Additional Projects in Corridor Loop 202 General Purpose Lanes (Loop 101 to Gilbert Road) and HOV Lanes (Gilbert Road to Broadway Road) FY 2015 Construction Loop 101 General Purpose Lanes (SR 51 to Princess Drive) RTPFP Phase IV (2021 2025) Design and Construction Loop 101 General Purpose Lanes (Shea Blvd. to Princess Drive) RTPFP Phase IV (2021 2025) Design and Construction Loop 101/Princess Drive Traffic Interchange Preliminary Engineering/Environmental Study 2014 16

Public Outreach for Design Phase Three public meetings Project postcard and flyer distribution for City of Scottsdale and SRPMIC residences, business and schools, within the impacted project area Website updates Targeted business outreach Continue coordination with City of Scottsdale and SRPMIC PIO staff Conduct additional stakeholder meetings, if requested 17

Loop 101: Shea Boulevard to Loop 202 For more information visit azdot.gov/loop101pima, email projects@azdot.gov or call 855.712.8530 Thank you! 18