1 Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route 202, all ramps in Pennsylvania and New Jersey, and the shoulders of US Route 202 in New Jersey. Spalled concrete and loose mortar on PA Route 32 bridge. Replacement of concrete roadway panels which have cracked and settled on both the Pennsylvania and New Jersey segments of US Route 202. Loose mortar on the masonry for the main river bridge. NJ Route 29 has deteriorated bearings, joints and paint, rusted girders, and deteriorated concrete. Spall repairs on the PA Route 32 bridge and repoint deteriorated sections of the masonry on the PA Route 32 bridge and main river bridge. Peeling paint on light poles and overhead sign structures. On the NJ Route 29 bridge: Repair all spalls and delaminated concrete in the piers. Replace all bearings with new elastomeric bearings. Perform steel repairs to replace areas with section loss. Replace all deck joints. Blast clean and paint the entire steel superstructure. Seal the decks of all 3 bridges. Clean and paint all lights and overhead sign structures.
2 Overall Project Scope Ramp F, Ramp G And US Route 202 Shoulders Asphalt Pavement Remove Existing Pavement Construct New Pavement RAMP F RAMP G US Route 202 Asphalt Pavement Remove Existing Pavement Construct New Pavement PENNSYLVANIA US Route 202 Bridge Over NJ Route 29 Replace Bearings Rehabilitate Piers Replace Deck Joints Seal Bridge Deck NEW JERSEY US Route 202 Concrete Pavement Remove Damaged Concrete Install New Concrete TOLL PLAZA RAMP B US Route 202 Bridge Over The Delaware River Repoint Mortar At Stone Facades Seal Bridge Deck RAMP C DELAWARE & RARITAN CANAL US Route 202 Bridge Over PA Route 32 Repair Concrete At Bridge Deck Repair Joint Repoint Mortar At Stone Facades Seal Bridge Deck RAMP D US Route 202 Concrete Pavement Remove Damaged Concrete Install New Concrete Legend: - Asphalt Pavement - Concrete Pavement Ramp B, Ramp C, Ramp D and US Route 202 Shoulders Asphalt Pavement Remove Existing Pavement Construct New Pavement
3 Existing Conditions -US Route 202Cracked Asphalt Pavement -US Route 202Cracked Asphalt Pavement -US Route 202 RampsCracked Asphalt Pavement -US Route 202Asphalt Pavement Cores -US Route 202Cracked Concrete Pavement -PA Route 32 BridgeDeteriorated and Spalled Concrete at Underside Arch -NJ Route 29 BridgeHeavily Rusted Bearing (Typical at Both Piers) -NJ Route 29 BridgeHole in Bottom Flange of Rusted Girder -NJ Route 29 BridgeHeavily Rusted Bearing with Peeling Paint -NJ Route 29 BridgeHeavily Rusted Bearing with Deteriorated Anchor Bolts
4 Pennsylvania Detour Routes Southbound US Route 202 Detour Anticipated Full-Time Closure Duration: 2-3 Weeks Ramp G Detour Anticipated Full-Time Closure Duration: 1 Week Notes: 1.) Northbound US Route 202 remains open at all times during construction. 2.) Only one ramp will be closed at one time. Ramp F Detour Anticipated Full-Time Closure Duration: 1 Week Legend: - Construction Work Zone Closure - Detour Route
5 New Jersey Ramp Detour Routes Ramp B Detour (Anticipated Full-Time Closure Duration - 1 Week) Ramp C Detour (Anticipated Full-Time Closure Duration - 1 Week) Ramp D Detour (Anticipated Full-Time Closure Duration - 1 Week) Note: Only one ramp will be closed at one time. Legend: - Construction Work Zone Closure - Detour Route
6 Construction Staging Roadway Roadway Roadway 11.5 CENTERLINE US ROUTE CENTER LINE US ROUTE CENTER LINE US ROUTE Work Area Work Area Completed Work Area Work STAGE 1 US Route 202 Northbound and Southbound Traffic Maintained STAGE 2 US Route 202 Northbound Traffic Maintained Full-Time Closure of US Route 202 Southbound Anticipated Full-Time Closure Duration: 2-3 Weeks STAGE 3 US Route 202 Northbound and Southbound Traffic Maintained US Route 202 Asphalt Reconstruction Staging Sections PENNSYLVANIA NEW JERSEY RAMP F RAMP G TOLL PLAZA SINGLE LANE FULL-TIME CLOSURES DELAWARE & RARITAN CANAL RAMP C RAMP D RAMP B US Route 202 Limits of Single Closures
~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:
Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031
Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D
Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT
CITY OF TRAIL MEMORANDUM
0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest
REHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
FY 2016 2025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions
Bridge Electrical Upgrades Burlington County Bridge Commission Burlington Bristol Bridge This project includes the replacement of the existing 480 volt power feed from the Pennsylvania power house to the
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS)
APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June
Public Information & Public Scoping Meeting
Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
REQUEST TO QUALIFY (RTQ) INFORMATION FOR
I. INTRODUCTION: REQUEST TO QUALIFY (RTQ) INFORMATION FOR GEORGE WASHINGTON BRIDGE REPLACEMENT OF THE PIP HELIX RAMP AND REHABILITATION OF UPPER LEVEL SPANS OVER NJ ANCHORAGE AND HUDSON TERRACE CONTRACT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Truss Bridges of Kentucky
ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire
5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.
CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION
PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION SEPTEMBER 2014 EDITION with June 2015 Changes DECKS OR SLABS TABLE OF CONTENTS Unit Reinforced
OTTAWA CIVIC CENTRE & NORTH SIDE STANDS LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007
OTTAWA CIVIC CENTRE & NORTH SIDE STANDS at LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007 for CITY OF OTTAWA REAL PROPERTY ASSET MANAGEMENT prepared by ADJELEIAN ALLEN RUBELI LIMITED
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION
GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION Issam ElKhatib, P.Eng., Dennis Baxter, P.Eng. Totten Sims Hubicki Associates, Canada Abstract The rehabilitation history of the Garden City Skyway Bridge
The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.
The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
WSDOT Bridge Elements
Chapter 4 WSDOT Bridge Elements 4.01 List of WSDOT Elements by Number 12 Concrete Deck............................... 4-14 13 Bridge Deck Surface........................... 4-14 14 Fully Supported Concrete
March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202
Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
CONCEPTUAL REHABILITATION ALTERNATIVE
Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com
Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti
I-66 Pavement Rehabilitation
I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
HEAVY MOVABLE STRUCTURES, INC. 12 TH BIENNIAL SYMPOSIUM NW 17 TH AVENUE BRIDGE REHABILITATION OVER THE MIAMI RIVER MIAMI-DADE COUNTY
HEAVY MOVABLE STRUCTURES, INC. 12 TH BIENNIAL SYMPOSIUM November 3-6, 2008 NW 17 TH AVENUE BRIDGE REHABILITATION OVER THE MIAMI RIVER MIAMI-DADE COUNTY John Low, P.Eng. Hardesty & Hanover, LLP CARIBE ROYALE
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
REHABILITATION WORKS FOR PINAWA BRIDGE OVER WINNIPEG RIVER
REHABILITATION WORKS FOR PINAWA BRIDGE OVER WINNIPEG RIVER Vaibhav Banthia 1, M.Sc., P.Eng., (Presenting) Troy Hengen 2, P.Eng. (Presenting) Beth Phillips 1, P.Eng. 1 Tetra Tech WEI Inc. 2 Manitoba Infrastructure
PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1
PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT Abstract Xiaohua H. Cheng 1 The 3.5 mile (5.63 km) long Pulaski Skyway is located in northern New Jersey, serving as a major
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges
T. J. Wipf, F. S. Fanous, F. W. Klaiber, A. S. Eapen Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges April 2003 Sponsored by the Iowa Department of Transportation
Preliminary Structure Report Bridge No. 05222 November 2014 State Project No. 023 0127 Town Bridge Road over Farmington River Canton, CT
Preliminary Structure Report Bridge No. 05222 November 2014 State Project No. 023 0127 Town Bridge Road over Farmington River Prepared By: TranSystems Corporation 530 Preston Avenue Suite 100 Meriden,
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 [email protected] Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
EI 08-002 ENGINEERING INSTRUCTION
To: New York State Department of Transportation ENGINEERING INSTRUCTION EI 08-002 Title: REVISED PLAN SHEET GUIDANCE Distribution: Approved: Manufacturers (18) Surveyors (33) Local Govt. (31) Consultants
Robson Forensic Engineers, Architects, Scientists & Fire Investigators
PROFESSIONAL EXPERIENCE 2012 to Robson Forensic, Inc. present Associate Provide technical services to attorneys, insurance companies, public authorities, road and street owners, trucking and railroad companies,
REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY
NOTES REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY Presenter: Summary: Tony Sherrad, FDOT Project Manager The Cortez Bridge in Manatee County,
Commercial Roof Inspection Form
Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program
Risk - Based Inspection Frequencies
Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Bridge Rehabilitation Alternatives
Kennedy Bridge Planning Study Technical Memorandum: Bridge Rehabilitation Alternatives MnDOT S.P. No. 6018-02 Prepared for: Minnesota Department of Transportation DRAFT April 28, 2014 Prepared by: Report
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013
Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement
CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007
CIRCULAR LETTER 2007-20 PPC DECK BEAM NEW SHAPE IMPLEMENTATION, STANDARD BRIDGE PLAN RETIREMENT, AND PPC DECK BEAM INSPECTION COUNTY ENGINEERS/SUPERINTENDENTS OF HIGHWAYS MUNICIPAL ENGINEERS/DIRECTORS
Bridge Structural Rehabilitation Using FRP Laminates
Bridge Structural Rehabilitation Using FRP Laminates South Santiam River Quartzville Road, Linn County Linn County Road Department 2011 Cooperative Partnerships Making Linn County a Better Place to Live
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You
Structural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW
Bridge Inspection Handbook 4-1 CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW 4.1 INTRODUCTION In this chapter, MassDOT policies and procedures for performing bridge inspections
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects. Manhattan Community Board 6 Transportation Committee - June 2, 2014
Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects Manhattan Community Board 6 Transportation Committee - June 2, 2014 Opened to traffic in 1940 Two parallel tubes (North & South), each
INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE
INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE BRAGI Bridge Reporting for Appraisal & Greater Inventory Volume III: Other INDOT Items November 2011 Item Number Item Name BRAGI
STRATEGIC PLAN FOR THE REHABILITATION OF THE F. G. GARDINER EXPRESSWAY
STRATEGIC PLAN FOR THE REHABILITATION OF THE F. G. GARDINER EXPRESSWAY ASSIGNMENT NO. 9117-12-5096 February 21, 2014 Prepared for the City of Toronto by: Prepared by: Doug Dixon, P.Eng Project Director
How To Manage The County Of Simcoe'S Infrastructure
Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
1What purpose do guard
g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Stone Arch Bridges of Washington County, MD
Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John
William R. Burkett Department of Engineering Technology and Civil Engineering, Texas Tech University, Lubbock, Texas, USA
The current issue and full text archive of this journal is available at wwwemeraldinsightcom/0969-9988htm Enhancing the capability of rapid bridge after extreme events Yong Bai and Seong Hoon Kim Department
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.
Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing
CONDITION SURVEY REPORT & REPAIR RECOMMENDATIONS. for the. PHOENIX PLAZA & PARKING GARAGE Pontiac, MI. Prepared for: City of Pontiac Pontiac, MI
CONDITION SURVEY REPORT & REPAIR RECOMMENDATIONS for the PHOENIX PLAZA & PARKING GARAGE Pontiac, MI Prepared for: City of Pontiac Pontiac, MI Submitted by: DESMAN Associates May 2012 and Repair Recommendations
Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders
2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders Harry A. Campbell, P. E., Central Office, Traffic Engineering Division - October 6, 2015 2016
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
Stay Cable Replacement of the Luling Bridge
Stay Cable Replacement of the Luling Bridge Armin Mehrabi, Bridge Engineering Solutions, PC 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge, LA Lower Anchorage Upper
Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental