Network Interconnection of Offshore Wind

Similar documents
Viking Link Interconnector

Wind Power Overview - with offshore focus. Jörgen Svensson Industrial Electrical Engineering and Automation

Magnus Callavik, ABB Power Systems, HVDC, Västerås, Sweden Phone: +46(0)

Optimization of the coupled grid connection of offshore wind farms

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

factsheet High Voltage Direct Current electricity technical information

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

Polish Offshore Grid SA

Electricity market drivers

HV Submarine Cable Systems Design, Testing and Installation

Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration

CIEMADeS 4th INTERNATIONAL CONFERENCE

2012 San Francisco Colloquium

Offshore Wind. IEEE Boston PES - November 16, 2010

Grid connection of near shore wind farms

Brochure Introducing HVDC

Trends und Innovationen für ein Energiesystem der Zukunft Prof. Dr. Michael Weinhold, CTO Energy Management Division, Siemens AG Fraunhofer ISE,

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS. W.Grainger 1 and N.Jenkins 2 SYNOPSIS

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions

factsheet High Voltage Direct Current Electricity technical information

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

HVDC Light Cables. Submarine and land power cables

Curriculum Vitae Fredrik Rüter 1 December 2014

Wind energy scenarios for A report by the European Wind Energy Association - July Wind energy scenarios for 2020

Renewable Energy Grid Integration

Introduction to The Trans Bay Cable Project

INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems

Voltage Source HVDC Overview Mike Barnes Tony Beddard

Offshore Wind: some of the Engineering Challenges Ahead

Intelligent power superhighways

Infrastructure in a low-carbon energy system to 2030: Transmission and distribution. Final report. for. The Committee on Climate Change

HVDC Light & SVC Light Reference list

AMSC s Superconductor Cable Technologies for Electric Utilities

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues

Transmission technologies for collective offshore wind farm connections

CONCEPT OF THE OFFSHORE GRID DEVELOPMENT ON THE BALTIC SEA

2012 San Francisco Colloquium

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

De energievoorziening in 2040;


Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

HTS Cables: Pitfalls and Potential LIPA Cable Project. J. Maguire American Superconductor. DOE Wire Workshop January, 2007 Panama City, FL

What Matters for Successful Integration of Distributed Generation

HVDC Technology for Large Scale Offshore Wind Connections

Achievement and experience in service of long length High Voltage AC electrical links by insulated power cables

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Lucien Antonissen Key Account Manager LIOS Technology Germany

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Dutch wind energy strength

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

About T&D Europe : The association

Offshore Wind in Germany

Offshore Windpark DanTysk. Cost-Effective Foundations Design to Installation

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Turnkey cable solutions to better deploy your windfarm infrastructure

UK regional peering Northern Ireland. Mike Higgins

Agder Energi. God kraft. Godt klima. Solar as a distributed energy source. How will it challenge the traditional utility business?

Integrating 300 GW wind power in European power systems: challenges and recommendations. Frans Van Hulle Technical Advisor

Wind Power in Germany in 2014

TenneT Vision2030. Foreword

We appreciate your feedback

Consulting the grid code

INVESTING IN A TRANSITIONING SECTOR

Low Frequency AC Transmission System

An Introduction to High Voltage Direct Current (HVDC) Underground Cables

RENEWABLE ENERGY MIX FOR EGYPT

The installation and servicing

Energy Valley and NNOW in Offshore Wind an example

Offshore Platform Powered With New Electrical Motor Drive System

CLASS. Customer Load Active System Services

Geotechnical Engineering in Offshore Wind - how can we contribute to lowering the cost of electricity? DGF Seminar, Gentofte, 1 st April 2014

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Energinet.dk and the Danish Energy System

Wind Power opportunities in Västerbotten, northern Sweden

Looking ahead: Future Scenarios for Europe s Power Supply Grid

Renewable Energy Financing point view

Survey of Offshore Wind Farm Project in EU and Their Connecting Grid Systems

Offshore wind power: big challenge, big opportunity. Maximising the environmental, economic and security benefits

WHEN AN EFFECTIVE EU ENERGY POLICY?

Smart Grid - Big Data visualized in GIS

Modern Power Systems for Smart Energy Society

Medium voltage products. Technical guide Smart grids

London Array Off-Shore Wind Farm

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM

GE Grid Solutions. Providing solutions that keep the world energized Press Conference Call Presentation November 12, Imagination at work.

Transcription:

Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust.

Introducing KEMA A trusted independent partner providing advise throughout the entire chain of Energy KEMA Experience you can trust Proprietary & Confidential 2

Offshore Wind Experience in Europe Offshore wind has grown dramatically in the last years United Kingdom Ireland 1 Project 25 MW in Operation 8 Projects 598 MW Installed 1,392 MW Pending Sweden 4 Projects 132.5 MW Installed 30 MW Pending Denmark 8 Projects 426.15 MW Installed 428.2 MW Pending Country MW # Avg Size (MW) Operating UK 598.00 8 74.75 Denmark 426.15 8 53.27 Netherlands 244.80 3 81.60 Sweden 132.50 4 33.13 Belgium 30.00 1 30.00 Ireland 25.00 1 25.00 Totals 1456.45 25 58.26 Pending UK 1,392.00 8 174.00 2009-12 Germany 728.30 4 182.08 Denmark 428.20 4 107.05 Sweden 30.00 1 30.00 Totals 2,578.50 17 151.68 Belgium Netherlands 1 Project 30 MW Installed Germany 4 Projects 244.8 MW Installed 728.3 MW Pending Proprietary & Confidential 3

Strategy on offshore wind energy The Netherlands The Dutch government set a target of realizing 6.000 MW of offshore wind energy before 2020 (i.e. 25% of the expected maximum load - 10.000MM ) North Sea favourable place for offshore wind power: high average wind speeds, shallow waters, etc KEMA performed a study for the Dutch Government to evaluate technical and economic, financial and legal impacts: The target was technically and economically feasible But was dependant on adaptations to the electricity grid Proprietary & Confidential 4

Strategy on offshore wind energy The Netherlands How to connect 6 GW offshore wind power to the Dutch Transmission Network? Proprietary & Confidential 5

Dutch transmission network, offshore North Sea Peak load ~20 GW (2010) 380/220 kv double-circuit rings 2 favourable feed-in locations have been chosen Offshore transmission distance to shore 25-70 km Proprietary & Confidential 6

and onshore Consumption ~130 TWh, peak load ~20 GW (2010) substations and large cities close to the shore Grid reinforcements are necessary to enable power transmission Grid investments on mainland are needed and amount some 4% of wind park investments (350-650 MM ) System balance needs to be secured Proprietary & Confidential (*) Additionally trading and regulation mechanisms and legal issues in implementing 7 such a wind resource

3x1200 mm 2 Cu 750 MVA Langsscheiding dubbelrail Incl. convertertransformator STAT COM STAT COM STAT COM 12-mijlszone 2x1x2000 mm 2 Cu 3x1200 mm 2 Cu Kustlijn Spoel ca. 50 Mvar Incl. convertertransformator Beverwijk/ Velsen Een station Maasvlakte, evt een 3e station Types of grid connexion different alternatives Alternative 1: radial networks (150kV) Alternative 2: radial networks (380/150kV hub) 12- mijlszone Kustlijn BESTAAND 380kV-station 12- mijlszone Kustlijn BESTAAND 380kV-station Trafo 300 MVA Kuststation Trafo 300 MVA Kuststation 3x1200 mm 2 Cu 3x1200 mm 2 Cu Trafo 750 MVA Trafo 750 MVA 12-mijlszone Kustlijn BESTAAND 380kV-station 12-mijlszone Kustlijn BESTAAND 380kV-station Trafo 300 MVA Trafo 300 MVA 3x1200 mm 2 Cu Trafo 380/150: 750 MVA Trafo 150/: 300 MVA Evt. spoel op tertiare wikkeling Spoel 3x1200 mm 2 Cu Trafo 380/150: 750 MVA Trafo 150/: 300 MVA Evt. spoel op tertiare wikkeling Spoel Alternative 3: AC ring structure Alternative 4: HVDC ring structure 3x1200 mm 2 Cu dubbelrail 12-mijlszone Kustlijn Beverwijk/ Velsen Filters 750 MVA Filters 1,5 GW G ± 450 kv 2x 1,5 GW Compensatiespoelen 1,5 GW Langsscheiding Maasvlakte, evt een 3e station 1,5 GW 1,5 GW Compensatiespoelen Proprietary & Confidential 8

Break-even distance AC/DC Low power density energy source Large spacing of available locations. Forbidden areas: military area shipping routes offshore platforms piping routes anchoring places Large offshore DC terminal substation Low-capacitance XLPE cables Proprietary & Confidential 9

Ring power flow AC ring quickly overloaded FACTS required additional value? HVDC ring Controllable loop flows Hybrid (AC + DC) ring Proprietary & Confidential 10

Cost comparison Proprietary & Confidential 11

Conclusions Growth of wind power might be limited by mainland grid transmission capacity - managing the consequences for the stability of the network Bundling individual 150kVAC offshore wind farm connections into hubs: yields no significant economies of scale but reduces the number of shore crossings If a ring structure with the mainland network would help mitigate problems in the mainland network, a HVDC or hybrid (AC + DC) network is expected to be the preferred solution Proprietary & Confidential 12

Thank you for your attention. www.kema.com carlos.aguirrecalzada@kema.com +34 914171497 Experience you can trust.