1 Offshore Wind IEEE Boston PES - November 16, 2010

2 Offshore Wind A high-level overview of offshore wind project development identifying current technologies, challenges, risks and costs. Presented by: Brook Knodel Electrical Group Manager, Mott MacDonald LLC brook.knodel@mottmacinc.com

3 Discussion Outline Industry Overview Components Turbines/Foundations 33 kv Collector System (Inter-Array Cables) Offshore and Onshore Substations HV Submarine Cable Risks and Obstacles Costs Questions

4 Industry Overview Wind turbine technology has proven to be one of the most effective sources of renewable energy. By the end of 2009 worldwide capacity reached 159 GW, generating 340 TWh annually. Offshore wind offers many performance benefits versus onshore wind generation including strong, steady winds and proximity to metropolitan centers. Source: WWEA World Wind Energy Report 2009

5 Industry Overview cont. Over 3 GW of offshore wind installed globally Mainly Europe and UK Roughly 2 GW currently in construction Growth has been exponential with 32 GW targeted for the UK by 2020 and 30 GW for Germany by 2030 Ability to meet these targets limited by several factors Technology Supply Chain Construction Capacity

6 Industry Overview cont. In North America, several developers are proposing offshore wind along the North Atlantic Coast and Great Lakes. Deepwater Wind, Fisherman s, Bluewater Wind/NRG, Cape Wind Trillium, Great Lakes Offshore Wind, Windstream Energy Developers are jumping into large scale 500 MW+ projects Progress has been slowed due to many factors: Financing, permitting (land rights/boemre), supply chain, infrastructure, regulatory, lack of long-term federal guidance

7 Components Offshore wind farms have many similarities to their onshore counterparts but the marine environment poses unique technical design challenges. Major components of an offshore wind farm include: Turbines Foundations Inter-Array Cables Offshore Platform Substation/High Voltage Export Cable Interconnection Facilities

8 Components cont.

9 Components cont.

10 Components cont.

11 Components cont.

12 Components cont.

13 Thornton Bank Phase I, Belgium REpower 5 MW turbines (30 MW) Components - Turbines

14 Turbines cont. Typical types High-Speed Multi-Stage Gearbox (Vestas) Direct Drive PM/Converter (GE, Siemens, Vestas) Multibrid Low-Speed Gearbox (AREVA, REpower) Projects in development now will probably utilize 5+ MW turbines as the technology continues to develop Costs average $2.5M per MW (not installed) Factories are fully booked for the next few years and global capacity is not sufficient for even a small subset of the proposed projects currently in development.

15 Turbines cont. Manufacturers: Clipper (USA) 10 MW Scanwind 6 MW GE 4 MW Mitsubishi 5 MW Vestas 3 MW * Nordex 2.5 MW* Repower 5 MW* Sinovel 3 MW* Siemens 3.6 MW* Econtechnia 2.5 MW Multibrid/AREVA 5 MW* Enercon 6 MW Darwin 5 MW Bard 6 MW* Rolls Royce 5 MW * - available now

16 Turbines cont. Typical Dimensions: REpower 5M (5 MW) Doubly-Fed Induction Generator Type Rotor Diameter: 414 feet Hub Height: 328 feet + transition piece Nacelle Weight: 430 tons From sea level to top of rotor blade is equivalent to a 50 story building! Turbines are spaced approx. ½ mile apart to reduce wake effect.

17 Thornton Bank Phase I, Belgium Foundations Components - Foundations

18 Foundations cont. Types Monopile (most popular type) Gravity Foundation (previous slide - 10 stories high, 3000 tons!) Jackets (inexpensive and most suitable for deep water projects) Tripods (specialty for some turbine manufacturers) Floating? (currently being developed) Past projects were in shallow waters (60 ft) and current projects are in 100 ft depths. Future projects are planned for much greater depths which will create installation challenges.

19 Foundations jackets and mono-piles

20 Foundations tripods and gravity type

21 Foundations cont. Currently the foundations and turbines are erected using large jack-up barges customized for turbine erection. The depth of water is a limiting factor and alternate means of erection are being investigated for future deep water projects. The east coast has relatively shallow depths along the continental shelf, but current US jack-up barges may not be suitable. Foundation selection is very dependent upon subsurface conditions. In-depth marine geotech studies are essential. Costs range from $2.5M to $4M each (not installed)

22 Components Inter-Array Cables ABB XLPE Submarine Cable 36kV, 3 core copper conductor with steel wire armor Source: ABB Submarine Cable Systems User Guide

23 Inter-Array Cables cont. Utilize solid-dielectric 36 kv insulation offshore generator vendors provide a standard 33 kv primary on each generator step-up transformer. Optical fiber integrated for communications. Each cable can collect up to 35 MW of generation. Larger projects require offshore consolidation of multiple feeders. Installed costs are a small portion of the project, but Installation has proven a challenge (over 80% of insurance claims $$ for offshore wind are related to the inter-array cabling). Many installation contractors have gone bankrupt.

24 Components Offshore Substation Platform/High Voltage Export Cable Barrow Offshore Wind Farm, East Irish Sea, UK Offshore High Voltage Substation Platform

25 Offshore Platform/Export Cable cont. Necessary for projects larger than 35 MW to consolidate inter-array cable feeders and step voltage up to suitable transmission levels Design Considerations: Weight and real estate are restrictive. Gas insulated designs (GIS) are utilized for 33 kv and High Voltage AC switchgear. Location of the platform is selected to optimize cost of inter-array and export cable installation For projects larger than 200 MW multiple platforms may be preferable/necessary.

26 Offshore Platform/Export Cable cont. Export cables are solid dielectric XLPE. Not much track record above 245 kv. Long distance submarine cables have high losses and can generate significant VARs necessitating reactors to control power factor. Splices are potential weaknesses so preference is a continuous cable per phase from shore to platform.

27 Offshore Platform/Export Cable cont. Routing of the export cables requires significant planning. Cable crossings need to be coordinated with the affected party. Existing cables need to be physically protected and crossings need to be perpendicular. Negotiations may impact schedule. Subsurface investigations may show obstacles that need to be avoided (shipwrecks). Closer in to shore, human, fish, plant and animal habitats may restrict access. Typically the shore landing requires directional drilling or sawing. There are heavy duty saws available but they cost $2M to mobilize, $0.1M per day to operate and another $2M to demobilize.

28 Offshore Platform/Export Cable cont. As projects get larger and further offshore, new voltage source converter HVDC technology is being considered. Standard HVDC converter technology is too space intensive to fit on an offshore platform. VSC converter technology, such as ABB s HVDC Light, can be configured to fit and provides significant benefits at the point of interconnection including enhanced voltage/var support, black start capability and minimal short circuit contribution. Many countries (including the UK, Europe and the United States) are looking into developing offshore HVDC backbones for interconnection of renewable energy and strengthening of regional transmission networks. Current designs accommodate up to 1200 MW per +/-320 kvdc converter although these technologies are new and have not been in commercial operation. (400 MW offshore has been operational) Installing HVDC requires an onshore converter station which can be costly in densely populated regions such as New York City. Lack of HVDC circuit breakers make multi-terminal designs a challenge. Temporary solutions utilize AC CBs as switches. Costs on order of $1M per MW installed (including submarine cable) Source: ABB It is Time to Connect

29 Offshore Platform/Export Cable cont. Export cable and HVDC technologies represent a lot of risk for the currently proposed projects over 500 MW. There is little or no track record for the submarine cable and converter equipment although many major manufacturers are focusing on bringing these technologies to market.

30 Components Interconnection Facilities NYPA s Ryan Substation, New York 230 kv Substation

31 Interconnection Facilities cont. In much of Europe, utilities are required to bring the point of interconnection to the offshore platform. In the United States, the export cable and substation upgrades required to support the project are the responsibility of the developer. Details are defined by the interconnection studies conducted by the region s Independent System Operator in coordination with the interconnecting transmission owner. Costs vary widely based on voltage and the area s ability to accommodate the proposed plant output.

32 Risks and Obstacles Offshore wind projects face many obstacles to success. Mitigation of these risks becomes a project unto itself. Getting a project from conceptual phase to commercial operation requires coordination and cooperation with investment capital, local and federal government, permitting authorities, engineers, contractors, utilities, vendors, banks, etc. This is true of both offshore and onshore projects. Unlike it s onshore cousin, offshore construction projects are particularly susceptible to the vagaries of weather. All the coordination in the world cannot remove mother nature from the equation.

33 Risks and Obstacles cont. How will you finance it? (Multibillion dollar projects) Who will buy the electricity? (FIT, PPA) What ships will you use? (Jones Act, St Lawrence Seaway) What labor force? (Jones Act) Where are you going to stage the construction? (Ports) Will your technology survive the conditions? Will political support remain in place? (Federal, State) Will the weather impact your schedule? How will you maintain it?

34 Costs Compared to onshore wind, offshore wind costs approximately three times as much to install. These increased costs are partially offset by increased efficiency due to steady winds and closer access to metropolitan areas along the coast. Land based wind projects typically require $1.5M per MW investment. Offshore wind costs have been increasing over time as the projects move from shallow coastal waters to deeper regions. Current investment projections vary from $3M to $5M per MW.

35 Comparative generating costs, base case 2009 start Discounted lifetime cost / production Mid 2010 datum

36 Costs cont. A typical breakdown of the costs associated with largescale offshore wind: Development 2.5% Permitting, Legal Fees, Preliminary Design, Interconnection Studies, Site Investigation, Land Acquisition Turbine Procurement 40 % Foundation Procurement 10 % Other Supply Costs 7.5 % Platforms, Cables, Substation Equipment Installation and Erection 15 % Other Costs 25 % Owner Management Costs, Contingencies, Bank Fees, Insurance, Interest

37 Costs cont. Operation and maintenance costs are difficult to project for US projects. Vendors are not regional and there are no experienced ships or crews in existence. O&M Costs, based on what is being done in Europe are $150k - $200k per MW depending on distance from shore and contract conditions. This equates to approximately $0.05 per kwh for O&M alone.

38 Questions?

39

Offshore Wind Challenges for the Insurance Industry. AIMU Marine Insurance Issues 2011

Offshore Wind Challenges for the Insurance Industry. AIMU Marine Insurance Issues 2011 Challenges for the Insurance Industry AIMU Marine Insurance Issues 2011 Power Unlike the typical usage of the term offshore in the marine industry, offshore wind power includes inshore water areas such

More information

The installation and servicing

The installation and servicing European Forum for Renewable Energy Sources The installation and servicing of offshore wind farms Kaj Lindvig, CSO, A2SEA A/S 16 th September 2010 A2SEA Started 1 st July 2000 100% dedicated offshore wind

More information

Offshore Work Packages

Offshore Work Packages Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up

More information

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most

More information

HV Submarine Cable Systems Design, Testing and Installation

HV Submarine Cable Systems Design, Testing and Installation HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications

More information

By Manitoba Hydro, March 4 th 2013

By Manitoba Hydro, March 4 th 2013 Rebuttal to Bipole III Coalition underground cable report Potential Use of Underground Cables for Sections of the Planned 500 kvdc Bipole III Overhead Line in Manitoba By Manitoba Hydro, March 4 th 2013

More information

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity

More information

Nordex SE. Nordex goes Offshore

Nordex SE. Nordex goes Offshore Nordex SE Nordex goes Offshore Hannover, April 2011 Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 2 Strong growth prospects

More information

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues J Egan, P O Rourke EirGrid Plc, Republic of Ireland john.egan@eirgrid.com paul.o rouke@eirgrid.com

More information

Press Presse Press Presse

Press Presse Press Presse Press Presse Press Presse Energy Sector Renewable Energy Division Fact sheet Siemens Wind Power USA Erlangen, December 3, 2010 Siemens Wind Power USA Overview The U.S. is one of the most important wind

More information

Grid connection of near shore wind farms

Grid connection of near shore wind farms Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400

More information

Trends in offshore wind economics the past and the future

Trends in offshore wind economics the past and the future Downloaded from orbit.dtu.dk on: Jun 24, 216 Trends in offshore wind economics the past and the future Kitzing, Lena; Morthorst, Poul Erik Published in: Proceedings - 14th Wind Integration Workshop Publication

More information

Optimization of the coupled grid connection of offshore wind farms

Optimization of the coupled grid connection of offshore wind farms Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven

More information

Network Interconnection of Offshore Wind

Network Interconnection of Offshore Wind Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the

More information

Offshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper

Offshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper A National Renewables Infrastructure Plan Stage 2 Information Paper With investment of 100 billion planned over the next 10 years, the offshore wind sector offers a huge opportunity for Scottish businesses.

More information

London Array Off-Shore Wind Farm

London Array Off-Shore Wind Farm London Array Off-Shore Wind Farm 1 Jamie R Mathlin Construction Manager Off-Shore Sub-Stations Project Commissioning Manager 27 Years Experience in the Power Industry Grid Trained Electrical Engineer 10

More information

Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com

Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com HVDC GRIDS FOR OFFSHORE AND ONSHORE TRANSMISSION Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com SUMMARY The objective with this

More information

Introduction to The Trans Bay Cable Project

Introduction to The Trans Bay Cable Project Introduction to The Trans Bay Cable Project We ve come a long way 1 But thanks to the advances of two men and 2 The Battle of Currents 3 Utilities are able to choose the most effective and efficient means

More information

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems

More information

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009 Preliminary Information Memorandum Thanet Offshore Transmission Assets July 2009 SUMMARY In April 2009 Ofgem distributed a teaser document, UK Offshore Transmission Investment Opportunity, to investors

More information

E.ON Offshore Wind Energy Factbook

E.ON Offshore Wind Energy Factbook E.ON Offshore Wind Energy Factbook E.ON Climate & Renewables December 2011 1 Picture taken at E.ON Offshore Project - Robin Rigg (United Kingdom, 2009) 2 Dear Reader, Offshore wind is one of the most fascinating

More information

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels E-Highway2050 WP3 workshop April 15 th, 2014 Brussels High voltage underground and subsea cable technology options for future transmission in Europe Ernesto Zaccone, Chairman Europacable High Voltage Systems

More information

installation, operations & maintenance

installation, operations & maintenance installation, operations & maintenance Contents Introduction... 2 The offshore wind opportunity... 2 Innovation in offshore wind... 2 The cost of offshore wind projects... 2 Offshore wind foundation, turbine

More information

Value breakdown for the offshore wind sector

Value breakdown for the offshore wind sector [RAB (2010) 0365] Value breakdown for the offshore wind sector A report commissioned by the Renewables Advisory Board February 2010 1 Value breakdown for the offshore wind sector Contents 1. Introduction...

More information

JEDI Capital Expenditure Update

JEDI Capital Expenditure Update JEDI Capital Expenditure Update U.S. Offshore Wind Market and Supply Chain Workshop Presented by Aaron Smith National Renewable Energy Laboratory Brent Cooper Ocean & Coastal Consultants, Inc. 2014 Navigant

More information

Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)

Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV) Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV) 29 th January 2015 Lyndon Greedy / Hans Cleijne 1 SAFER, SMARTER, GREENER DNV GL Renewables

More information

Jen Banks Wind Energy Project Coordinator North Carolina Solar Center

Jen Banks Wind Energy Project Coordinator North Carolina Solar Center Jen Banks Wind Energy Project Coordinator North Carolina Solar Center North Carolina Solar Center Mission Statement to advance the use of renewable energy resources to ensure a sustainable economy that

More information

Nautischer Verein zu Bremerhaven Bremerhaven, 15.09.2011. 15.09.2011 Nautischer Verein

Nautischer Verein zu Bremerhaven Bremerhaven, 15.09.2011. 15.09.2011 Nautischer Verein Nautischer Verein zu Bremerhaven Bremerhaven, 15.09.2011 1 Contents Company Introduction Market development Logistics Vessel Presentation Vessel Operation 2 Contents Company Introduction Market development

More information

OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS

OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS 1 OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS April 2013 Contents A B C Offshore market volume of EUR 130 bn by 2020 Agenda 2020 Markets Trends Competition Page 3 Value chain evaluation

More information

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type

More information

Dutch wind energy strength

Dutch wind energy strength Dutch wind energy strength Chris Westra (senior consultant ECN) (general manager We@Sea) www.we-at-sea.org www.ecn.nl www.haveneilandopzee.nl 2010 The start in 1972 here we are now: 2010 Drivers for offshore

More information

factsheet High Voltage Direct Current electricity technical information

factsheet High Voltage Direct Current electricity technical information factsheet High Voltage Direct Current electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

List of wind turbine manufacturers

List of wind turbine manufacturers List of wind turbine manufacturers From Wikipedia, the free encyclopedia Jump to: navigation, search turbines This is a list of wind turbine manufacturers sorted alphabetically. It contains the manufacturers

More information

Morris S. Stover, P.E. Sponsor, Transmission Area

Morris S. Stover, P.E. Sponsor, Transmission Area Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development

More information

HVDC Light Cables. Submarine and land power cables

HVDC Light Cables. Submarine and land power cables HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in

More information

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS.

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS. DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS December 20, 2004 David W. Forrest Rachel I. Mosier 1. EXECUTIVE SUMMARY CL&P

More information

E.ON Offshore Wind Energy Factbook

E.ON Offshore Wind Energy Factbook E.ON Offshore Wind Energy Factbook E.ON Climate & Renewables September 2012 Introduction 3 Offshore Wind Industry 5 Challenges of Offshore Wind 9 Technical Solutions 14 E.ON s Approach 37 Factsheets of

More information

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General

More information

Brochure Introducing HVDC

Brochure Introducing HVDC Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in

More information

Essex... A great location for offshore wind

Essex... A great location for offshore wind Essex... A great location for offshore wind The UK Government has very ambitious plans for the development of offshore wind farms in its coastal waters involving up to 40GW of installed capacity by 2020

More information

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES MAXIMISING YOUR Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES RES is one of the world s leading renewable energy companies active in the wind, wave, tidal, solar and biomass sectors Asset

More information

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN H. Kazemi Karegar a,b, A.Zahedi a,v. Ohis a, G. taleghani b and M. Khalaji b a Department of Electrical & Computer Systems Engineering, PO Box 35, Monash University,

More information

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION 1 EFFICIENT ELECTRICAL ENERGY TRANSMISSION

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:

More information

NORDEX USA, INC. GREAT LAKES SYMPOSIUM

NORDEX USA, INC. GREAT LAKES SYMPOSIUM NORDEX USA, INC. GREAT LAKES SYMPOSIUM CHICAGO 24 Sep 2013 AGENDA 1 About Nordex 2 Wind Industry Challenges & Our Responses Nordex USA, Inc. Great Lakes Symposium Presentation Chicago Sept 2013 Slide 2

More information

Summary of Electric Transmission Assessment Report

Summary of Electric Transmission Assessment Report Summary of Electric Transmission Assessment Report January 2010 Assessment and Analysis of the State-Of-the-Art High-Voltage Electric Transmission Systems with Specific Focus on High-Voltage Direct Current

More information

Port and Infrastructure Analysis for Offshore Wind Energy Development

Port and Infrastructure Analysis for Offshore Wind Energy Development FEBRUARY 2010 Port and Infrastructure Analysis for Offshore Wind Energy Development PREPARED FOR 133 Federal Street, Boston, Massachusetts 02110 Port and Infrastructure Analysis for Offshore Wind Energy

More information

Offshore Platform Powered With New Electrical Motor Drive System

Offshore Platform Powered With New Electrical Motor Drive System Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy

More information

The Market for Installation Vessels

The Market for Installation Vessels The Market for Installation Vessels SPEAKER: Lars Nedergaard, A2SEA A/S Date: June 8, 2011 Agenda A2SEA The Offshore Wind Farm Harbour The Products The Vessels The Market 2 A2SEA SEA ENERGY 2002 SEA POWER

More information

OWPST & Titan 200 & UK Offshore

OWPST & Titan 200 & UK Offshore OWPST & Titan 200 & UK Offshore A look at the Company, our Product and the Technology being applied in the UK Offshore Market Introduction Douglas Hines CEO/President Offshore Wind Power Systems of Texas

More information

SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement

SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement www.sse.com Programme Introduction to SSE Overview of Tenders Overview of supplier requirements to work for SSE Overview of Procurement Process

More information

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh, Head of Cost of Energy Siemens AG, Wind Power and Renewables Answers for energy. Introduction Siemens Wind Power

More information

EuroAsia Interconnector Project Submarine power cable

EuroAsia Interconnector Project Submarine power cable EuroAsia Interconnector Project Submarine power cable Feasibility study status Executive summary Presented by: Yakov (Yasha) Hain, Senior Executive VP Israel Electric Corporation Ltd. Doing business with

More information

Request for Renewable Energy Alternate Use Lease on the Outer Continental Shelf near North Carolina

Request for Renewable Energy Alternate Use Lease on the Outer Continental Shelf near North Carolina Request for Renewable Energy Alternate Use Lease on the Outer Continental Shelf near North Carolina Outer Banks Ocean Energy, LLC 212 East High Street Charlottesville, Virginia 22902 July 14, 2010 Request

More information

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore Wind Power & Renewables Division Market Unit Offshore Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference on Renewable Energy, Hamburg, siemens.com/answers Siemens

More information

Scottish Enterprise. Offshore Wind Power: Priorities for Research and Development (R&D) and Innovation. Supporting a globally competitive Scotland

Scottish Enterprise. Offshore Wind Power: Priorities for Research and Development (R&D) and Innovation. Supporting a globally competitive Scotland Scottish Enterprise OPPORTUNITIES IN ENERGY Offshore Wind Power: Priorities for Research and Development (R&D) and Innovation Supporting a globally competitive Scotland Introduction Successful offshore

More information

Wind Turbine Technicians

Wind Turbine Technicians Wind Turbine Technicians about ersg ersg is an international workforce solutions provider with expertise in delivering highly skilled professionals. We are established within the Renewables (particularly

More information

AN INDEPENDENT ANALYSIS COMMISSIONED BY STATKRAFT UK

AN INDEPENDENT ANALYSIS COMMISSIONED BY STATKRAFT UK OFFSHORE WIND: DELIVERING MORE FOR LESS AN INDEPENDENT ANALYSIS COMMISSIONED BY STATKRAFT UK JULY 2015 BVG Associates BVG Associates is a technical consultancy with expertise in wind and marine energy

More information

Turnkey cable solutions to better deploy your windfarm infrastructure

Turnkey cable solutions to better deploy your windfarm infrastructure Turnkey cable solutions to better deploy your windfarm infrastructure expertise supports your network s evolution Both on land and offshore, Nexans has the expertise to interconnect large wind turbines

More information

Port facilities & offshore wind energy. ATO / We@Sea Conference Chris Westra

Port facilities & offshore wind energy. ATO / We@Sea Conference Chris Westra Port facilities & offshore wind energy ATO / We@Sea Conference Chris Westra Complexity of the construction of an offshore wind project Offshore wind installation Model description Wind Farms Harbour development

More information

Curriculum Vitae Fredrik Rüter 1 December 2014

Curriculum Vitae Fredrik Rüter 1 December 2014 Name RÜTER Fredrik Date of Birth 8 May 1960 Nationality Position Languages Coordinates Swedish Senior Consultant Swedish: mother tongue English: fluent (business, conversation, reading, writing) German,

More information

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

POWER TRANSMISSION FROM OFFSHORE WIND FARMS POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred

More information

Newsletter September 2013

Newsletter September 2013 Newsletter September 2013 This newsletter should inform you about the latest developments of aerodyn Energiesysteme GmbH Dear customers and business friends In the six months since our last newsletter,

More information

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn

More information

Offshore Wind: some of the Engineering Challenges Ahead

Offshore Wind: some of the Engineering Challenges Ahead Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse

More information

Wind Service Offshore. We can t conquer the elements But we can outthink them

Wind Service Offshore. We can t conquer the elements But we can outthink them Wind Service Offshore We can t conquer the elements But we can outthink them We make maintenance a routine, not an adventure Turning unpredictability into output Massive waves. Racing tides. Early nightfall.

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

The Leader in Wind Energy

The Leader in Wind Energy The Leader in Wind Energy About the Cover: The 102-megawatt Red Mesa Wind Energy Center in New Mexico is capable of generating enough electricity to power more than 30,000 homes. NextEra Energy Resources

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters

More information

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions Higher cost efficiency in Wind Power Transmission Siemens presents new DC grid connection for offshore wind farms siemens.com/grid-access-solutions is leading in offshore grid access To date Siemens has

More information

OFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998

OFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998 OFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998 For the Long Island New York City Offshore Wind Collaborative Submitted By: AWS Truewind, LLC 463 New Karner Road

More information

Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project

Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL is a national laboratory

More information

RENEWABLE ENERGY IN FIFE Skills and Supply Chain

RENEWABLE ENERGY IN FIFE Skills and Supply Chain RENEWABLE ENERGY IN FIFE Skills and Supply Chain Fife aspires to be the centre of excellence for the renewables industry in Scotland, and in particular the offshore wind sector. This document highlights

More information

Hendrix Spacer Cable

Hendrix Spacer Cable Hendrix Spacer Cable What is Spacer Cable? Covered Conductor Withstands temporary branch contact Eliminates temporary faults Protects wildlife Less clearance issues Compact Configuration Multiple Circuits

More information

Document number #12 DNS13006. Authors #20 Telephone: Date #40 AUGUST 2013

Document number #12 DNS13006. Authors #20 Telephone: Date #40 AUGUST 2013 #0 INSPECTION REPORT Discipline or report series #0 Inspection VESTAS wind turbines Title #5 VESTAS WIND TURBINE #2 Report number #52 #3 Authors #20 Telephone: Date #40 AUGUST 203 Summary #60 6 UNIT VESTAS

More information

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

Life-Cycle Cost of a Floating Offshore Wind Farm

Life-Cycle Cost of a Floating Offshore Wind Farm Life-Cycle Cost of a Floating Offshore Wind Farm Laura Castro-Santos Abstract This chapter describes a general methodology in order to calculate the costs of a floating offshore wind farm. It is based

More information

Offshore Renewable Energy in Virginia

Offshore Renewable Energy in Virginia Offshore Renewable Energy in Virginia Presented to the Renewable Natural Resources Foundation December, 8 2009 Neil Rondorf Vice President, Maritime Operations Science Applications International Corporation

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS. W.Grainger 1 and N.Jenkins 2 SYNOPSIS

OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS. W.Grainger 1 and N.Jenkins 2 SYNOPSIS OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS W.Grainger 1 and N.Jenkins 2 1 Border Wind Ltd, Hexham 2 Dept of Electrical Engineering and Electronics, UMIST SYNOPSIS The development of large scale offshore

More information

Wind Power Overview - with offshore focus. Jörgen Svensson Industrial Electrical Engineering and Automation

Wind Power Overview - with offshore focus. Jörgen Svensson Industrial Electrical Engineering and Automation Wind Power Overview - with offshore focus Jörgen Svensson Industrial Electrical Engineering and Automation Organisation - research group Lund university, 1666, students 47000 staff 7200 Faculty of Engineering,

More information

factsheet High Voltage Direct Current Electricity technical information

factsheet High Voltage Direct Current Electricity technical information factsheet High Voltage Direct Current Electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

Appendix D: Benefit Cost Analysis: Economic Feasibility of Offshore Wind Energy Development on the California Central Coast

Appendix D: Benefit Cost Analysis: Economic Feasibility of Offshore Wind Energy Development on the California Central Coast Appendix D: Benefit Cost Analysis: Economic Feasibility of Offshore Wind Energy Development on the California Central Coast Photo Credit: Principle Power Benefit-Cost Analysis: Economic Feasibility of

More information

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission

More information

How To Build A Wave Energy Power Station In Germany

How To Build A Wave Energy Power Station In Germany ZEE- EN WATERBOUW IN EN ROND VLAANDEREN 4 JUNI 2015 UITVOERING WINDMOLENPARKEN & ANDERE TOEKOMSTIGE GROENE STROOM OPWEKKERS Bart De Poorter General Manager GeoSea TABLE OF CONTENTS 1. Introduction DEME

More information

Voltage Source HVDC Overview Mike Barnes Tony Beddard

Voltage Source HVDC Overview Mike Barnes Tony Beddard Voltage Source HVDC Overview Mike Barnes Tony Beddard Note: This is a version with images removed which have copyrighted other than from the University of Manchester, for web publication. Should a conference

More information

London Array. Operations and Maintenance

London Array. Operations and Maintenance London Array londonarray.com London Array Operations & Maintenance Base Port of Ramsgate Military Road Ramsgate CT11 9LG Registered in England and Wales No 04344423 Operations and Maintenance 1 2 Operations

More information

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL... POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public

More information

Jen Banks Wind Energy Project Coordinator North Carolina Solar Center

Jen Banks Wind Energy Project Coordinator North Carolina Solar Center Jen Banks Wind Energy Project Coordinator North Carolina Solar Center North Carolina Solar Center Mission Statement to advance the use of renewable energy resources to ensure a sustainable economy that

More information

NSW Submarine Power. Cables for the future, delivered today.

NSW Submarine Power. Cables for the future, delivered today. Submarine Power. Cables for the future, delivered today. NorddeutSChe Seekabelwerke GmbH () for Renewable Energies The submarine competence center within the General Cable Group After was founded in by

More information

Cable Laying and Repair - Cable Ship Operations

Cable Laying and Repair - Cable Ship Operations http://oceanexplorer.noaa.gov/explorations/03edge/background/sargassum/sargassum.html Cable Laying and Repair - Cable Ship Operations Dr. R.J. Rapp, Director, Industry & Marine Liaison, TE SubCom Submarine

More information

Best Practice Guide. How to Choose an Offshore Wind Transport & Installation Provider March 2013

Best Practice Guide. How to Choose an Offshore Wind Transport & Installation Provider March 2013 Best Practice Guide How to Choose an Offshore Wind Transport & Installation Provider March 0 Introduction It s still relatively early days in the offshore wind industry. And even though the industry is

More information

GENERATING ENERGY AND PROSPERITY:

GENERATING ENERGY AND PROSPERITY: Offshore Renewable Energy Catapult GENERATING ENERGY AND PROSPERITY: Economic Impact Study of the offshore renewable energy industry in the UK March Foreword March It is my pleasure to introduce Generating

More information

Offshore Windfarm Egmond aan Zee 4 years of Operation

Offshore Windfarm Egmond aan Zee 4 years of Operation Offshore Windfarm Egmond aan Zee 4 years of Operation CUEN Offshore Wind Energy Conference 28 June 2011, Cambridge Elke Delnooz Operations Support Manager www.noordzeewind.nl 1 Contents Project description

More information

E.ON Wind Turbine Technology and Operations Factbook

E.ON Wind Turbine Technology and Operations Factbook Global Unit Renewables E.ON Wind Turbine Technology and Operations Factbook September 203 Global Unit Renewables E.ON is one of the world s largest investor-owned power and gas companies, with annual sales

More information

An Introduction to High Voltage Direct Current (HVDC) Underground Cables

An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 1 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Brussels, 10 October 2011 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 2 Table of content

More information

GRAVITY BASE FOUNDATIONS

GRAVITY BASE FOUNDATIONS GRAVITY BASE FOUNDATIONS 2 Crown with reference to Marine All Activity Map Concrete gravity base foundations able to be floated and towed out to deeper water windfarms and installed without specialist

More information

HVDC-VSC: transmission technology of the future

HVDC-VSC: transmission technology of the future A bi-pole ± 285 kv HVDC line sandwiched between 3-phase 400 kv HVAC lines. HVDC-VSC: transmission technology of the future A new hybrid HVDC circuit technology using voltage source converters is only half

More information

A clean energy solution from cradle to grave

A clean energy solution from cradle to grave Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental