International Review of Grid Connection Requirements related with Voltage Dips for Wind Farms



Similar documents
Results using Wind Turbine Models for the Certification Process required by the Grid Codes

Wind Turbine Operation in Power Systems and Grid Connection Requirements

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

Solar Power Plant Design and Interconnection

Advanced Protection of Distribution Networks with Distributed Generators

Context: significant penetration of DG = increased risks for system security

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Analysis of requirements in selected Grid Codes. Willi Christiansen & David T. Johnsen

Renewable Energy Interconnection Requirements for the US. IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering

Technical Information Short-Circuit Currents Information on short-circuit currents of SMA PV inverters

Guidelines for Large Photovoltaic System Integration

Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration

Control Development and Modeling for Flexible DC Grids in Modelica

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

2012 San Francisco Colloquium

What Matters for Successful Integration of Distributed Generation

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

System Protection Schemes in Eastern Denmark

INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

Grid Code - High and extra high voltage - Tennet TSO GmbH Bernecker Straße 70, Bayreuth

Reactive Power Generation by DFIG Based Wind Farms with AC Grid

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

The Application and Benefits of Multi-phase Auto-reclosing

Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

Control Strategies of the Doubly Fed Induction Machine for Wind Energy Generation Applications

Grid codes for renewable energy integration

Calculating voltage dips in power systems using probability distributions of dip durations and implementation of the Moving Fault Node method

Consulting the grid code

Nuclear Power Plant Electrical Power Supply System Requirements

Make your electric distribution network safe

Magnus Callavik, ABB Power Systems, HVDC, Västerås, Sweden Phone: +46(0)

Wind Cluster Management for Grid Integration of Large Wind Power

Renewable Energy Grid Integration

Calculation of Voltage Sag Indices for Distribution Networks

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS

Microgrids and self-generation with renewable energies

TURBOtech srl. SED-635 Digital Excitation System. Industrial Electronics Sector FEATURES

DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS

Dually Fed Permanent Magnet Synchronous Generator Condition Monitoring Using Stator Current

Distributed Generation and Power Quality Case Study

Brochure Introducing HVDC

Power products and systems. Intelligent solutions for power distribution Zone concept

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems

SUPPORTING PAPER FOR THE OPERATIONAL SECURITY NETWORK CODE FOR PUBLIC CONSULTATION

Monitoring the Operation of Wind Turbines Alex Robertson, Vestas Northern Europe

Balancing and Reserve Power by PV Plants. Ken Christensen MSEE, BSEE Global Product Manager, SMA Utility-Scale and Hybrid Solutions

Modelling of wind power fluctuations and forecast errors. Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM

Wind energy development in Spain. Luis Atienza Chairman & Chief Executive Officer April, 3rd 2009

Electricity Rates Forecasting:

Planned Islanding on Rural Feeders - Utility Perspective

SPECIFICATION COG-2007

HVDC. A firewall against disturbances in high-voltage grids. Lennart Carlsson

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

Chapter 5. System security and ancillary services

Wind Power and District Heating

Medium voltage products. Technical guide Smart grids

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO

Equipment Performance Due to Voltage Sags Test Results for Contactor and Induction Motor

VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Cahier technique no. 196

RENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa

CHAPTER 1 INTRODUCTION

Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer

Connection of micro-generation to the electricity distribution network

Grid Interconnection of Renewable Energy Sources Using Modified One-Cycle Control Technique

How To Understand And Understand The Theory Of Electricity

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw

Knowing the FACTS. FACTS that enhance power quality in rail feeder systems

SYNCHRONOUS MACHINES

ANN Based Fault Classifier and Fault Locator for Double Circuit Transmission Line

Measurement, Modeling and Simulation of Capacitor Bank Switching Transients

Hybrid processing of SCADA and synchronized phasor measurements for tracking network state

2012 San Francisco Colloquium

A Design of DC/DC Converter of Photovoltaic Generation System for Streetcars

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

Performance Analysis of Grid connected Wind Energy Conversion System with a DFIG during Fault Condition

7. Reactive energy compensation

Electric Power Distribution

INFLUENCE ANALYSIS OF SMALL REPOWERED WIND POWER PLANTS ON THE RELIABILITY OF THE LOCAL GRID

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

ATTACHMENT G. Network Operating Agreement

Power Quality for Information Technology System

AC COUPLED HYBRID SYSTEMS AND MINI GRIDS

Midroc SWPTC. Big Glenn and Göteborg Wind Lab Ola Carlson. Stockholm

Data center power dynamics within the settings of regional power grid

Technical Challenges of Smart- and Microgrids

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION

HVDC Technology for Large Scale Offshore Wind Connections

Wide Area Monitoring Current Continental Europe TSOs Applications Overview

Energy Systems Integration

The design and performance of Static Var Compensators for particle accelerators

MICRO HYDRO POWER PLANT WITH INDUCTION GENERATOR SUPPLYING SINGLE PHASE LOADS

Transcription:

International Review of Grid Connection Requirements related with Voltage Dips for Wind Farms J. A. Fuentes, M. Cañas, A. Molina, E. Gómez, F. Jiménez Abstract In this work, the Spanish grid code is compared to other recently approved or proposals published or under revision international regulations for connection of wind turbines to the network. More specifically, it highlights their main characteristics. Index Terms Voltage dips, wind turbines, grid codes I. INTRODUCTION Over the last few years the installed capacity of wind power has undergone an outstanding growth around the world. Special mention should be given to Europe, in particular Germany and Spain, where the production of clean energy reaches a considerable percentage of their energy supply. Due to the policies and incentives offered in these countries, the industry has developed a technology that allows large wind farms to be considered as a serious alternative to traditional power plants. The more relevant advances in this field have been based in the Double Fed Induction Generator and the power electronics that allows the wind turbine accomplish with the code of each country for a safe operation of the electric grid. The stability and reliability of the power system depends strongly on the penetration of wind farms in such systems. Consequently the Operators have modified their Grid Codes in the last years to improve the integration of the large wind farms to the grid. Wind farms must maintain uninterrupted generation throughout power system disturbances, supporting the network voltage and frequency, and therefore, extending features such as low voltage ride through, or reactive an active power capabilities. Low voltage ride through is particularly important to maintain the voltage stability, specially in areas with high concentration of wind power generation. If the wind turbine is not designed to achieve these requirements and disconnects from the grid during a power system disturbance, this may result in severe stability failures in the grid, which in turn could amplify the disturbance, [], [2]. Among power system disturbances, voltage dips are mainly due to short-circuits and earth faults in the grid, [2], i.e. they are the disturbances involved in low voltage ride through J. A. Fuentes and A. Molina are with the Department of Electrical Eng. Universidad Politécnica de Cartagena, 322 Cartagena (SPAIN); juanalvaro.fuentes@upct.es E. Gómez and M. Cañas are with the Renewable Energy Research Institute and the Dept. of Electrical, Electronic, and Control Eng, EPSA. Universidad de Castilla-La Mancha, 27 Albacete (SPAIN); emilio.gomez@uclm.es F. Jiménez is with Engineering Department, Gamesa Eólica S.A., Polígono Agustinos, calle A, E-33 Pamplona (SPAIN); fjimenez@eolica.gamesa.es studies. A voltage dip is a sudden voltage reduction (between % and 9%) at a specific location in the electrical system, which lasts for half a cycle to min, [3]. Nevertheless, several national network codes have been approved or are under investigation nowadays to avoid explicitly the disconnection of the electrical generation units, when submitted to voltage dips related to correctly cleared shortcircuits, [4] due to the notable increase in the demand as well as in the installed wind power capacity,. The disconnection of wind farms can cause a multiple contingency with its associated high risk of supply interruptions, [2]. Furthermore, it is necessary that wind farms supply reactive power depending on the network demands and the corresponding voltage levels. Obviously, these grid codes specified by the transmission system operators are responsible for maintaining the power system stability and power quality and they impose the requirements regarding wind turbine integration to the network. In [5] [8] the grid connection requirements corresponding to Denmark, Germany, Ireland, Sweden, Scotland and Spain have been studied as shown in figure summarizes their requirements related with undervoltage and overvoltage protection and requirements for islanding, [7], [8]. The REE requirements have been discussed below, including government-based and other national grid codes (Germany, Ferc and Hydro-Québec). II. REE REQUIREMENTS RELATED TO VOLTAGE DIPS REE grid code, recently published, specifies that the wind farm must support voltage dips, at the point of interconnection with the transmission network, without tripping. The voltagetime curve that limits the magnitude and duration of the voltage dips, produced by single-phase-to-ground, two-phaseto-ground and three-phase short-circuits, is shown in figure. In the case of phase-to-phase short-circuits, the maximum voltage drop is.6 pu, instead of.2 pu as plotted. The recently published REE grid code specifies that the wind farm must support voltage dips at the point of interconnection with the transmission network without tripping. The voltage-time curve that limits the magnitude and duration of the voltage dips produced by single-phase-to-ground, twophase-to-ground and three-phase short-circuits is shown in figure. In the case of phase-to-phase short-circuits, the maximum voltage drop is.6 pu, instead of.2 pu.

Reactive power generation 2 3 % % Active Power (pu) Beginning ot the fault Clearance ot the fault 5 ms Rest of the fault 5 ms Voltage (%) 9 % 7 % 5 % 3 % % - %.. Svk > MW Svk < MW Scottish ESBNG Time (s) Eltra E.ON Eltra&Elkraft REE Active power consumption Active power generation -. Time (ms) Fig. 2. REE Grid Code requirements for active power (balanced three-phase faults) Ireactive / Itotal (pu) Fault and recovery Normal operation.9 Fig.. Requirements for voltage operating range, [7] A. Balanced three-phase faults Wind farms will not absorb reactive power during either balanced three-phase faults, or the voltage recovery period after the clearance of the fault, Nonetheless, reactive power absorptions may occur during a period of 5 ms after the beginning of the fault, and also 5 ms after the clearance of the fault, although the following requirements must be met: The net reactive power consumption of the wind farm during the 5 ms interval after the beginning of the fault, in 2 ms cycles, must not exceed 6% of its rated power. The net reactive energy consumption of the wind farm after the clearance of the fault must not exceed 6% of its rated power, and the reactive current, in 2 ms cycles, must not exceed.5 times the rated current. The constraints of the reactive power are imposed to avoid the absorption of a large amount of reactive power, during faults and post-faults periods, when the generator is allowed to remain connected to the grid. This absorption of a large amount of the reactive power may induce instability on the line, especially for large-scale wind parks, [9]. A more detailed study about the power system stability in case of large-scale wind farms can be found in []. In terms of active power, the wind farm at the grid connection point must not absorb active power during the fault or the voltage recovery period after the clearance of the fault. On the other hand, absorption of active power is accepted for 5 ms after the beginning of the fault and further 5 ms after the clearance of the fault, figure 2. During the rest of the fault, the active power consumptions are additionally may take place up to a % of the wind farm rated power. Regarding currents, wind farm must provide the maximum generation of reactive current to the electrical network at the Reactive power consumption.2.5.85 Voltage at the point of interconnection with the transmission network (pu) Fig. 3. REE Grid Code requirements for current and reactive power (balanced three-phase faults) grid connection point during the fault and later in the voltage recovery period. In any case, this current must be located in the shaded area in figure 3, within 5 ms after the beginning of the fault or after the clearance of the fault. Therefore, the wind farm must generate reactive current with voltages below.85 pu, and it must not consume reactive power between.85 pu and the minimum admissible voltage for average operation of the electrical network. B. Unbalanced two-phase and single-phase faults During unbalanced two-phase and single-phase faults, as well as in the voltage recovery period after the clearance of the fault, wind farms must not absorb reactive power at the grid connection point. Nonetheless, reactive power absorptions are admitted during a period of 5 ms after the beginning of the fault and a period of 5 ms after the clearance of the fault, with two constraints: The net reactive power consumption of the wind farm, during the 5 ms interval after the beginning of the fault, will not exceed the 4% of its rated power during a period of ms.

3 The net reactive power consumption of the wind farm after the fault clearance, in 2 ms cycles, will not exceed the 4% of its rated power. Additionally, transitory consumption is allowed during the rest of the fault with two constraints: The net active consumption must not exceed the 45% of the equivalent rated active energy of the installation during a period of ms. The consumption of active power, in cycles of 2 ms, must not exceed the 3% of its rated active power. III. EON REQUIREMENTS RELATED TO VOLTAGE DIPS In Germany, the first Grid Code for wind farms was introduced in 23. In 25 and due to the accumulated experience and considering the positive results derived from the application of the Code, the German transmission grid operators (E.O.N. among them) in addition to several German research institutes and wind turbine manufacturers performed an extensive technical study about the viability of wind power utilisation. This study was called dena-study, [], and was carried out by DENA (Deutsche Energie-Agentur - the German Energy Agency). In this study, the consequences of wind power utilisation on the system stability and operation of the German grid were analysed. They concluded that the transport and distribution of wind power could alter the power flow along the structure of the German transport grid, causing new congestions. To avoid such congestions, new transport lines were necessary to ensure that the electricity generated in wind parks can be distributed with a certain quality level imposed by the Grid Code, [2]. The importance of these Grid codes lies on the installed wind turbine capacity (8 GW). This means that if the wind power generation falls down during a fault and is disconnected from the grid, the whole system will become unstable and the risk of a total black-out increases significantly. This certainly explains why the wind farms can not be disconnected during a non-severe grid fault. In a near future, by the year 22, it is expected a total wind power capacity installed of nearly 5GW, which in percentage means a large wind power penetration in the system and hence the role of wind farms will be far more relevant on the stability and operation of the German grid. A wind farm connected to the German grid must be capable to work with the following conditions during a grid fault: Zero voltage for about 5 ms at the grid connection point. The total duration of the low voltage period referred in the Grid Code is.5 s. Short-Term Interruption is introduced and always required when low voltage occurs for less than.5s and the Fault Ride Through (FRT) should not take place without tripping. The wind turbines must ensure that the power generation after FRT continues within the shortest possible time. To achieve this, the required minimum power gradients must be previously defined. In the future, large offshore wind farms equipped with 3-5 MW wind turbines will have an important role in the continuous voltage control of the grid. This requires the design of voltage controllers taking into account power system stability aspects as occurs in conventional synchronous generators. A fast continuous voltage control, e.g. rise time 2 ms, is necessary to ensure variable voltage support during normal operation of the grid. This type of control helps to ensure the availability of reactive current in-feed during faults. A reactive current of. p.u. will be supplied at voltages below 5% of the initial, whereas the minimum reactive current/voltage gain required is 2. p.u. according to the new Eon Grid Code. A voltage support is required when there is a dead band of % around the current voltage operation point at the grid connection. If the voltage drops below 85% of the grid rated voltage at the connection point and the reactive power flow is directed to the wind farm, the wind turbines must be disconnected after.5 s delay. The disconnection should be done at the wind turbines directly in order to ensure a quick restoration. IV. FERC REQUIREMENTS RELATED TO VOLTAGE DIPS The Federal Energy Regulatory Commission (FERC) of the US issued the Order No. 66-A on December 2, 25. This Order specified the standard procedures and revised the agreements for the interconnection of large wind farms established in Order No. 66. In Order No. 66-A. The FERC revised the low voltage ride-through (LVRT) standards to adopt the LVRT provisions jointly proposed on September 9, 25, by the North American Reliability Council (NERC) and the American Wind Energy Association (AWEA). Specifically, FERC imposed standards for LVRT, supervisory control and data acquisition (SCADA) and power factor requirements. In Order No. 66 FERC had required all public utilities to revise their open access transmission tariffs to adopt the FERC standard procedures and the technical requirements for the interconnection of large wind generating facilities. An aspect related to power factor requirements caused a partial disagreement from Order No. 66-A as the FERC declined to revise the power factor requirements for a wind farm, i.e. a wind farm has to maintain the same power factor as other generators only if the Transmission Provider demonstrates in a System Impact Study that reactive power is necessary to ensure the safety or reliability of the transmission system. The decision to exempt wind generators from compliance with the same power factor standards as synchronous generators results in an excessive preference for wind generators and creates an uncertainty for the wind industry. A further consequence is that the stability of the grid is not ensured. Basically, the Order No. 66-A imposes that wind farms shall be able to remain connected during voltage disturbances if these are not severe and the Transmission Providers System Impact Study shows that low voltage ride-through capability is required from the wind plant to ensure a good operation of the grid. Before time. s, the voltage at the grid connection point is the rated voltage. At time. s, the voltage drops. If the voltage remains at a level greater than 5 percent of the rated voltage for a period that does not exceed.625 s, the wind farm shall stay connected. Further, if the voltage returns to 9 percent of the rated voltage within 3 s of the beginning

4 of the voltage drop, the wind farm shall be still connected. A wind generating plant must be able to operate continuously at 9 % of the rated line voltage, measured at the high voltage side of the wind plant substation transformer. If the Transmission Providers System Impact Study shows that a voltage ride-through capability is required to ensure safety or reliability, the wind farm shall maintain a power factor within the range of.95 leading to.95 lagging measured at the point of interconnection. To accomplish these requirements, the wind farm must be equipped with power electronic converters designed to supply such level of reactive capability or fixed and switched capacitors if agreed with the Transmission Provider, or a combination of the two. Wind farms shall also be able to provide sufficient dynamic voltage support for system safety or reliability and helping to asynchronous generators with the automatic voltage regulation to maintain an adequate voltage level. Fig. 4. Voltage dip generator system V. HYDRO QUÉBEC REQUIREMENTS RELATED TO VOLTAGE DIPS Today, only MW of wind power are installed in Québec. However, Québec has a very good wind potential and Hydro- Québec expects to integrate 53MW of wind power in its grid over the next years. These large wind farms must be integrated with the requirements to ensure system reliability [3]. Hydro-Québec s system has a number of features that make stability, voltage control and frequency control critical issues in the design of its transmission system. The Hydro- Québec transmission system (with no synchronous link with neighboring systems, Hydro-Québec relies only on its own inertia to control its frequency) is isolated with the large distances between generation and load centres and the concentration of generation at large hydroelectric sites. Therefore, generating facilities connected to Hydro-Québec transmission system should remain in service without tripping as long as possible during severe events that cause large voltage or frequency variations. The reason for this requirement is, on one hand, not to interfere with the automatic controls in use on the system, and on the other hand, to help restoring or maintaining voltage and frequency. For wind farms equipped with asynchronous generators capable of voltage regulation (such as wind turbines equipped with double-fed asynchronous generators or those equipped with a converter), the generator facilities must be designed to supply or absorb at the generating unit outlet (system side) the reactive power that corresponds to an overexcited or under excited rated power factor equal to or less than.95. The reactive power must be available over the entire active power generation range. Facilities that use power electronics must remain operational throughout the entire voltage range except for voltage levels greater than.25 p.u. where temporary blocking is allowed and must deblock as soon as the voltage goes under.25 p.u.. The minimum periods of time when wind farms must remain in service without any tripping during voltage variation are these: one should note that the voltage is the positive sequence voltage at rated frequency. For the first.5 s the wind farm must support, without tripping, a voltage level of p.u.. During the first second, if the voltage level is above.25 p.u. the wind farm must be operational. The same occurs for the first 2 seconds, the wind farm must be operational if the voltage level is over.5 p.u.. During the first 3 seconds, the voltage level must be over.85 p.u., otherwhise the wind farm can be disconnected of the grid. Voltage protection with a threshold set to operate in the voltage zone (.85 V 9) should have a minimum time-lag of 3 seconds. VI. FIELD TESTS AND RESULTS To compare the requirements imposed by the chosen grid codes, a voltage dip field test an unbalanced phase-to-phase voltage dip to a Gamesa G8 wind turbine is applied and the results obtained according to the REE grid code evaluated. The test has been carried out with a special installation, developed by Gamesa, in medium voltage in order to generate voltage dips and test wind turbines. This equipment can generate all kind of balanced and unbalanced faults while the network electrical conditions in the rest of the wind farm, and external grid, remain unchanged. The Gamesa medium voltage dip generator is connected between the wind farm 2 kv grid and the point of wind turbine connection, figure 4. A. Unbalanced phase-to-phase voltage dip In figure 5(b), the amplitude of the voltage space vector of a phase-to-phase voltage dip and the time intervals, along with the intervals between the beginning of the dip and 5 ms, and the end of the dip and 5 ms, considered by the REE grid code are represented. It is also represented the.85 pu level, which marks the beginning of the dip when is crossed by the voltage. It represents the evolution of the line voltages during the voltage dip in a compact form, [8], with the line voltages defined in figure 5(a). Figure 5(d) represents the instantaneous reactive power. In [8] is presented a detailed study about the computation of reactive power using different well-known definitions. Table I summarizes the differences obtained for the calculated generated reactive energy through the time intervals defined in the

5 x 2.5 4 UL UL2 UL3.4.2 Filtered space vector voltage (pu) Beginning of the voltage dip (.85 pu) Beginning of the dip and 5ms interval Clearance of the dip and 5ms interval.5 Voltage (pu).5 V (pu).8.6.4.5.2 2.5.5 Time (s) 6 (a) Line Voltages.2.4.6.8.2.4 t.8 (b) Voltage space vector 5.6 4.4 Frequency (Hz) 3 pu.2 2.2.4.2.4.6.8.2.4 t (c) Filtered frequency.6.2.4.6.8.2.4 t (d) Filtered generated reactive power Fig. 5. Phase-to-phase voltage dip test TABLE I GENERATED REACTIVE ENERGY IN PU DURING THE TIME INTERVALS FOR THE PHASE-TO-PHASE VOLTAGE DIP Time interval [dip, dip+5ms] [clear, clear+5ms] [dip+5ms, clear] Reactive energy (pu) -.38 -.86 -.354 REE grid code for the phase-phase voltage dips, taking into account the results shown in figure 5(d). all kind of balanced and unbalanced faults required by the different national grid codes. VII. CONCLUSIONS This paper adds to the previous bibliography regardings the regulations for the interconnection of wind farms with the power system, following the Spanish REE grid code. Field tests have been performed to study the behavior of the Gamesa G8 wind turbines when they are submitted to a range of voltage dips. To generate such dips, a specially designed equipment has been used, which allows the generation of To take advantage of the voltage dip records where instantaneous voltages and currents were measured in the tests, reactive power and reactive energy have been calculated according to the methodology specified by the REE grid code. These tests have been done to a Gamesa G8 wind turbine checking that fulfils the REE grid code voltage dips requirements for existing wind turbines, not being representative its results to new ones.

6 ACKNOWLEDGMENT The authors would like to thank Gamesa and their team for the technical support, and the Gamesa people involved in all the testing campaign, and Junta de Comunidades de Castilla-La Mancha (PCI-5-24) for the financial support. REFERENCES [] C. Abbey and G. Joos, Effect of low voltage ride through (lvrt) characteristic on voltage stability, in Power Engineering Society General Meeting, June 25, pp. 9 97. [2] M. H. J. Bollen, G. Olguin, and M. Martins, Voltage dips at the terminals of wind power installations, Wind Energy, vol. 8, pp. 37 38, 25. [3] Recommended practices and requirements for harmonic control in electrical power systems, IEEE Standard 59-992. [4] S. Seman, J. Niiranen, S. Kanerva, and A. Arkkio, Analysis of a.7 MVA doubly fed wind-power induction generator during power systems disturbances, in Nordic workshop on power and industrial electronics, Trondheim, Norway, 24. [5] C. Jauch, J. Matevosyan, T. Ackermann, and S. Bolik, International comparison of requirements for connection of wind turbines to power systems, Wind Energy, vol. 8, pp. 295 36, 25. [6] C. Jauch, P. Sorensen, and B. Bak-Jensen, International review of grid connection requirements for wind turbines, in Nordic wind power conference, Goteborg, March 24. [7] J. Matevosyan, T. Ackermann, S. Bolik, and L. Sder, Comparison of international regulations for connection of wind turbines to the network, in Nordic wind power conference, Goteborg, March 24. [8] E. Gómez, J. A. Fuentes, A. Molina, F. Ruz, and F. Jiménez, Results using different reactive power definitions for wind turbines submitted to voltage dips: Application to the spanish grid code, in Power Systems Conference (IEEE PES), Atlanta (USA), 26, pp. 768 775. [9] A. Perdana, O. Carlson, and J. Persson, Dynamic response of gridconnected wind turbine with doubly fed induction generator during disturbances, in Nordic workshop on power and industrial electronics, Trondheim, Norway, 24. [] M. Martins, Y. Sun, and M. H. J. Bollen, Voltage stability of wind parks and similarities with large industrial system, in Nordic wind power conference, Goteborg, March 24. [] D. E.-A. (DENA), Dena grid study, Deutsche Energie-Agentur (DENA), Tech. Rep., May 25. [2] I. Erlich, W. Winter, and A. Dittrich, Advanced grid requirements for the integration of wind turbines into the german transmission system, in Power Engineering Society General Meeting IEEE, Montreal (QC Canada), June 26, pp. 7. [3] S. Bernard, D. Beaulieu, and G. Trudel, Hydro-quebec grid code for wind farm interconnection, in Power Engineering Society General Meeting IEEE, vol. 2, San Francisco, CA, USA, 25, pp. 248 252.