The existing roof angle change terminations and flashings when sound and intact can be reused.



Similar documents
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

Residential Roofing Guide

Sheet A-1 KEY SHEET A-1. Football Roof Plan SHEET A-2 SHEET A-3 SHEET A-4. LaCross Roof Plan. Soccor 2 Roof Plan 88' 45' 87' 46' 45' 45' 10' 3' 25'

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Asphalt Shingle Application Requirements

ROOF INSPECTION & MAINTENANCE

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

TARRANT COUNTY DETAIL STANDARDS

Durapax Coal Tar BUR Application Guide

ITEM THERMOPLASTIC MEMBRANE ROOFING

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

MODULAR EPDM ROOFING SYSTEMS

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Chapter 9: INSTALLING ROOFING

Roof Insulation Building. Energy. Environment friendly e-library

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

SEAMS SEAMING USING SEAM TAPE

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center

Crescent Valley High School Roof Investigation

3 Installation. 9 Roof Edges... p Wall Terminations... p Membrane Repair... p Miscellaneous... p

Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems

EPDM System Repair and Cleaning

Low-slope reroofing guidelines

SECTION THERMOPLASTIC MEMBRANE ROOFING

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

How To Install A Membrane Roofing System

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ 36.

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Bituminous Sheet Flat Roofs: Their repair and maintenance

Work Experience Form Roofer

3 Installation. 3. Installation. EPDM Installation

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION

Commercial Roof Management

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, Sauer-Danfoss Building

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

ALPHA 15-Year Permathane II FR w/granules

Building Owners Guide to a Duro-Last System!

Georgia State University. Urban Life Building Roof Replacement

SECTION PVC SINGLE PLY ROOFING

UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS

Quality You Can Trust Since From North America s Largest Roofing Manufacturer

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Avoiding Air Barrier Pitfalls

New Construction Stud Frame Vinyl Window Installation Guide

FIRESTONE BUILT-UP ROOFING SYSTEMS APPLICATION GUIDE 3/14/2011

Window Installation Instructions

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

Your guide to home maintenance. Flat Roofs

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

Best Practices in Roof Design: Sustainable Energy Efficient Reroofing

WATERPROOFING FOR CONCRETE STRUCTURES

APPENDIX 1: ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE

Installation Guide MATTERHORN METAL ROOFING TO LAST A LIFETIME. MATTERHORN Standing Seam

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

Solicitation DTFACN-11-R Attachment #9

UNIT 4: SHEATHING AND SHINGLING THE ROOF

Commercial Roof Inspection Form

BLACK JACK ALL WEATHER ROOF COATING

Shingle Installation Guide

The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco

Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: , Fx:

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

Sun Windows General Information Sun New Construction Window Installation Instructions

Air Conditioner Duct Construction & Repair

Tundra Series Windows January 2016

REQUEST FOR PROPOSALS

PERIMETER FLASHING. Table of Contents

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

Ver. 2. Guide to. Inspecting Residential Brick Veneer

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Retrofitting an Insulated Cold Roof

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

FIRESTONE APP ROOFING SYSTEMS APPLICATION GUIDE TABLE OF CONTENTS

DELTA Premium Moisture Management Systems for Foundations.

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

Please read the entire document before purchasing and installing any of these products

Maintenance & Inspection Guide

Transcription:

January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing Roof s Intact Angle Change Terminations as a Shear Skirt T.L. Kelly The existing roof angle change terminations and flashings when sound and intact can be reused. Simply clean the angle change area and seam the new 2001 Co. C-EPDM repair membrane to the existing membrane using 6 inseam zip tape. This maintenance repair and/or warranty upgrade work is a 2 nd ply roof membrane to the existing, similar to a coating.. This repair can be tax deductible in the year installed because it is not a new roof. It is a repair or a maintenance upgrade 2nd ply to the existing. Existing Roof Assembly Information Original 1 st Roof 2 nd Roof Assembly New Wind Vented Roof 1. Deck Separator Separator 2. Air/Vapor Barrier Air/Vapor Barrier Air/Vapor Barrier 3. Insulation Insulation Insulation 4. Cover Board Cover Board Cover Board 5. Attachment Attachment Attachment 6. Roofing Membrane Roofing Membrane Roofing Membrane 7. Membrane Attachment Membrane Attachment Membrane Attachment 8. Membrane Surfacing Membrane Surfacing Membrane Surfacing Preparation 1. Clean existing roof surface of dirt and debris. 2. Refasten or remove and replace deteriorated bowing or cupping existing 2 nd roofing system membrane and insulation. When replacement is necessary, replace to equal height with insulation and ½ Weighted Cover Board, Dens Deck or equal to 2001 Co. specifications. 1

3. Remove existing deteriorated angle change terminations and bridging flashings: Repair with new to 2001 Co. Shear Skirt or other 2001 Co. Air Sealing details. NOTE: If the existing terminations and flashings are intact, they can be left in place and used as a shear skirt for the new 2001 Wind Vented membrane skin over the existing repair. 4. Replace Nailers wherever deteriorated or deficient: If the existing angle change terminations and flashings are intact, they can be left in place and re-roofed over directly. 5. When necessary replace existing angle change terminations, install new to 2001 Co. Shear Skirt 2 or 3 4 wide reinforced membranes to 2001 Co. Specifications and Details: Shear Skirts can also be installed on the existing angle change and fastened in place with a new nailer board used as a termination bar into the vertical wall or horizontal roof deck. (See 2001 Co. Shear Skirt details attached with a termination board). Make sure there is a two inch (2 ) membrane extension beyond the term bar or new nailer board for Shear Skirt rip through resistance. When new plywood or treated lumber nailer securement board is used instead of a termination bar to fasten a Shear Skirt, fasten the board 6 on center, in a stagger fastener pattern so the nailer board will not split. 6. When using an existing roof s intact angle change terminations as a Shear Skirt for a new 2001 Co. membrane: Clean the existing membrane angle change area for 24 minimum out from angle change termination. 7. Clean the existing roof membrane: With soapy water and a 3M Doodle Bug Scotch Bright Scrub Pad. Suck up dirty water with a shop vacuum. Wipe up remaining residue with clean rags. For final cleaning of the membrane use Windex window cleaner and clean rags or paper towels. 2

8. Inseam Tape Preparation: After cleaning the existing angle change area, use the proper membrane cleaner and primers to install 6 double sided inseam tape. 9. Install membrane, seams, and flashing to 2001 Co. Specifications and Details: A. 6 double sided seam tape is installed on the existing roof membrane horizontal surface at the angle change and 24 (twenty-four inches) minimum out from the angle change to attach the new 2001 Company Wind Vented C-EPDM replacement roof membrane. B. In areas where deficient angle change terminations were replaced with new Shear Skirts, attach the new Wind Vented roof membrane to the new Shear Skirts. C. Note an option on existing thermoplastic membrane: is to use a thermoplastic membrane and heat weld the seams wherever possible. Note: If a PVC maintenance membrane is chosen, use fleece backed PVC membranes over existing membranes to block plasticizer migration. 10. Install one of the following optional separator layers over the existing roof: 1. Nothing: The new 2001 C-EPDM membrane can be installed directly over an existing smooth surface roof membrane that will not abrade or contaminate the new membrane from the underside. Note: If the existing roof membrane is permeated you must use a separator sheet. 2. 2001 Co. Fleece Backed Membrane, Geotextile Felt or Fireguard Underlayment Gravel Mat comes in 5/16 or 7/16 : is loose laid over the existing permeated roof surface to assist in air exchange. 3. Weighted Cover Board: Gypsum, Dens Deck, Cement Board, or approved equal. 3

4. Rigid Roof Insulation Boards: expanded polystyrene 1-lb. minimum density, Polyisocyannrate, ISO, and the like insulation boards are loose laid and weighted in place with a Weighted Cover Board or mechanically fastened over the existing into the roof deck. 11. Loose Lay 2001 Co C-EPDM: over the existing roof assembly and optional separator layer. 12. Attach Field membrane to the cleaned, primed and seam taped existing membrane angle change termination areas or new Shear Skirt Air Seal with 6 seam tape: Totally adhere the new 2001 Co. C-EPDM field membrane over the remainder of the existing field membrane and adhere or seam tape it to the existing intact flashings. 13. Where new angle change terminations and flashing are required: Adhere the new field membrane over the Shear Skirt and up the vertical wall as a flashing in itself and finish on top of the existing counter flashing metal with 4 seam tape and termination bars, to 2001 Co. details. Note: On through wall and riglet counter flashing metal skirts, 2001 Co. recommends not bending up metal counter flashings and terminating a base flashing under the metal counter flashing. This causes kink dams in the metal counter flashing forcing water to seep backwards into the masonry around the counter flashing. 2001 Co. recommends to terminate vertical wall flashings on the face of metal counter flashings. Note: Repair existing counter flashing metal on vertical walls if kinked where it goes into the masonry wall. Flatten kinked metal with an oak board edge so it will drain water properly. Clean plugged up weep holes above the metal counter flashing so they can work. 14. Seam tape is used to attach the base flashing membrane to the face of the metal counter flashing on the vertical wall: A termination bar is installed in a convex position, a ½ down on 4

the counter flash metal to compress the new flashing membrane, the counter flashing metal, and the existing flashing into the vertical wall, parapet, curb, etc. 15. Install the 2001 Co. Wind Venting Equalizer Valves for wind uplift transfer and continual drying of the wet roof substrate: According to the 2001 Company s Equalizer Valve Placement diagram pin pointing the wind vortex intensity zones for this specific building. 16. Finish Flashing on Existing perimeters and penetrations are not necessary when existing are in tact: They are a future maintenance/repair with the installing roofer that the building owner can add to the warrantee once completed. 17. Newly flashed perimeters and penetrations: installed to 2001 Co. detail drawings are included in the 2001 Co. extended Maintenance Warrantee Protection. 18. Provide optional walk-way pads, equipment sleepers, oil drip pans, safety equipment, and other roof top accessories: At building owner s requests, as an optional cost extra per item for the building owner to purchase now or in future maintenance. 5