Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
|
|
|
- George York
- 9 years ago
- Views:
Transcription
1 AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings AC TopSeal Colors: Grey, WeatherWood, Black, White, Brown & Tan DESCRIPTION: AC TopSeal rolled roofing is a self-adhered, rubberized asphalt product designed to protect residential low slope roofs. AC TopSeal rolled roofing consists of a proprietary modified asphalt, a tough polyester reinforcing core, and a granular surface to protect against UV rays, weathering and physical damage. AC TopSeal rolled roofing is available in 100 sq. ft. (9.3 sq. m.) rolls, 3 ft. by 33.3 ft. (0.9 m by 10.1 m). Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS A. PRECAUTIONS: Only for use on: Oriented Strand Board (OSB) or plywood roof decks (no planked roofs). AC TopSeal rolled roofing may be used for new construction or re-roofing. Minimum OSB or plywood thickness is 15/32 in. (1.19 cm.). Maximum space between sheathing is 1/4 in. (0.64 cm.). Roof Conditions: The roof deck must be structurally sound, securely nailed, dry, clean, and free of dust, oil, frost and protruding nails. Priming: All roof decks require priming. Please see Section D. Priming for details. Ventilation: The attic or roof space must be adequately ventilated according to local building code requirements. Mastic/Adhesive: All end lap treatments require mastic/adhesive for AC TopSeal rolled roofing. Please see Section E. Mastics/Adhesives for details. Roll Size: When measuring the roof to be covered, consider that approximately 10% of the roll will be consumed for side laps, end laps, and waste. Temperature Restrictions: AC TopSeal rolled roofing is to be installed when ambient and substrate temperatures are 40 F (5 C) and rising, including the 24 hours before installation. Store rolled roofing inside for better adhesion prior to application. At ambient temperatures above 90 F (32.2 C) and rising, AC TopSeal rolled roofing should be stored in a shaded area prior to application. If the rolled roofing is exposed to high temperatures or direct sunlight, the paper release liner may be difficult to remove. Moving the rolls to a shaded location will allow them to cool sufficiently and allow the release liner to be easily removed. Roof Protrusions: All roof protrusions such as soil pipes and vents should be addressed prior to installing rolled roofing over the roof deck. See Figure 9 and Roof Protrusion instructions. Storage: AC TopSeal rolled roofing should be stored in an inside, dry, well-ventilated area. Stand rolls upright. Do not store at 90 F (32.2 C) or warmer for extended periods of time. Store on a hard, flat, level surface. Do not stack more than two (2) pallets high. If there is any sign of pallet damage or water intrusion to pallets or boxes, do not double stack. When working on the roof use all necessary safety precautions and guidelines in accordance with proper roofing trade practices. AC TopSeal rolled roofing should be installed by a professional contractor. AC TopSeal rolled roofing is intended for exterior roof applications only. Do NOT install AC TopSeal rolled roofing over uncured caulking, uncured sealants, or flexible vinyl. If these products are installed over any of these materials, the adhesive will melt and run causing unsightly streaks and drips. It is the installer s responsibility to determine whether all the materials used are compatible with each other. Contact the caulking or sealant manufacturer to ensure the product is compatible with asphalt. Caulking and sealants must be fully cured before covering with AC TopSeal rolled roofing. Do NOT install AC TopSeal rolled roofing over granular surfaced roofing, EPDM, urethane based materials or flexible PVC. B. ROOF PITCH REQUIREMENTS: 1. The minimum slope is 1:12 and the maximum slope is 2: Back nailing is required along the selvedge edge every 12 in. (30.5 cm.). See Figure 3B. 3. All roof surfaces must have positive drainage. Page 1 of 5
2 C. NEW ROOF DIRECT-TO-DECK PREPARATION: The roof deck must be structurally sound, securely nailed, dry, clean, and free of dust, oil and frost. AC TopSeal rolled roofing must be applied directly to a primed plywood or a primed OSB structural deck. D. PRIMING Prime roof deck to enhance the bond of the rolled roofing to the substrate. Ensure all areas are primed prior to installing AC TopSeal rolled roofing. Carefully read the installation instructions provided with the primer before starting work. Follow the manufacturer s published installation recommendations, paying particular attention to environmental conditions, storage requirements, application rates, anticipated dry times and surface conditions at the time of rolled roofing application. While it is typically appropriate for primers to fully dry, some water based primers should dry only until the surface is dry but tacky, at which time the rolled roofing is applied. Only prime the area that the rolled roofing can be applied to that day. If an SBS modified asphalt primer is not available, SealBest DrySeal manufactured by ThorWorks Industries, Inc., can be used as an alternative product with the following changes to the application: 1. SealBest DrySeal should be applied by brush or roller to the entire area to be covered by the rolled roofing. 2. SealBest DrySeal should be applied as a thin coating that completely covers the surface. The 60 mil (1.524 mm.) requirement by ThorWorks Industries is not needed when using SealBest DrySeal as a primer underneath AC TopSeal rolled roofing. 3. SealBest DrySeal should be allowed to dry until it is dry to the touch but does not transfer to your hand. The material will dry black. CAUTION! Prior to drying, primer may wash off in a rain event. Primer will permanently stain finishes if washed into adjacent surfaces. E. MASTICS / ADHESIVES Mastics are used to adhere membrane to membrane applications where there is a granular substrate surface or there is inadequate adhesion between the self-adhered membrane layers. An SBS polymer modified mastic shall be used in all applications. All mastics should comply with ASTM D4586. Apply mastic with a trowel, forming a 1/8 in. (.32 cm.) thick layer. Do NOT over apply mastic. Clean off excess while still wet. Always form the lap into wet mastic. LOW SLOPE INSTALLATION INSTRUCTIONS RE-ROOF APPLICATION PREPARATION: AC TopSeal rolled roofing may be installed over a layer of existing self-adhered ice & water protection membrane as long as the top surface of the ice & water is smooth, dry and has a non-granulated surface. All blisters or wrinkles must be cut, re-nailed and sealed with appropriate mastic. Applications of this type are based on the judgment of the roofer as to the conditions of the old roof system. The manufacturer does not assume responsibility for problems that are due to the conditions of the old roof system. The roof deck must be dry, clean, and free of dust, oil, frost and protruding nails. The surface should be swept thoroughly. The substrate being covered must be primed following the instructions in Section D. Priming. Primed Roof Deck FIGURE 1 ROOF EDGE PREPARATION: The roof edge must be prepared using this method: A. Install metal drip edge to the eaves and rakes. Nail the metal drip edge 8 inches (20.32 cm.) on center. B. Prime the top of the drip edge prior to membrane installation. See Section D. Priming. 1 Drip edge Page 2 of 5
3 2 3A Back Nail 12ʺ on center. First course First course application FIGURE 2 ROLL APPLICATION INSTRUCTIONS: Nails should be hot dipped galvanized tin caps. Cap nails should have integral metal caps (do not use plastic caps), minimum 1 in. (2.54 cm.) in diameter with rounded heads. Consult manufacturer s literature, local building codes, and project specifications for appropriate nail and fastener types and spacing. Roof only as much area as can be completed in one day. A. Roll AC TopSeal out onto roof and cut into manageable lengths of 12 to 16 ft. (3.66 to 4.88 m.). Allow the AC TopSeal to lay flat for 15 minutes to relax from roll configuration. AC TopSeal must be laying flat at time of installation. FIGURES 3A & 3B FIRST COURSE APPLICATION: A. Align the AC TopSeal parallel with the eaves, with the selvedge at the top of the roll. Edge of AC TopSeal should be flush with drip edge on the eaves and rakes (the bottom and side edges of the roof). If wrinkles or fishmouths appear, re-align the membrane. B. Fold the lower half of the membrane back to expose half of the release liner. Remove lower half of the release liner and press the membrane into place, starting in the middle and working your way out to the ends of the AC TopSeal. See Figure 3A. C. Repeat the same process with the upper half of the membrane. Back nail 12 in. (30.5 cm.) on center through the selvedge area using nails as described before. See Figure 3B. 3B FIGURE 4 END LAPS: Apply adhesive to the 6 overlap area If an additional AC TopSeal segment is needed to complete the run along the eaves, a 6 in. (15.24 cm.) overlap will be needed. Apply adhesive to the entire 6 in. (15.24 cm.) area at the end of the first run where the overlap will occur. See Section E. Mastics / Adhesives. 4 Page 3 of 5
4 45 angle at the selvedge overlap first roll by 6 FIGURE 5 Cut the corner of the selvedge of the overlapping membrane to a 45 angle. Apply the second section by overlapping the section by 6 in. (15.24 cm.), covering all of the adhesive. 5 FIGURE 6 All end laps should be staggered from course to course and be at least 36 in. (91.44 cm.) apart. Staggered end laps - minimum 36 apart 6 Second course FIGURE 7 7 SECOND COURSE APPLICATION: Apply the second course using the same procedure as the first course. Position the upper course to overlap the selvedge edge of the lower course. The selvedge edge is designed to create a 3 in. (7.62 cm.) overlap. Fold back the lower section of the upper course and remove the protective release paper covering the selvedge tape on the lower course. Remove the release liner of the upper course and adhere to the lower course. Roll with a minimum 40 lb. weighted (flooring or garden) roller to ensure good initial adhesion. End laps FIGURE apart STAGGER END LAPS: After each course is installed, roll with a minimum 40 lb. weighted (flooring or garden) roller to ensure good initial adhesion. Remember all end laps are to be staggered from course to course and be a minimum of 36 in. (91.44 cm.) apart. Page 4 of 5
5 PROTRUSION DETAIL FIGURE 9 ROOF PROTRUSIONS SUCH AS SOIL PIPES: 9 Topseal inverted a. If a sleeve or boot is being used to seal the roof protrusion, cut a section of AC TopSeal that will extend a minimum of 6 in. (15.24 cm.) beyond the flange on the sleeve or boot. b. Cut a hole in the center of the AC TopSeal the size of the pipe projection. An exact size can be obtained by placing the center of the AC TopSeal over the pipe and tapping it gently to create the hole pattern. c. Apply a 1/8 in. (.32 cm.) thick coat of an SBS polymer modified mastic around the opening in the roof deck extending it out to the size of the AC TopSeal cut in step a. d. Slide the section of AC TopSeal cut in step a down over the pipe, release liner side up. e. Remove the release liner and nail in 1 in. (2.54 cm.) from each corner. f. Ensure that the top surface (sticky surface) of the inverted top seal is clean and free of dirt, oil, water, or other debris that will affect the adhesion of the cap sheet around the penetration. g. Slide the sleeve or boot over the pipe and nail the sleeve or boot to the roof deck 1 in. (2.54 cm.) in from each corner. Before installing the finish course of AC TopSeal over the pipe sleeve or boot, a 1/8 in. (.32 cm.) thin coat of SBS polymer modified mastic should be applied over the flange on the pipe sleeve. Don t do this step until applying the finish course to avoid tracking roof adhesive over the finished surface. h. Apply a silicone caulking approved for roof application around the pipe protrusion. WARNING! SLIPPERY SURFACE: Use extreme caution when installing AC TopSeal rolled roofing. The surface of AC TopSeal rolled roofing is slippery even when dry. Use of Fall Protection is Highly Recommended. Consult OSHA for Guidelines on Fall Protection (29 CFR 1926,500). FALLING HAZARD: Secure area below work. Unsecured materials may slide on roof. Place on level plane or secure to prevent sliding. Wear a hard hat. WARNING: This product contains a chemical known in the State of California to cause cancer. FOR TECHNICAL INQUIRIES PLEASE CALL *See actual warranty for complete details, limitations and requirements. Page 5 of 5 61 Pine Road, Brentwood, NH The data contained herein, is considered to be true and accurate and is offered for the user s consideration, investigation and verification. NEI does not warrant the results to be obtained. Effective Copyright 2016 Northern Elastomeric, Inc. All Rights Reserved.
G VYCOR DECK PROTECTOR
G VYCOR DECK PROTECTOR Self-Adhered Flashing Contractor s Guide DECKS AND DETAIL AREAS For longer lasting decks, install Grace Vycor Deck Protector. FROM THE MAKERS OF G Ice & Water Shield What Self-Adhered
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
SEAMS SEAMING USING SEAM TAPE
SEAMING USING SEAM TAPE SEAMS The membrane should be positioned so that the width of the seam is 3. Remove excess chalk from a chalk line by snapping the line into the air and then chalk a line one-quarter
CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs
CertainTeed Self-Adhering Roof Systems for Low Slope Residential Roofs Goes down fast. Stays on strong. Flintlastic SA performs in all the right ways. What s more important to you? Speed of installation,
How to repair your existing low slope flat roof.
How to repair your existing low slope flat roof. Recycled Rubber Roofing is not a "Roof Coating." It is a liquid emulsion used as the underlayment of a new or retrofit, built-up roofing system. One of
Please read the entire document before purchasing and installing any of these products
Please read the entire document before purchasing and installing any of these products USA SBS UNDERLAYMENT ROOFING UNDERLAYMENT SBS Mineral Surfaced MINERAL SURFACE CAP SHEET Ice and Water Protection
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal
Installing a Low-Slope Exposed EPDM for roof transition Exposed EPDM for resistance to ice damming Sidewall flashing Done with care, a flat roof can provide 0 years or more of leak-free service Gravel
THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
G VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects.
For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects. G VYCOR DECK PROTECTOR Self-Adhered Flashing NEW FROM THE MAKERS OF G Ice & Water Shield I Moisture
Final inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Peel & Seal Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Directions For Applying Malarkey Laminate Shingles
S Laminate Shingle Instructions 1 Directions For Applying Malarkey Laminate Shingles GENERAL INSTRUCTIONS Install Malarkey laminate shingles according to building code and local amendments. To qualify
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
Shingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
Maintenance & repair Solutions
Maintenance & repair Solutions low-slope ROOFING We ve got what you need in the sizes you need them and the options to match the results that building owners want Seal-fast Temporary roof sealer Now you
SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
ATLAS Roofing Products
ATLAS Roll Roofing Products World s Largest producer of roofing s Preferred by roofing professionals. Atlas has you covered on every part of the job, even what goes under your roofing. We are proud to
Detached accessory structures that contain no conditioned floor area are exempt.
RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration
Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration DS497 SECTION ONE A. Objective The objective of this guide is to provide owners and general contractors/construction
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
SHINGLE APPLICATION GUIDE
SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS
Chapter 9: INSTALLING ROOFING
9.1 LEAK BARRIER (ICE AND WATER SHIELD) 9.2 SHINGLE UNDERLAYMENT 9.3 INSTALLING GUTTER APRON AND GABLE D-EDGE 9.4 INSTALLING SHINGLES 9.5 RIDGE VENT AND CAP Tools needed by each volunteer: Hammer (16 oz.
application instructions
application instructions ARCHITECTURAL COLLECTION PRIMED BOLD PROFILE 120 SERIES LAP SIDING (D5, T4, D8, T5, Q4) General At the time of manufacture, siding meets or exceeds the performance standards set
CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -
CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b
A. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 13]
CREEK Technical Services, LLC
EVALUATION REPORT 2010 FLORIDA BUILDING CODE Manufacturer: Henry Company Report Issued February 20, 2013 999 North Sepulveda Blvd., Suite 800 El Segundo, CA 90245 (800) 486-1278 Manufacturing Plants: Quality
RECOATING AND RENEWING SPF ROOFING SYSTEMS
RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the
Colorado State University. Durrell Center Roof Repair
Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
MODULAR EPDM ROOFING SYSTEMS
MODULAR EPDM ROOFING SYSTEMS INSPECTION, REPAIR & MAINTENANCE HANDBOOK Now that you ve selected one of the best roofing systems available today, please take the time to read through this handbook carefully
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION
07560 BUR BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION PART 1: GENERAL 1.01 SCOPE: To extend the useful service life of the aged or new asphalt built-up roof system and to reduce cooling
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
Technology at its best. Benefits
Protecting what s under your roof from the elements is simplicity itself with Ruberoid Roofing Shingles. Roofing Shingles make ideal roofing; they are attractive, easy to install and are perfect for use
ROOFING PRODUCTS. www.resisto.ca INSTALLATION GUIDE FOR RESISTO. Time-tested premium quality products
INSTALLATION GUIDE FOR RESISTO ROOFING PRODUCTS 3 EAVES PROTECTION Time-tested premium quality products Whether you re building or renovating, RESISTO products offer effective solutions for preventing
Carpet Tile Installation Guidelines
NOTICE FAILURE TO FOLLOW THESE GUIDELINES CAN RESULT IN VOIDING THE CARPET WARRANTY. Installation Guidelines The following instructions should be reviewed prior to installation. Shaw Industries will not
GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 [07 31 14]
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions All questions and concerns please call 904-696-9700 Discount Direct Metal Roofing Plus Rib metal roofing panels are a strong,
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS
OPTIONAL TITLE 24 CRITICAL POINTS POLYISO THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE DESCRIPTION TORCH OVER POLYISO (5,7,9 YR) TH/BS-TH/CS 2 No 0. SUBSTRATE. THERMOTEK USA PRO 2.0 FV
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS
PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED
Installation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised
Page 1 of 6 instructions VC 104+ Rigid Grade / VC 104+ Rigid Grade Imagine / (for the rest of this document referred to as VC 104) can be applied to new and used trucks and trailers with painted rigid
Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
There s a new problem on deck. Corrosion. And now there s a solution. Quick and easy. G VYCOR DECK PROTECTOR. Self-Adhered Flashing
There s a new problem on deck. Corrosion. And now there s a solution. Quick and easy. G VYCOR DECK PROTECTOR Self-Adhered Flashing G Good news for the environment is bad news for decks. New wood preservatives
UNIT 4: SHEATHING AND SHINGLING THE ROOF
KEY CONCEPTS 1. Identify tools needed for roofing 2. Steps to finishing a roof 3. Maintenance of a roof 4. Safety while roofing INSTRUCTIONAL ACTIVITIES 1. Complete Follow Up Worksheet from Unit 3 2. Roof
GENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals 13940 Magnolia Ave. Chino, CA 91710
VAIL Metal Shingles Application Instructions 13940 Magnolia Ave. Chino, CA 91710 VAIL Metal Shingles Application Instructions When installing or walking on VAIL Metal Shingles: 1. OSHA fall protection
Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation
INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425)
INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining
Rooflight INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary
Laminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
Your guide to home maintenance. Flat Roofs
Your guide to home maintenance Flat Roofs Your guide to home maintenance is a series of information leaflets that gives you all the information you need to keep your home in tiptop condition. Flat Roofs
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,
EPDM. Roofing systems
Roofing systems Our Promise Through ongoing interchange of experiences with contractors, Mule-Hide keeps on top of the latest roofing requirements and solutions Trusted in roofing since 1906, Mule-Hide
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
CHAPTER 3 MOISTURE TESTING
CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
STANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
Epdm Flat Roofing Systems
Epdm Flat Roofing Systems EDPM can be fully bonded, loose laid and ballasted or mechanically attached depending on the existing roof and its proposed usage. This applies to roofs to be refurbished and
K2 STONE NATURAL VENEER
INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin
CHAPTER 6 ASPHALT ROLL ROOFING
CHAPTER 6 ASPHALT ROLL ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 6.1.1 General 6.1.3 Mineral-Surfaced Asphalt roll roofing is roofing in sheet form Mineral-surfaced roll roofing is composed
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: 800-474-7570, 602-272-8128 Fx: 602-272-8014 www.bestmaterials.com Email: Sales@BestMaterials.
FULLY-ADHERED ROOFING SYSTEM INSTALLATION INSTRUCTIONS Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: 800-474-7570, 602-272-8128 Fx: 602-272-8014 www.bestmaterials.com Email: [email protected]
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
G VYCOR. Contractor s Guide. Flash it rightṭm WINDOWS, DOORS AND DETAIL AREAS. Self-Adhered Flashing
G VYCOR Self-Adhered Flashing Contractor s Guide WINDOWS, DOORS AND DETAIL AREAS Flash it rightṭm Install Grace Vycor Self-Adhered Flashing under, and call-backs are over. FROM THE MAKERS OF G Ice & Water
BLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
SECTION 07320 ROOFING TILE
SECTION 07320 ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Vitrified clay roofing tiles. 2. Tile accessories. 3. Felt underlayment. 4. Self-adhering sheet underlayment. 5. Snow guards.
WATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
Ver. 2. Guide to. Inspecting Residential Brick Veneer
Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan
Fully Adhered System ApplicationHandbook
Roofing Products International, Inc. Fully Adhered System ApplicationHandbook ALL ADHESIVES, TAPES, AND FLASHING DETAILS for Royal Edge EPDM Re-Flex EPDM & Re-Flex TPO 800-628-2957 57460 Dewitt Street,
3 Installation. 3. Installation. EPDM Installation
3 Installation The information provided within this chapter may assist the contractor to install the Firestone EPDM Systems in accordance with Firestone s requirements. It may also help him and the designer
GigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3