Building Owners Guide to a Duro-Last System!
|
|
|
- Deirdre Glenn
- 10 years ago
- Views:
Transcription
1 Building Owners Guide to a Duro-Last System
2 Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof to Other Flat Roof Repair Systems Section 4: Maintaining Your Duro-Last Roof System
3 Section1: Introduction to Duro-Last Roofing Systems
4 Introduction to Duro-Last Roofing Systems Duro-Last has been manufacturing products to meet the needs of the roofing industry since From prefabricated Duro-Shield roofing membranes to specialized membranes and insulating panels, the company provides roofing solutions to make flat roof repair and protection an easier process for everyone involved. Membrane Systems The Duro-Shield metal retrofit roofing system is a prefabricated membrane, customized to fit an individual roofing system. This product is designed to be installed over a failing metal roof and prevent water penetration. Duro-Shield and other Duro-Last membranes offer chemical, fire and high wind resistance. Cool Zone and a Vinyl Rib membrane system are two other options available from Duro-Last to meet different roofing needs. Cool Zone meets the requirements for a sustainable roofing system and provides high-performance results. The Vinyl Rib system provides an architectural standing seam appearance and is excellent for use in areas with higher snow amounts. While white roofing systems offer energy efficiency, membranes are available in several color choices. The Rock-Ply roofing membrane replicates the look of a stone roofing ballast while still providing the superior durability of all Duro-Last membranes. There are no stones that can move, to expose the underlying membrane, or cut through the material. Insulation Panels Duro-Guard EPS and ISO insulation panels are designed to work with the Duro-Last membrane system and offer higher Long Term Thermal Resistance (LTTR). These panels also contain no HCFCs or CFCs and meet EPA requirements. Insulating systems are installed in the flutes of an existing roof, with a second layer of insulation on top, to form a smooth even surface. This insulation reduces heat loss in colder weather and prevents the condensation that can occur from a cold exterior surface and warm interior.
5 Duro-Guard Sopravap r is a vapor barrier membrane that can be added to other Duro-Last roofing systems. Sopravap r is self-adhesive and self-sealing. Duro-Guard Elastocol Stick is a primer manufactured with synthetic rubber and natural resins. Elastocol Stick increases the adhesion of Sopravap r to concrete, wood, masonry and gypsum. Flat roof replacement or major overhauls are no longer the only options when an existing metal roof begins to fail. Duro- Last roofing membranes simplify flat roof repair and provide years of reliable protection against the elements.
6 Section 2: Benefits of a Duro-Last Roofing System
7 Benefits of a Duro-Last Roofing System When you need to restore or repair a flat roof, you want a system that will offer you the longest lasting results and the best protection. Roof coatings do offer protection, but require continual maintenance and re-coating. A Duro-Last roofing system provides you with an alternative to a complete flat roof replacement while restoring your roof to its original protective function. Duro-Last vinyl membranes are a thermoplastic formulation that is manufactured to provide a durable, watertight sheeting material. The manufacturing process includes flame-retardants and U.V. absorbers. The single-ply membrane remains flexible through temperature variations and meets or exceeds all major wind and fire code requirements. The roofing membrane is prefabricated at the factory to reduce onsite seam welding and make the installation process easier. The custom work includes stack and curb flashings, further reducing field labor and potential for leaks. Prefabrication reduces the onsite labor for flat roof repair by up to 85 percent; this also reduces the potential for errors in installation that are the main cause of roofing failures. Prefabrication of the Duro-Last roofing membrane also means that installation can be completed at any time of year. With less work required in the field, adverse weather is not an obstacle. Seam work done on the rooftop is completed with hot air welding, which is not hindered by damp or cold weather. A custom manufactured membrane benefits both the building owner and the environment by producing less waste. Only the required amount of material is ordered. Duro-Last roofing systems also improve energy-efficiency and a Cool Zone membrane is one choice for a reflective white roofing solution. You can also choose to change the appearance of your commercial rooftop with the same protection of the Duro-Shield membrane system. Duro-Last Shingle-Ply is a single-ply, thermoplastic watertight membrane that creates the look of shingles. The design is imprinted onto the material and a polymer coat is added to keep the appearance from fading or marring.
8 A Duro-Last Rock-Ply system creates the effect of a stone ballast with the same imprinting and polymer protective coating. The Shingle-Ply and Rock-Ply membranes come with the superior industry leading warranty that all Duro-Last roofing systems offer. Talk to a professional today to learn about all of the benefits that Duro-Last has to provided.
9 Section 3: Comparing a Duro-Last Roof to Other Flat Roof Repair Systems
10 Comparing a Duro-Last Roof to Other Flat Roof Repair Systems There are many products on the market used for flat roof repair or restoration. In order to select the best roofing system, you need to compare the types of materials used, the installation procedures, maintenance requirements and warranties. Duro-Last membranes are manufactured with a thermoplastic formula of PVC resins that includes stabilizers, flameretardants, biocides and U.V. absorbents. Other systems use TPO, EPDM or Modified Bitumen. A polyester scrim is laminated between the top and bottom layers of the PVC film to provide exceptional durability and strength. This membrane meets both fire and wind resistance code requirements. Failures in roofing systems frequently come from problems during installation. Duro-Last membranes are prefabricated in sizes up to 2,500 square feet. This greatly reduces the amount of seaming required in the field. Curbs and stacks are also custom manufactured to provide a superior finished product. The prefabrication system also allows for quicker installation and no removal of the old roof is required. The interior of the building is not exposed to the elements during the flat roof repair process. The building can remain in use without fear of exposure to chemicals or odors. Flashings are reinforced and installation is completed with heat welding in the field. Many other companies use glues or hot-mopping products to secure flashings. These materials can wear out over time and become a source of leaks. Maintenance of a Duro-Last system is minimal. Flashings and other connections do not require re-coating for full service life. The Duro-Last prefabricated membrane system comes with a 15-year transferable warranty. This warranty is included at no extra cost to the customer. Extended warranties are available. Duro- Last also covers more in the provided warranty than many other manufacturers. If your flat roof has problems with ponding water, many manufacturers will not provide coverage for membrane damage from this situation. Duro-Last designs membranes to handle standing water and includes this in the warranty. The warranty also covers the repair or replacement of the roofing system. Most manufacturers will only provide repairs to the membrane or coating.
11 Talk to a professional today to compare the materials and protection offered by a variety of flat roof repair systems. Make sure to look at the details included in warranties and the actual installation procedures. Duro-Last provides an alternative to flat roof replacement that gives you the most value for your roofing budget.
12 Section 4: Maintaining Your Duro-Last Roof
13 Maintaining Your Duro-Last Roof Duro-Last roofing systems are designed to be virtually maintenance free. In order to protect your investment in flat roof repair or restoration, there are steps that you should take to ensure the longevity of the membrane system and maintain the warranty. Regular inspections should be performed to prevent premature failures of the roofing membrane. Detecting minor problems before they become serious allows for quick repair without disruptions. Roofing inspections should be performed by a professional who is knowledgeable in Duro-Last membranes. These inspections should be completed twice each year in average climates. One inspection should be performed in the early spring to make note of any potential problems that harsh winter weather may have caused. This also allows any repairs to be completed in a timely manner during reasonable weather conditions. The second yearly inspection should be completed in mid to late fall, before snow or ice can accumulate. The fall inspection allows debris to be removed from the roof surface that could otherwise present a drainage problem. Additional inspections should be performed after any heavy storms, nearby fires or when the building has undergone construction work that involves the rooftop. During the inspection of the Duro-Last system, notes should be made regarding any unusual wear patterns or deterioration. A record should be kept with notes about any areas with poor drainage or substantial debris accumulation. While Duro-Last does not exclude standing water under the membrane warranty, the problem should be resolved to prevent structural damage. If any ballast is used on the roof, loss or displacement of the ballast should be noted.
14 Areas that use sealants or caulks require careful inspection. Sealants are prone to peeling, cracking or splitting and repair work should be completed immediately, before water can begin to penetrate the area. Any sealants used for flat roof repair should be a Duro-Last product. This ensures the quality of the sealant and the compatibility with the membrane material. A white roof membrane should be washed with a non-abrasive, non-sudsing cleanser to help maintain the solar reflectivity. Duro-Last flat roof repair membranes are prefabricated before installation. This eliminates up to 85 percent of the installation work and seaming that would otherwise be completed on the site. Seam work done on the roof top is completed with heat welding, which provides a stronger seal than glues or liquid products. With regular roof inspections, your Duro-Last flat roof repair should provide you with years of superior service.
The Perfect Fit For Metal Retrofit
D u r o - S h i e l d M e t a l R e t r o f i t R o o f i n g S y s t e m The Perfect Fit For Metal Retrofit Lock out leaks. Lock in your investment. Has time caught up with your metal roof? There are
Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2
Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building
Roof Restoration System. For building owners, property management firms and facility managers. seamless possibilities
Roof Restoration System For building owners, property management firms and facility managers seamless possibilities Extending your roof life Think of your existing older roof custom fit with a seamless,
Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.
Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that
COMMERCIAL BUILDING APPLICATIONS
EXPANDED POLYSTYRENE FOR COMMERCIAL BUILDING APPLICATIONS www.falconfoam.com Commercial Building Ap Expanded Polystyrene Insulation Falcon Foam leads the commercial building industry with products that
Please read the entire document before purchasing and installing any of these products
Please read the entire document before purchasing and installing any of these products USA SBS UNDERLAYMENT ROOFING UNDERLAYMENT SBS Mineral Surfaced MINERAL SURFACE CAP SHEET Ice and Water Protection
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide
SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide Inspection Questions? Call Bloom At 800-483-9932 www.bloomroofing.com DISCLAIMER
Peel & Seal Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!
Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Rooftop Matters. 2 0 1 2 Benchmark Report. Executive Summary
The 2012 Benchmark Report is our initial survey covering results from roof inspections and service calls over a six-month period. Our intention is to update these results annually in order to provide meaningful
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Preventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
Roofing Systems. New Applications / Re-Roofing / Maintenance
Roofing Systems New Applications / Re-Roofing / Maintenance New Roof Installation In terms of the design and installation of an original roofing system (in conjunction with the construction of a new building),
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new
Commercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
What to Do About Your Roof and How to Hire a Roofing Contractor
ROOFI NG What to Do About Your Roof and How to Hire a Roofing Contractor On those rare occasions when it rains in Arizona and you have a leak, you may wonder if you need a brand new roof, especially if
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
ROOF INSPECTION & MAINTENANCE
Physical Plant Administration Facilities Maintenance Department ROOF INSPECTION & MAINTENANCE All roofs require periodic inspection and maintenance in order to perform as designed and to provide a long
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
Winterizing Your Building
Winterizing Your Building DEC Author: Steven J. Susca This article was originally published in the Hoffmann Architects Journal in Issue 3, 2009. As spring thaws uncover the ravages winter weather has wreaked
CARLISLE OWNER S MANUAL
Investing in Solutions for Over 45 Years For over 45 years Carlisle Construction Materials Incorporated (CCM) has been creating solutions for the construction industry. Beginning with single-ply roofing
Get Rid of Roof Problems for Good. How spray foam roofing can protect your building and make you money
Get Rid of Roof Problems for Good How spray foam roofing can protect your building and make you money What is a Spray Foam Roofing System? 300 MILLION Board feet of roofing spray foam installed annually
FAST FACTS ADVANTAGES OF MULTI PLY BUILT-UP ROOFING. Asphalt Roofing Manufacturers Association
FAST FACTS ADVANTAGES OF MULTI PLY BUILT-UP ROOFING Roofing Manufacturers Association Why is a built-up roof considered a multi-ply roof? ARMA defines a built-up roofing system as a roof where multiple
07 5423-1 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center A. Tear off existing roof system down to wood deck and install new Thermoplastic membrane roofing
EPDM. Roofing systems
Roofing systems Our Promise Through ongoing interchange of experiences with contractors, Mule-Hide keeps on top of the latest roofing requirements and solutions Trusted in roofing since 1906, Mule-Hide
Firestone RubberGard The EPDM reference
Firestone RubberGard The EPDM reference EPDM Roofing Systems 1.000.000.000 m 2 of proven performance The Firestone heritage of success and quality is extended to the construction industry through the Firestone
Proven roofing SyStemS
Proven Roofing Systems Above all. Roofing challenges are never over our heads At GenFlex, we live to tackle and solve the toughest challenges in roofing. The result is a full line of proven, durable roofing
BLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
Site Inspection Report
Site Inspection Report Project Title: 1 Canada Square Location: 1 Canada Square, Canary Wharf, London Date of Inspection: 16/05/12 System / Products: TBA (suggested flame free application) Attendees: G
PVC ROOFING SYSTEMS BUILDING SOLUTIONS A SINGLE SOURCE FOR SINGLE-PLY ROOFING
V E R S I C O R O O F I N G S Y S T E M S PVC ROOFING SYSTEMS BUILDING SOLUTIONS A SINGLE SOURCE FOR SINGLE-PLY ROOFING Versico, PO Box 1289, Carlisle, PA 17013 Tel: 800.992.7663 Fax: 717.960.4036 Web:
COMPARATIVE PERFORMANCE OF EPDM RUBBER ROOFING MEMBRANE AS PROTECTION AGAINST HAIL DAMAGE
www.epdmroofs.org COMPARATIVE PERFORMANCE OF EPDM RUBBER ROOFING MEMBRANE AS PROTECTION AGAINST HAIL DAMAGE By Ric Vitiello President Forensic Roof Consulting and Hail Damage Assessment Training www.benchmark-services.com
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION
HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION David Marut TEST CASE REPORT July 1, 2014 Case Study Pro Guard EPDM Super Coat Liquid Rubber Membrane Roof System
ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"
2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE
Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Best Practices in Roof Design: Sustainable Energy Efficient Reroofing
Best Practices in Roof Design: Sustainable Energy Efficient Reroofing Best Practice Roof Design: Sustainable Energy Efficient Reroofing Presented by Edis Oliver, PE Principal 9511 Lake Creek Parkway Austin,
Maintaining Your Roof
Maintaining Your Roof Roofs play a key role in protecting building occupants and interiors from outside weather conditions, primarily moisture. The roof, insulation and ventilation must all work together
Shingle Roofing: What s below the surface is important
What s below the surface is important The roof is leaking, the shingles look old, and the downspouts are dripping. It must be time to replace the roof or is it? Shingle roofs may seem simple, but a roof
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
RECOATING AND RENEWING SPF ROOFING SYSTEMS
RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the
DELTA Premium Moisture Management Systems for Foundations.
DELTA protects property. Saves energy. Creates comfort. DELTA Premium Moisture Management Systems for Foundations. DELTA Premium Moisture Management Systems provide the best protection for foundations.
Roof Condition Analysis
Roof Condition Analysis Prepared for: J.W. Nelson John Evans Middle School - Gym Dome 2900 15th Avenue Greeley, Colorado Prepared by: Gregory Ham Coastal Specified Products 5252 Sherman Street Denver,
BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES
BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES ABOUT POLYGLASS U.S.A., INC. MODIFIED CEMENTS & ADHESIVES MASTICS ALUMINUM COATINGS EMULSIONS & PRIMERS PROTECTIVE COATINGS Polyglass manufactures
Exhibit 1. With 14 patents in coating technology, APOC is the industry leader in product development, performance and durability!
Æ Exhibit 1 Extending the life of your roof is one of the smartest decisions an owner, facility manager or property manager can make! APOC s time tested restoration systems have been performing for decades.
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
NEOGARD. Preventive Maintenance Manual
NEOGARD Preventive Maintenance Manual Fluid-Applied Roof Coating Systems December 2014 Notes NEOGARD luid-applied roof coating systems are designed to be long lasting, monolithic membranes which provide
The Peak of Protection
FUTURE ROOF The Peak of Protection Our Future is Your Satisfaction E l e g a n t Imagine the look of heavy wood shake without all the problems associated with wood. Future Shake by Future Roof Systems
metal Duil~ing manufacturers Association
metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building
Commercial Roof Inspection Form
Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT.
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT. awipanels.com From freezing, sub-zero temperatures to Contents dry heat or high humidity, Mother Nature continually tests the limits of building envelopes. That's
CONDENSATION IN REFRIDGERATED BUILDINGS
CONDENSATION IN REFRIDGERATED BUILDINGS By: Steve Salisbury Nov. 10, 2010 (revised Nov. 14, 2013) Introduction The following discussion reviews the basic causes of condensation in refrigerated buildings
BURNISHED SLATE COVER PHOTO: SLATE GREY
BURNISHED SLATE COVER PHOTO: SLATE GREY Never. Yet millions of homeowners annually purchase asphalt shingle roofs that will only last 20 years at best. Fortunately, this is changing. Homeowners are discovering
Water Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
0845 0098 980 www.nicholsonsts.com
0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution
Roof Systems Overview
Roof Systems Overview Cold Applied Built-Up Roofing Systems BURmastic Tremco s line of cold applied built-up roofing systems. BURmastic 200 Combines Tremco s expertise in asphalt blending technology with
The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage
The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage Sam Hagerman, Hammer and Hand [email protected] Florian Speier, Zola Windows [email protected] Paul Grahovac,
bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls
A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
Roof Inspection. Summary Report
Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:
ROOFS - Guidance for Repair, Maintenance and Replacement
ROOFS - Guidance for Repair, Maintenance and Replacement Guilford Association Architectural Committee ROOFING Slate and tile roofs are a critical design feature of Guilford homes. The homes were designed
Roof Insulation Building. Energy. Environment friendly e-library
Roof Insulation Building Codes & Energy Efficiency Environment friendly e-library Building Code Driver Buildings consumer almost 50% of all energy. Experts believe that a 30% increase in building efficiency
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT
PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT PREVENTING GROUNDWATER POLLUTION IS EVERYONE S JOB! Even if our drinking water comes from rivers, lakes, or reservoirs, we need to be mindful of
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
ROOFING CONTRACTORS QUESTIONNAIRE
ROOFING CONTRACTORS QUESTIONNAIRE ALL QUESTIONS MUST BE ANSWERED 1. Applicant Name: Website Address: Address: Years in business under the applicant name: Are you an NRCA (National Roofing Contractors Association)
INNOVATIONS. Economic Flat Roof Refurbishment with NOVOPROOF Sealing Systems. A Company of the SAARGUMMI Group
INNOVATIONS Economic Flat Roof Refurbishment with NOVOPROOF Sealing Systems A Company of the SAARGUMMI Group OUR SOLUTION TO REFURBISH ROOFS FOR LONG-TERM DURABILITY Quality and Experience from the Innovation
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
TPO: Getting Better With Age
TPO: Getting Better With Age By Michael Mendoza, TPO product manager, Firestone Building Products Thermoplastic polyolefin has matured. By any criteria, TPO is no longer the new kid on the block when it
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
Roof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO
Avoiding the Landfill: The Recycling of Vinyl Roof Membranes
Avoiding the Landfill: The Recycling of Vinyl Roof Membranes With its European counterparts blazing the trail, the North American vinyl (PVC) roofing industry has entered a new phase in its commitment
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
STANDING SEAM METAL ROOFING PANELS
STANDING SEAM METAL ROOFING PANELS Roof it for the last time. ENERGY EFFICIENCY WITH STYLE & DURABILITY METAL ROOFING FOR RESIDENTIAL AND COMMERCIAL APPLICATIONS. Featuring the TITAN Cool Roof Reflective
Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building
Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building Prepared For: Ms Marilyn Bittenbender Colliers International 805 New Hampshire St Lawrence Kansas, 66046 Prepared
Crescent Valley High School Roof Investigation
Crescent Valley High School Roof Investigation Project: Corvallis School District Crescent Valley High School Roof Date: July 26, 2011 Report By: Rowell Brokaw Architects: Mark Young, AIA, Chris Andrejko
Georgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
Maintenance & Inspection Guide
ADDRESSING THE NEEDS OF OUR CUSTOMERS AND THE ENVIRONMENT ONE high Performance roofing SOLUTION AT A TIME. Maintenance & Inspection Guide TABLE OF CONTENTS Topic: Page: I. Introduction 1 II. Maintenance
GUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
SchoolRoof Repair - Cost For Replacement of a Student Roof, Part 2
ROOF REPAIR UPDATE For the November school newsletter, I wrote an article in which I explained the condition of the school roof, the estimated cost of replacing the three flat sections from the 1996 building
1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Natatorium Building Enclosure Deterioration Due to Moisture Migration
Buildings 2012, 2, 534-541; doi:10.3390/buildings2040534 OPEN ACCESS buildings ISSN 2075-5309 www.mdpi.com/journal/buildings/ Case Study Natatorium Building Enclosure Deterioration Due to Moisture Migration
SikaProof A Technology
SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of
PIMA Technical Bulletin #115. The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing. What is a High R Roof?
PIMA Technical Bulletin #115 The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing About Polysio Insulation Polyiso is a rigid foam insulation used in over 70% of commercial roof construction,
Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS
OPTIONAL TITLE 24 CRITICAL POINTS POLYISO THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE DESCRIPTION TORCH OVER POLYISO (5,7,9 YR) TH/BS-TH/CS 2 No 0. SUBSTRATE. THERMOTEK USA PRO 2.0 FV
Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
The Harold J. Becker Company, Inc.
The Harold J. Becker Company, Inc. It is the mission of The Harold J. Becker Company, Inc. to deliver the absolute best possible quality product at the most efficient cost to our clients, while providing
Maintenance & repair Solutions
Maintenance & repair Solutions low-slope ROOFING We ve got what you need in the sizes you need them and the options to match the results that building owners want Seal-fast Temporary roof sealer Now you