Integrated Public Transport Control Systems Information Day



Similar documents
Farshad Jalali. Hojat Behrooz

Right of way for mobility. The Bus Rapid Transit (BRT) traffic concept. MAN kann.

URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES

Traffic Management for a Smarter City:Istanbul Istanbul Metropolitan Municipality

Lesson 2: Technology Applications Major Transit Technologies Grouped by Function

E-TICKETING SYSTEM FOR PUBLIC BUS TRANSPORT USING PRE-PAID SMART CARDS

Sustainable Mobility in Almada

Traffic Signal Priority (TSP) and Automatic Vehicle Tracking System (AVTS) For Calgary Transit Buses

Rajkot Municipal Corporation. Maru Smart Rajkot. Draft Smart City Proposal (SCP) Follow us on

01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries Plants : 50 -R&D: 20

Ticketing and user information systems in Public Transport in Thessaloniki area

Fares Policy In London: Impact on Bus Patronage

Transport Department Government of Uttar Pradesh

Request for CTF Project Preparation Grant (PPG)

City of Joburg experience Results of internal review and considerations Commentary on Transport Functional Study views

CASE STUDY 1. CLIENT: Chandigarh Transport Undertaking PROBLEM DOCUMENT:

HÁ LIMITES PARA O CRESCIMENTO DO SETOR IMOBILIÁRIO? Jacques van Zijl Rea Vaya Project Manager

Electronic Payment Scheme for Transportation: A case study of LAMATA

and Passenger Information

This document is part of a series of Building a Stronger South Australia policy initiatives from the Government of South Australia.

How to use your go card on the TransLink network. TransLink go card user guide

Los Angeles Metro Rapid

Management of public transport

Montgomery County Bus Rapid Transit System Information Technology Needs

Downtown Tampa Transportation Vision

Barcelona case study. Successfully managing the transition from one ticketing system to another. Albert Tortajada, FGC Infrastructure Director

Customer Service Charter

Integrated Platforms. Includes: - Environmental monitoring system - Integrated Traffic Management - Network Monitoring. Index. Purpose.

Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future

e: w: Inspired Technologies

Advanced Technologies

Linking Planning and Operations Initiative A Data Driven Approach. Chris Francis Transportation Statistics

ATTAC Project Objectives

Warsaw City Card. Warsaw,

Guide to using public transport in the Helsinki region

Customer Satisfaction Index 2014

The Mobility Opportunity Improving urban transport to drive economic growth

Recommendations for regional cycling developments of Budapest metropolitan area

GUIDELINES FOR IMPLEMENTERS

Best Practice on Electronic Ticketing

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx

Public Transport Vehicle Management System. Request for Information

Sustainable transport in Stockholm. Gustaf Landahl City of Stockholm

STRATEGIC PUBLIC TRANSPORTATION SYSTEMS PROGRAM

Measuring the Street:

SWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea

Transport Demand Management

Innovative ticketing systems for public transport

Article 17(1) of Directive 2010/40/EU, National Report for Ireland. 26 August 2011

Eliminating Gridlock Through Effective Travel Demand Management and Urban Mobility Strategies

EPA Technical Assistance for Sustainable Communities Building Blocks

FIRST IN TRAFFIC SOLUTIONS. SWARCO GROUP PERFORMANCE PORTFOLIO. SWARCO I First in Traffic Solutions.

Public Transport Fleet Management

When is BRT the Best Option? 1:30 2:40 p.m.

Innovations in London s transport: Big Data for a better customer experience

Customer Charter.

A guide to your new tram service

Vision for Salisbury Quality Bus Partnership. 25 July 2012

Transport Scotland Strategic Transport Projects Review Report 3 Generation, Sifting and Appraisal of Interventions Annex 2

INTELLIGENT AND INNOVATIVE TRANSPORT SYSTEMS

Best Practice: Bus Rapid Transit (BRT) System

Appendix A - Cost Estimate Spreadsheet

We make Smart Cities a reality. Schneider Electric Smart Cities


NFC in Transport for London

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

Seamless journeys from door to door.

Fleet Optimization with IBM Maximo for Transportation

Rome Mobility Agency: ITS for Large Events Management and the EU Stadium Project

INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Our journey to a low carbon economy. Sustainable travel in Greater Manchester

Gautrain s s Approach for an Integrated Ticketing System

Advantages and Disadvantages of One Way Streets October 30, 2007

Ticketing Scheme for Public Transport in Greater Manchester

car2go San Diego Parking Rules and FAQs

Ticket prices. From 1 January HSL Customer Service Tel Mon-Fri 7am-7pm, Sat-Sun 9am-5pm.

Ericsson Intelligent Traffic Management Solutions. Presented by Renato Filjar, Ericsson Nikola Tesla, Zagreb, Croatia

STATE TRANSIT POSITION DESCRIPTION

Guidelines for travel expenses related to medical and hospital services, medical reviews and return to work case conferencing.

Pilot Staff Bike Share Project. Induction Notes

Transdev Melbourne Customer Service Charter. ptv.vic.gov.au

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland , 2006

RouteMatch Fixed Route

4. Technology Assessment

Transcription:

Integrated Public Transport Control Systems Information Day www.wyg.com creative minds safe hands

Tender Procedure 1 Integrated Package Electronic Ticketing AVL / RTPI On-bus CCTV Intersection CCTV / Bus stops CCTV This tender has certain interrelationships with BRT construction work and traffic signal operations www.wyg.com creative minds safe hands

Scale 28 New Diesel Buses 39 New CNG Buses 10 Existing CNG Buses All to be Retro-fitted All to Specify an inclusive Maintenance Period Currently single operator system but additional inter-urban operators to be added later www.wyg.com creative minds safe hands

Electronic Ticketing E ticketing to include the following functionality: Paper Ticket Issue on bus by bus drivers (Single and possibly other fare types) Kerbside machines to recharge smartcards at key central locations Smartcards: Zonal Fares Season Tickets Promotional Fares E Purse (on bus and office top-up) Concessions (free and part payment) Back Office & Management System Readers on Doors / Conductor Handheld readers www.wyg.com creative minds safe hands

AVL / RTPI 77 Diesel / CNG buses to be Equipped Control Centre and Depot Control System Driver progress (late / on-time / early display) RTPI at all bus stops BRT Stops Central Bus Stations / 4 Terminals) (possibly 3 Line / 30 Char per line / Pole Mounted) Other Stops (smaller integrated within bespoke bus stop sign/ Possibly 3 Line / 15 Char per Line) Talking Bus Stop Facility at Certain Stops (fob triggered) 2 Displays (or more on articulated buses) on each bus (1 single line 15 char / 1 15in TFT Screen) Data entry and Reporting Software Information available on web based facility www.wyg.com creative minds safe hands

Communications System Communications requirements Data to Control Centre Data Control Centre to Bus Stops Voice Drivers and Control Centre Panic Button functionality Municipality Fibre Optic Cables for Control Centre to Bus Stops where possible Some existing Fibre Optic Cables Proposal to extend the existing Fibre Optic Cable Network in conjunction with the BRT civil engineering works www.wyg.com creative minds safe hands

Control Centre AVL Monitor showing vehicle locations across the City. This will be linked to terminals at the operators depot and/or dispatcher. RTPI Monitor will show what is displayed at any selected screen in the city and will enable messages to be sent to displays (bespoke or from a library of messages). Bus Company on bus transaction terminal (either previous day or real time depending on requirements). RTPI set up terminal. ETM Back office control systems. CCTV monitors. Voice communication with buses. This functionality will also be available at the depot and/or dispatch centre. www.wyg.com creative minds safe hands

On Bus CCTV Each bus/trolley bus will need to be fitted with 4 CCTV cameras (5 for articulated buses) The data from these cameras will be digitally stored on the vehicle and can be downloaded at a later stage should there be a requirement. The data will not be over written for a minimum of 14 days. Should an emergency occur and the driver uses the panic button, then the CCTV pictures will be streamed to the control centre automatically. www.wyg.com creative minds safe hands

BURGAS INTEGRATED URBAN TRANSPORT

BURGAS INTEGRATED URBAN TRANSPORT THE INTEGRATED PLANNING APPROACH: EXAMINES THE URBAN TRANSPORT AS A COMPLEX SYSTEM COMPRISING ECOLOGICAL, ECONOMIC, SOCIAL, CULTURAL, GOVERNMENTAL AND INFRASTRUCTURAL ASPECTS; GOES BEYOND THE TRADITIONAL UNDERSTANDING OF A WITH PROVIDED FINANCING; PLANS STRATEGIES FOR FINANCING LONG- TERM PROGRAMMES; APPLIES A HOLISTIC APPROACH IN PLANNING AND IMPLEMENTATION OF STRATEGIES FOR RESOLVING SECTORAL PROBLEMS. THE S DEVELOPED ARE NEVER JUST ECOLOGICAL OR JUST SOCIAL OR JUST INFRATSRUCTURAL; PROVIDING FINANCIAL RESOURCES IS A LONG - TERM TARGET AND THE BASED FINANCING IS JUST A PART OF IT; IT RELIES ON SUCCESSFUL COMBINATION OF APPROPRIATE FINANCIAL TOOLS IN DEVELOPMENT;

BURGAS INTEGRATED URBAN TRANSPORT THE LONG- TERM PROGRAMME FOR MODERNIZATION OF PUBLIC TRANSPORT IN BURGAS BURGAS INTEGRATED URBAN TRANSPORT BUILDING A BLUE ZONE IN THE CENTRAL CITY AREA AND MODERNIZATION OF THE BUS STOPS BRT PLUS: BUILDING P&R FACILITIES, CONNECTED WITH THE BRT ROUTE; CONSTRUCTION OF A MULTI MODAL TERMINAL; VIADUCT, CONNECTING THE MULTI MODAL TERMINAL WITH THE BRT ROUTE.

BURGAS INTEGRATED URBAN TRANSPORT OBJECTIVES INCREASING THE ATTRACTIVNESS OF PUBLIC TRANSPORT IN THE CITY, THROUGH IMPROVING THE QUALITY AND ACCESS TO TRANSPORT SERVICES; CREATING CONDITIONS FOR INCREASED MOBILITY OF THE POPULATION AND VISITORS OF BURGAS INTRODUCING ECOLOGICALLY FRIENDLY MEANS OF TRANSPORT AND REDUCING EMISSIONS INCREASING THE CAPACITY OF URBAN TRANSPORT SYSTEM STRENGTHENING THE METROPOLITAN FUNCTIONS OF THE CITY

BURGAS INTEGRATED URBAN TRANSPORT COMPONENTS: New buses - articulated diesel buses and CNG buses Introduction of a Bus Rapid Transit route (BRT) Priority for buses at traffic lights New optimised and attractive bus route network Central Bus Stop of attractive design Electronic Ticketing System Real passenger information at stops and in buses Public Transport Monitoring and Control System Upgrade of bus depot and workshop Diesel and CNG filling station Improved bus terminals Modernization of Public Transport

BURGAS INTEGRATED URBAN TRANSPORT COMPONENTS: Development of a network of cycling routes Alternative modes of transport Safe pedestrian crossings Improved accessibility of bus stops in pleasant and safe environment

BURGAS INTEGRATED URBAN TRANSPORT COMPONENTS: Public awareness campaign and promotion of environmental friendly transport modes Publicity Visibility measures

BURGAS INTEGRATED URBAN TRANSPORT ITMS COMPONENTS: Priority at traffic lights Electronic Ticketing System Real passenger information at stops and in buses Public Transport Monitoring and Control System CCTV

BURGAS INTEGRATED URBAN TRANSPORT EXPECTED RESULTS PUBLIC TRANSPORT IN BURGAS ACCESSIBLE Optimized network of bus lines ENVIRONMENTALLY FRIENDLY New attractive buses RECOGNIZIBLE An unified type of public transport HIGH SPEED Reducing the travel time POPULAR Marketing of public transport COMFORTABLE Integrated electronic ticketing system (distance based) Improving the information for passengers

BURGAS INTEGRATED URBAN TRANSPORT APPLICATION FORM INDICATORS LENGTH OF BRT NETWORK CONSTRUCTED 15km LENGTH OF BYCICLE LANES 20.2km NUMBER OF NEW DIESEL BUSES 28 NUMBER OF NEW CNG BUSES 39 NUMBER OF TRIPS WITH PUBLIC TRANSPORT (2013) 33.6 million NUMBER OF THE POPULATION BENEFITING BY THE Citizens of Burgas 220,000 Citizens of the agglomeration area 318,000 Tourists and guests of the city 120,000 People with disabilities using the public transport 6,000 REDUCING THE GREEN- HOUSE GAS EMISSION WITH 1 507 t per year

BURGAS INTEGRATED URBAN TRANSPORT FINANCIAL PLAN Total investment cost Source of total investment costs ( ) Community assistance National public (or equivalent) National private Other sources (City of Burgas) Of which (for Information) EIB/EIF loans: (a)= (b)+(c)+(d)+(e) (b) (c) (d) (e) (f) 61,936,920 44,043,962.95 7,772,464.05 10,120,493

BURGAS INTEGRATED URBAN TRANSPORT THANK YOU FOR YOUR ATTENTION!