BUILDING DATA. Facility Assessment Report, Garland Independent School District 3. Williams Stadium (Facility #913)



Similar documents
HOUSTON MIDDLE SCHOOL

October 5, 2015 Dear Client,

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

Middleborough Police Electronic Security Narrative

Facility Assessment for East Main Street, Huntley, IL

LAKEVIEW CENTENNIAL HIGH SCHOOL

Current as of 11/10/08 1 of 1

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

HICKMAN ELEMENTARY SCHOOL

A Self-Audit of Your Current Campus Security Systems

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

Slavic Village Building Condition Review

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

How To Plan A Building

SECTION 3 ONM & J STRUCTURAL ANALYSIS

EAST LYME HIGH SCHOOL

Property Condition Assessment

PLUMMER ELEMENTARY SCHOOL

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

17,280 square feet Overview:

Building Description Project Description Estimated Cost Notes Total Deferred

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Building Condition Assessment: North Howard Street Baltimore, Maryland

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Print Shop/Mail Room

Questions related to specific materials, methods, and services will be addressed at the conclusion of each presentation.

RRIO Checklist. Use of checklist: Definitions: Limitations

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

Water Leak 1: Intrusion Policy

Facility Assessment Report, Montgomery Independent School District

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Security Tools. Forms. Physical Security Assessment Security Plan Template Traffic Control Plan Template

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Best Practices for Safer School Facilities

Newton Public Schools Security Audits Executive Summary

BUNKER HILL ELEMENTARY SCHOOL

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION?

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

1. Perimeter fencing or walls should enclose the vicinity around cargo handling and loading areas, as well as storage facilities.

Inspection Item COMMENTS

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Mechanical, Plumbing, and Fire Protection Conditions

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

New Home Construction Packet

2. What building projects are exempted? (permit not required)

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

ADA Checklist for Polling Places

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

Data Center Due Diligence List

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Inspecting to a higher standard.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

Building Permits Permit Counter

HOUSTON ELEMENTARY SCHOOL

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

Architectural Inspection Site Structures

DRAPER ELEMENTARY SCHOOL

Five-Year Capital Plan Request FY through FY

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Crime Prevention through Environmental Design (CPTED) - Checklist

Architectural Condition Survey

Commercial or Business Security Survey

COMPREHENSIVE PROPERTY INSPECTIONS

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Building Condition Assessment Report

PUBLIC RESTROOMS, DESIGN INTENT

14 September Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste St. Paul, MN 55102

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas August 30, Prepared for:

Building Condition Assessment Report

This report presents the findings and recommendations of the assessment of energy use and

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Welcome to AISB Created by IT Facilities Manager, Lylah Shelor and Updated on July 28, 2015

Chicago Public Schools

CHRIS CURLES and ASSOCIATES INSPECTION SERVICES

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

Transcription:

WILLIAMS STADIUM

BUILDING DATA WILLIAMS STADIUM 510 Stadium Dr., Garland, TX 75040 Facility # 913 Year Built No. of Buildings No. of Portables 0 Approx. Total Square Footage Approx. Capacity Building Levels 53,964 Facility Assessment Report, Garland Independent School District 3

SITE PLAN 4 Facility Assessment Report, Garland Independent School District

MASTER PLAN COLOR LEGEND 1957 1980 2001 Facility Assessment Report, Garland Independent School District 5

MASTER PLAN 6 Facility Assessment Report, Garland Independent School District

MASTER PLAN Facility Assessment Report, Garland Independent School District 7

MASTER PLAN COLOR LEGEND Athletics Circulation Toilets/Support Spaces 8 Facility Assessment Report, Garland Independent School District

MASTER PLAN COLOR LEGEND Athletics Circulation Toilets/Support Spaces Williams Stadium (Facility #913) Facility Assessment Report, Garland Independent School District 9

MASTER PLAN COLOR LEGEND Athletics Circulation CATE Toilets/Support Spaces 10 Facility Assessment Report, Garland Independent School District

SITE - CIVIL GENERAL EXISTING SITE CONDITIONS AND DEFICIENCIES Overall vehicular paving condition: Fair Overall sidewalk paving condition: Good Pavement striping condition: Poor Site Deficiencies: The pavement condition across the site is fair with the exception of the drive aisle at the south side of the stadium itself, which is in good condition. There appears to be one small area of localized cracking in the dumpster area within the southeast corner of the western parking lot. The disabled parking area within the western parking lot does not have an ADA compliant route across the adjacent drive aisle to connect to the stadium facility. The un-paved gravel area located just east of the drive aisle on the south side of the stadium is currently being utilized for parking and presents an unstable surface that is difficult to maintain. This area should be permanently paved for future parking consideration. A section of sidewalk adjacent to Stadium drive located at the northeast corner of the site has subsided resulting in sidewalk failure and exposure of the back of curb. The striping condition across the entire site is poor, with the majority of parking spaces and drive aisle markings needing re-striped. Facility Assessment Report, Garland Independent School District 11

SITE - CIVIL 6 1 5 1 4 1 3 1 7 1 8 1 2 1 1 1 9 1 Location Map 12 Facility Assessment Report, Garland Independent School District

SITE - CIVIL Concrete pavement condition fair. Striping poor condition. Concrete pavement failure and cracking in dumpster area. Concrete pavement condition good. Off-street gravel parking. Concrete pavement condition fair. Striping poor condition. Sidewalk subsided along street. Facility Assessment Report, Garland Independent School District 13

SITE - CIVIL Concrete pavement condition fair. Striping poor condition. Stalls do not have an ADA compliant route across drive. Concrete pavement condition fair. Striping poor condition. 14 Facility Assessment Report, Garland Independent School District

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The home side press box is currently being served by two Trane DX Gas rooftop units (RTUs) that were installed in 2003. These units are in good moderate condition but should have several years of useful life left. The field house is being served by two Carrier DX Gas RTUs that were installed in 2003. These units are in moderate condition. RTU-C, installed in 2000, is a unit that is also serving the Field House. It is approaching the end of its useful life and may need to be replaced in the near future. A fourth RTU serves Field House Room M9. It is a 10 ton Carrier unit that was installed in 2009. It is in good condition and should have several years of useful life left. RTU-E is a Trane unit that serves the locker room areas and was installed in 2004. It is in moderate condition but should have some useful life left. Different areas of the field house are also being served by Carrier DX Splits that were installed in 2001. These units are approaching the end of their useful life and may need to be replaced in the near future. The girls dressing room is currently being served by a Carrier DX air handling unit (AHU) that was installed in 1987. This AHU, along with its condensing unit, is in poor condition and may need to be replaced in the near future. The visitor side press box is currently being served by Carrier window units that are in poor condition. Electrical Systems Information The electrical system at Williams Stadium has undergone several renovations since the facility first opened. Electrical distribution equipment typically has a 20 to 30 year useful life, after which, retrofitting, refurbishing, or replacement is necessary to maintain a reliable electrical system. There are a total of ten distribution panels throughout the facility that are at the end of their useful life and may need to be replaced in the near future. General Electric panels located in the home side restroom and concession stand are in poor condition and are at the end of their useful life. The same can also be said for General Electric Panels located in the varsity equipment room, field house boiler room, visitor concession, and weight room areas. An ITE panel that is located in the varsity equipment room has also reached the end of its useful life and may need to be replaced in the near future. There are several Square D and Cutler Hammer panels and transformers located throughout the facility that have been installed within the last ten years. This equipment is in good condition and should have several years of useful life left. Maintenance has requested a need for electrical power to the storage building on the east side of the stadium. Facility Assessment Report, Garland Independent School District 15

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Plumbing Systems Information The sewer and water mains are original to the facility. Maintenance has reported that the field house showers are outdated and that there are trough urinals in the facility s older restrooms. Flush valves on toilets and urinals are a combination of Sloan and Zurn manufacturers. Approximately half of the flush valves are low consumption and the other half are not. A majority of the lavatory faucets throughout the facility are metered. The field house shower faucets are Bradley manufacturers. The facility s electric water coolers are Oasis units, all of which are in good condition. The water heater that serves the girl s locker room is in poor condition and may need to be replaced within the next five years. Lighting Information Exterior lighting is not sufficient. Additional parking light poles should be installed on both the home and visitor sides, a combined total of 15 poles. The original field house and girls locker rooms need to have their lighting replaced. The lighting under the bleachers will need to be upgraded. The lighting in the rest of the facility is in good condition. Fire Alarm Information There are currently four fire alarm panels in Williams Stadium. The first fire alarm panel is manufactured by Notifier. The model of this panel is AFP 200. This panel was installed in 2001. The area which the panel is located in is the field house. The second fire alarm panel is manufactured by Notifier. The model of this panel is AFP 200. This panel was installed in 2003. The area which the panel is located in is the press box. The third fire alarm panel is manufactured by Firelite. The model of this panel is MP 24. This panel was installed in 1993. The area which the panel is located in is the athletics office. The fire alarm panels in the field house and the athletics office should be connected to the press box fire alarm system. Fire Sprinkler System Information There is a fire sprinkler system provided in place at Williams Stadium which only serves the press box. This portion of the facility is up to code. 16 Facility Assessment Report, Garland Independent School District

ENERGY MANAGEMENT Energy Management System Information The EMS has been updated several times as new equipment has been installed over the years. All current controls and corresponding sensors appear to be working adequately at this time. Maintenance has reported that areas not on the EMS are experiencing issues due to people turning thermostats too low. This issue can be remedied by putting these sections of the building on controllers so the building is controlled by one system. Maintenance has also reported that there is no EMS control in the weight room. All controls and sensors appear to be working at this time. Facility Assessment Report, Garland Independent School District 17

ENGINEERING REPORT - STRUCTURAL The recommendations below are based on our Structural Team s review of the scans of existing documents available in Garland ISD Archives, interviews with Garland ISD Staff from the School Facilities Department and the Maintenance Department, and onsite visual surveys of representative areas that were accessible. As with any structural condition assessment, more detailed assessments can always be performed at an additional cost with more time and may lead to additional recommendations; recommendations for specific types of more detailed assessments are provided below. Specific data regarding structural descriptions and observations of current conditions is provided in the Engineering Report - Structural Appendix separately for each construction phase of each facility. Therefore, refer to the Engineering Report Structural Appendix for more detailed information on where the following recommendations apply. Further Study is recommended to confirm that there is not a vapor barrier under the slab. If this is the case, recommend any new flooring be systems which allow moisture to breathe through the system or systems that have sufficiently moisture-resistant adhesives if possible or removing and replacing the slab with a new slab over a new vapor barrier. Further Study is recommended to determine if the unreinforced masonry will have any net axial tension or excessive flexural tension under code required design wind forces, which is not permitted by the code. Retrofitting new structural components may be recommended. Further Study is recommended to determine the design and condition of the connectors between wythes. Installing new connectors may be recommended after study. Further Study is recommended to determine if there is sufficient lateral anchorage at the top of all exterior unreinforced masonry that are parallel to roof joists. Installing lateral restraints may be recommended after further study. If any modification to the Unreinforced Masonry is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Further Study of the mechanical anchorage of the framing members from the wood roof trusses to the foundation is recommended. Installing retrofit connectors to provide net uplift resistance may be recommended. Installing new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is recommended when an opportunity presents itself such as a building remodel. Facility Assessment Report, Garland Independent School District 19

SECURITY Summary: This security assessment was performed on September 24, 2013 at Williams Stadium in Garland Texas. There was a brief interview with a staff member, however no campus personnel accompanied us with the walk through. The survey includes information on the stadium and the athletic office. General Statistics: The areas immediately surrounding the campus building are the GISD Technology and Transportation Building to the east, industrial businesses to the south, GISD Student Services to the west, and densely packed single family residences to the north. The roads bordering the campus are Stadium Drive to the north and Travis Street to the south. There are two main parking lots on the east and west sides of the stadium. Preparedness and Life Safety: Campus Evacuations, Lockdown Procedures, and Drills o It is assumed that all students, faculty, and staff all practice the ISD s mandatory standard for fire drills, emergency lock down, and shelter in place for inclement weather. Severe Weather o It is unknown if the campus has a functioning weather radio system which includes exterior mounted devices used for monitoring the weather. Automated External Defibrillator AED o A map depicting the location of AEDs should be placed at all exterior exits of the press box, concessions stand, elevators and other occupied spaces around the stadium. First Aid Kits o There was a first aid kit in the concessions area, athletic office, and press boxes. Student Pick-up and Drop-off o Not applicable Outer perimeter: Other than parking, there is a six foot fence that creates an enclosed perimeter around the stadium itself and there were few gaps or gates without locks. Building Exterior: There were electrical panels for the Athletic Office with on/off switches that were not secured. There were utility pull boxes under the bleachers on the west side of the stadium that were open with cabling exposed. There are signs of graffiti the property on the east wall of the Athletic Office. Facility Assessment Report, Garland Independent School District 21

SECURITY Doors and Vestibules: All exterior doors are kept locked during the day and most gates had padlocks on them. Visitor Management: For the stadium, the only visitor management are the gates that are used to control entry during an event. At the Athletic Office there is a main entry, but there is no intercom or surveillance camera system. It is unknown if visitors are required to press the intercom button near the front door to request entry or if the door remains unlocked during school hours. Electronic Safety Security / Communications: Surveillance The stadium and athletic office has an existing surveillance system that monitors both the interior and exterior of the building. The majority of the cameras are installed inside the press box at major entrances. o Due to the long distances between buildings and school property, there appears to be insufficient camera coverage around the general exterior of the stadium. o Due to the nature of the Athletic Office and boys locker rooms, there are very few interior cameras. Intrusion There is an existing intrusion alarm system used on campus. Motion detection is used as the primary means of detection. Motion detectors have been strategically located at exits and main administrative area, but not in locker rooms. o Inside of the concessions storage room was a motion detector that was poorly installed and appeared to be broken or not functioning properly. Access Control The existing access control system consists of card readers at strategically located doors; main entry and choice keyed exterior doors. o There was no access control on the GHS Field House, Visitor Locker Room, or the Weight Room to the south of the stadium. o The two concessions at the northeast and north west of the stadium do not have access control. Intercom An intercom system was not observed inside of the press box or concessions areas. Two Way Radios It is unknown if there were handheld radios inside of the stadium. 22 Facility Assessment Report, Garland Independent School District

SECURITY Building Condition: Exterior 51 21 1 1 3 1 4 1 All the numbers used on the map above correspond to the photos on the following page. Facility Assessment Report, Garland Independent School District 23

SECURITY View of cables hanging out of box under the west side bleachers. View of painted hand prints outside on the east wall of the Athletic Office. View of electrical switches with an on/off switch that was unlocked with no padlock on the outside south wall of the Athletic Office. There are several dumpsters that are placed in the fire lane and are not protected by bollards. There are covered trailers and overseas storage containers that are locked, but there aren t any cameras or chains preventing them from being forced open or moved. 24 Facility Assessment Report, Garland Independent School District

SECURITY Building Condition: Interior Facility Assessment Report, Garland Independent School District 25

SECURITY Recommendations: 1. To increase the ability for administrative staff and/or SRO to accurately identify a person of interest in a video, the resolution or quantity of interior and exterior cameras should be increased. 2. To help first responders during an emergency the school district should standardize the identification of: a. Exterior Doors: Every exterior door should be numbered on both the interior and exterior side of the door. 3. A map indicating the location of all AEDs should be placed on the inside of the stands at: i. The concessions stands ii. All bathroom entrances 4. All devices that had exposed wires need to be repaired or replaced. 5. Consider adding motion detection and access controls to the stadium support buildings. 26 Facility Assessment Report, Garland Independent School District