3 CAMPUS DATA HOUSTON MIDDLE SCHOOL 2232 Sussex Dr., Garland, TX 7504 Facility # 043 Year Built 960 (w/additions) No. of Buildings 2 No. of Portables 6 Approx. Total Square Footage Grades Served 95,802 6th through 8th Current Enrollment 846 Approx. Capacity 966 Building Levels Facility Assessment Report, Garland Independent School District 3
4 SITE PLAN 4 Facility Assessment Report, Garland Independent School District
5 MASTER PLAN COLOR LEGEND Facility Assessment Report, Garland Independent School District 5
6 MASTER PLAN COLOR LEGEND Administration Athletics CATE Fine Arts Library Toilets/Support Spaces Cafeteria/Kitchen Computer Lab Resource Circulation Science Lab 6 Facility Assessment Report, Garland Independent School District
7 SITE - CIVIL GENERAL EXISTING SITE CONDITIONS AND DEFICIENCIES Overall vehicular paving condition: Excellent-Good Overall sidewalk paving condition: Good Pavement striping condition: Good Site Deficiencies: Pavement condition of the majority of the school site is good to excellent, with the exception of one localized area of previous pavement repair that is continuing to fail, located at the southwest entrance from Sussex drive. The pavement condition of the tennis courts located at the northeast corner of the site is generally in good condition, with minor evidence of cracking and ponding water. The accessible parking areas within the south and west parking lots are non-compliant due to excessive longitudinal and cross slope. The marked crosswalk area that services the south entrance to the school from Sussex drive is lacking compliant ramps at both ends. Approximately 00 feet of sidewalk that runs along the north side of the school is in poor condition, with excessive cracking due to subsidence. Transverse and/or longitudinal slope of approximately 70 feet of sidewalk adjacent to the south parking lot area exceeds the ADA maximum. The landscape area adjacent to the east face of a portable building on the northeast corner of the school appears to have subsided, resulting in localized ponding of water against the building. Multiple landscape areas adjacent to the internal portions of the school site appear to lack the proper elevation fall from the building outwards to encourage efficient drainage. The landscape area adjacent to the tennis courts in the northeast corner of the site has eroded Facility Assessment Report, Garland Independent School District 7
8 SITE - CIVIL Location Map 8 Facility Assessment Report, Garland Independent School District
9 SITE - CIVIL Sidewalk non-accessible from Sussex Dr. due to steps. East parking lot and drive aisle pavement in good condition. Excessive cross slope within HC spaces. No HC signage. Non-compliant. Sidewalk exceeds 2.0% cross slope. Concrete pavement repair failing. Excessive slope within handicap spaces. Non-compliant Sidewalk failure, cracking. Facility Assessment Report, Garland Independent School District 9
10 SITE - CIVIL Sidewalk failure, cracking Football field uneven. North drive aisle pavement in excellent condition. Minor cracking and evidence of ponding water. Bare ground under trees with siltation on sidewalk. Ponding occurring along portable building. 0 Facility Assessment Report, Garland Independent School District
11 BUILDING CONDITION: EXTERIOR This facility consists of brick structure with plaster soffits. Parts of the structure show its age and is in need of repair. Paint is peeling off plaster and concrete surfaces. A few areas have water stains on the wall material, indicating possible moisture issues at the wall cavities. Sealant around windows should be checked and replaced with new material, as needed. Facility Assessment Report, Garland Independent School District
12 BUILDING CONDITION: EXTERIOR Site Plan 2 Facility Assessment Report, Garland Independent School District
13 BUILDING CONDITION: EXTERIOR Plaster soffits at main entrance. Exposed wiring; sleeve is not secured. Brick walls do not show signs of major moisture damage at this area. Typical window condition. Building has single pane glazing. Base of window panel has water stain. Roof drains should be cleared of debris. Facility Assessment Report, Garland Independent School District 3
14 BUILDING CONDITION: EXTERIOR Structure has a low roof. Walkways appear to slope towards door, creating potential drainage issues. 4 Facility Assessment Report, Garland Independent School District
15 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Classroom doors are plastic laminate and have lever type handles. Doors are not equipped with lock-down capability from inside the room. Corridor doors are metal, and have rust due to heavy use at these high traffic areas. Hardware and accessories should be replaced with new devices. Finish has worn off door handles and panic bars have missing components. Facility Assessment Report, Garland Independent School District 5
16 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Facility Assessment Report, Garland Independent School District
17 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Door handle finish has worn off. Panic hardware is missing components. Plastic laminate is chipped at edge and missing material. Lockset needs to be repaired. Steel doors and hardware are damaged. Daylight is visible at bottom of door. Facility Assessment Report, Garland Independent School District 7
18 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) Classrooms have rolled carpet floors with lay in ceilings. Carpet is unraveling at the seams and should be replaced with new material. Water damage is evident at some classroom window sills and ceiling tiles, causing the wall surface to peel as well. Corridors have VCT floors with lay in ceilings. VCT floors are in need of total replacement. Cracked tiles and uneven surfaces are visible throughout the facility. 8 Facility Assessment Report, Garland Independent School District
19 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) Facility Assessment Report, Garland Independent School District 9
20 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) VCT flooring is severely damaged. Broken VCT tiles. Water stain at ceiling and peeling material at wall surface. Broken window should be replaced. Carpet is torn at the seams and taped together to prevent further unraveling. Damage at walls. 20 Facility Assessment Report, Garland Independent School District
21 BUILDING CONDITION: INTERIOR (RESTROOMS) Restrooms will need to be reconfigured to bring them into code compliance. Fixtures should be relocated to meet the required dimensions and mounting heights, and sinks currently do not have the proper faucet handles. Restroom finishes have wall tile and floor tile. Several locations have cracked or broken tiles, especially at the floor line. Facility Assessment Report, Garland Independent School District 2
22 BUILDING CONDITION: INTERIOR (RESTROOMS) Floor Plan 22 Facility Assessment Report, Garland Independent School District
23 BUILDING CONDITION: INTERIOR (RESTROOMS) Sealant behind sink is cracked at wall. Laminate backsplash is not secure to wall. Broken toilet accessories. Porcelain tile is cracked at floor line. Facility Assessment Report, Garland Independent School District 23
24 BUILDING CONDITION: FINE ARTS The Band Hall has carpet flooring with lay in ceiling tiles. Per district standards, carpet at Fine Arts rooms should be replaced with VCT flooring. As a result of flooring changes, acoustic treatments may be needed or existing treatments may be altered to acquire the appropriate sound transmission rating. Instrument storage is made of plastic laminate dividers with carpeted shelves. Laminate is damaged from heavy use. 24 Facility Assessment Report, Garland Independent School District
25 BUILDING CONDITION: FINE ARTS Floor Plan Facility Assessment Report, Garland Independent School District 25
26 BUILDING CONDITION: FINE ARTS Choir hall has carpet floors and lay-in ceiling tiles. Cafetorium Stage has border curtains. Band Hall has carpet flooring with acoustic wall panels. Panels at Band Hall. Room has high ceiling. Typical practice room; room has gyp board walls with carpet floor and lay-in ceiling tiles. Instrument storage has chipped laminate at shelves. 26 Facility Assessment Report, Garland Independent School District
27 BUILDING CONDITION: ATHLETICS Both gyms are in need of new flooring. The current VCT floors have cracks throughout, some of them might cause tripping or safety hazards. Athletic equipment is in good condition at the competition gym, but needs attention at the practice gym. Floor striping should also be redone. Plastic bleachers are damaged and missing seats. Bleachers show heavy wear and should be replaced with new units. Facility Assessment Report, Garland Independent School District 27
28 BUILDING CONDITION: ATHLETICS Floor Plan 28 Facility Assessment Report, Garland Independent School District
29 BUILDING CONDITION: ATHLETICS VCT flooring has broken tiles. Athletic equipment should be repaired. Foldable bleachers are damaged and missing seats. Wooden aisles are heavily worn. Striping should be redone. Basketball goals at competition gym are in good condition. View of bleachers. Facility Assessment Report, Garland Independent School District 29
30 BUILDING CODE AND TAS Several items do not currently meet code compliance. Handrails at stairs do not have the correct height dimensions or extensions. Sinks are not equipped with the proper faucet handles and do not provide knee space for wheelchair occupants. Additionally, single user restrooms are too small and do not have the required clear floor area for the fixtures. 30 Facility Assessment Report, Garland Independent School District
31 BUILDING CODE AND TAS Floor Plan Facility Assessment Report, Garland Independent School District 3
32 BUILDING CODE AND TAS Sink does not provide knee clearance. Exposed wiring overhead at science lab. Wiring should be placed in conduit and secured to wall or ceiling. Wires have been cut and are exposed, causing a potential safety hazard. Sink at faculty lounge does not meet code compliance. Restroom does not have accessible fixtures or grab bars. Toilet accessories are mounted too close to the grab bars. 32 Facility Assessment Report, Garland Independent School District
33 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY Facility Assessment Report, Garland Independent School District 33
34 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY 34 Facility Assessment Report, Garland Independent School District
35 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY Facility Assessment Report, Garland Independent School District 35
36 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY 36 Facility Assessment Report, Garland Independent School District
37 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY Facility Assessment Report, Garland Independent School District 37
38 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY 38 Facility Assessment Report, Garland Independent School District
39 TEA COMPLIANCE AND EDUCATIONAL ADEQUACY Facility Assessment Report, Garland Independent School District 39
40
41 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Houston Middle School consists of DX/Gas rooftop units. Sixty one York rooftops installed in 992 serve the entire facility with exception to the kitchen and MDF closet. The kitchen and MDF closet are served by 2004 Trane roof top units. Overall the facility is served by 337 tons of cooling. The York equipment is in poor condition and needs replacement. Mechanical systems are shown in the areas of the building they serve on the color-coded floor plan below. Electrical Systems Information The electrical system has undergone multiple renovations/additions. The MSB was replaced and a majority of the panels were installed in 992 with an addition/renovation of building. The most recent renovation took place in 2004 with a kitchen addition/renovation. Panels were added in the addition area as well as in rooms 30 and J300. The electrical system has high voltage 480/277 and low voltage 208/20 equipment. The MSB (main switch board), located in room 324, is a 3000 amp and is manufactured by General Electric. The panels and transformers throughout the facility are manufactured by mainly General Electric and Eaton. There are also one Square D panel and Sylvania equipment on site. The system is in good condition as whole. Plumbing Systems Information The majority of the plumbing fixtures are in good condition. There are ADA compliancy issues in rooms 208, 30, 0, 08, 404 and the teacher s production center. Maintenance has reported a lack of isolation valves on site. The under slab sewer piping is original to initial construction in 960. Maintenance reported that it is in poor condition and problems frequently occur. The domestic water piping is also original. Flush valves on toilets and urinals are manufactured by Sloan. The flush valves on site are a mixture of low flow and non-low flow. There are two tank type toilets. A majority of the lavatory faucets throughout the facility are metered. Wash stations utilized in areas of the building. The building s electric water coolers are a combination of Oasis, Halsey Taylor and Elkay units. Domestic hot water heaters are manufactured by Rudd, AO Smith and Lochinvar. There is also and insta-hot water heater manufactured by Ariston. The AO smith is an electric water heater the other water heaters are gas fired. All domestic water heaters are in moderate to good condition. Facility Assessment Report, Garland Independent School District 4
42 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Facility Assessment Report, Garland Independent School District
43 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING MECHANICAL EQUIPMENT AREA PLAN NOTES:. Area served by 992 York rooftop units. (Orange) 2. Area served by 2004 Trane rooftop units. (Green) Facility Assessment Report, Garland Independent School District 43
44 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Lighting Information Lighting was renovated in All ballasts are electronic and the standard fluorescent bulb size is T8 throughout the building. Gym lighting fixtures are T5HO high bay fluorescents. Exterior lighting is not sufficient. The parking lot lighting needs to be upgraded. Lighting is in good condition throughout the facility. Fire Alarm Information The fire alarm panel is manufactured by Notifier. The model of the panel is AFP 640. The panel is addressable and was installed in The current tag status is blue and the panel was not reporting any warnings at the time of the visit. Fire Sprinkler System Information There is no fire protection system in place in Houston Middle School. In order for this facility to be completely up to code, a fire protection system should be installed. Energy Management System Information In 2004, new EMS controls were installed on HVAC equipment. T.A.C. DDC controls were installed on existing York rooftops and Trane rooftops. All controls and sensors appear to be working at this time. 44 Facility Assessment Report, Garland Independent School District
45 ENGINEERING REPORT - ROOFING General Conditions The building was re-roofed in 992 and features a brick veneer exterior. Asphalt gravel surfaced Built-Up roofs cover all conditioned space areas. Roof areas terminate into edge conditions or walls. Drainage is provided by edge drainage at most locations. There are some sections that have gutters and downspouts and other areas on the West side have interior drains and through wall scuppers. The structural deck is s lightweight concrete. Drainage/Slope Drainage would be graded as good. No significant areas of ponding water were observed. Roof Membrane The roof membrane is in fair condition. No major defects were observed. Flashings Modified Bitumen was installed at base, wall and curb flashings and is in satisfactory condition. Surfacing Gravel surfacing coverage is uniform in most areas although there are some isolated areas along the gravel guard edge where erosion was observed. As part of a hail damage claim in 2002, all areas were covered with an additional layer of gravel embedded in a flood coat of hot asphalt. Sheet Metal Sheet metal components such as copings, counter flashings, gravel guards and expansion joint covers are in satisfactory condition. There is standing seam panel roof that covers the main entrance that s in very good condition. Miscellaneous A rusting pitch pocket was observed above the Principal s office. A small addition to the kitchen was constructed. Some repairs were made at tie-ins to the existing roof but the addition roof is in good condition. Roof Performance The building has had very few leaks in the past. Most of the leaks were traced to penetrations or wall conditions. Facility Assessment Report, Garland Independent School District 45
46 ENGINEERING REPORT - ROOFING Campus Recommendations. Remove debris from all roof areas. 2. Resurface locations erosion of gravel surfacing was found. 3. Replace rusted out pitch pocket above the Principal s office. 46 Facility Assessment Report, Garland Independent School District
47 ENGINEERING REPORT - ROOFING Facility Assessment Report, Garland Independent School District 47
48 ENGINEERING REPORT - ROOFING Gutters and downspouts. Rusting pitch pan above office. Gutters and downspouts on upper roof and drains on lower roof. Base and counter flashing detail. Gravel erosion at roof edge. General appearance. 48 Facility Assessment Report, Garland Independent School District
49 ENGINEERING REPORT - ROOFING Through wall scupper flashing and coping. Edge drainage into gutters. Standing seam roof above entrance. Facility Assessment Report, Garland Independent School District 49
50
51 ENGINEERING REPORT - STRUCTURAL The recommendations below are based on our Structural Team s review of the scans of existing documents available in Garland ISD Archives, interviews with Garland ISD Staff from the School Facilities Department and the Maintenance Department, and onsite visual surveys of representative areas that were accessible. As with any structural condition assessment, more detailed assessments can always be performed at an additional cost with more time and may lead to additional recommendations; recommendations for specific types of more detailed assessments are provided below. Specific data regarding structural descriptions and observations of current conditions is provided in the Engineering Report - Structural Appendix separately for each construction phase of each facility. Therefore, refer to the Engineering Report Structural Appendix for more detailed information on where the following recommendations apply. Further Study is recommended to confirm that there is not a vapor barrier under the slab. If this is the case, recommend any new flooring be systems which allow moisture to breathe through the system or systems that have sufficiently moisture-resistant adhesives if possible or removing and replacing the slab with a new slab over a new vapor barrier. Relevelling or replacement of all or some of the existing floor slab and possibly the perimeter grade beams/piers is recommended to address barriers to handicap accessibility and general tripping hazards due to significant foundation movement. Further Study is recommended to determine if the unreinforced masonry will have any net axial tension or excessive flexural tension under code required design wind forces, which is not permitted by the code. Retrofitting new structural components may be recommended. Further Study is recommended to determine the design and condition of the connectors between wythes. Installing new connectors may be recommended after study. Further Study is recommended to determine if there is sufficient lateral anchorage at the top of all exterior unreinforced masonry that are parallel to roof joists. Installing lateral restraints may be recommended after further study. Further Study is recommended to determine if the structural unreinforced masonry has cracked behind wall finishes such as interior coverings and exterior veneers due to foundation movement. Repair of such cracks or retrofitting new structural components may be recommended. Repairing all known cracks in all structural unreinforced masonry due to foundation movement is recommended. If any modification to the Unreinforced Masonry is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Installing new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is recommended when an opportunity presents itself such as a building remodel. Facility Assessment Report, Garland Independent School District 5
52 ENGINEERING REPORT - STRUCTURAL Further Study of the enclosure that occurred after this structure was originally built is recommended to determine if the lateral force resisting system is sufficient to withstand wind forces required by the code considering the projected areas which are greater than when the building was originally designed. Installing new structural elements may be recommended Facility Assessment Report, Garland Independent School District
53 ENGINEERING REPORT - STRUCTURAL Sloping floor in hallway corridor. Sloping floor in hallway corridor. Facility Assessment Report, Garland Independent School District 53
54
55 FOOD SERVICE Replace Pass thru Refrigerator and Hot Food Cabinet Replace Pass thru Refrigerator and Hot Food Cabinet (no picture available) Replace Reach-In 2-Door Refrigerator Replace Walk-In Cooler/Freezer (no picture available) Replace Refrigerated Milk Cabinets Facility Assessment Report, Garland Independent School District 55
56
57 SECURITY Summary: This security assessment was performed on September 25, 203 at Sam Houston Middle School in Garland, Texas. There was a brief interview with the campus principal Don Hernandez, however no campus personnel accompanied us during the walk through. General Statistics: The areas immediately surrounding the campus consist of densely packed single family residences and Parkcrest Elementary to the north. The two roads bordering the campus are Sussex Drive to the south and Parkcrest Drive to the north. Entry into the campus is clearly marked with school zone signage, flashing lights, reduced speed signs. There is one main drive into the campus is off of Sussex Drive, which splits off into two secondary drives on the east and west ends of the campus. The main drive is first one is clearly marked for directional flow. There were bike racks right outside the main entrance and also on the southwest corner, both which are not observable by staff. The open fields to the north are shared with the public while students are in class. The staff parking is on the south and east of the campus, and in the grass fields on the west. There is no physical separation between most of the campus and public spaces. Preparedness and Life Safety: Campus Evacuations, Lockdown Procedures, and Drills o Students, faculty and staff all practice the ISD s mandatory standard for fire drills, emergency lock down, and shelter in place for inclement weather. o It was indicated that the school practiced Reverse Evacuation drills for students outside of the classroom or interior area of the school. o Not all classrooms displayed the plans for emergency procedures at the entry to the classroom. Severe Weather o The campus has a functioning weather radio system which includes exterior mounted devices used for monitoring the weather. However, there were not enough exterior PA speakers to hear the announcements for everyone outside of the school. Automated External Defibrillator AED A map depicting the location of AEDs should be placed in the interior corridors at all exterior doors, gymnasium, cafeterias, and entrance into the school. o Not all faculty and staff are trained on the AED device. First Aid Kits o There was a first aid kit in the clinic, but not in the cafeteria or gymnasium. Student Pick-up and Drop-off o High visibility life safety attire was not worn by teachers/staff during pickup and drop-off times. Facility Assessment Report, Garland Independent School District 57
58 SECURITY Outer perimeter: There is no separation of school grounds on the east or west of the campus. The fire lane on the east side of campus is a shared alley way with the residents. On the west side the school grounds run right up to the backyards of the residents. Building Exterior: There were signs of graffiti and damage to school property at: o Door #3 Written on with a sharpie marker. o There are signs of damage to the canopy outside of Door #9 like someone hung on to the edge of the canopy bending it. o A lot of the exterior doors have damage to them. The most extreme of them looks like someone hit the door with a hammer or other blunt object. The principal indicated that the doors have been like that for some time. o There were signs of old covered up graffiti on the exterior of walk-in cooler. o There was new graffiti on the down spout outside of Door #8. Outside of Door #5 are milk crates that can be stacked to gain access to the walk-in cooler then the roof. The exterior lighting appears to be very limited on the property including the play areas and canopies leading to the portables. Future investment in adequate lighting may be required to support any future surveillance camera improvements. There were two gates outside of the detached weight room or training building, that were left unlocked during school hours. When speaking to a coach, he indicated that the Authority Having Jurisdiction requires that the gates stay unlocked during school hours. There were no cameras in this area. The detached weight room does not have motion detectors or occupancy sensors inside of the room. The portable buildings had damage to the following items: o The Masonite skirting was damaged, allowing rodents and debris under the portable. o There were several electrical boxes that had the on/off switch unsecured. o There aren t any lights under the canopies which make it difficult for teachers and other staff to use this as a viable exit. There is a low point in the roof line outside of Classroom #302 which could be used to access the roof. Doors and Vestibules: The main entry does not have a manageable vestibule. Door #8 is unlocked during school hours because this is how students gain access to the gymnasium using Door #9. Door #5 has damage to the door hardware on the leaf to the left and has a damaged led light on the HID reader. Not all exterior doors were numbered on both the interior and exterior side of the door. 58 Facility Assessment Report, Garland Independent School District
59 SECURITY All exterior doors are kept locked during the day except during pick up and drop off periods. This information is posted at the main entrance and campus website. None of the roof hatches in the school were secured with locks or motion detectors. Visitor Management: The main entry does utilize an existing intercom and surveillance camera system which is located on the exterior side of the entry. Visitors are required to press the intercom button near the front door to request entry. As visitors are identified, they are permitted to enter the office directly, which is to the left as you enter the main entry. The administrative staff indicated that the LED display on the Aiphone was dark and difficult to see the face of the person seeking entry. After entering the controlled vestibule there is no secondary set of doors to force the visitor into the main office. The administrative staff indicated that they were diligent in intercepting visitors who attempt to bypass the office. The campus currently utilizes a Raptor based system for checking in visitors against a sexual predator database. Electronic Safety Security / Communications: Surveillance The campus has an existing surveillance system that monitors both the interior and exterior of the building. The majority of the cameras are installed inside the building at major entrances, all exit doors, and high traffic areas. o There is insufficient camera coverage around the general exterior of the building including all play areas, pick up and drop off points and delivery entrances. Intrusion There is an existing intrusion alarm system used on campus. Motion detection is used as the primary means of detection. Motion detectors have been strategically located at exits, computer labs, the cafeteria, the gymnasium, and main administrative area, but not in classrooms or at roof hatch locations. Access Control The existing access control system on campus consists of card readers at strategically located doors; main entry and choice keyed exterior doors. The access control system is not used to monitor the condition of the exterior doors during the day. Visitors are required to press the intercom button near the front door to request entry. However, the camera view is dark and the angle is not aligned with the face of the person seeking entry due to ADA requirements. Intercom The campus has an intercom system throughout the school as well as four speakers installed around the exterior of the campus. Two Way Radios There were a limited number of handheld radios located on campus. o Radios were present in the main office, gymnasium, cafeteria and other select classrooms. o Not all personnel carried handheld radio at all times. o When talking to administrative staff, it was indicated that there weren t enough radios for all teachers and key personnel. Facility Assessment Report, Garland Independent School District 59
60 SECURITY Building Condition: Exterior The numbers used on the map above correspond to the photos on the preceding pages. 60 Facility Assessment Report, Garland Independent School District
61 SECURITY View of fire lane on the east side of the campus grounds, showing that there is no real separation between the campus and residents. View of campus grounds on the west side of the campus, showing that there is no real separation between the campus and residents. Graffiti on the exterior Door #3. View of damaged canopy outside of Door #9. Door # showing signs of damage. Covered up graffiti on the exterior of walk-in cooler and damage to the dumpster. Facility Assessment Report, Garland Independent School District 6
62 SECURITY Graffiti on down spout outside of Door #8. View of milk crates that can be stacked outside Door #5, to gain access to the canopy then the roof. View of Door #6 and of the pallets that can be stacked to gain access to the canopy then the roof. View of Portable Building #5. View of damaged to the door hardware on Door #0. View of damaged HID reader outside of door #0. 62 Facility Assessment Report, Garland Independent School District
63 Facility Assessment Report, Garland Independent School District 63 Houston Middle School (Facility #043) SECURITY Building Condition: Interior The letters used on the map above correspond to the photos on the preceding pages. A B J F G H K L I C M D E N
64 SECURITY The Raptor PC should not be turned around so that visitors could log themselves in. The access control system panel resides in a paper room in the main office area. The doors were not secured to prevent tampering of the system. There are no maps directing you to where the AED is located. This door was constantly being used as an entrance and exit by students throughout the day. There is no camera or access control on this door. There was a full propane tank being stored in this hot exterior room. There was no signage on the outside of this room that there were flammable materials stored. The lack of a managed vestibule makes it difficult to control visitors once they are allowed inside the building.. 64 Facility Assessment Report, Garland Independent School District
65 SECURITY All of the windows in the classroom were operable. Most of the windows were locked with the exception of this window that looks out to the staff parking lot. The emergency evacuation plan was too high to be read. This laptop/ipad cabinet was left open and unsecure in a classroom corridor. This storage area also serves as an IDF but the cabinets and panels were completely inaccessible. This is a close up view of Pic #J. This is an IDF rack that s blocked by stored material. This emergency exit in the shop class was blocked by a wood sander. The shop teacher indicated that this was a temporary place for this equipment and that it would be moved. Facility Assessment Report, Garland Independent School District 65
66 SECURITY There were two gas cylinders used for welding inside of the shop class. There was no signage indicating that welding or flammable equipment was stored. The end of this crash bar was coming apart. When mentioned to the principal, he said it would be reported to maintenance. Recommendations:. To increase visibility and visitor awareness, it s recommended that: a. The solid barriers between the main office and main entrance should be modified so as to provide a better line of site of the entryway for the administrative staff. b. Due to the fact that existing Aiphone door stations are installed per ADA required height it is difficult to see persons of average height. Use of other cameras located nearby is recommended. c. There is an existing exterior camera at the main entrance that has a side view of visitors requesting entry into the school. If access to this camera can be given to the administrative staff, they can use it in addition to the Aiphone, to view the main entrance and visitors requesting entrance. 2. Additional PA speakers need to be added to the exterior of the building. 3. To increase the ability for administrative staff and/or SRO to accurately identify a person of interest in a video, the resolution or quantity of interior and exterior cameras should be increased. 4. Secure all roof hatches by adding keyed locks and access control. Motion detectors should be added inside the room where roof hatch doors are located. 5. To help first responders locate themselves in the school during a lock down, the school district should standardize the identification of: a. Classroom Windows: A single exterior classroom window should be marked with either the classroom number or a unique identifier that can be given to a first responder. b. Exterior Doors: Every exterior door should be numbered on both the interior and exterior side of the door. 6. Turn the Raptor System around so that the public is not allowed to check themselves in. 7. Display the plans for emergency procedures at the entry of each classroom. 8. To prevent the unwanted shut off of power to the school, secure all electrical panels around the building with a padlock. 9. Remove all graffiti around the exterior and portables. 0. All exterior doors should be numbered on both the interior and exterior sides of the door.. To prevent animals from accessing or living under the portables, replace all damaged Masonite kick panels. 66 Facility Assessment Report, Garland Independent School District
67 SECURITY 2. All gates serving the school property should be secured during school hours. 3. First aid kits should be kept in the cafeteria and gymnasium. 4. Train all faculty and staff on how to use an AED device. 5. A map depicting the location of AEDs should be placed in the interior corridors at all exterior doors, gymnasium, cafeterias, and entrance into the school. 6. Staff providing direction during students drop off and pick up hours should wear high visibility life safety vests and carry hand held radios. 7. Reverse evacuation drills should be performed on campus during recess to ensure students and staff can quickly re-enter the building when an outside threat occurs. The school district should oversee all exercises with local first responders. 8. Doors to the janitorial closet, storage rooms, and unoccupied rooms should remain locked when out occupied. Facility Assessment Report, Garland Independent School District 67
BUILDING DATA. Facility Assessment Report, Garland Independent School District 3. Williams Stadium (Facility #913)
WILLIAMS STADIUM BUILDING DATA WILLIAMS STADIUM 510 Stadium Dr., Garland, TX 75040 Facility # 913 Year Built No. of Buildings No. of Portables 0 Approx. Total Square Footage Approx. Capacity Building
HICKMAN ELEMENTARY SCHOOL
HICKMAN ELEMENTARY SCHOOL 2 Facility Assessment Report, Garland Independent School District CAMPUS DATA HICKMAN ELEMENTARY SCHOOL 3114 Pinewood Dr., Garland, TX 75044 Facility # 133 Year Built 1975 No.
www.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Facility Assessment Report, Montgomery Independent School District
THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a
LAKEVIEW CENTENNIAL HIGH SCHOOL
LAKEVIEW CENTENNIAL HIGH SCHOOL CAMPUS DATA LAKEVIEW CENTENNIAL HIGH SCHOOL 3505 Hayman Dr., Garland, TX 75043 Facility # 005 Year Built 976 No. of Buildings No. of Portables 20 Approx. Total Square Footage
17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
Van Vleck ISD Bond Election
Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to
Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.
Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
Inspection Item COMMENTS
APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:
Facility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
How To Check For A Deficiency
UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The
Architectural Inspection Site Structures
0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape
Vision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
Property Condition Assessment
Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
RRIO Checklist. Use of checklist: Definitions: Limitations
CITY OF SEATTLE RENTAL REGISTRATION AND INSPECTION ORDINANCE (RRIO) RRIO Checklist Use of checklist: Property owners will use the RRIO Checklist to confirm that their rental housing properties and units
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
A Self-Audit of Your Current Campus Security Systems
A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,
PUBLIC RESTROOMS, DESIGN INTENT
PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Building Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
Self-Home Inspection Checklist
To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional
Current as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.
Architectural Elements Support Facilities A. System Description 1. Architectural support facilities include the lobby, classroom, fitness room, office area, staff toilet/showers, public toilet/lockers,
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10
Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
ADA Checklist for Polling Places
U.S. Department of Justice Civil Rights Division Disability Rights Section Americans with Disabilities Act ADA Checklist for Polling Places February 2004 Reproduction Reproduction of this document is encouraged.
Estimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228
Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor
2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
Georgia Home Inspection Services
Cover Page Property Inspection Report My street, Anytown GA, 30000 Inspection prepared for: John Doe Inspection Date: 7/18/2011 Time: 5pm Age: 25+ Size: >1500 Weather: Clear This ranch style home is in
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
How To Plan A Building
State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site
Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
Architectural Condition Survey
Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Inspecton Report. Property Address:
Inspecton Report Provided by: National Home Inspections Inspector: Bob Smith 456 S Main Denver, CO 46312 (645) 423-3242 [email protected] www.nationalhomeservices.com Property Address: 873
Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,
PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced
LIMITED ONE-YEAR WARRANTY SELLER S RESPONSIBILITY
LIMITED ONE-YEAR WARRANTY SELLER S RESPONSIBILITY Except as covered by a manufacturers limited warranty, the Seller hereby provides a Limited Warranty for the dwelling against defects in the original material
Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.
Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
Certification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
CONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668
Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:
SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
University of Northern Iowa Facilities Services
University of Northern Iowa Facilities Services February 2013 Page 1 Table of Contents: 3 General Service Information 3 Maintenance Services 4 Non-Maintenance Services 5 Area Maintenance Program 6 Carpentry
Chicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202
Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request
Commercial Roof Inspection Form
Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
Building Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
Monthly Inspection Checklists
Monthly Inspection Checklists These safety checklists are part of a monthly inspection of church property. The items listed are not meant to imply that other concerns could not be present. The items listed
Structural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
Slavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
Building Permits Permit Counter
Building Permits Permit Counter APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy of
This report presents the findings and recommendations of the assessment of energy use and
This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
New Home Walk-Through Package
New Home Walk-Through Package Carrying out a Successful Walk-through Before Closing John MacDonald Architect inc. The Courtyard @ Bonnie Stuart, 141 Whitney Place Suite 101, Kitchener, ON. N2G 2X8 New
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Roof Inspection. Summary Report
www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,
NORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,