Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary



Similar documents
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Statement Of Work Professional Services

Statement Of Work. Data Center Thermography Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work Professional Services

Energy Management Services

DATA CENTER ASSESSMENT SERVICES

Element D Services Heating, Ventilating, and Air Conditioning

Cisco Data Center Facilities Assessment Service

Statement of Work. 1.0 Executive Summary. 2.0 Features & Benefits. Service. Software Education Service. Table of Contents

Maintenance Service 1.1 ANNUAL PREVENTIVE MAINTENANCE 1.2 ON-SITE REMEDIAL SERVICES

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009

APC APPLICATION NOTE #92

HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.)

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Data center upgrade proposal. (phase one)

LEVEL 3 DATA CENTER ASSESSMENT

How To Run A Data Center Efficiently

HP Data Center Services

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

APC APPLICATION NOTE #112

Data Centre Testing and Commissioning

How To Improve Energy Efficiency In A Data Center

Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Power and Cooling for Ultra-High Density Racks and Blade Servers

Benefits of. Air Flow Management. Data Center

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Australian Government Data Centre Strategy

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

Data Center Technology: Physical Infrastructure

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Data Center Power Consumption

Design Best Practices for Data Centers

Airflow Simulation Solves Data Centre Cooling Problem

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs

1.1 ANNUAL PREVENTIVE MAINTENANCE VISIT

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

Managing Cooling Capacity & Redundancy In Data Centers Today

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

Using CFD for optimal thermal management and cooling design in data centers

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

Data Center Components Overview

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

The Pros and Cons of Modular Systems

Data Centers: How Does It Affect My Building s Energy Use and What Can I Do?

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

FNT EXPERT PAPER. // Data Center Efficiency AUTHOR. Using CFD to Optimize Cooling in Design and Operation.

- 1 - StruxureWare TM Data Center Expert Periodic Maintenance. Software Integration Service. 1.0 Executive Summary. 2.0 Features & Benefits

Re Engineering to a "Green" Data Center, with Measurable ROI

Increasing Data Center Efficiency through Metering and Monitoring Power Usage

How to Meet 24 by Forever Cooling Demands of your Data Center

Five Nines and Infrared (IR) Testing at Data Centers

Energy Efficiency and Availability Management in Consolidated Data Centers

Analysis of the UNH Data Center Using CFD Modeling

Applications for Infrared Thermography at Computer Centers

Reducing Data Center Energy Consumption

Strategies for Deploying Blade Servers in Existing Data Centers

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

Managing Data Centre Heat Issues

OPERATOR - FACILITY ADDRESS - DATE

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Network-critical Physical Infrastructure (NCPI) Vulnerability Assessment

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Choosing Close-Coupled IT Cooling Solutions

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems

Center Thermal Management Can Live Together

Using thermal mapping at the data centre

How Row-based Data Center Cooling Works

Imperial College 3 March 2009 Green Data Centers: An Overview

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Introducing AUDIT- BUDDY

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

The Different Types of Air Conditioning Equipment for IT Environments

PX100 MBP with Configurable Distribution

BRUNS-PAK Presents MARK S. EVANKO, Principal

Thermal Storage System Provides Emergency Data Center Cooling

Boosting the Energy efficiency of a Server Room: experimental + virtual approach.

Specialty Environment Design Mission Critical Facilities

Measure Server delta- T using AUDIT- BUDDY

ASX ITS Co-location Hosting Solution

ISOMEDIA COLOCATION

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Reduce the cost and delays associated with troubleshooting with the help of round-the-clock Service Desk Support.

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity

How to Build a Data Centre Cooling Budget. Ian Cathcart

Data Center Energy Efficiency. SC07 Birds of a Feather November, 2007 Bill Tschudi wftschudi@lbl.gov

Statement of Work Server Migration & Cable Management. Installation Services. Table of Contents. 1.0 Executive Summary. 2.0 Features & Benefits

TIA-942 Data Centre Standards Overview WHITE PAPER

Essential NCPI Management Requirements for Next Generation Data Centers

11 Top Tips for Energy-Efficient Data Center Design and Operation

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Transcription:

Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details of Service 4.0 Deliverables 5.0 Exclusions 6.0 Scope of Responsibility 7.0 Project Work Details 8.0 Pricing 9.0 Terms & Conditions The APC Data Center Power and Cooling Assessment Service provides an assessment and analysis of your data center facility and critical physical infrastructure components including the power systems, cooling systems, and rack configurations. APC will supply you with the information necessary to manage your facilities for optimum performance, extend the life of your hardware and strive for the highest level of network availability. The APC Data Center Power and Cooling Assessment Service offer a detailed review of your data center. APC professional services consultants will visit the site and collect data pertaining to: Environmental conditions Critical infrastructure capacity and utilization Cooling distribution and effectiveness Condition of power and cooling equipment With this data, APC will develop a comprehensive report that will include recommendations to: Address your specific concerns Correct deficiencies Optimize existing conditions Increase infrastructure capabilities Extend data center service life 2.0 Features & Benefits Features Comprehensive Data Center Power and Cooling Assessment Report. Measurement of existing environmental conditions. Measurement of the data center electrical infrastructure loads. Measurement of present temperature conditions using thermal imaging. Recommendations to optimize infrastructure utilization. Benefits Data center power and cooling utilization analysis identifies key infrastructure constraints that inhibit full space utilization. Indicates areas where temperature and humidity levels are not within tolerances established by industry standards and equipment manufacturers. Provides an accurate assessment of the actual data center power and heat loads; identifies excessive load conditions that can compromise existing reliability. Provides visual representation of excessive rack inlet temperatures and other potential hot spots within the data center. Identifies methods to maximize availability and the efficient use of power, cooling and space.

3.0 Details of Service The specific activities of this service are listed below. For each activity, APC will perform the work described. Activities Data Center Electrical Infrastructure Review Document Existing UPS and Configuration Document UPS Capacity and Utilization Document Static Transfer Switch Configuration Data Center Load Analysis Data Center Power Description Document nameplate data, manufacturer and configuration of the data center bulk power distribution equipment to include: main switchgear, switchboards, generator(s), automatic transfer switch (ATS) and other equipment as applicable. Identify redundancy of power distribution system. Perform a visual inspection of data center electrical equipment including: switchboard, generator(s), ATS, uninterruptible power supply (UPS) and UPS power distribution infrastructure, checking for improper installation practices, damaged equipment, and labeling of circuits. Review available maintenance records for the data center electrical equipment including: switchboard, generator(s) and ATS, and provide recommendations, where applicable, to improve practices. Document the generator fuel supply system and storage capacity. Document configuration, existing condition and nameplate data of the UPS and UPS power distribution infrastructure. Document configuration, existing condition and nameplate data of the battery system. Record input and output load measurements taken at the UPS. Identify and record preferred and alternate sources, document load readings, identify load balance and load transfer capabilities. Record, interpret and analyze displayed load values from metered power distribution units (PDU). Interpret and analyze measured load data collected from the data center, load panel boards taken during the assessment.

Activities Computer Room Air Conditioning (CRAC) System Characterization and Analysis Record Data Center Temperature and Humidity Levels Rack Analysis Infrared Thermography Air Distribution Effectiveness Data Center Cooling Description Visually assess the Computer Room Air Conditioning (CRAC) units. Check for general conditions, improper installation practices, damaged equipment and improper use. Identify the system type (i.e. direct expansion, water based or dry cooler, upflow or downflow) and document equipment manufacturer and model number. Document the rated capacity (based upon nameplate data and manufacturer nominal ratings) of the CRAC unit(s). Record and analyze supply and return temperatures, humidity, set points and operational modes to determine environmental conditions and where demand fighting may occur. Record and document room temperature levels to ensure that they are within ranges established by equipment manufacturers and recognized industry standards. Record average hot aisle and cold aisle temperatures. Identify conditions outside of recognized industry standards. Identify where air mixing is likely to occur and where blanking panels should be installed. Examine rack enclosures for airflow suitability. Identify airflow obstructions within, above, and below the rack environment. Detect and document areas where rack inlet temperatures exceed industry standards and guidelines using infrared thermography. Analyze rack arrangements for air distribution effectiveness. Identify the air distribution topology within the computer room. Evaluate the air distribution topology effectiveness relative to the computer room heat load. Measure airflow and temperature of the raised-floor air distribution system and overhead supply grills (if accessible). Identify possible obstructions and restrictions. Compare to nominal equipment nameplate data.

Deliverable Customer Identified Site Specific Issues Infrastructure Summary and Recommendations Data Center Electrical Infrastructure Analysis Data Center Electrical Distribution Analysis Data Center Cooling Infrastructure Analysis Data Center Cooling Distribution Analysis Data Center Analysis and Report Description Provide analysis and recommendations to address and correct customer specific issues within the data center using industry best practices. Provide a data center summary and recommendations to optimize the existing data center according to industry best practices. Provide a simplified one-line diagram from the main data center switchboard or separately derived source to critical load distribution panels, including transfer switches, UPSs, and generators. Tabulate and analyze the bulk power system within the data center. Provide recommendations where applicable. Determine bulk power utilization and identify limiting factors for increased power density within the data center. Project future growth load potential and analysis based on actual load measurements. Provide recommendations, where applicable, to optimize the operation and utilization of the generator infrastructure. Tabulate and analyze power distribution within the data center. Provide recommendations where applicable. Determine power distribution utilization and identify limiting factors for increased power density within the data center. Tabulate and analyze the bulk cooling distribution within the data center. Determine the bulk cooling utilization and identify limiting factors for increased power density within the data center. Report conditions that compromise bulk cooling effectiveness, where applicable, and provide recommendations to correct problems. Document and analyze the cooling distribution within the data center. Provide a cooling distribution floor plan of the data center identifying rack inlet air temperatures and tile airflow and temperature data, if applicable. Report conditions that compromise cooling distribution effectiveness, where applicable and provide recommendations to correct problems. Provide a floor plan of the existing data center depicting average hot and cold aisle temperatures, and raised floor supply tile airflow rates and temperature readings.

Deliverable Data Center Load Constraint Analysis Facilities Analysis Recommendations For Data Center General Recommendations Data Center Analysis and Report (cont.) Description Provide analysis of the infrastructure constraints and how the constraints limit increased data center loads. Document general facilities information. Provide a floor plan of the existing data center. If a floor plan is provided by the customer, it will be validated and updated as necessary to reflect the current operations. Provide analysis, scenarios and recommendations to optimize infrastructure utilization and availability. Provide power, cooling and infrastructure recommendations for each scenario. Provide conceptual floor plan depicting equipment layout for each recommended scenario. Provide general observations and recommendations for the data center infrastructure not covered in other sections of the report.

4.0 Deliverables APC will deliver a comprehensive data center assessment report to the customer that includes: Recommendations for specific actions addressing customer concerns. General recommendations to improve power, cooling and facility utilization. Identifying problem areas based on analysis performed using digital photography, thermal imaging, and actual field measurements. Tabular data collected from all the activities defined in Section 3.0, Details of Service. Three (3) hard copies and a PDF of the final report. An optional follow-up conference call to review the report and answer questions. 5.0 Exclusions The following items are outside the scope of this standard service offering. They can be integrated into a customized Statement of Work (SOW) at request of the customer. Contact an APC sales representative for more details. Specialized testing or commissioning Fire detection and fire suppression Physical security Structural analysis Circuit Tracing

6.0 Scope of Responsibility The items stated here are responsibilities of both APC and the customer. 6.1 APC RESPONSIBILITIES Assign a Professional Services Fulfillment Manager to the case. Initiate a meeting to: Review the assessment process and deliverables. Establish project stakeholders and key contacts. Review the Assessment Preparation Questionnaire to identify customer specific existing conditions and issues in the data center. Schedule an assessment and manage the complete assessment process through the APC Professional Services office. Perform an assessment of the customer site. Provide a written report to the customer of the completed field survey. 6.2 CUSTOMER RESPONSIBILITIES Complete and return the Assessment Preparation Questionnaire. This will identify issues or problems in the data center needing specific, detailed analysis and recommendations. Provide qualified personnel to take electrical panel readings on the day the APC Professional Services consultant performs the assessment. Provide qualified personnel for physical access to the data center, all infrastructure support areas and electric panels to be surveyed. These areas include, but are not limited to, the power systems within the data center and those feeding the data center from outside. Access to data center power systems will include: Generator. Service entrance. Uninterruptible power supplies. Breaker panels. Access to the internal and external cooling system components within the data center. Floor panel removal and sub-floor access. Provide building infrastructure one-line diagrams for the cooling and electrical systems, if available. Provide generator, switchgear, UPS and HVAC maintenance records, if available. Notify APC of any non-disclosure agreement, security clearance, safety or other certification requirements prior to arrival on site. Provide a single point of contact to assist during assessment.

7.0 Project Work Details The following details of the project specify the schedule, location and successful completion criteria. 7.1 SCHEDULE 1. All onsite services performed by APC are executed during the normal business hours of Monday through Friday from 8:00AM to 5:00PM, local time. Exceptions are national or provincial holidays. Services performed outside of normal working hours may incur additional charges. 2. The service will be scheduled as quickly as possible at the convenience of the customer. Delays in fulfilling the service caused by labor disputes of third parties, customer contracted services, or other unforeseen conditions may affect the schedule. APC will not be responsible for delays related to circumstances outside of its control. 7.2 ASSESSMENT PROCESS TIMELINE AND FLOW 1. Customer Purchase Order received by APC. 2. Assessment Preparation Questionnaire complete and returned to APC. 3. Site assessment scheduled with customer through APC Professional Services office. 4. Meet with IT, facility management and APC representative to coordinate site visit. 5. Site assessment performed at the customer location. 6. Customer Site Assessment Report completed. The actual and specific dates are not contracted due to the variability in each unique site assessment and analysis. 7.3 LOCATION The location of this project will be onsite. It will be discussed and approved by APC and the customer. 7.4 COMPLETION CRITERIA APC is expected to have finished its written duties when any of the following occurs: 1. APC completes all the items described in Section 4.0, Deliverables of this SOW. 2. This project and SOW are terminated for other reasons, within the APC customer agreement.

8.0 Pricing Part Number: QWPADCPC-MISC Pricing for the Data Center Power and Cooling Assessment varies depending on data center size, equipment, power capacity, cooling capacity, available existing documentation and location of the data center. To receive a price quote for your application, please visit www.apc.com or contact your APC sales representative. 9.0 Terms and Conditions APC standard Terms and Conditions apply. The information provided in this SOW cannot be used or duplicated, in full or in part. Other uses for this document are prohibited without written consent from APC. All documentation, photographs, thermal imaging or other information provided by the customer, or gathered at the customer site, will be for internal APC use only and used solely for the purpose of report generation, analysis and recommendations. 2008. All rights reserved. All APC trademarks are property of American Power Conversion. Other trademarks are property of their respective owners. Specifications are subject to change without notice. Disclaimer: This information is reliable at the point of creation and may be subject to change.