Analysis of the UNH Data Center Using CFD Modeling

Size: px
Start display at page:

Download "Analysis of the UNH Data Center Using CFD Modeling"

Transcription

1 Applied Math Modeling White Paper Analysis of the UNH Data Center Using CFD Modeling By Jamie Bemis, Dana Etherington, and Mike Osienski, Department of Mechanical Engineering, University of New Hampshire, Durham, NH January, 2009 Introduction In the Fall of 2008, Applied Math Modeling Inc., the UNH Data Center, and students from the UNH Mechanical Engineering Program collaborated on a project to improve the design and thermal efficiency of the UNH Data Center. The UNH Data Center is an off-campus facility that consists of approximately 2700 square feet of floor space, divided into three smaller rooms with a common pressurized subfloor plenum. The goal of the project was first to create a mathematical model of the data center thermal environment using the CoolSim CFD (computational fluid dynamics) application, and then to use the model to improve the cooling efficiency of the room, thereby reducing energy consumption and/or allowing more IT capacity using the existing cooling equipment. Temperature and air flow measurements were made in the data center to ensure that the model was accurately predicting the system behavior. Figure 1: 2D plan view of the UNH Data Center 2009 Applied Math Modeling Inc. 1

2 Figure 2: 3D model of the UNH Data Center UNH Data Center Layout The existing data center is composed of three main rooms, as shown in Figure 1. The four external walls are considered the domain boundary for the model. This analysis was concerned only with the elements that lie within this boundary, so components such as the HVAC system of the building was not a focus. Instead, attention was centered on how the system dynamics within the rooms can be optimized to achieve a better overall thermal performance. The UNH Data Center is separated into three small rooms labeled Operations Rooms 1, 2, and 3, which are used to house cooling and IT equipment. The design of this data center is a result of the conversion of space once used as a cold storage facility. The partitioning of the data center into separate rooms stems from its original use and poses some unique challenges for cooling. The main elements in a data center are the racks of servers, power supplies, computer room air conditioning (CRAC) units, and the mechanism for distributing the cold air to the heat-generating components in the room. Here, a raised floor mechanism is used, where cold air from the CRAC units is blown into the subfloor plenum, and perforated tiles are positioned around the equipment to allow the cold air to enter the room and cool the equipment. This data center also utilizes a passive return system, where the heated exhaust air from the racks is allowed to pass freely within the rooms before entering the CRAC returns on top of the cooling units. The perforated tiles are labeled by letter in Figure 1, and the racks by number. A few of the rack numbers are missing. This is due to 2009 Applied Math Modeling Inc. 2

3 the fact that the racks are currently empty, but may be populated in future scenarios. A base model for the data center was created and a simulation was run. The results were used to analyze the flow interactions between the rooms, the effectiveness of the raised floor and existing perforated tile arrangement, the flow paths through and around the servers, and the warm air return to the tops of the air conditioning units. were unknown, so initial estimates were based on worst case specifications supplied by the manufacturer (corresponding to the highest heat loads). The heat loads were then adjusted downward depending on the system configuration. For example, systems configured with half the maximum total memory and CPU cores were modeled at 50% of the manufacturer s total thermal load. The UNH data center has a couple of unique characteristics that are important aspects of the existing room configuration. First, the subfloor region is small, with a height of only 9 inches, and a quantity of cable trays and wires in the subfloor reduces the available volume in the plenum and obstructs the flow of supply air in places. Second, the data center was partitioned into smaller rooms for security reasons prior to its current use as a data center. To allow for better performance as a data center, perforated grills were placed in the upper sections of the walls separating the rooms to allow the hot exhaust air to travel freely to the closest CRAC unit. The data center is cooled by four Liebert CRAC units. Units 1, 3, and 4 are located in Operations Room 2, while Unit 2 is located in Operations Room 1. Table 1 outlines the specifications for each unit. The data center contains 39 server racks. The majority of the racks are located in Operations Room 2. The heat loads for the servers Table 1: CRAC Unit Specifications Creating the Model in CoolSim The methodology for modeling the data center was to first create a model in CoolSim based on the physical characteristics of the room. This process entailed taking inventory of all the equipment types and placements in the room including racks, power supplies, perforated tile locations, walls, under-floor obstructions, cable cutouts, and any other areas where air might be blocked or leak through the raised floor. A baseline CoolSim simulation was then performed to gain insight about the general dynamics of air movement, under floor pressure, and temperature distribution throughout the facility. Care was taken to not make this initial model too complicated in terms of geometry detail, but to include enough detail to obtain the basic flow characteristics. Once the baseline results were calculated, comparisons were made to actual measurements taken in the 2009 Applied Math Modeling Inc. 3

4 data center. Based on the comparison between the simulated results and measurements, additional details were added to the model to more closely represent the measured flow characteristics. Creating the data center in CoolSim was fairly easy and took only about 4 hours. The CoolSim model was built using details of the room geometry, cooling units, rack locations, IT equipment in the racks, and thermal load assumptions for the equipment. All the significant leaks (areas greater than 6 square inches) in the system were also represented in the model. The internal walls separating the rooms included properly positioned vents to allow the flow of return air back to the CRAC units. The vents were assumed to have 40 percent open area. The most time-consuming aspect of creating the model was acquiring the technical specifications for each piece of IT equipment, required to model the thermal load. Unfortunately, rack electrical load measurements were not feasible in the UNH facility, so load assumptions had to be made using IT manufacturing data. Once the locations and technical specifications for all of the equipment were collected, an average load per rack and corresponding rack flow rate were calculated and input into the software. Based on an assumed 20 F temperature rise across each rack, the flow rate was computed by Cool- Sim to be 156 CFM/kW of thermal load. A Data Center Assessment Report, available in the software to provide global totals of heat loads, cooling capacities, and flow rates was used to summarize the equipment in the room. The report is shown in Figure 3. According to this summary, the CRACs provide 49% more cooling capacity and 71% more air flow than is required by the current racks due to the recent retirement of older IT servers. Since one of the CRACs is almost twenty years old and another is ten years old, it is likely that they are not operating at their maximum rated values. The surplus of cooling capacity may therefore be an overestimate if some of the units are operating at a lower performance level. This will be discussed in a later section when the measured rack temperatures are compared to the simulation results. Note, however, that the assessment report is simply a summary and does not take the flow and temperature distribution into account. A CFD simulation is required to predict these distributions, so will provide a far more accurate representation of whether or not the CRACs can adequately cool the equipment, even if some are running at less than peak capacity. Modeling Assumptions A number of assumptions were made for the creation of the base model. First, because it was not possible to make actual load measurements on each equipment rack in the facility, the maximum rack thermal load was determined by researching the technical specifications for each server and summed for each rack. By comparing the actual configurations in the racks (based on server usage) with the maximum published configurations, an assumption was made that the actual racks were producing 60% of the maximum published heat loads. Second, an approximation was made in the base model regarding the room geometry. In 2009 Applied Math Modeling Inc. 4

5 CoolSim Data Center Assessment Report Copyright (c) 2008, Applied Math Modeling Inc. Specifications Room dimensions 46 X 64 X 8.5 feet Room floor area 2944 sq. ft. Supply plenum height 0.83 feet Number of downflow CRAC units 4 Number of rack rows 27 Total number of racks 36 Number of tile rows 12 Total number of tiles 27 Number of PDUs 4 Number of baffles 13 Number of cable cutout 6 Airflow Assessment Supply air flow rate from downflow CRACs CFM Demand air flow rate from racks CFM Total demand air flow rate CFM Supply air flow rate (% of demand air flow rate) 171% (71% excess of the demand air flow rate.) Estimated average flow rate through perforated tiles 660 CFM Estimated average pressure drop across the tiles lbf/ft2 Estimated rate of air leakage through cable cutouts 204 CFM (1% of the total supply plenum flow rate) Estimated net supply airflow rate through perf tiles CFM (70% excess of the demand flow rate from racks) Thermal Assessment Estimated heat density W/sq.ft. of room area Downflow CRAC cooling capacity kw Supply air total cooling capacity kw Total rack heat load kw Total PDU heat load 3.66 kw Total cooling load kw Supply air cooling capacity (% of total cooling load) 149% (49% excess than cooling demand) Estimated temperature rise of supply air F Estimated average temperature of hot air F (for 60 F supply air temperature) Figure 3: The CoolSim Data Center Assessment Report this model, it was assumed that the subfloor was entirely clear of obstructions such as wires and pipes. This approximation was subsequently dropped because it yielded poor agreement with measurements of flow distribution through the perforated floor tiles. This point will be discussed in a later section. Third, the cooling capacity for each CRAC unit was based on technical specifications obtained from the manufacturer. The Cool- Sim software contains a library of DataAire and Liebert CRACs, so that the user can select the make and model number from the list and have all the specifications automatically supplied. This option assumes that the units 2009 Applied Math Modeling Inc. 5

6 are operating at the manufacturer s rated performance levels, which may decline over time due to age. In addition to creating a model using the manufacturer s cooling capacities, a model was run with reduced cooling capacities, where the reductions were proportional to the age of the unit. Experimental Measurements Over 200 measurements were taken in the data center to provide insight into the system behavior. Measurements of airflow and temperature in the data center were done using a Mannix hand-held Air Master WDCFM8951 device. Flow rate measurements where determined by measuring the average air velocity approximately 6 inches above the perforated tile. Measurements were made at roughly 5 positions on each tile - in the center and at each of the corners - and the average velocity was then multiplied by the area of the floor tile to obtain the volumetric flow rate. This method is not nearly as accurate as when a hooded device such as a Velometer is used, but it does represent what most data centers would have available. Velocity measurements were also taken at three different heights for each of the racks and averaged for comparison to simulated data. The Air Master 8951 was also used for temperature measurements, which were made at three points on rack inlets and exits, and then averaged for comparison to the simulated values. Table 2: Comparison of simulated and measured total air flow rate in the room Due to time constraints and instrument limitations, the measurements were sparse. Ideally, a meshing scheme could have been constructed to gather many data points for each measurement, so that accurate averages could be found, and random data points could be discarded. However, this approach was not practical due to the time sensitivity of the project. Furthermore, the goal of taking measurements was to obtain a general idea of the system behavior, and ensure that the model was representative. Therefore, the exactness of the data was less of a priority than the general trending patterns. Simulation Results and Model Validation Once the model was complete, a baseline simulation was run, and the results were compared to measurements taken in the data center. A systematic analysis was performed to achieve correlation between the model and the actual system. First, the total air flow predicted by the simulation was compared to the total measured air flow. In Table 2, a comparison between the total measured and simulated flow rates shows very good agreement, with an error of just under 5%. The fact that the simulation does not overpredict the measured airflow suggests that the CRAC flow rates have not declined from their rated values with age. The next comparison was of the distribution of air flow through the perforated floor tiles. Figure 4 illustrates the Cool- Sim baseline results for flow rate along with the measured data. The comparison is 2009 Applied Math Modeling Inc. 6

7 Figure 4: Air flow distribution through perforated floor tiles through Tiles 12 and 13 (L and M) but underpredicts the flow through Tiles (O U). One possible cause for this discrepancy is the presence of obstructions in the underfloor region that had not been included in the base model. For example, there is a large 6 inch cable bundle running along the length of the room, and a smaller 3 inch bundle running along the width of the room. Obstructions of this size in the narrow plenum are likely candidates for altering the supply airflow patterns and impacting the flow distribution through the tiles. Table 3: Tile labels and corresponding numerical values used for Figures 4 and 5 In a revised CoolSim model, these obstructions were added to the supply plenum, as done for each tile in the room, identified by number, with numbers corresponding to the letters referenced in Figure 1 in Table 3. As can be seen, the simulated and measured values for most of the perforated tiles are not in very good agreement, with error that ranges from less than 1% to about 60%. The worst agreement appears to be for Tiles (L through U), with the exception of Tile 14 (N). The simulation overpredicts the flow Figure 5: Pipes added to the plenum as underfloor obstructions 2009 Applied Math Modeling Inc. 7

8 distribution would be in even better agreement with measurements. Another way of examining the role of underfloor obstructions is to compare the trajectories of the supply air with and without them. Pathline plots are used for this purpose. They represent the paths Figure 6: Air flow distribution through tiles with underfloor obstructions taken by imaginary fluid particles shown in Figure 5. The revised predictions and can be colored by any variable. In Figure 7, the pathline plots in the supply ple- for airflow distribution were in much better agreement overall with the measurements, as num, colored by velocity magnitude, are shown in Figure 6. The average absolute error dropped by 8 points. It was believed by compared for the case without (left) and with (right) underfloor obstructions. Clearly, even the team that had additional complexity been the addition of two relatively small objects added to the underflow region, the predicted can have a significant impact on the flow- Figure 7: Supply plenum pathlines without (left) and with (right) underfloor pipes 2009 Applied Math Modeling Inc. 8

9 field, and hence, the airflow distribution through the perforated tiles. Once the predicted airflow correlated adequately with measurements, comparisons of the simulated and measured rack inlet and exit temperatures were performed. In Figure 8 the inlet temperatures are shown to be in good agreement with data, with an overall average error of 13%. The most consistent error in the rack inlet temperatures was for the row located in Operations Room 3, housing Racks 1 through 7 and in Operations Room 2, for Racks 29 through 34. For all of these racks, the simula- Figure 8: Rack inlet temperatures Figure 9: Rack Outlet Temperatures 2009 Applied Math Modeling Inc. 9

10 tion underpredicts the inlet temperatures. The airflow through the tiles in Room 1 is in good agreement with measurements and is underpredicted for the tiles servicing Racks 29 through 34. This means that the likely reason for the underpredicted temperatures is the assumption that the CRACs are operating with maximum cooling capacity. The air being supplied by the CRACs in the model is too cold. Even if one CRAC is not capable of meeting its cooling target, its warmer supply air could mix with the other supply air in the plenum and impact the rack inlet temperatures. It is also possible that additional under floor obstructions contribute to this discrepancy, since they would contribute to thermal mixing and air distribution. A comparison of rack exit (outlet) temperatures was also performed, and the results are presented in Figure 9. The exit temperature error averaged 10%. For Racks 1 through 7 and 29 through 34, the exit temperatures are less than the measured values, as was true for the inlet temperatures on these racks. This enforces the suggestion that the error is due to the supply air being too cold. In some cases, CoolSim underpredicts the rack inlet temperature yet overpredicts the rack outlet temperature. Rack 23 is one example, and it can be concluded that the rack heat load in the model was assumed to be too high. For Rack 22, on the other hand, the inlet temperature prediction was too high and the exit temperature prediction too low, suggesting that the rack heat load was assumed to be too low. In CoolSim, the cooling capacity type of boundary condition for CRACs removes only as much heat as needed to maintain a userspecified thermostat temperature at the return. The cooling capacity that is set by the user is simply the maximum heat that the unit can remove from the return air. When the manufacturer s cooling capacities were Figure 10: Rack inlet temperatures computed using full and reduced cooling capacity ratings on CRAC Units 3 and Applied Math Modeling Inc. 10

11 used in the simulation, the actual heat removal was reported to be less than these values for all CRACs in the data center. Even so, an additional simulation was performed to examine the effect of aging on two of the units. CRAC Unit 3 (about 10 years old) was set to operate at 80% of its rated value and CRAC Unit 4 (about 20 years old) was set to operate at 70%. CRAC Units 1 and 2 were not changed. The impact of these reductions on the rack inlet temperatures can be seen in Figure 10, where the simulated values using the full and reduced CRAC cooling capacities are shown. These results show a small increase in the predicted inlet temperatures, with the overall error dropping to 11%. The increase is small because the CRACs do not need to operate at their peaks, given the cooling demands of the room. Even so, the units that operate at their full ratings need to work harder when the other units operate at reduced levels. In Table Table 4: Cooling capacity boundary conditions and resulting heat removal for CRACs modeled with their full ratings and with reduced ratings on Units 3 (80%) and 4 (70%) 4, the actual heat removed by each CRAC is compared to the cooling capacity boundary condition for the two scenarios. When Units 3 and 4 operate at reduced levels, Units 1 and 2 operate at increased levels. The division of labor changes because the diminished cooling capacity of Unit 3 is smaller than the heat it was called upon to remove when running at maximum value. This exercise identifies Unit 3 as a potential weakness in the data center. It is old, yet needs to operate at close to its maximum rated value. Even the newest CRACS, Units 1 and 2, could be operating at reduced levels. A simulation was performed in which all of the units were derated by 30%, and this reduced the error for Racks 1 through 7 by 30% compared to the fully rated case and the overall error for the inlet temperatures by 40% (from 13% to 8%). Recommendations for Improved Efficiency Once the validity of the model was established, the simulation results were studied to see if recommendations could be made to improve the data center s efficiency. A number of key problem areas were found. First, as shown above, the cooling load was not evenly distributed between the four air conditioning units, and Unit 3 may be overtaxed. By balancing the load among the CRACs, the data center would be better prepared for a potential failure of one of them. Another common problem that was observed is that some of the cold air coming out of the floor tiles travels directly to the 2009 Applied Math Modeling Inc. 11

12 Figure 11: Short-circuiting of the supply air to the CRAC returns (royal blue) CRAC returns without ever passing through the racks. This phenomenon is known as short-circuiting and is shown in Figure 11 below. Here, supply pathlines trace the trajectories of air from their entry into the room at the perforated floor tiles to their exit points, which should be at the rack inlets. The image shows that some of the trajectories go directly to the CRAC returns (shown in blue) in Operations Room 2. While shortcircuiting in general reduced efficiency, some is to be expected in the UNH Data Center, however, because there is an abundance of supply air. As IT equipment is added to the facility in the future, it will be important to make sure that short-circuiting does not keep the available supply air from reaching the racks. Finally, CRAC 2 in Operations Room 1 is located in an area with virtually no heat load other than a power supply. By either removing the surrounding walls or relocating the unit, it could be more effectively utilized. These main results, as well as some smaller details, are now providing the foundation for the alternative designs. Conclusions and Future Work During the past four months, the UNH data center has been studied and the behavior of the system analyzed. The design team conducted extensive research to develop an understanding of the causes behind the current data center operating characteristics. At this point, the system has been effectively modeled, so the dynamics of the system are well understood. The model can now be used to test design alternatives to see if the efficiency of the facility can be improved Applied Math Modeling Inc. 12

13 A few obstacles were encountered during the first phase of this project. First, the task of obtaining measurements from the existing data center was challenging due to time constraints and instrument limitations. For future measurements, additional velocity and temperature transducers should be purchased. Furthermore, a velometer would provide an improved method of capturing the true volume flow rate from the perforated floor tiles, compared to the current method, which is somewhat crude. During the creation of the CFD model, approximations were made when specifying the heat loads of the racks. The original heat loads were based on technical specifications supplied by the manufacturers; however these values represented worst case scenarios (with the highest possible heat loads) and were not necessarily representative of the real system. Using the room measurements as a guide, the team was able to adjust the heat loads of the racks until valid results were achieved. Through this process, the team developed a sense of engineering judgment that will be useful in later aspects of the project. Acknowledgements The UNH design team would like to thank a number of people who made this project possible. We would like to recognize the management team at the UNH Data center, for their enthusiasm and cooperation throughout this project, and for allowing us to spend significant time in the data center gathering data. We would like to thank Professor John McHugh for acting as an advisor to the team, and for his assistance with the mathematical model of the system. Additionally, we would like to give a special thanks to the support staff at Applied Math Modeling Inc., for the use of their modeling tools, and for their valued support throughout the semester. The next focus of the project will be on developing system improvements and modeling the increase in thermal load anticipated for the next couple of years. All of these results will be presented to the director of UNH Data Services for review Applied Math Modeling Inc. 13

Reducing the Annual Cost of a Telecommunications Data Center

Reducing the Annual Cost of a Telecommunications Data Center Applied Math Modeling White Paper Reducing the Annual Cost of a Telecommunications Data Center By Paul Bemis and Liz Marshall, Applied Math Modeling Inc., Concord, NH March, 2011 Introduction The facilities

More information

Using CFD for optimal thermal management and cooling design in data centers

Using CFD for optimal thermal management and cooling design in data centers www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,

More information

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue

More information

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Minneapolis Symposium September 30 th, 2015 Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Learning Objectives 1. Gain familiarity with Computational

More information

Benefits of. Air Flow Management. Data Center

Benefits of. Air Flow Management. Data Center Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment

More information

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack

More information

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Autodesk Revit 2013 Autodesk BIM 360 Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Data centers consume approximately 200 terawatt hours of energy

More information

Thinking Outside the Box Server Design for Data Center Optimization

Thinking Outside the Box Server Design for Data Center Optimization Thinking Outside the Box Server Design for Data Center Optimization Marie Ross, Senior Applications Engineer Tom Gregory, Consultant Engineer October 2013 The benefits of analyzing thermal performance

More information

How To Improve Energy Efficiency Through Raising Inlet Temperatures

How To Improve Energy Efficiency Through Raising Inlet Temperatures Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD

More information

Unified Physical Infrastructure (UPI) Strategies for Thermal Management

Unified Physical Infrastructure (UPI) Strategies for Thermal Management Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting

More information

Managing Cooling Capacity & Redundancy In Data Centers Today

Managing Cooling Capacity & Redundancy In Data Centers Today Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS

More information

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,

More information

W H I T E P A P E R. Computational Fluid Dynamics Modeling for Operational Data Centers

W H I T E P A P E R. Computational Fluid Dynamics Modeling for Operational Data Centers W H I T E P A P E R Computational Fluid Dynamics Modeling for Operational Data Centers 2 Executive Summary Improving Effectiveness of CFD Technology in Cooling of Data Centers IT managers continue to be

More information

How To Run A Data Center Efficiently

How To Run A Data Center Efficiently A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw

More information

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room

More information

Boosting the Energy efficiency of a Server Room: experimental + virtual approach.

Boosting the Energy efficiency of a Server Room: experimental + virtual approach. Boosting the Energy efficiency of a Server Room: experimental + virtual approach. Nowadays, the increase in computing power allows the successful applications of the CFD simulation methods in civil environments.

More information

Data Center Power Consumption

Data Center Power Consumption Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling

More information

RAISED-FLOOR DATA CENTER: PERFORATED TILE FLOW RATES FOR VARIOUS TILE LAYOUTS

RAISED-FLOOR DATA CENTER: PERFORATED TILE FLOW RATES FOR VARIOUS TILE LAYOUTS Paper Presented at ITHERM 2004 Ninth Intersociety Conference on Thermal and Thermomechanical Phenomena in Electronic Systems June 1-4, Las Vegas, NV RAISED-FLOOR DATA CENTER: PERFORATED TILE FLOW RATES

More information

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.

More information

Energy Efficient Data Center Design. Can Ozcan Ozen Engineering Emre Türköz Ozen Engineering

Energy Efficient Data Center Design. Can Ozcan Ozen Engineering Emre Türköz Ozen Engineering Energy Efficient Data Center Design Can Ozcan Ozen Engineering Emre Türköz Ozen Engineering 1 Bio Can Ozcan received his Master of Science in Mechanical Engineering from Bogazici University of Turkey in

More information

HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.)

HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.) HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.) Felipe Visbal / March 27, 2013 HPPR Data Center Technologies Team Services Data Centers: Thermal Assessments

More information

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0)20 7849 6848 Fax: +44 (0)20 7203 6701 Email: info@itisltd.co.uk www.itisltd.com Introducing Computational

More information

Strategies for Deploying Blade Servers in Existing Data Centers

Strategies for Deploying Blade Servers in Existing Data Centers Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling

More information

Virtual Data Centre Design A blueprint for success

Virtual Data Centre Design A blueprint for success Virtual Data Centre Design A blueprint for success IT has become the back bone of every business. Advances in computing have resulted in economies of scale, allowing large companies to integrate business

More information

Benefits of Cold Aisle Containment During Cooling Failure

Benefits of Cold Aisle Containment During Cooling Failure Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business

More information

IPACK2005-73273 DISTRIBUTED LEAKAGE FLOW IN RAISED-FLOOR DATA CENTERS

IPACK2005-73273 DISTRIBUTED LEAKAGE FLOW IN RAISED-FLOOR DATA CENTERS Proceedings of IPACK5 ASME InterPACK '5 July 17-, San Francisco, California, USA IPACK5-7373 DISTRIBUTED LEAKAGE FLOW IN RAISED-FLOOR DATA CENTERS Amir Radmehr Innovative Research, Inc. Plymouth, MN, USA

More information

Application of CFD modelling to the Design of Modern Data Centres

Application of CFD modelling to the Design of Modern Data Centres Application of CFD modelling to the Design of Modern Data Centres White Paper March 2012 By Sam Wicks BEng CFD Applications Engineer Sudlows March 14, 2012 Application of CFD modelling to the Design of

More information

Data center upgrade proposal. (phase one)

Data center upgrade proposal. (phase one) Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The

More information

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial facilities commonly occupy spaces with ceilings ranging between twenty and thirty feet in height.

More information

BRUNS-PAK Presents MARK S. EVANKO, Principal

BRUNS-PAK Presents MARK S. EVANKO, Principal BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations

More information

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School A Comparative Study of Various High Density Data Center Cooling Technologies A Thesis Presented by Kwok Wu to The Graduate School in Partial Fulfillment of the Requirements for the Degree of Master of

More information

Effect of Rack Server Population on Temperatures in Data Centers

Effect of Rack Server Population on Temperatures in Data Centers Effect of Rack Server Population on Temperatures in Data Centers Rajat Ghosh, Vikneshan Sundaralingam, Yogendra Joshi G.W. Woodruff School of Mechanical Engineering Georgia Institute of Technology, Atlanta,

More information

Improving Data Center Energy Efficiency Through Environmental Optimization

Improving Data Center Energy Efficiency Through Environmental Optimization Improving Data Center Energy Efficiency Through Environmental Optimization How Fine-Tuning Humidity, Airflows, and Temperature Dramatically Cuts Cooling Costs William Seeber Stephen Seeber Mid Atlantic

More information

Using CFD for Data Center Design and Analysis

Using CFD for Data Center Design and Analysis Applied Math Modeling White Paper Using CFD for Data Center Design and Analysis By Liz Marshall and Paul Bemis, Applied Math Modeling Inc., Concord, NH January, 2011 Introduction Computational fluid dynamics

More information

APC APPLICATION NOTE #92

APC APPLICATION NOTE #92 #92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center

More information

Statement Of Work Professional Services

Statement Of Work Professional Services Statement Of Work Professional Services Data Center Cooling Analysis using CFD Data Center Cooling Analysis Using Computational Fluid Dynamics Service 1.0 Executive Summary Table of Contents 1.0 Executive

More information

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015 Data Center Cooling & Air Flow Management Arnold Murphy, CDCEP, CDCAP March 3, 2015 Strategic Clean Technology Inc Focus on improving cooling and air flow management to achieve energy cost savings and

More information

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich

More information

Data Center Components Overview

Data Center Components Overview Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room

More information

Enclosure and Airflow Management Solution

Enclosure and Airflow Management Solution Enclosure and Airflow Management Solution CFD Analysis Report Des Plaines, Illinois December 22, 2013 Matt Koukl- DECP Mission Critical Systems Affiliated Engineers, Inc. Contents Executive Summary...

More information

The New Data Center Cooling Paradigm The Tiered Approach

The New Data Center Cooling Paradigm The Tiered Approach Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,

More information

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009 Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges

More information

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no

More information

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Cooling Audit for Identifying Potential Cooling Problems in Data Centers Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous

More information

- White Paper - Data Centre Cooling. Best Practice

- White Paper - Data Centre Cooling. Best Practice - White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH

More information

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models The MIT Faculty has made this article openly available. Please share how this access benefits

More information

Choosing Close-Coupled IT Cooling Solutions

Choosing Close-Coupled IT Cooling Solutions W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of

More information

Rittal Liquid Cooling Series

Rittal Liquid Cooling Series Rittal Liquid Cooling Series by Herb Villa White Paper 04 Copyright 2006 All rights reserved. Rittal GmbH & Co. KG Auf dem Stützelberg D-35745 Herborn Phone +49(0)2772 / 505-0 Fax +49(0)2772/505-2319 www.rittal.de

More information

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white

More information

Great Lakes Data Room Case Study

Great Lakes Data Room Case Study Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment

More information

FAC 2.1: Data Center Cooling Simulation. Jacob Harris, Application Engineer Yue Ma, Senior Product Manager

FAC 2.1: Data Center Cooling Simulation. Jacob Harris, Application Engineer Yue Ma, Senior Product Manager FAC 2.1: Data Center Cooling Simulation Jacob Harris, Application Engineer Yue Ma, Senior Product Manager FAC 2.1: Data Center Cooling Simulation Computational Fluid Dynamics (CFD) can be used to numerically

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

How Row-based Data Center Cooling Works

How Row-based Data Center Cooling Works How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that

More information

Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers. Sami Alkharabsheh, Bahgat Sammakia 10/28/2013

Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers. Sami Alkharabsheh, Bahgat Sammakia 10/28/2013 Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers Sami Alkharabsheh, Bahgat Sammakia 1/28/213 2 ES2 Vision To create electronic systems that are self sensing and

More information

Using Simulation to Improve Data Center Efficiency

Using Simulation to Improve Data Center Efficiency A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience

More information

Using Simulation to Improve Data Center Efficiency

Using Simulation to Improve Data Center Efficiency A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience

More information

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Prediction Is Better Than Cure CFD Simulation For Data Center Operation. Prediction Is Better Than Cure CFD Simulation For Data Center Operation. This paper was written to support/reflect a seminar presented at ASHRAE Winter meeting 2014, January 21 st, by, Future Facilities.

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent

More information

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features

More information

Rack Hygiene. Data Center White Paper. Executive Summary

Rack Hygiene. Data Center White Paper. Executive Summary Data Center White Paper Rack Hygiene April 14, 2011 Ed Eacueo Data Center Manager Executive Summary This paper describes the concept of Rack Hygiene, which positions the rack as an airflow management device,

More information

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs WHITE PAPER Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs By Lars Strong, P.E., Upsite Technologies, Inc. 505.798.000 upsite.com Reducing Room-Level

More information

Understanding How Cabinet Door Perforation Impacts Airflow by Travis North

Understanding How Cabinet Door Perforation Impacts Airflow by Travis North & design deployment The first step in determining the proper perforation for an application is to understand the airflow requirements of the equipment that will be used in the cabinet. Understanding How

More information

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.

More information

Airflow Simulation Solves Data Centre Cooling Problem

Airflow Simulation Solves Data Centre Cooling Problem Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length

More information

Control Strategies for Plenum Optimization in Raised Floor Data Centers

Control Strategies for Plenum Optimization in Raised Floor Data Centers Control Strategies for Plenum Optimization in aised Floor Data Centers Keke Chen, Clifford C. Federspiel, David M. Auslander, Cullen E. Bash, Chandrakant D. Patel Enterprise Software and Systems Laboratory

More information

Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling

Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling Student Intern Earth and Environmental Engineering,

More information

11 Top Tips for Energy-Efficient Data Center Design and Operation

11 Top Tips for Energy-Efficient Data Center Design and Operation 11 Top Tips for Energy-Efficient Data Center Design and Operation A High-Level How To Guide M e c h a n i c a l a n a l y s i s W h i t e P a p e r w w w. m e n t o r. c o m When is Data Center Thermal

More information

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical

More information

Environmental Data Center Management and Monitoring

Environmental Data Center Management and Monitoring 2013 Raritan Inc. Table of Contents Introduction Page 3 Sensor Design Considerations Page 3 Temperature and Humidity Sensors Page 4 Airflow Sensor Page 6 Differential Air Pressure Sensor Page 6 Water Sensor

More information

MEASUREMENTS AND PREDICTIONS OF THE FLOW DISTRIBUTION THROUGH PERFORATED TILES IN RAISED-FLOOR DATA CENTERS

MEASUREMENTS AND PREDICTIONS OF THE FLOW DISTRIBUTION THROUGH PERFORATED TILES IN RAISED-FLOOR DATA CENTERS Proceedings of IPACK 01 The Pacific Rim/ASME International Electronic Packaging Technical Conference and Exhibition July 8 13, 2001, Kauai, Hawaii, USA IPACK2001-15728 MEASUREMENTS AND PREDICTIONS OF THE

More information

Flow in data racks. 1 Aim/Motivation. 3 Data rack modification. 2 Current state. EPJ Web of Conferences 67, 02070 (2014)

Flow in data racks. 1 Aim/Motivation. 3 Data rack modification. 2 Current state. EPJ Web of Conferences 67, 02070 (2014) EPJ Web of Conferences 67, 02070 (2014) DOI: 10.1051/ epjconf/20146702070 C Owned by the authors, published by EDP Sciences, 2014 Flow in data racks Lukáš Manoch 1,a, Jan Matěcha 1,b, Jan Novotný 1,c,JiříNožička

More information

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200

More information

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers CABINETS: ENCLOSED THERMAL MOUNTING MANAGEMENT SYSTEMS WHITE PAPER Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers 800-834-4969 techsupport@chatsworth.com www.chatsworth.com All products

More information

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres School of something School of Mechanical Engineering FACULTY OF OTHER ENGINEERING Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres A. Almoli 1, A. Thompson 1, N. Kapur 1,

More information

Airflow Utilization Efficiency (AUE) Can we cool today s servers with airflow?

Airflow Utilization Efficiency (AUE) Can we cool today s servers with airflow? AirflowUtilizationEfficiency(AUE) How to use River Cooling to reduce energy costs while improving server performance. By ThomasS.Weiss Sr.VicePresident TriadFloorsbyNxGen,LLC This paper offers insight

More information

Energy Management Services

Energy Management Services February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the

More information

Raised Floor Data Centers Prepared for the Future

Raised Floor Data Centers Prepared for the Future Raised Floor Data Centers Prepared for the Future Raised Floors Protect My Investment by Providing a Foundation for Current and Future Technologies. Creating the Future Proof Data Center Environment The

More information

Data Centers and Mission Critical Facilities Operations Procedures

Data Centers and Mission Critical Facilities Operations Procedures Planning & Facilities Data Centers and Mission Critical Facilities Operations Procedures Attachment A (Referenced in UW Information Technology Data Centers and Mission Critical Facilities Operations Policy)

More information

Prompt Engineering applies successfully CFD analysis on large Server Room for a simulation driven Energy saving approach.

Prompt Engineering applies successfully CFD analysis on large Server Room for a simulation driven Energy saving approach. Prompt Engineering applies successfully CFD analysis on large Server Room for a simulation driven Energy saving approach.. ABSTRACT The Energy Saving approach is the target of this case story. The problem

More information

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Improving Rack Cooling Performance Using Airflow Management Blanking Panels Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures

More information

Data Center Airflow Management Retrofit

Data Center Airflow Management Retrofit FEDERAL ENERGY MANAGEMENT PROGRAM Data Center Airflow Management Retrofit Technology Case Study Bulletin: September 2010 Figure 1 Figure 2 Figure 1: Data center CFD model of return airflow short circuit

More information

Role of the PI System in Research @ Georgia Tech Data Center Laboratory

Role of the PI System in Research @ Georgia Tech Data Center Laboratory Role of the PI System in Research @ Georgia Tech Data Center Laboratory Presented by Vaibhav K. Arghode Prepared by Vikneshan Sundaralingam Outline Data center laboratory general information Current use

More information

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009 IT Cost Savings Audit Information Technology Report Prepared for XYZ Inc. November 2009 Executive Summary This information technology report presents the technology audit resulting from the activities

More information

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling

More information

Mobile Visual Analytics for Data Center Power and Cooling Management

Mobile Visual Analytics for Data Center Power and Cooling Management Mobile Visual Analytics for Data Center Power and Cooling Management Ratnesh Sharma, Ming Hao, Ravigopal Vennelakanti, Manish Gupta, Umeshwar Dayal, Cullen Bash, Chandrakant Patel, Deepa Naik, A Jayakumar,

More information

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com

More information

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center

More information

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National

More information

Energy Performance Optimization of Server Room HVAC System

Energy Performance Optimization of Server Room HVAC System International Journal of Thermal Technologies E-ISSN 2277 4114 2 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijtt/ Research Article Manoj Jadhav * and Pramod Chaudhari Department

More information

Center Thermal Management Can Live Together

Center Thermal Management Can Live Together Network Management age e and Data Center Thermal Management Can Live Together Ian Seaton Chatsworth Products, Inc. Benefits of Hot Air Isolation 1. Eliminates reliance on thermostat 2. Eliminates hot spots

More information

Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems

Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are

More information

Driving Data Center Efficiency Through the Adoption of Best Practices

Driving Data Center Efficiency Through the Adoption of Best Practices Data Center Solutions 2008 Driving Data Center Efficiency Through the Adoption of Best Practices Data Center Solutions Driving Data Center Efficiency Through the Adoption of Best Practices Executive Summary

More information

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational

More information