1 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue NW, Suite 200 Washington, DC ISSUE FOR BID & PERMIT 31 JULY 2014

2 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 METHODOLOGY... 4 ASSUMPTIONS... 5 EXISTING CONDITIONS... 5 SMARTS PROJECT... 5 CONCEPTUAL DESIGN OPTIONS... 6 Option 1 CRAH Units... 6 Option 2 IRC Units... 6 ANALYSIS... 6 OPTION OPTION COST ESTIMATE SUMMARY AND RECOMMENDATIONS APPENDICIES APPENDIX 1 Air Temperature at 40 AFF For Option 1 Normal Operation APPENDIX 2 Air Temperature at 40 AFF For Option 1 Failure Operation APPENDIX 3 Air Temperature at 40 AFF For Option 2 Normal Operation APPENDIX 4 Air Temperature at 40 AFF For Option 2 Failure Operation APPENDIX 5 Conceptual Floorplan of Equipment Racks APPENDIX 6 Calculations APPENDIX 7 CAD Drawings July 2014 Page 2

3 EXECUTIVE SUMMARY Verizon Business requested Liberty Engineering, LLP to perform a conceptual study to compare two (2) mechanical design options for providing the required heat removal for the addition of proposed equipment associated with the SMARTS project. This project will add rack mounted technology equipment in the CPU Room in the Perryman Data Center in Aberdeen, MD. The study utilized Computational Fluid Dynamics (CFD) modeling of the two (2) options to evaluate the effectiveness in meeting the new equipment thermal requirements. Additionally, a ROM cost comparison of the two options was developed for comparison purposes. From this study Verizon will select a preferred option to implement as the final design for the HVAC system modification. The study utilized two different options to evaluate the required cooling capacity needed within the space and determine if any hotspots existed. Each option has been thermally modeled in a three dimensional CFD program to simulate the HVAC performance of the mechanical system and rack layout. The two options are: Option #1 The addition of two CRAH units. Option #2 The addition of twelve In-Row Cooling (IRC) units. These results were compared against one another to analyze the air temperature distribution throughout the area in the CPU Room where equipment is being added. The temperature distribution throughout the room was analyzed to determine which of the two options best supported the addition of new equipment. Each room layout accounts for 31 racks at 10 kw of load each and 4 racks at 3 kw each. Each rack was modeled with all server positions filled and an equal distribution of load across the frame. The racks are configured with a front intake, rear discharge air distribution, with 8 existing racks having an additional top discharge. The equipment load calculated has a sensible cooling requirement of approximately 98 Tons. The data center is modeled using Liebert CW181 CRAH units that supply cool air at 56.7 F DB with a relative humidity of 95% in Option 1. In Option 2, the data center is modeled using Liebert CR040RC In Row Cooling units that supply cool air at 56.9 F DB with a relative humidity of 95%. A total of two 60.9-Ton CRAH with N+1 redundancy with new and existing supply and return grilles comprise Option 1. In Option 2, twelve IRC s with N+2 redundancy and new and existing supply and return grilles are provided. Using the program 6Sigma, a CFD computer program, both models were created to determine which concept was most effective. Results showed that Option 1, provides more effective heat removal. This option was able to handle an outage much more successfully than the IRC option. Additionally, Option 1 is estimated to produce a savings of $320,017 versus Option 2. For the reasons stated above, Liberty Engineering recommends Option 1, to be implemented in the final design. 31 July 2014 Page 3

4 INTRODUCTION Verizon is planning to install a new technology deployment project named "SMARTS" that will add new equipment to the CPU Room of the Perryman Data Center (PDC) located in Aberdeen, MD which will require utility infrastructure modifications to meet the equipment requirements. This will include upgrades to both the mechanical HVAC and electrical power systems. To identify the required mechanical system modifications, Verizon has requested Liberty Engineering to perform a conceptual study of two different options to provide heat removal for the SMARTS equipment. Option 1 utilizes Computer Room Air Handling (CRAH) units and Option 2 utilizes In Row Cooling (IRC) units, both fed from the existing chilled water system. This report provides an analysis and recommendations of the two (2) options to allow Verizon to select which one will be implemented for the final design. The report is presented as follows. First a description of the methodology and key assumptions used to create the report is provided followed by a description of the existing conditions and the proposed SMARTS project. Then a description of the two conceptual mechanical design options, an analysis of the options under specific operating scenarios, and a summary of the analysis with recommendations are provided. Supporting documentation is included in an Appendix for reference to the different sections. METHODOLOGY To create the requested report, Liberty performed a site survey to assess the existing conditions of the facility. Liberty then reviewed the proposed SMARTS equipment provided by Verizon to identify the mechanical design requirements. The owner provided SMARTS equipment included a conceptual floor plan layout of the equipment racks, their associated heat load, and air distribution configuration (see Appendix 5 for reference). From this, two conceptual design options for the required heat removal were developed to address the SMART equipment requirements within the constraints of the existing data center. The concept designs developed included the location and sizes of the required HVAC equipment, the air distribution system, and the chilled water hydronic system. The conceptual layouts are included in Appendix 7 with supporting design calculations and equipment selections included in Appendix 6. The concept designs were then modeled using Computational Fluid Dynamics (CFD) modeling software to assess their heat removal effectiveness under two operating scenarios: NORMAL and FAILURE. Normal operation is defined as having all HVAC equipment available at the design heat load of the data center equipment. Failure operation is defined as only having the non-redundant mechanical equipment available at the full design load conditions. The CFD results for each option under the two operating scenarios were then analyzed and compared to each other utilizing recommended operating temperature criteria for technology equipment as defined by ASHRAE. A Rough Order of Magnitude (ROM) cost estimate was created for each option for comparison, as well. The comparative analysis was then summarized with Liberty's recommendations as a conclusion to the report. The program utilized for the analysis of each option, 6Sigma (Release 8), is a computational fluid dynamic computer program that three-dimensionally simulates air temperature, velocity, airflow path and pressures within the model. At any location, the user can graphically and numerically see the temperature, humidity, and velocity to validate if the proposed design solution meets the design criteria. The program is specifically created for the analysis of data centers and provides highly detailed output data. It has the ability to analyze actual manufacturers of equipment and different models to account for unique aerodynamic shapes, thermal properties of materials and their variance in heat exchange. The Racks, CRAHs, IRCs, and PDUs were not available in the program s library, so general 31 July 2014 Page 4

5 equipment was modified to match the dimension and capacity of the existing units and units used in the design. ASSUMPTIONS 1. During Normal Operation, the inlet temperature to the equipment will be compared to a mean inlet temperature of 64.4 F to 80.6 F, the recommended temperature range per ASHRAE TC The maximum allowable inlet temperature to the racks is 90 F during a failure condition, which is the maximum acceptable temperature per ASHRAE TC Failure Operation for Option 1 will be defined as one (1) CRAH unit being unavailable. 4. Failure Operation for Option 2 will be defined as three (3) in-row coolers being unavailable. 5. The rack configuration is based on customer provided information. 6. Racks are assumed to be 10kW unless otherwise noted in configuration provided by customer. 7. The Liebert CRAH unit s mode of operation is a constant supply temperature of 56.7 F. 8. The Liebert IRC unit s mode of operation is a constant supply temperature of 56.9 F of the new racks will operate at 10kW of the new racks will operate at 3kW 11. Racks are front inlet and rear outlet, with units in Row 79 having an additional top outlet. 12. Failure analysis includes failure of a single power distribution path. 13. Racks, cooling equipment plan south of column line four (4) do not impact the build out, and do not need to be modeled. 14. There is a wall added at column line 4, since the area beyond it is not modeled. 15. There is cold aisle containment in the aisle between Row 83 and Row 87. EXISTING CONDITIONS The existing conditions are based on the information provided by the customer, as well as information gathered from site surveys. There is a 30 inch raised floor, and a drop ceiling 8 feet above the raised floor. There are 31 existing storage racks, and 1 existing network rack. Existing racks are found in Rows 96, 95, 83, and 79. Racks are arranged to create hot and cold aisles. The area has two (2) 30 Ton, two (2) 40 Ton, and two (2) 28 Ton CRAHs. All the CRAH units have plenums to the drop ceiling, which allows them to draw air from hot aisles through the return grilles in the drop ceiling. The average height of the return plenum above the ceiling ranges, but all are between 1-9 to 2-1/2. Vented floor tiles are placed throughout the area in cold aisles. Cold aisle containment is in place in 2 areas: the cold aisle for a portion of Row 79, and the area north of Row 96. There are also 8 PDUs. 4 Panelboards are in the space being modeled, but they are not the only ones utilized to power the equipment shown. The chilled water system being utilized is a below floor redundant pipe loop distributed from the 3000 Ton chiller plant. The variable flow distribution system is a primary chilled water system with 3 pumps. The system operates with a 50 F supply and 64 F return temperature per the design. There are pathways present for power and network cabling in the form of below floor conduits, troughs, and cable trays below the drop ceiling. SMARTS PROJECT The SMARTS project calls for the addition of 35 new racks, 31 at 10kW, and 4 at 3kW. 22 of the 10kW racks will be in an area with cold aisle containment. The remaining racks will not have cold aisle 31 July 2014 Page 5

6 containment. To support this extra heat load, additional heat removal must be installed. Two concept design are provided as options for this required heat removal for the scope of this study. CONCEPTUAL DESIGN OPTIONS Option 1 CRAH Units The concept behind Option 1 is to utilize four (4) existing to remain CRAH units, and add two (2) Liebert CW181 units. The new CRAHs are chilled water hydronic units. The two (2) units will provide N+1 redundancy, and will be powered from different panels to match the redundancy. All CRAH units will supply air to the racks through perforated tiles, via the raised floor. All CRAH units will have a plenum connecting to the drop ceiling and will draw hot air from aisles through return grilles. Under Normal Operation, all CRAH units will be cooling the area. During Failure Operation, one of the two new CRAH units is assumed to fail. See Figure 1 for Option 1 Layout. Option 2 IRC Units Option 2 will utilize four (4) existing to remain CRAH units, and add twelve (12) Liebert CR040RC IRCs. IRCs will be placed strategically in the rack rows to provide cold air effectively to the new racks being added. Due to the units being in-row, racks will need to be relocated to accommodate the units. There is a redundancy of N+2 for these units, and they will be fed from 4 different panels to match the redundancy. During Normal Operation, all cooling units will run as designed. Failure Operation is modeled as 3 IRCs unavailable. See Figure 4 for Option 2 Layout. ANALYSIS There were two scenarios used for each of the options, a Normal Operation and Failure Operation. Normal Operation is defined as having all cooling systems available. Failure Operation for Option 1 removes one CRAH unit from operation, and removes 3 IRC from operation for option 2. For Option 1, rack locations were preserved, and CRAH units were placed advantageously near the new racks. Each output from the CFD simulation was analyzed to determine if the operating conditions met the acceptance criteria provided by the customer for satisfactory operation. Under normal operating conditions, with all units enabled, the allowable mean rack inlet temperature is 64.4 F to 80.6 F, as recommended by ASHRAE TC 9.9 guidelines. During Failure Operation, the maximum allowable rack inlet temperature is 90 F, as recommended by ASHRAE TC 9.9 guidelines. The CFD simulation produced three outputs that were found to be useful during the analysis process: the median rack inlet temperature under Normal Operation, the maximum rack inlet temperature under Failure Operations, and the air temperature at half-rack elevation (40 AFF). The first output, the median rack inlet temperatures under Normal Operation, illustrates rack inlet temperatures ranging from 64.4 F to 80.6 F depicted by a color gradient. This output was utilized as one of two determining factors for whether an option passed or failed in regards to heat removal effectiveness. The second output, the maximum rack inlet temperatures under failure operation, illustrates rack inlet temperatures ranging from 64.4 F to 90.0 F depicted by a color gradient. This output was utilized as the 31 July 2014 Page 6

7 second of the two determining factors for whether an option passed or failed in regards to heat removal effectiveness. The third output exhibiting the air temperature distribution is a two-dimensional image showing the air temperature throughout the CPU Room at 40 AFF. Air temperatures range from 64.4 F to 90 F and were characterized by a color scale. This output was useful to identify hot spots, recognize recirculation issues, and visualize the direction of airflow in each area. The expanded rack layout provided by the customer has a total power consumption of 347kW, or 98 Tons of cooling. Accounting for the additional lighting, skin loads, and existing racks, the total heat load of the room is calculated to be kw, or Tons. Based on the overall loads and capacities, the CRAHs in option 1 will operate with N+1 redundancy. For Option 2, the IRCs will provide Tons of cooling each, but are most effective in close proximity to the racks. 31 July 2014 Page 7

8 OPTION 1 The design for Option 1 incorporates the addition of two (2) CRAH units to offset the additional load being added by the new racks. This cold air is distributed through the space by 2 x2 56% open perforated floor tiles via the raised floor. Returns grilles are placed in the drop ceiling above the hot aisles, to return the exhaust air to the CRAHs and minimize recirculation. Figure 1, below, shows the design concept for Option 1: Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 1 Option 1 Layout 31 July 2014 Page 8

9 The median rack inlet temperatures for Option 1 during Normal Operation are shown in Figure 2. To see additional room condition results from the CFD modeling for Option 1 during Normal Operation, see Appendix 1. Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 2 Option 1 Normal Operation Mean Rack Inlet Temperatures Observations for Option 1 Normal Operation: During Normal Operation, 4 racks in Row 95 exceed the maximum recommended temperature of 80.6 F. 2 Racks in Row 79 exceed the maximum recommended temperature of 80.6 F. Since racks in Row 79 are not new, this may be an error due to a wall being placed south of these racks for the purposes of this simulation. During Normal Operation, Only 1 rack, 10.95, exceeds the maximum allowable temperature of 90 F. 31 July 2014 Page 9

10 For the Failure Operation of Option 1, one of the new CRAH units is removed from operation. There were no other changes to the model. Maximum rack inlet temperatures for this model can be found in Figure 3. Other CFD outputs for Option 1 s failure operation, including the Air Temperature at 40 AFF, can be found in Appendix 2. Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 3 Option 1 Failure Operation Maximum Rack Inlet Temperatures Observations for Option 1 Failure Operation: During Failure Operation, 4 racks in Row 79 exceed the maximum allowable temperature of 90.0 F. 3 racks in Row 95 exceed the maximum allowable temperature of 90 F during Failure Operation. Other than the racks in Rows 79 and 95, racks are operating within the acceptable 64.4 F to 90 F temperature range during Failure Operation. Since racks in Row 79 are not new, this may be an error due to a wall being placed south of these racks for the purposes of this simulation. Option 1 Summary of Observations: During Normal Operation, 6 racks exceed the maximum recommended temperature, and only 1 rack exceeds the maximum allowable temperature. During Failure Operation, 7 racks exceed the maximum allowable temperature. 31 July 2014 Page 10

11 OPTION 2 Option 2 utilizes IRCs being placed in Rows 83, 87, 91, 95. The IRCs are intended to be the sole source of cooling in those aisles, therefore perforated tiles and return grilles are not added. The cold aisle between Row 83 and Row 87 will have containment installed. The design concept for option 2 is shown in Figure 4. Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 4 Option 2 Layout 31 July 2014 Page 11

12 The locations of the new IRCs are selected to maximize the impact of the units on the racks. In the design, there are no more than four (4) racks between each IRC. The existing to remain CRAHs have minimal impact on the new racks in this option affecting them only through the return grilles already in place at the hot aisles. Median rack inlet temperatures for this model can be found in Figure 5. Other CFD outputs for Option 2, including the Air Temperature at 40 AFF, can be found in Appendix 3. Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 5 Option 2 Normal Operation Median Rack Inlet Temperatures Observations for Option 2 Normal Operation: During Normal Operation, 3 racks in Row 95 exceed the recommended median rack inlet temperature. During Normal Operation, 3 racks in Row 83 exceed the recommended median rack inlet temperature. 3 Racks in Row 79 exceed the recommended median rack inlet temperature during Normal Operation. Since racks in Row 79 are not new, this may be an error due to a wall being placed south of these racks for the purposes of this simulation. All racks are within the maximum allowable inlet temperature. Other than Rack and racks in Row 79, racks are operating within the acceptable 64.4 F to 80.6 F temperature range. 31 July 2014 Page 12

13 For the Failure Operation of Option 2, 3 IRCs are removed from operation, 1 in Row 83, 1 in Row 87, and 1 in Row 91. There were no other changes made to the model. Maximum rack inlet temperatures for this model can be found below, in Figure 6. Other CFD outputs for Option 2 s failure mode, including the Air Temperature at 40 AFF, can be found in Appendix 4. Row 99 Row 96 Row 95 Row 91 Row 91 Row 87 Row 83 Row 79 Figure 6 Option 2 Failure Operation Maximum Rack Inlet Temperatures Observations for Option 2 Failure Operation: During Failure Operation, the majority of racks exceed the acceptable 64.4 F to 90 F temperature range. Summary of Observations for Option 2: During Normal Operation, 9 racks exceed the maximum recommended temperature, none of which exceeded the maximum allowable temperature. During Failure operation, all but 14 racks exceed the maximum allowable temperature. 31 July 2014 Page 13

14 COST ESTIMATE A rough order of magnitude (ROM) cost estimate was developed for each option based on the concept design to provide additional comparison. Option 1 is estimated to cost $423,902, including installation costs. Option 2 is estimated to cost $743,919, including installation. Option 1 yields a savings of $320,017 when compared to Option 2. SUMMARY AND RECOMMENDATIONS Normal Operation of Option 1 yields 8 racks which exceed the maximum recommended mean inlet temperature. However, there is only one rack, Rack 10.95, which exceeds the maximum allowable temperature. One possible reason for units in row 95 exceeding the temperature range is the trough approximately 3 feet plan south of Row 95 underneath the raised floor. This trough obstructs a portion of the perforated tiles in place, preventing them from reaching their maximum airflow. One possible solution is to add additional vented floor tiles and ceiling returns in the cold and hot aisles respectively or the addition of containment for this row. The existing racks in Row 79 are shown to exceed recommended temperatures from the modeling, but this is assumed to be inaccurate due to the approximation of this model for the simulation which imposes a wall to cut off available units in the remainder of the room. Option 1 during Failure Operation supports the majority of new racks being added. Only 2 new racks, and 09.95, are at risk during Failure operation. One possible reason for this is the trough approximately 3 feet plan south of Row 95, underneath the raised floor. This trough obstructs a portion of the perforated tiles in place, preventing them from reaching their maximum airflow. One possible solution is to add containment for this row. Normal Operation of Option 2 yields 5 racks which exceed the allowable temperature; all of these units are existing. Again, the units in Row 79 which are at risk cannot efficiently draw air from the nearby perforated tiles. This may be due to containment observed to be separating the perforated tiles from the racks at risk. Possible solutions are adding additional perforated tiles to serve those racks, and expanding the containment area to include those racks. Failure operation of Option 2 yields 4 racks which remain within the allowable temperature region. Racks which were seemingly unaffected by the failure exceed the permitted temperature range as well. This is unacceptable, and it is unlikely to be remedied by containment or additional perforated tiles. Given the results of the CFD simulations and the comparative cost estimate, Liberty recommends Option 1. Given failure rate shown in both options, Option 1 cools the racks most effectively. With the possible solutions stated above, Option 1 can potentially be tailored to fit the customer s needs. Additionally, Option 2 is estimated approximately $320,000 times expensive than Option July 2014 Page 14

15 APPENDICIES APPENDIX 1 Air Temperature at 40 AFF For Option 1 Normal Operation 31 July 2014 Page 15

16 APPENDIX 2 Air Temperature at 40 AFF For Option 1 Failure Operation 31 July 2014 Page 16

17 APPENDIX 3 Air Temperature at 40 AFF For Option 2 Normal Operation 31 July 2014 Page 17

18 APPENDIX 4 Air Temperature at 40 AFF For Option 2 Failure Operation 31 July 2014 Page 18

19 SMARTS MEP SCOPE - Liberty Comments 2014 Mar 31

20 SMARTS MEP SCOPE - Liberty Comments - In Row Option 2014 APR 09

21 PROJECT: VZ SMARTS Phase II PROJECT NUMBER: BUILDING/AREA: Cooling Load Calculation DATE: 25 June 2014 PREPARED BY: N. Jabs PAGE #: 1 of 2 Purpose: 1. Determine the total heat load for the SMARTS data center area. Assumptions: 1. Rack equipment heat load is based upon: Rack quantity and size 2. Lighting load is assumed to be 1 watt per square foot in accordance with ASHRAE Building exterior wall heat transfer coefficient is assumed to be: 0.09 BTU/(hr F ft²) 4. Building roof heat transfer coefficient is assumed to be: 0.05 BTU/(hr F ft²) 5. Weather data is based upon ASHRAE conditions listed for Baltimore, MD; Outdoor Design Weather Conditions: 94 F dry bulb 74.9 F wet bulb 6. Solar load through roof is assumed to be an additional 20 degrees added to space; Design Criteria: 1. Rack Equipment Information 31 rack positions (South) 10 kw per rack 4 rack positions (North) 3 kw per rack 2. Space Information 3265 square feet of area 14 feet of exterior wall height 67 linear feet of exterior wall 75 F dry bulb setpoint Equations: Rack Equipment Load: [(Rack Quantity)*(Rack kw)]* Lighting Load: (Space Area)*(Lighting Watts/SF)* Wall Skin Load: (Wall U factor)*(wall Height)*(Wall Length)*(Outdoor Temp Space Temp) 1000 Calculations: Heat Load Roof Skin Load: (Roof U factor)*(space Area)*(Outdoor Temp + 20 Space Temp) 1000 This document is the property of Liberty Engineering, LLP and is not to be distributed to parties without the prior written consent of Liberty Engineering, LLP. CONFIDENTIAL PROPRIETARY

22 PROJECT: VZ SMARTS Phase II PROJECT NUMBER: BUILDING/AREA: Cooling Load Calculation Cooling Load (MBH) Sensible Latent Rack Load n/a Lighting Load 11.1 n/a Wall Skin Load 1.6 n/a Roof Skin Load 6.4 n/a CRAH unit fans 0.0 n/a Space Total: DATE: 25 June 2014 PREPARED BY: N. Jabs PAGE #: 2 of 2 CRAH Fans load already accounted for in capacity This document is the property of Liberty Engineering, LLP and is not to be distributed to parties without the prior written consent of Liberty Engineering, LLP. CONFIDENTIAL PROPRIETARY

23

24

25

26

How To Improve Energy Efficiency Through Raising Inlet Temperatures

How To Improve Energy Efficiency Through Raising Inlet Temperatures Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD

More information

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges

More information

APC APPLICATION NOTE #92

APC APPLICATION NOTE #92 #92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center

More information

Data Center Components Overview

Data Center Components Overview Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room

More information

Benefits of. Air Flow Management. Data Center

Benefits of. Air Flow Management. Data Center Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment

More information

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the

More information

Improving Data Center Energy Efficiency Through Environmental Optimization

Improving Data Center Energy Efficiency Through Environmental Optimization Improving Data Center Energy Efficiency Through Environmental Optimization How Fine-Tuning Humidity, Airflows, and Temperature Dramatically Cuts Cooling Costs William Seeber Stephen Seeber Mid Atlantic

More information

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

Unified Physical Infrastructure (UPI) Strategies for Thermal Management

Unified Physical Infrastructure (UPI) Strategies for Thermal Management Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting

More information

Statement Of Work Professional Services

Statement Of Work Professional Services Statement Of Work Professional Services Data Center Cooling Analysis using CFD Data Center Cooling Analysis Using Computational Fluid Dynamics Service 1.0 Executive Summary Table of Contents 1.0 Executive

More information

Enclosure and Airflow Management Solution

Enclosure and Airflow Management Solution Enclosure and Airflow Management Solution CFD Analysis Report Des Plaines, Illinois December 22, 2013 Matt Koukl- DECP Mission Critical Systems Affiliated Engineers, Inc. Contents Executive Summary...

More information

Analysis of the UNH Data Center Using CFD Modeling

Analysis of the UNH Data Center Using CFD Modeling Applied Math Modeling White Paper Analysis of the UNH Data Center Using CFD Modeling By Jamie Bemis, Dana Etherington, and Mike Osienski, Department of Mechanical Engineering, University of New Hampshire,

More information

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com

More information

HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.)

HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.) HPPR Data Center Improvements Projects Towards Energy Efficiency (CFD Analysis, Monitoring, etc.) Felipe Visbal / March 27, 2013 HPPR Data Center Technologies Team Services Data Centers: Thermal Assessments

More information

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Minneapolis Symposium September 30 th, 2015 Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Learning Objectives 1. Gain familiarity with Computational

More information

Airflow Simulation Solves Data Centre Cooling Problem

Airflow Simulation Solves Data Centre Cooling Problem Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length

More information

Data Center Power Consumption

Data Center Power Consumption Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling

More information

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Cooling Audit for Identifying Potential Cooling Problems in Data Centers Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous

More information

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical

More information

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room

More information

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling

More information

How Row-based Data Center Cooling Works

How Row-based Data Center Cooling Works How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that

More information

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National

More information

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white

More information

How to Build a Data Centre Cooling Budget. Ian Cathcart

How to Build a Data Centre Cooling Budget. Ian Cathcart How to Build a Data Centre Cooling Budget Ian Cathcart Chatsworth Products Topics We ll Cover Availability objectives Space and Load planning Equipment and design options Using CFD to evaluate options

More information

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Autodesk Revit 2013 Autodesk BIM 360 Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Data centers consume approximately 200 terawatt hours of energy

More information

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Prediction Is Better Than Cure CFD Simulation For Data Center Operation. Prediction Is Better Than Cure CFD Simulation For Data Center Operation. This paper was written to support/reflect a seminar presented at ASHRAE Winter meeting 2014, January 21 st, by, Future Facilities.

More information

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel

More information

Thinking Outside the Box Server Design for Data Center Optimization

Thinking Outside the Box Server Design for Data Center Optimization Thinking Outside the Box Server Design for Data Center Optimization Marie Ross, Senior Applications Engineer Tom Gregory, Consultant Engineer October 2013 The benefits of analyzing thermal performance

More information

DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers

DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers DOE FEMP First Thursday Seminar Achieving Energy Efficient Data Centers with New ASHRAE Thermal Guidelines Learner Guide Core Competency Areas Addressed in the Training Energy/Sustainability Managers and

More information

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015 Data Center Cooling & Air Flow Management Arnold Murphy, CDCEP, CDCAP March 3, 2015 Strategic Clean Technology Inc Focus on improving cooling and air flow management to achieve energy cost savings and

More information

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010 White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence

More information

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw

More information

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.

More information

The New Data Center Cooling Paradigm The Tiered Approach

The New Data Center Cooling Paradigm The Tiered Approach Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

Using CFD for optimal thermal management and cooling design in data centers

Using CFD for optimal thermal management and cooling design in data centers www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,

More information

Specialty Environment Design Mission Critical Facilities

Specialty Environment Design Mission Critical Facilities Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,

More information

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School A Comparative Study of Various High Density Data Center Cooling Technologies A Thesis Presented by Kwok Wu to The Graduate School in Partial Fulfillment of the Requirements for the Degree of Master of

More information

Strategies for Deploying Blade Servers in Existing Data Centers

Strategies for Deploying Blade Servers in Existing Data Centers Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling

More information

Improving Data Center Efficiency with Rack or Row Cooling Devices:

Improving Data Center Efficiency with Rack or Row Cooling Devices: Improving Data Center Efficiency with Rack or Row Cooling Devices: Results of Chill-Off 2 Comparative Testing Introduction In new data center designs, capacity provisioning for ever-higher power densities

More information

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack

More information

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0)20 7849 6848 Fax: +44 (0)20 7203 6701 Email: info@itisltd.co.uk www.itisltd.com Introducing Computational

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

Benefits of Cold Aisle Containment During Cooling Failure

Benefits of Cold Aisle Containment During Cooling Failure Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business

More information

Energy Impact of Increased Server Inlet Temperature

Energy Impact of Increased Server Inlet Temperature Energy Impact of Increased Server Inlet Temperature By: David Moss, Dell, Inc. John H. Bean, Jr., APC White Paper #138 Executive Summary The quest for efficiency improvement raises questions regarding

More information

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Agenda Review of cooling challenge and strategies Solutions to deal with wiring closet cooling Opportunity and value Power

More information

How To Run A Data Center Efficiently

How To Run A Data Center Efficiently A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly

More information

Using Simulation to Improve Data Center Efficiency

Using Simulation to Improve Data Center Efficiency A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience

More information

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Cooling Small Server Rooms Can Be Inexpensive, Efficient and Easy - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Server Rooms Description & Heat Problem Trends

More information

Great Lakes Data Room Case Study

Great Lakes Data Room Case Study Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment

More information

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling Joshua Grimshaw Director of Engineering, Nova Corporation

More information

Adaptive Cooling in Data Centers. Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009

Adaptive Cooling in Data Centers. Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009 Adaptive Cooling in Data Centers Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009 Maximizing Cooling Efficiency in a Concurrently Maintainable and Fault

More information

Data center upgrade proposal. (phase one)

Data center upgrade proposal. (phase one) Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

Managing Cooling Capacity & Redundancy In Data Centers Today

Managing Cooling Capacity & Redundancy In Data Centers Today Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent

More information

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features

More information

STULZ Water-Side Economizer Solutions

STULZ Water-Side Economizer Solutions STULZ Water-Side Economizer Solutions with STULZ Dynamic Economizer Cooling Optimized Cap-Ex and Minimized Op-Ex STULZ Data Center Design Guide Authors: Jason Derrick PE, David Joy Date: June 11, 2014

More information

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building

More information

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency

More information

Reducing the Annual Cost of a Telecommunications Data Center

Reducing the Annual Cost of a Telecommunications Data Center Applied Math Modeling White Paper Reducing the Annual Cost of a Telecommunications Data Center By Paul Bemis and Liz Marshall, Applied Math Modeling Inc., Concord, NH March, 2011 Introduction The facilities

More information

Best Practices in HVAC Design/Retrofit

Best Practices in HVAC Design/Retrofit Best Practices in HVAC Design/Retrofit Little Server Room BIG $AVINGS Justin Lewis, P.E., LEED AP, DCEP Sr Energy Project Manager C:530.400.6042 O:530.754.4870 jlewis@ucdavis.edu 1 What s the problem here?

More information

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich

More information

Center Thermal Management Can Live Together

Center Thermal Management Can Live Together Network Management age e and Data Center Thermal Management Can Live Together Ian Seaton Chatsworth Products, Inc. Benefits of Hot Air Isolation 1. Eliminates reliance on thermostat 2. Eliminates hot spots

More information

Using Simulation to Improve Data Center Efficiency

Using Simulation to Improve Data Center Efficiency A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience

More information

Data Center Energy Profiler Questions Checklist

Data Center Energy Profiler Questions Checklist Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space

More information

BRUNS-PAK Presents MARK S. EVANKO, Principal

BRUNS-PAK Presents MARK S. EVANKO, Principal BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations

More information

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.

More information

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Improving Rack Cooling Performance Using Airflow Management Blanking Panels Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures

More information

Elements of Energy Efficiency in Data Centre Cooling Architecture

Elements of Energy Efficiency in Data Centre Cooling Architecture Elements of Energy Efficiency in Data Centre Cooling Architecture Energy Efficient Data Center Cooling 1 STULZ Group of Companies Turnover 2006 Plastics Technology 400 Mio A/C Technology 200 Mio Total

More information

Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms

Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms By Neil Rasmussen White Paper #49 Executive Summary Avoidable mistakes that are routinely made when installing cooling

More information

W H I T E P A P E R. Computational Fluid Dynamics Modeling for Operational Data Centers

W H I T E P A P E R. Computational Fluid Dynamics Modeling for Operational Data Centers W H I T E P A P E R Computational Fluid Dynamics Modeling for Operational Data Centers 2 Executive Summary Improving Effectiveness of CFD Technology in Cooling of Data Centers IT managers continue to be

More information

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Kenneth G. Brill, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies, Inc. 505.798.0200

More information

Analysis of data centre cooling energy efficiency

Analysis of data centre cooling energy efficiency Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe

More information

- White Paper - Data Centre Cooling. Best Practice

- White Paper - Data Centre Cooling. Best Practice - White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH

More information

In Row Cooling Options for High Density IT Applications

In Row Cooling Options for High Density IT Applications In Row Cooling Options for High Density IT Applications By Ramzi Y. Namek, PE, LEED AP, BD+C; Director of Engineering 1 Users wishing to deploy high density IT racks have several In Row Cooling solutions

More information

Choosing Close-Coupled IT Cooling Solutions

Choosing Close-Coupled IT Cooling Solutions W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of

More information

FAC 2.1: Data Center Cooling Simulation. Jacob Harris, Application Engineer Yue Ma, Senior Product Manager

FAC 2.1: Data Center Cooling Simulation. Jacob Harris, Application Engineer Yue Ma, Senior Product Manager FAC 2.1: Data Center Cooling Simulation Jacob Harris, Application Engineer Yue Ma, Senior Product Manager FAC 2.1: Data Center Cooling Simulation Computational Fluid Dynamics (CFD) can be used to numerically

More information

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no

More information

Best Practices for Wire-free Environmental Monitoring in the Data Center

Best Practices for Wire-free Environmental Monitoring in the Data Center White Paper Best Practices for Wire-free Environmental Monitoring in the Data Center April 2012 Introduction Monitoring for environmental threats in the data center is not a new concept. Since the beginning

More information

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres School of something School of Mechanical Engineering FACULTY OF OTHER ENGINEERING Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres A. Almoli 1, A. Thompson 1, N. Kapur 1,

More information

Virtual Data Centre Design A blueprint for success

Virtual Data Centre Design A blueprint for success Virtual Data Centre Design A blueprint for success IT has become the back bone of every business. Advances in computing have resulted in economies of scale, allowing large companies to integrate business

More information

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center

More information

Green Data Centre Design

Green Data Centre Design Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS

More information

Virginia Tech. Background. Case Summary. Results

Virginia Tech. Background. Case Summary. Results Background Virginia Tech When Virginia Tech initiated plans to build a supercomputer by clustering hundreds of desktop computers, it had ambitious goals for the performance of the new system and a very

More information

Managing Data Centre Heat Issues

Managing Data Centre Heat Issues Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design

More information

Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers

Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers Data Centre Best Practises Workshop Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers Shishir Gupta 17 th March 2009 You are Here Introduction to CFD Data

More information

Data Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1

Data Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 Data Center CASE Scope Existing Title 24 2008 Scope Current scope ( 100 T24-2008) exempts process space from many of the requirements, however

More information

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Business Management Magazine Winter 2008 Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Contrary to some beliefs, air is quite

More information

HP Data Center Services

HP Data Center Services HP Data Center Services HP Technology Services - Per Event Services Technical data Enterprise-class data center facility infrastructures need to support both current IT objectives and new equipment and

More information

COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE KASTURI RANGAN RAJAGOPALAN

COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE KASTURI RANGAN RAJAGOPALAN COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE by KASTURI RANGAN RAJAGOPALAN Presented to the Faculty of the Graduate School of The

More information

Energy and Cost Analysis of Rittal Corporation Liquid Cooled Package

Energy and Cost Analysis of Rittal Corporation Liquid Cooled Package Energy and Cost Analysis of Rittal Corporation Liquid Cooled Package Munther Salim, Ph.D. Yury Lui, PE, CEM, LEED AP eyp mission critical facilities, 200 west adams street, suite 2750, Chicago, il 60606

More information

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial facilities commonly occupy spaces with ceilings ranging between twenty and thirty feet in height.

More information

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Improving Rack Cooling Performance Using Airflow Management Blanking Panels Improving Rack Cooling Performance Using Airflow Management Blanking Panels White Paper 44 Revision 4 by Neil Rasmussen > Executive summary Unused vertical space in open frame racks and rack enclosures

More information

Application of CFD modelling to the Design of Modern Data Centres

Application of CFD modelling to the Design of Modern Data Centres Application of CFD modelling to the Design of Modern Data Centres White Paper March 2012 By Sam Wicks BEng CFD Applications Engineer Sudlows March 14, 2012 Application of CFD modelling to the Design of

More information